HomeMy WebLinkAboutFile Documents.315 E Dean St.0032-2023-BCOM (4)Ironstar Construction, Inc. 2600 E. Southlake Blvd. #120-234 - Southlake, TX 76092 Prepared For:Joel Hocknell Project Name: St Regis Hotel - Aspen Colorado Spa - Conceptual Budget BUDGET SUMMARY 1 $1,533,261 TOTAL PROJECT BUDGET $1,533,261 BUDGET DETAIL Total 2.0 CONSTRUCTION COSTS WITHOUT CONTINGENCY AND TAX $1,383,498 CONTINGENCY & TAX COSTS $149,763 2.1 $1,091,564 2.2 Not Used $0 2.3 $291,934 2.4 $109,156 10% $40,606 9.3% TOTAL PROJECT COST $1,533,261 CONSTRUCTION COST DETAIL BY AREA 2.1 SPA Subtotal: $1,091,564 QTY UNIT 2.1.01 Gym 100 $186,197.87 Demo , flooring, wall finishes , General 2,255 SF Demo millwork cabinet near entry 1 All RB-1 Rubber Flooring - Labor & Material (Rope, ReNew Brand) - RB - 1 1,750 SF RB-2 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 2 480 SF RB-3 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 3 25 SF P2 Paint Ceilings 2,255 SF P1 Paint walls 3,537 SF WM1 Manufacture and Install new millwork for towel & bottle storage 1 All 2.1.02 Storage 101 $3,318.02 Demo , flooring, 34 SF RB-1 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 1 34 SF Install new ceiling - drywall 34 SF P1 Paint walls 230 SF P2 Paint Ceiling - prime new drywall 34 SF 2.1.03 PT Studio #102 $56,939.96 Demo , flooring, wall finishes , General 620 SF RB-1 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 1 620 SF Install new ceiling - assumes drywall 620 SF P1 Paint walls 768 SF P2 Paint Ceiling - prime new drywall 620 SF WC-4 Furnish & Install new wallcovering - east wall only 32 LYD 2.1.04 Storage 103 $2,461.47 Demo , flooring, 25 SF RB-1 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 1 25 SF Install new ceiling - drywall 25 SF P1 Paint walls 176 SF P2 Paint Ceiling - prime new drywall 25 SF 2.1.05 Restroom 104 / 105 $2,251.00 Tile flooring to remain - clean and re-grout as required 92 SF Paint Ceilings 92 SF Paint walls 459 SF 2.1.06 Hall 107 $25,574.88 Demo , flooring, wall finishes , General 286 SF RB-1 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 1 286 SF Install new ceiling - drywall 286 SF P1 Paint walls 1,152 SF P2 286 SF 2.1.07 Men's Steam Room #108 $4,170.00 Clean existing pebble floor 67 SF Re-finish bench 1 ALL 2.1.08 Men's Hot Tub #109 $26,853.18 Clean existing pebble floor & skim-grout 283 SF T-2 Furnish and install new waterline tile - cold plunge - T-2 15 LF T-1 Furnish and install new waterline tile - Hot Tub - T-1 40 LF CONTRACTOR CONTINGENCY ON CONSTRUCTION COSTS ASPEN TAX ON MATERIALS (40% of Construction Cost Allowance) Paint Ceiling - prime new drywall Aspen Owner LLC 150 East 58th Street Fl 22 New York, NY 10155 MISCELLANEOUS Updated:REVISED 5-24-2023 CONSTRUCTION COSTS SPA Page 1 of 6 08/21/2023 Re-plaster inside of hot tub 240 SF Install new Owner Provided decorative flush mount light fixtures F-01 1 ALL P3 Paint existing ceilings 283 SF Prime existing painted walls 1,215 SF Prep walls & ceilings for new work 1,498 SF Existing stack-stone @ walls to remain - Option to paint the stack-stone 320 SF ($3.000.00 Allowance) WC-2 Furnish & Install new wallcovering - east, south & west wall only 90 LYD 2.1.09 Men's Hallway #110 $7,102.04 Clean existing pebble floor & skim-grout 56 SF install new Owner Provided decorative flush mount light fixtures 1 ALL P2 Paint existing ceilings 56 SF Prep walls & ceilings for new work 362 SF Existing stack-stone @ walls to remain - Option to paint the stack-stone 320 SF ($3.000.00 Allowance) WC-2 Furnish & Install new wallcovering 23 LYD 2.1.10 Storage Room #111 $831.75 P2 Paint existing ceilings 21 SF P1 Paint existing painted walls 162 SF Prep walls & ceilings for new work 183 SF 2.1.11 Men's Shower Vestibule #112 $2,992.04 Clean existing pebble floor & skim-grout 62 SF Install new Owner Provided