Loading...
HomeMy WebLinkAboutFile Documents.315 E Dean St.0032-2023-BCOM (11) Page 1 of 2 St. Regis Aspen Spa Remodel Project: 22209.00 – RAKxa Aspen Spa Subject: Fire Protection Letter Date: 19 April 2023 To whom this may concern, This letter is to state that there will be no damage to the existing fire rated assemblies as part of the Interior remodel for St Regis Spa. Property: St. Regis Hotel Area of Remodel: Lower Level Spa Construction Type: 1A The proposed spa remodel will include minor demolition on non-bearing interior partitions and new finishes throughout including the replacement of existing decorative lighting in ceiling. Per IBC Table 601,a Type 1A construction requires no fire rating for nonbearing interior partitions but does require floor assemblies to be 2 hour fire rated. The existing floor/ceiling assembly as seen in previous remodel construction document plan sets, and as shown below, shows the assembly as a 2 Hour fire rated post tension concrete slab. Existing Floor/Ceiling Assembly Detail: 06/08/2023 07/25/2023 jimp Page 2 of 2 Reference Table 601: The interior remodel of the Spa is proposing replacement of finishes and decorative light fixtures, in their current location. Both of these will affect the finish layer of the floor/ ceiling assembly but not penetrate the existing concrete assembly. Please reach out with any questions. Sincerely, Corrie Kowalinski Corrie.kowalinski@rowlandbroughton.com (970)429-8704 Ext 207 06/08/2023 07/25/2023 jimp