HomeMy WebLinkAboutFile Documents.620 Gillespie St.0033-2020-BCOM (14)COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
THE ASPEN INSTITUTE
1000 N. 3RD ST.
ASPEN, CO 81611
Owner/Agent:
CRAIG LAWRENCE
ROWLAND + BROUGHTON
1830 BLAKE ST
DENVER, CO 80202
303-308-1373
craig.lawrence@rowlandbroughton.
com
Designer/Contractor:
EMILY BYNUM
ELEMENT LIGHTING DESIGN LLC
983 CHERRYVALE RD
BOULDER, CO 80303
720-560-4931
ebynum@elementlighting.com
Project Information
Energy Code:
THE BOETTCHER CENTER
Enhanced Interior Lighting Controls
Additional Efficiency Package(s)
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Office 7160 0.82 5871
5871Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-Office
LED 1: F1: RECESSED LED ADJ ACCENT: Other:1 58 12 696
LED 2: F2: WALL MOUNTED LINEAR DIR/IND: Other:1 98 6 637
LED 3: F3-8FT: RECESSED WALL COVE AT RESTROOMS: Other:1 3 21 62
LED 3 copy 1: F3-32FT: RECESSED WALL COVE: Other:1 1 109 109
LED 4: F4: 2X2 LED TROFFER: Other:1 5 33 165
LED 4 copy 1: F4A: 2X2 LED TROFFER: Other:1 3 22 66
LED 5: F5: SURFACE MOUNT LED: Other:1 3 16 48
LED 6: F6: LINEAR DIRECT INDIRECT: Other:1 2 368 736
Track lighting 5: F6: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-voltage
transformer capacity
0 0 150 150
Track lighting 5 copy 1: F6: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-
voltage transformer capacity
0 0 150 150
LED 8: F7: 4FT LINEAR LED: Other:1 2 21 42
LED 9: F8: SUSPENDED LED CYLINER: Other:1 35 19 679
LED 6 copy 1: F9: LINEAR DIRECT INDIRECT: Other:1 5 135 675
Track lighting 5 copy 2: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-
voltage transformer capacity
0 0 40 40
Track lighting 5 copy 3: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-
voltage transformer capacity
0 0 40 40
Track lighting 5 copy 1: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-0 0 40 40
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
91 ofPage07/28/2020
counted twice the wattage - per transformer only counted twice the wattage - per transformer only
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
voltage transformer capacity
Track lighting 5 copy 4: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-
voltage transformer capacity
0 0 40 40
Track lighting 5 copy 5: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-
voltage transformer capacity
0 0 40 40
LED 12: F11: 3FT X 5FT ILLUMINATED PANEL: Other:1 12 40 480
LED 19: P1: DECORATIVE PENDANT: Other:1 1 40 40
LED 20: P3: 7FT LINEAR LED: Other:1 2 31 62
LED 13: SM1: DECORATIVE SURFACE MOUNT: Other:1 8 31 248
LED 14: V1: ILLUMINATED MIRROR: Other:1 2 120 240
LED 16: W2: LINEAR WALL MOUNT: Other:1 4 11 44
LED 16 copy 1: W3: LINEAR WALL MOUNT: Other:1 6 21 126
Track lighting 2: X1: UNDERCABINET LIGHTING AT KITCHE: Wattage based on low-voltage
transformer capacity
0 0 60 Exempt
Exemption:Furniture-mounted Supplemental Task Lighting
Track lighting 2 copy 1: X1: CONCEALLED LTG AT POD CORRIDOR: Wattage based on low-
voltage transformer capacity
0 0 40 40
5695Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES: Design 3% better than code
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
92 ofPage
Emily Bynum, Principal 0721-2020
07/28/2020
cut sheet calls out 60 w minimum transformer
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
THE ASPEN INSTITUTE
1000 N. 3RD ST.
ASPEN, CO 81611
Owner/Agent:
CRAIG LAWRENCE
ROWLAND + BROUGHTON
1830 BLAKE ST
DENVER, CO 80202
303-308-1373
craig.lawrence@rowlandbroughton.
com
Designer/Contractor:
EMILY BYNUM
ELEMENT LIGHTING DESIGN LLC
983 CHERRYVALE RD
BOULDER, CO 80303
720-560-4931
ebynum@elementlighting.com
Project Information
Energy Code:
THE BOETTCHER CENTER
1 (Developed rural area)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
South Entrance (Entry canopy)153 ft2 0.25 Yes 38
East Entrance (Other door (not main entry))3 ft of door 20 Yes 60
NE Patio (Plaza area)300 ft2 0.14 Yes 42
West Entrance (Other door (not main entry))3 ft of door 20 Yes 60
West Pod Entrance (Other door (not main entry))3 ft of door 20 Yes 60
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
260
260
500
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
South Entrance ( Entry canopy 153 ft2): Tradable Wattage
LED 1: F1: RECESSED LED DOWNLIGHT: Other:1 5 17 85
East Entrance ( Other door (not main entry) 3 ft of door width): Tradable Wattage
LED 1 copy 1: F1: RECESSED LED DOWNLIGHT: Other:1 1 17 17
NE Patio ( Plaza area 300 ft2): Tradable Wattage
LED 3: L1: STEPLIGHT: Other:1 6 2 12
LED 4: L2: SHEILDED WALLMOUNT: Other:1 4 4 18
West Entrance ( Other door (not main entry) 3 ft of door width): Tradable Wattage
LED 1 copy 1: F1: RECESSED LED DOWNLIGHT: Other:1 1 17 17
West Pod Entrance ( Other door (not main entry) 3 ft of door width): Tradable Wattage
LED 3 copy 1: L1: STEPLIGHT: Other:1 3 2 6
155Total Tradable Proposed Watts =
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
93 ofPage07/28/2020
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 80% better than code
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
94 ofPage
Emily Bynum, Principal 07-21-2020
07/28/2020
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
95 ofPage07/28/2020
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.1
[EL15]1
Lighting controls installed to uniformly
reduce the lighting load by at least
50%.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1
[EL18]1
Occupancy sensors installed in
required spaces.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1,
C405.2.2.
3
[EL23]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
C405.2.2.
1
[EL22]2
Automatic controls to shut off all
building lighting installed in all
buildings.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3
[EL16]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
3
[EL21]1
Enclosed spaces with daylight area
under skylights and rooftop monitors
are equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.5
[EL25]null
Automatic lighting controls for exterior
lighting installed. Controls will be
daylight controlled, set based on
business operation time-of-day, or
reduce connected lighting > 30%.
Complies
Does Not
Not Observable
Not Applicable
C405.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
96 ofPage07/28/2020
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
97 ofPage07/28/2020
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
C405.4.1
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C405.5.1
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
C406.4
[FI54]1
Enhanced digital lighting controls
efficiency package: Interior lighting
has following enhanced lighting
controls in accordance with Section
C405.2.2: Luminaires capable of
continuous dimming and being
addressed individually, <= 8
luminaires controlled in combination
in a daylight zone, digital control
system for fixtures, "Sequence of
Operations" documentation, and
functional testing per Section C408.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
1
[FI16]3
Furnished as-built drawings for
electric power systems within 90 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
98 ofPage07/28/2020
Project Title:
Data filename:
THE BOETTCHER CENTER
F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck
07/21/20Report date:
99 ofPage07/28/2020