decorative flush mount light fixtures F-03 1 ALL P2 Paint existing ceilings 62 SF Prep walls & ceilings for new work 368 SF WC-2 Furnish & Install new wallcovering 23 LYD 2.1.12 Men's Shower #113, #114 & #115 $6,048.60 Clean existing pebble floor & skim-grout 62 SF Re-grout walls as required 62 SF Demo shower floor tile 46 SF T-1 Furnish & Install new shower floor tile T-1 46 SF P3 Paint existing ceilings 72 SF Prep walls & ceilings for new work 530 SF WC-2 Furnish & Install new wallcovering 37 LYD 2.1.13 $24,384.84 Clean existing pebble floor & skim-grout 239 SF T-1 Furnish and install new waterline tile 40 LF Re-plaster inside of pool 173 SF P3 Paint existing ceilings 239 SF Prep walls & ceilings for new work 1,597 SF Existing stack-stone @ walls to remain - Option to paint the stack-stone 634 SF ($6,500.00 Allowance) Finish & install perimeter soffit lighting UC-03 110 LF 2.1.14 Women's Steam Room #117 $3,200.00 Clean existing pebble floor 70 SF Re-finish bench 1 ALL 2.1.15 Women's Hot Tub #118 $23,982.37 Clean existing pebble floor & skim-grout 222 SF T-2 Furnish and install new waterline tile - cold plunge - T-2 16 LF T-1 Furnish and install new waterline tile - Hot Tub - T-1 38 LF Re-plaster inside of hot tub 240 SF Install new Owner Provided decorative flush mount light fixtures F-01 1 ALL P3 Paint existing ceilings 222 SF Prime existing painted walls 981 SF Prep walls & ceilings for new work 1,203 SF WC-2 Furnish & Install new wallcovering 73 LYD Existing stack-stone @ walls to remain - Option to paint the stack-stone 320 SF ($3.000.00 Allowance) 2.1.16 Women's Restroom #119 $7,968.80 Clean existing pebble floor & skim-grout 241 SF Install new Owner Provided decorative flush mount light fixtures F-03 2 ALL P2 Paint existing ceilings 241 SF Prep walls & ceilings for new work 898 SF WC-2 Furnish & Install new wallcovering 49 LYD 2.1.17 Women's Water Closet #120, #121. #122, #123, #124 $8,529.62 Clean existing pebble floor & skim-grout 128 SF P2 Paint existing ceilings 128 SF Prep walls & ceilings for new work 995 SF WC-2 Furnish & Install new wallcovering 68 LYD Re-grout walls as required 1 ALL 2.1.18 Women's Shower Vestibule #125 $2,233.56 Clean existing pebble floor & skim-grout 39 SF Install new Owner Provided decorative flush mount light fixtures F-03 1 EA P2 Paint existing ceilings 39 SF Prep walls & ceilings for new work 264 SF WC-2 Furnish & Install new wallcovering 17 LYD 2.1.19 Women's Shower #126, #127, #128, #129 $9,141.56 Clean existing pebble floor & skim-grout 90 SF Re-grout walls as required 131 SF Demo shower floor tile 58 SF T-1 Furnish & Install new shower floor tile T - 1 58 SF P3 Paint existing ceilings 148 SF Prep walls & ceilings for new work 913 SF WC-2 Furnish & Install new wallcovering 60 LYD 2.1.20 Women's Locker Room #130 $23,948.79 Demo Flooring 397 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 397 SF Install Owner Provided new decorative flush mount light fixtures S-03 4 EA Install Owner Provided new decorative flush mount light fixtures P-03 1 EA Pool Cave #116 Page 2 of 6 08/21/2023 P2 Paint existing ceilings 397 SF Prep walls & ceilings for new work 1,363 SF WC-2 Furnish & Install new wallcovering 75 LYD WC-4 Furnish & Install new wallcovering - existing counter cubbies only 21 LYD 2.1.21 Bathroom 131 $4,057.14 Demo Flooring 51 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) with underlayment 51 SF P2 Paint existing ceilings 51 SF Prime existing walls 255 SF Prep walls & ceilings for new work 306 SF Install new Owner Provided decorative flush mount light fixtures F-03 1 EA WC-2 Furnish & Install new wallcovering 16 LYD 2.1.22 Bathroom 132 $1,542.25 P2 Paint existing ceilings 56 SF P1 Paint existing walls 281 SF Prep walls & ceilings for new work 337 SF 2.1.23 BOH Area 133 $5,013.80 Demo Flooring 