Loading...
HomeMy WebLinkAboutFile Documents.315 E Dean St.0032-2023-BCOM (2) Page 1 of 6 RAKxa Wellness – Scope of Work Project: RAKxa Wellness – St. Regis Spa (22209.00) Date: 10 March 2023 Room by Room Breakdown of Scope Gym #100 • New Finishes • New gym equipment by owner • All existing lighting to remain • New towel drop millwork in same location as existing Mechanical #100A • No work in this area Storage #101 • New Finishes PT Studio #102 • New Finishes Storage #103 • New Finishes Gym Restroom #104 and #105 • Paint walls only Storage #106 • No work in this area Hall #107 • New Finishes Men’s Steam Room #108 • Clean existing pebble floor finish • Re-seal Bench and Re-finish as required Men’s Hot Tub #109 • Re-plaster inside of hot tub • New Accent waterline tile • New Decorative Flush mount light fixture to replace existing in same location • Re-paint ceiling and hall walls • Wall stacked stone to remain 06/08/2023 Men’s Hall #110 • Pebble floor tile to remain, clean and re-grout as required • New Decorative Light to replace existing in same location • New Wall Finishes Storage #111 • Re-paint wall and ceiling Men’s Shower Vestibule #112 • Pebble floor tile to remain, clean and re-grout as required • New Decorative Light to replace existing in same location • New wall and ceiling finish • Skim grout the existing pebble tile floor Men’s Shower #113, #114, #115 • Pebble floor tile to remain, clean and re-grout as required • New wall and ceiling finish • Wall tile to remain, Re-grout as required • New Shower Floor tile Pool Cave #116 • Replace blue soffit light with 2700K LED in same location as existing • Re-plaster inside of pool • New Accent waterline tile • Skim grout the existing pebble tile floor Women’s Steam Room #117 • Clean existing pebble floor finish • Re-seal Bench and Re-finish as required Women’s Hot Tub #118 • Re-plaster inside of hot tub • New Accent waterline tile • New Decorative Flush mount light fixture in same location as existing • Re-paint ceiling and Hall Walls • Wall stacked stone to remain • Skim grout the existing pebble tile floor Women’s Restroom #119 • Pebble floor tile to remain, clean and re-grout as required • New Vinyl Wallcovering • New Decorative Wall Sconce in same location as existing • New Decorative Flush mount Light in same location as existing • Re-paint ceiling • Skim grout the existing pebble tile floor Women’s Water Closet #120, #121, #122, #123, #124 • Pebble floor tile to remain, clean and re-grout as required 06/08/2023 • Wall tile to remain, Re-grout as required • New Vinyl Wallcovering • New Decorative Light in same location as existing • Re-paint ceiling • Skim grout the existing pebble tile floor Women’s Shower Vestibule #125 • Pebble floor tile to remain, clean and re-grout as required • New Vinyl Wallcovering • New Decorative Light in same location as existing • Re-paint ceiling • Skim grout the existing pebble tile floor Women’s Shower #126, #127, #128, #129 • Pebble floor tile to remain, clean and re-grout as required • Wall tile to remain, Re-grout as required • New Vinyl Wallcovering • Re-paint ceiling • New shower floor tile • Skim grout the existing pebble tile floor Women’s Locker Room #130 • New Decorative Pendant Light in same location as existing • New Wall Sconces at Vanity in same location as existing • New Floor and Wall Finishes Employee #131 • New Finishes Employee #132 • New Finishes Employee #133 • New Finishes Retail #134 • Existing Retail shelving to remain, patch and repair existing wood finish as required • Provide (2) New Floor Displays • New Finishes • Provide new Decorative lighting wall scones in same location as existing • Provide New pendant in same location as existing Reception #135 • New Decorative Wall Sconce in same location as existing • New Decorative Chandelier in same location as existing • New Stone Reception Desk for 3 people in same location as existing • New Finishes • Provide new upholstered bench • Provide new Retail Merchandising Display 06/08/2023 Cryo Therapy Room #136 • All Nail Salon Equipment to be removed • New Finishes • Extend existing wall to enclose room • Provide new treatment room Millwork, re-se plumbing from pedicure stations for sink at millwork, cap all unused plumbing in current location. • Provide new Wall Sconce in same location as existing Tesla Forming #137 • All Nail Salon Equipment to be removed • New Finishes • Extend Existing wall to enclose room • Provide new treatment room Millwork • Provide new Wall Sconce in same location as existing Men’s Locker Room #138 • New Finishes • New Decorative Pendant Light in same location as existing • New Wall Sconces at Vanity in same location as existing Men’s Restroom #139 • Pebble floor tile to remain, clean and re-grout as required • New Finishes • New Decorative Wall Sconce in same location as existing • New Decorative Flush mount Light in same location as existing Men’s Water Closet #140, #141 • Pebble floor tile to remain, clean and re-grout as required • New wall Finish Treatment Room #142, #143, #145, #146, #147 • New Finishes • New Decorative Wall Sconce in same location as existing • Existing millwork to remain Storage Room #144 • New Finishes Storage Room #148 • New Finishes Employee Break Room #149 • No work in this area Employee #150, #151 • New Finishes Storage #152, #153 • No work in this area Hall #154 06/08/2023 • New Finishes Manger’s Office #155 • New Finishes Relaxation Lounge #156 • New Finishes • New Pendant Light in same location as existing fixture • Wrap fireplace in new stone tile • Provide new beverage center millwork with slat wood finish and stone top • Provide new built in banquette lounge seating Private Oxygen Lounge #156A • Provide new wall sconce in same location as existing • Provide new privacy curtains between beds • Wrap fireplace in new stone tile • Provide new stackable door system between two oxygen lounges where existing wall exists Storage #157 • New Finishes Treatment Room #158 • New Decorative Wall Sconce in same location as existing • Existing millwork to remain • New Finishes Treatment Personal Shower #159 • New Finishes Treatment Room #160, #161 • New Finishes • New Decorative Wall Sconce in same location as existing • Existing millwork to remain Couple’s Treatment Room #162 • New Finishes • New Decorative Wall Sconce in same location as existing • Existing millwork to remain Treatment Personal Shower #163 • New Finishes Treatment Room #164, #165 • New Finishes • New Decorative Wall Sconce in same location as existing • Existing millwork to remain Treatment Hall #166 • New Finishes • New Decorative Flush Mount Light Fixture in same location as existing 06/08/2023 Treatment Personal Shower #167 • New Finishes Treatment Room #168, #169, #170, #171 • New Finishes • New Decorative Wall Sconce in same location as existing • Existing millwork to remain Treatment Room Shower #172 • New Finishes Treatment Room #173 • New Finishes • New Decorative Wall Sconce in same location as existing • Existing millwork to remain Employee #174 • No work in this area 06/08/2023