Loading...
HomeMy WebLinkAboutFile Documents.620 Gillespie St.0033-2020-BCOM (12)COMcheck Software Version 4.1.2.1 Envelope Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Vertical Glazing / Wall Area:20% Location:Aspen, Colorado Climate Zone:7 Construction Site: 620 Gillepspie Ave Aspen, CO 81611 Owner/Agent: The Aspen Institute 1000 N 3rd Ave Aspen, CO 81611 Designer/Contractor: Craig Lawrence Rowland+Broughton Architecture 500 W Main Street Aspen, CO 81611 craig.lawrence@rowlandbroughton. com Project Information Energy Code: Boettcher Seminar Building 4%Skylight / Roof Area Enhanced Interior Lighting Controls Additional Efficiency Package(s) Building Area Floor Area 1-Office : Nonresidential 6091 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof - Assy R1: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]2489 ---35.0 0.028 0.028 Skylight 2: Vinyl/Fiberglass Frame:Plastic, No Curb, Perf. Specs.: Product ID NA, SHGC 0.50, [Bldg. Use 1 - Office] (b) 32 ------0.500 0.500 Roof - Assy R2: Attic Roof with Wood Joists, [Bldg. Use 1 - Office] : Comment: 422 56.0 0.0 0.018 0.021 Roof - Assy R2b: Attic Roof with Wood Joists, [Bldg. Use 1 - Office] : Comment: 673 28.5 0.6 0.035 0.021 Roof - Assy R3: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]821 ---35.0 0.028 0.028 Skylight 1: Metal Frame with Thermal Break:Glass, No Curb, Perf. Specs.: Product ID NA, SHGC 0.26, [Bldg. Use 1 - Office] (b) 147 ------0.280 0.500 Roof - Assy R5: Attic Roof with Wood Joists, [Bldg. Use 1 - Office]777 56.0 0.0 0.018 0.021 Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Office] : Comment: (c) 358 ------0.730 0.520 NORTH Exterior Wall 1: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 800 0.0 22.0 0.039 0.071 Window 4 copy 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 24 ------0.290 0.290 Window 5 copy 1: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 11 ------0.350 0.370 EAST Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 101 ofPage12/02/2020 01/22/2021 bonniem Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Exterior Wall 2: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 982 0.0 22.0 0.039 0.071 Window 2: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 170 ------0.290 0.290 Window 6: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 56 ------0.350 0.370 Door 4: Wood, Swinging, [Bldg. Use 1 - Office] : Comment:43 ------0.770 0.370 SOUTH Exterior Wall 2 copy 1: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 718 0.0 22.0 0.039 0.071 Window 4 copy 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 98 ------0.290 0.290 Window 5 copy 1: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 21 ------0.350 0.370 Door 2 copy 1: Glass (> 50% glazing):Nonmetal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 43 ------0.770 0.770 WEST Exterior Wall 2 copy 2: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 982 0.0 22.0 0.039 0.071 Window 4: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 176 ------0.290 0.290 Window 5: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 56 ------0.350 0.370 Door 2: Glass (> 50% glazing):Nonmetal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 42 ------0.770 0.770 Door 3: Wood, Swinging, [Bldg. Use 1 - Office] : Comment:20 ------0.770 0.370 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.2.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 0.4% better than code Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 102 ofPage 2020-12-01Craig Lawrence, Architect 12/02/2020 Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.2.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C402.4.2. 2 [PR15]1 Skylights in office, storage, automotive service, manufacturing, non-refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 103 ofPage12/02/2020 Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C104 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [FO12]3 Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 104 ofPage12/02/2020 Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3 [FR11]1 Skylight SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3. 4 [FR9]1 Skylight fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.4 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 2.2 [FR20]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and average assembly air leakage <= 0.04 cfm/ft2. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.2, C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable C402.5.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 105 ofPage12/02/2020 Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable C402.5.5, C403.2.4. 3 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 106 ofPage12/02/2020 Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C402.2.1 [IN4]3 Skylight curbs are insulated to the level of roofs with insulation above deck or R-5. Complies Does Not Not Observable Not Applicable C402.2.1 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable C104 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C104 [IN8]2 Installed floor insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C104 [IN2]1 Installed roof insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 107 ofPage12/02/2020 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 108 ofPage12/02/2020 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C402.5.3 [FI51]3 Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms are sealed and insulated. Complies Does Not Not Observable Not Applicable C402.5.6 [FI37]1 Weatherseals installed on all loading dock cargo doors. Complies Does Not Not Observable Not Applicable C402.5.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable C406.4 [FI54]1 Enhanced digital lighting controls efficiency package: Interior lighting has following enhanced lighting controls in accordance with Section C405.2.2: Luminaires capable of continuous dimming and being addressed individually, <= 8 luminaires controlled in combination in a daylight zone, digital control system for fixtures, "Sequence of Operations" documentation, and functional testing per Section C408. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 109 ofPage12/02/2020 Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 1010 ofPage12/02/2020