65 SF T5 Furnish & Install new tile flooring (Daltile Ambassador)65 SF Counter to remain and be repaired/restored 1 ALL Existing slat wood walls to remain - repair & restore 1 ALL P2 Paint existing ceilings 29 SF P1 Paint existing walls 216 SF Prep walls & ceilings for new work 245 SF Install new Owner Provided decorative flush mount light fixtures S-01 1 EA 2.1.24 Retail 134 $33,336.64 Demo , flooring, wall finishes , General 317 SF T5 Furnish & Install new tile flooring (Daltile Ambassador)317 SF P2 Paint Ceilings 267 SF PLS2 Plaster ceilings / partial 50 SF Prep walls & ceilings for new work 981 SF Existing Retail shelving to remain, patch and repair existing wood finish as required 1 ALL WC-4 Provide new #M Di-Noc film on back of every open shelf in existing retail displays 26 LYD Install New Millwork Items - supplied by Owner 1 ALL Furnish & Install new recessed vertical light 48 LF WC-2 Furnish & Install new wallcovering 60 LYD Install new Owner Provided decorative flush mount light fixtures S-01 3 EA Install new Owner Provided decorative flush mount light fixtures P-02 1 EA 2.1.25 Reception 135 $131,471.71 Demo , flooring, wall finishes , General 616 SF T5 Furnish & Install new tile flooring (Daltile Ambassador)616 SF CPT1 Furnish & install new area rug CPT-1 1 ALL Paint Ceilings 160 SF PLS2 Plaster ceilings / partial 460 SF Prep ceilings for new work 160 SF MW2 Manufacture and Install new registration desk 1 All Manufacture and Install new counter top on existing cabinets behind registration desk 1 All T-3 Apply brick viner @ existing column T-3 120 SF Install new Owner Provided decorative flush mount light fixtures S-01 1 EA Existing slat wood walls to remain, patch and repair as required 1 ALL 2.1.26 Cryo Therapy 136 $20,472.10 All Nail Salon Equipment to be removed 1 ALL Demo , flooring, wall finishes , General 144 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 144 SF B2 New base where required to match existing 1 ALL Extend Existing wall to enclose room 1 ALL Manufacture & install new treatment room Millwork 1 All WC-2 Furnish & Install new wallcovering 39 LYD Prep ceilings for new work 144 SF P2 Paint Ceilings 144 SF 2.1.27 Tesla Forming 137 $17,815.75 All Nail Salon Equipment to be removed 1 ALL Demo , flooring, wall finishes , General 123 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 123 SF B2 New base where required to match existing 1 ALL Extend Existing wall to enclose room 1 ALL Manufacture & install new treatment room Millwork 1 All WC-2 Furnish & Install new wallcovering 30 LYD Prep ceilings for new work 123 SF P2 Paint Ceilings 123 SF 2.1.28 Men's Locker Room #138 $22,967.62 Demo Flooring 305 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 305 SF Install Owner Provided new decorative flush mount light fixtures S-03 6 EA Install Owner Provided new decorative flush mount light fixtures P-03 1 EA P2 Paint existing ceilings 305 SF Prep walls & ceilings for new work 1,277 SF WC-2 Furnish & Install new wallcovering 72 LYD WC-4 Furnish & Install new wallcovering - existing counter cubbies only 36 LYD 2.1.29 Men's Restroom #139 $4,277.98 Clean existing pebble floor & skim-grout 78 SF Install Owner Provided new decorative flush mount light fixtures S-03 2 EA Install new Owner Provided decorative flush mount light fixtures F-03 1 EA P2 Paint existing ceilings 78 SF Prep walls & ceilings for new work 393 SF Page 3 of 6 08/21/2023 WC-2 Install new Owner provided wallcovering 23 LYD 2.1.30 Men's Water Closet #140 & 141 $5,902.77 Clean existing pebble floor & skim-grout 96 SF P2 Paint existing ceilings 96 SF Prep walls & ceilings for new work 668 SF WC-2 Furnish & Install new wallcovering 37 LYD Install new Owner Provided decorative flush mount light fixtures F-03 1 EA 2.1.31 Treatment Room #142, #143, #145, & #147 $36,920.27 Demo Flooring 474 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 747 SF Demo existing wallcovering 1,629 SF Remove wall covering in coffered ceiling and repaint ceiling 300 SF WC-2 Furnish & Install new wallcovering 121 LYD Prep walls & ceilings for new work 1,049 SF P2 Paint existing ceilings 474 SF Existing millwork to remain as-is 1 ALL Install new Owner Provided decorative flush mount light fixtures S-02 4 EA 2.1.32 BOH 144 / 148 / 149 / 150 / 151 / 153 / 155 / 174 / 106 / 100A $6,187.39 NO SCOPE P1 Paint Walls 148, 151 819 SF CPT2 Furnish & install new area rug CPT-2 (IN ROOM 148 &151 ONLY)24 YDS 2.1.33 Hall 146 $19,113.34 Demo Flooring 279 SF P2 Paint existing ceilings 279 SF CPT1 Furnish & install new carpet and pad (TSAR - Custom)31 YDS Prep walls & ceilings for new work 1,457 SF Install new Owner Provided decorative flush mount light fixtures F-02 1 EA WC-1 Furnish & Install Select Custom Panels 8 Panels WC-1 Furnish & Install Field Wallcovering 70 LYD 2.1.34 Hall 154 $5,583.43 Demo , flooring, wall finishes , General 81 SF T5 Furnish & Install new tile flooring (Daltile Ambassador)81 SF P2 Paint existing ceilings 81 SF Prep walls & ceilings for new work 499 SF WC-1 Furnish & Install Field Wallcovering 30 LYD 2.1.35 Storage 152 $5,563.43 Demo Flooring 56 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 56 SF P1 Paint existing painted walls 801 SF P2 Paint existing ceilings 56 SF Prep walls & ceilings for new work 857 SF 2.1.36 Relaxation Lounge #156A $106,262.42 Demo, flooring, wall finishes, general 582 SF CPT1 Furnish & install new carpet and pad (TSAR - Custom)65 YDS P2 Repaint outer soffit 1 All PLS2 New metallic ceiling plaster inside upper ceiling soffit 443 SF Install new Owner Provided decorative flush mount light fixtures S-02 1 EA Prep walls & ceilings for new work 1,428 SF T-4 Wrap fireplace in new stone tile T-4 40 SF M2 Provide new beverage center millwork with slat wood finish and stone top 1 All Install new built in banquette lounge seating, provide hidden storage 1 All WC-3 Furnish & Install new wallcovering 63 LYD Build and or modify walls for new sliding door system 1 All Furnish and Install new sliding door systems 1 All 2.1.37 Private Oxygen Lounge 156B $50,449.90 Demo , flooring, wall finishes , General 409 SF CPT1 Furnish & install new carpet and pad (TSAR - Custom)45 YDS P2 Repaint outer soffit 1 All PLS2 New metallic ceiling plaster inside upper ceiling soffit 313 SF Install new Owner Provided decorative flush mount light fixtures S-01 2 EA Prep walls & ceilings for new work 1,165 SF T-4 Wrap fireplace in new stone tile T-4 110 SF Provide new Privacy Curtain and hardware 20 LF WC-3 Furnish & Install new wallcovering 56 LYD 2.1.38 Storage Room #157 $2,332.00 P2 Paint existing ceilings 102 SF P1 Paint existing painted walls 344 SF Prep walls & ceilings for new work 446 SF 2.1.39 Treatment Rooms #158 $7,180.34 Demo Flooring 78 SF Remove wall covering in coffered ceiling and repaint ceiling 65 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 78 SF B2 Wood base 55 LF Install new decorative flush mount light fixtures 1 All P2 Paint existing ceilings 142 SF Prep walls & ceilings for new work 637 SF WC-2 Furnish & Install new wallcovering 37 LYD Existing millwork to remain 1 All 2.1.40 Treatment Personal Shower #159 $9,949.66 Demo Flooring 25 SF T1 Furnish & Install new shower floor tile T - 1 25 SF B1 Furnish & Install new tile base B-1 20 LF Demo wall tile 180 SF Install new backer board 180 SF Page 4 of 6 08/21/2023 T5 Furnish & Install new wall tile (Daltile Ambassador)180 SF P3 Paint existing ceilings 25 SF Prep ceilings for new work 25 SF 2.1.41 Treatment Room #160 & #161 $16,319.99 Demo Flooring 271 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 271 SF Remove wall covering in coffered