HomeMy WebLinkAboutFile Documents.620 Gillespie St.0033-2020-BCOM (12)COMcheck Software Version 4.1.2.1
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Vertical Glazing / Wall Area:20%
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
620 Gillepspie Ave
Aspen, CO 81611
Owner/Agent:
The Aspen Institute
1000 N 3rd Ave
Aspen, CO 81611
Designer/Contractor:
Craig Lawrence
Rowland+Broughton Architecture
500 W Main Street
Aspen, CO 81611
craig.lawrence@rowlandbroughton.
com
Project Information
Energy Code:
Boettcher Seminar Building
4%Skylight / Roof Area
Enhanced Interior Lighting Controls
Additional Efficiency Package(s)
Building Area Floor Area
1-Office : Nonresidential 6091
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof - Assy R1: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]2489 ---35.0 0.028 0.028
Skylight 2: Vinyl/Fiberglass Frame:Plastic, No Curb, Perf. Specs.:
Product ID NA, SHGC 0.50, [Bldg. Use 1 - Office] (b)
32 ------0.500 0.500
Roof - Assy R2: Attic Roof with Wood Joists, [Bldg. Use 1 - Office] :
Comment:
422 56.0 0.0 0.018 0.021
Roof - Assy R2b: Attic Roof with Wood Joists, [Bldg. Use 1 - Office] :
Comment:
673 28.5 0.6 0.035 0.021
Roof - Assy R3: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]821 ---35.0 0.028 0.028
Skylight 1: Metal Frame with Thermal Break:Glass, No Curb, Perf.
Specs.: Product ID NA, SHGC 0.26, [Bldg. Use 1 - Office] (b)
147 ------0.280 0.500
Roof - Assy R5: Attic Roof with Wood Joists, [Bldg. Use 1 - Office]777 56.0 0.0 0.018 0.021
Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Office] : Comment:
(c)
358 ------0.730 0.520
NORTH
Exterior Wall 1: Concrete Block:8", Partially Grouted, Cells Insulated,
Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment:
800 0.0 22.0 0.039 0.071
Window 4 copy 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA,
SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b)
24 ------0.290 0.290
Window 5 copy 1: Wood Frame:Operable, Perf. Specs.: Product ID NA,
SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b)
11 ------0.350 0.370
EAST
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
101 ofPage12/02/2020
01/22/2021
bonniem
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Exterior Wall 2: Concrete Block:8", Partially Grouted, Cells Insulated,
Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment:
982 0.0 22.0 0.039 0.071
Window 2: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC
0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b)
170 ------0.290 0.290
Window 6: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC
0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b)
56 ------0.350 0.370
Door 4: Wood, Swinging, [Bldg. Use 1 - Office] : Comment:43 ------0.770 0.370
SOUTH
Exterior Wall 2 copy 1: Concrete Block:8", Partially Grouted, Cells
Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] :
Comment:
718 0.0 22.0 0.039 0.071
Window 4 copy 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA,
SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b)
98 ------0.290 0.290
Window 5 copy 1: Wood Frame:Operable, Perf. Specs.: Product ID NA,
SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b)
21 ------0.350 0.370
Door 2 copy 1: Glass (> 50% glazing):Nonmetal Frame, Entrance Door,
Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 -
Office] : Comment: (b)
43 ------0.770 0.770
WEST
Exterior Wall 2 copy 2: Concrete Block:8", Partially Grouted, Cells
Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] :
Comment:
982 0.0 22.0 0.039 0.071
Window 4: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC
0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b)
176 ------0.290 0.290
Window 5: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC
0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b)
56 ------0.350 0.370
Door 2: Glass (> 50% glazing):Nonmetal Frame, Entrance Door, Perf.
Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] :
Comment: (b)
42 ------0.770 0.770
Door 3: Wood, Swinging, [Bldg. Use 1 - Office] : Comment:20 ------0.770 0.370
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.2.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 0.4% better than code
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
102 ofPage
2020-12-01Craig Lawrence, Architect
12/02/2020
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.2.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
C402.4.2.
2
[PR15]1
Skylights in office, storage,
automotive service, manufacturing,
non-refrigerated warehouse, retail
store, and distribution/sorting area
have a measured haze value > 90
percent unless designed to exclude
direct sunlight.
Complies
Does Not
Not Observable
Not Applicable
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
103 ofPage12/02/2020
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
C104
[FO3]2
Installed slab-on-grade insulation type
and R-value consistent with insulation
specifications reported in plans and
COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
104 ofPage12/02/2020
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3
[FR11]1
Skylight SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3.
4
[FR9]1
Skylight fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
2.2
[FR20]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and average
assembly air leakage <= 0.04 cfm/ft2.
Air barrier penetrations are sealed in
an approved manner.
Complies
Does Not
Not Observable
Not Applicable
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
105 ofPage12/02/2020
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close.
Complies
Does Not
Not Observable
Not Applicable
C402.5.5,
C403.2.4.
3
[ME58]3
Outdoor air and exhaust systems have
motorized dampers that automatically
shut when not in use and meet
maximum leakage rates. Check
gravity dampers where allowed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
106 ofPage12/02/2020
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN4]3
Skylight curbs are insulated to the
level of roofs with insulation above
deck or R-5.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN17]3
Insulation intended to meet the roof
insulation requirements cannot be
installed on top of a suspended
ceiling. Mark this requirement
compliant if insulation is installed
accordingly.
Complies
Does Not
Not Observable
Not Applicable
C104
[IN6]1
Installed above-grade wall insulation
type and R-value consistent with
insulation specifications reported in
plans and COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C104
[IN8]2
Installed floor insulation type and R-
value consistent with insulation
specifications reported in plans and
COMcheck reports.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C104
[IN2]1
Installed roof insulation type and R-
value consistent with insulation
specifications reported in plans and
COMcheck reports. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
107 ofPage12/02/2020
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
108 ofPage12/02/2020
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C402.5.3
[FI51]3
Where open combustion air ducts
provide combustion air to open
combustion fuel burning appliances,
the appliances and combustion air
opening are located outside the
building thermal envelope or enclosed
in a room, isolated from inside the
thermal envelope. Such rooms are
sealed and insulated.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo doors.
Complies
Does Not
Not Observable
Not Applicable
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
C406.4
[FI54]1
Enhanced digital lighting controls
efficiency package: Interior lighting
has following enhanced lighting
controls in accordance with Section
C405.2.2: Luminaires capable of
continuous dimming and being
addressed individually, <= 8
luminaires controlled in combination
in a daylight zone, digital control
system for fixtures, "Sequence of
Operations" documentation, and
functional testing per Section C408.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
109 ofPage12/02/2020
Project Title:
Data filename:
Boettcher Seminar Building
P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck
12/01/20Report date:
1010 ofPage12/02/2020