ceiling and repaint ceiling 185 SF Install new Owner Provided decorative flush mount light fixtures S-02 2 EA P2 Paint existing ceilings 289 SF Prep walls & ceilings for new work 1,198 SF WC-2 Furnish & Install new wallcovering 67 LYD Existing millwork to remain 2 All 2.1.42 Treatment Room #162 $17,023.39 Demo Flooring 47 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 47 SF B1 Furnish & Install new tile base B-1 20 LF T5 Furnish & Install new shower floor tile T - 5 25 SF B2 Furnish & Install new tile base B-2 20 LF Remove wall covering in coffered ceiling and repaint ceiling 164 SF Install new Owner Provided decorative flush mount light fixtures S-02 2 EA P2 Paint existing ceilings 258 SF Prep walls & ceilings for new work 969 SF WC-2 Furnish & Install new wallcovering 53 LYD Existing millwork to remain 1 All Existing tub to remain provide new stone surround, patch and repair wood finish 1 All 2.1.43 Treatment Personal Shower #163 $6,138.89 Demo Flooring 15 SF T1 Furnish & Install new shower floor tile T - 1 15 SF B1 Furnish & Install new tile base B-1 12 LF Demo wall tile 135 SF Install new backer board 135 SF T5 Furnish & Install new wall tile (Daltile Ambassador)135 SF P3 Paint existing ceilings 15 SF Prep ceilings for new work 15 SF 2.1.44 Treatment Room #164 & #165 $17,374.53 Demo Flooring 240 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 240 SF B2 Furnish & Install new tile base B-2 110 LF Remove wall covering in coffered ceiling and repaint ceiling 132 SF Install new Owner Provided decorative flush mount light fixtures S-02 2 EA P2 Paint existing ceilings 265 SF Prep walls & ceilings for new work 1,183 SF WC-2 Furnish & Install new wallcovering 68 LYD Existing millwork to remain 2 All 2.1.45 Hall 166 $29,546.00 Demo, flooring, wall finishes, general 399 SF CPT1 Furnish & install new carpet and pad (TSAR - Custom)44 YDS Install new Owner Provided decorative flush mount light fixtures S-02 3 EA Prep walls for new work 1,839 SF P-2 Paint existing ceilings 399 SF WC-1 Furnish & Install Select Custom Panels 15 Panels WC-1 Furnish & Install Field Wallcovering 90 LYD 2.1.46 Treatment Personal Shower #167 $5,298.73 Demo Flooring 13 All T1 Furnish & Install new shower floor tile T - 1 13 SF B1 Furnish & Install new tile base B-1 10 LF Demo wall tile 117 SF Install new backer board 117 SF T5 Furnish & Install new wall tile (Daltile Ambassador)117 SF P3 Paint existing ceilings 13 SF Prep ceilings for new work 13 SF 2.1.47 Treatment Room #168, #169, #170, #171 $30,487.33 Demo existing wood Flooring 440 SF Existing floor tile to remain WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 440 SF Remove wall covering in coffered ceiling and repaint ceiling 294 SF Prep walls & ceilings for new work 2,663 SF P2 Paint existing ceilings 593 SF Install new Owner Provided decorative flush mount light fixtures S-02 4 EA WC-2 Furnish & Install new wallcovering 153 LYD Existing millwork to remain as-is 4 All 2.1.48 Treatment Room Shower #172 $7,680.35 Demo Flooring 17 SF T1 Furnish & Install new shower floor tile T - 1 17 SF B1 Furnish & Install new tile base B-1 12 LF Demo wall tile 153 SF Install new backer board 153 SF T5 Furnish & Install new wall tile (Daltile Ambassador)153 SF P3 Paint existing ceilings 17 SF Prep ceilings for new work 17 SF 2.1.49 Treatment Room #173 $8,460.26 Demo Flooring 113 SF WD1 Furnish & install new wood flooring (Amorim - Cork Inspire 700 - 7" x 48" ) Glue Down 113 SF Remove wall covering in coffered ceiling and repaint ceiling 52 SF Install new Owner Provided decorative flush mount light fixtures S-02 1 EA Prep walls & ceilings for new work 500 SF P2 Paint existing ceilings 113 SF Page 5 of 6 08/21/2023 WC3 Furnish & Install new wallcovering 29 LYD Existing millwork to remain as-is 1 All 2.1.50 Gym Entry #175 $22,783.14 Demo Flooring 275 SF RB1 Rubber Flooring - Labor & Material (Rope, ReNew Brand) RB - 1 303 SF Prep walls & ceilings for new work 1,005 SF P2 Paint existing ceilings 231 SF P1 Paint existing walls 774 SF Install new decorative flush mount light fixtures 4 EA 2.1.51 FF&E Procurement Per Responsibility Matrix $5,921.41 Items Not Included above 1 All 2.2 Not Used Subtotal: SUB TOTAL CONSTRUCTION Subtotal: $1,091,564 2.3 Subtotal: $291,934 2.3.1 1 LS 2.3.2 1 LS 2.3.3 1 LS 2.3.4 1 LS CONSTRUCTION COSTS Total: $1,383,498 Clarifications / Exclusions No Bond has been included Electrical is limited to the replacement of surface mounted lighting and some millwork lighting. All in existing locations and existing j-boxes. No new devices, cover plates of major work is included. MISCELLANEOUS General Conditions General Requirements Overhead & Profit Insurance Only scope identified in the line item description is included in this proposal No fire life safety work is included No removal of mold, asbestos or any other chemical or hazardous materials has been figured. No union labor No plumbing work is included No major construction or modifications to comply with ADA is included All changes or additional work must be in writing and approved by the owner and contractor before work is started. Concealed or hidden existing conditions to be address by change order Restrooms for the workforce will be provided by Owner/Operations Price assumes the all exiting wall finishes will come off walls without major damage to the drywall. Should the drywall suffer major damage due to the removal of the existing finishes, repairs may be needed at an additional cost to the project. All Existing FF&E and new FF&E removal and installation by Owner Owner to provide and pay for a storage facility that is maned and able to receive and all products until such time they are needed to complete the project The items ICI will be purchasing such as construction materials and FF&E items are identified on the responsibility matrix dated 5/9/2023. Any changes to the list will be handled as a change order to the project . Shipping cost for FF&E and construction materials to be billed separately at a cost plus 10% rate Owner to provide a room for ICI senior management site visits Removal and re-installation of the Gym equipment by Owner Where drywall ceilings are to be replaced, it is assumed the existing framing is existing to remain Owner to provide workforce parking for primary personal Owner agrees to advance funds for long lead time construction materials and FF&E deposit/payments as required by the manufactures. ICI will not advance funds for long lead time items, FF&E payments or custom orders Work to be completed during normal working hours No primum time included General Conditions and General Requirements are based on the project schedule with continuous work. Should the project be delayed beyond ICI's control, or the project be completed in more than one move-in, the GC & GR costs are subject to change. Delays due to Owner Provided items or by Owner or by City Officials can potentially add additional time and/or costs to the project Due to the extreme supply shortages and logistical hardships, Ironstar Construction, Inc will do it's best to assure we stay on top of the materials needed to complete the project. However, should a specific product not be available or be held up by shipping the project could be delayed at no fault of ICI Permits by Owner Elevator use will be provided by hotel and not delay construction progress No rework or replacement for floor drains or shower drains are considered No new drain covers, ports, jets or trims are considered for the pool & spa replastering All doors are existing to remain as-is unless otherwise noted to include the finish Page 6 of 6 08/21/2023