Loading...
HomeMy WebLinkAboutFile Documents.620 Gillespie St.0033-2020-BCOM (14)COMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: THE ASPEN INSTITUTE 1000 N. 3RD ST. ASPEN, CO 81611 Owner/Agent: CRAIG LAWRENCE ROWLAND + BROUGHTON 1830 BLAKE ST DENVER, CO 80202 303-308-1373 craig.lawrence@rowlandbroughton. com Designer/Contractor: EMILY BYNUM ELEMENT LIGHTING DESIGN LLC 983 CHERRYVALE RD BOULDER, CO 80303 720-560-4931 ebynum@elementlighting.com Project Information Energy Code: THE BOETTCHER CENTER Enhanced Interior Lighting Controls Additional Efficiency Package(s) Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Office 7160 0.82 5871 5871Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures 1-Office LED 1: F1: RECESSED LED ADJ ACCENT: Other:1 58 12 696 LED 2: F2: WALL MOUNTED LINEAR DIR/IND: Other:1 98 6 637 LED 3: F3-8FT: RECESSED WALL COVE AT RESTROOMS: Other:1 3 21 62 LED 3 copy 1: F3-32FT: RECESSED WALL COVE: Other:1 1 109 109 LED 4: F4: 2X2 LED TROFFER: Other:1 5 33 165 LED 4 copy 1: F4A: 2X2 LED TROFFER: Other:1 3 22 66 LED 5: F5: SURFACE MOUNT LED: Other:1 3 16 48 LED 6: F6: LINEAR DIRECT INDIRECT: Other:1 2 368 736 Track lighting 5: F6: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-voltage transformer capacity 0 0 150 150 Track lighting 5 copy 1: F6: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low- voltage transformer capacity 0 0 150 150 LED 8: F7: 4FT LINEAR LED: Other:1 2 21 42 LED 9: F8: SUSPENDED LED CYLINER: Other:1 35 19 679 LED 6 copy 1: F9: LINEAR DIRECT INDIRECT: Other:1 5 135 675 Track lighting 5 copy 2: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low- voltage transformer capacity 0 0 40 40 Track lighting 5 copy 3: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low- voltage transformer capacity 0 0 40 40 Track lighting 5 copy 1: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low-0 0 40 40 Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 91 ofPage07/28/2020 counted twice the wattage - per transformer only counted twice the wattage - per transformer only E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures voltage transformer capacity Track lighting 5 copy 4: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low- voltage transformer capacity 0 0 40 40 Track lighting 5 copy 5: F9: GIMBAL LIGHTING W/ REMOTE XFMR: Wattage based on low- voltage transformer capacity 0 0 40 40 LED 12: F11: 3FT X 5FT ILLUMINATED PANEL: Other:1 12 40 480 LED 19: P1: DECORATIVE PENDANT: Other:1 1 40 40 LED 20: P3: 7FT LINEAR LED: Other:1 2 31 62 LED 13: SM1: DECORATIVE SURFACE MOUNT: Other:1 8 31 248 LED 14: V1: ILLUMINATED MIRROR: Other:1 2 120 240 LED 16: W2: LINEAR WALL MOUNT: Other:1 4 11 44 LED 16 copy 1: W3: LINEAR WALL MOUNT: Other:1 6 21 126 Track lighting 2: X1: UNDERCABINET LIGHTING AT KITCHE: Wattage based on low-voltage transformer capacity 0 0 60 Exempt Exemption:Furniture-mounted Supplemental Task Lighting Track lighting 2 copy 1: X1: CONCEALLED LTG AT POD CORRIDOR: Wattage based on low- voltage transformer capacity 0 0 40 40 5695Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES: Design 3% better than code Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 92 ofPage Emily Bynum, Principal 0721-2020 07/28/2020 cut sheet calls out 60 w minimum transformer COMcheck Software Version 4.1.1.0 Exterior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: THE ASPEN INSTITUTE 1000 N. 3RD ST. ASPEN, CO 81611 Owner/Agent: CRAIG LAWRENCE ROWLAND + BROUGHTON 1830 BLAKE ST DENVER, CO 80202 303-308-1373 craig.lawrence@rowlandbroughton. com Designer/Contractor: EMILY BYNUM ELEMENT LIGHTING DESIGN LLC 983 CHERRYVALE RD BOULDER, CO 80303 720-560-4931 ebynum@elementlighting.com Project Information Energy Code: THE BOETTCHER CENTER 1 (Developed rural area)Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / Unit D Tradable Wattage E Allowed Watts (B X C) South Entrance (Entry canopy)153 ft2 0.25 Yes 38 East Entrance (Other door (not main entry))3 ft of door 20 Yes 60 NE Patio (Plaza area)300 ft2 0.14 Yes 42 West Entrance (Other door (not main entry))3 ft of door 20 Yes 60 West Pod Entrance (Other door (not main entry))3 ft of door 20 Yes 60 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 260 260 500 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures South Entrance ( Entry canopy 153 ft2): Tradable Wattage LED 1: F1: RECESSED LED DOWNLIGHT: Other:1 5 17 85 East Entrance ( Other door (not main entry) 3 ft of door width): Tradable Wattage LED 1 copy 1: F1: RECESSED LED DOWNLIGHT: Other:1 1 17 17 NE Patio ( Plaza area 300 ft2): Tradable Wattage LED 3: L1: STEPLIGHT: Other:1 6 2 12 LED 4: L2: SHEILDED WALLMOUNT: Other:1 4 4 18 West Entrance ( Other door (not main entry) 3 ft of door width): Tradable Wattage LED 1 copy 1: F1: RECESSED LED DOWNLIGHT: Other:1 1 17 17 West Pod Entrance ( Other door (not main entry) 3 ft of door width): Tradable Wattage LED 3 copy 1: L1: STEPLIGHT: Other:1 3 2 6 155Total Tradable Proposed Watts = Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 93 ofPage07/28/2020 Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES: Design 80% better than code Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 94 ofPage Emily Bynum, Principal 07-21-2020 07/28/2020 Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 95 ofPage07/28/2020 Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable C405.2.5 [EL25]null Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Complies Does Not Not Observable Not Applicable C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 96 ofPage07/28/2020 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 97 ofPage07/28/2020 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C405.5.1 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. C406.4 [FI54]1 Enhanced digital lighting controls efficiency package: Interior lighting has following enhanced lighting controls in accordance with Section C405.2.2: Luminaires capable of continuous dimming and being addressed individually, <= 8 luminaires controlled in combination in a daylight zone, digital control system for fixtures, "Sequence of Operations" documentation, and functional testing per Section C408. Complies Does Not Not Observable Not Applicable C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 98 ofPage07/28/2020 Project Title: Data filename: THE BOETTCHER CENTER F:\19006 Aspen Institute\BOETTCHER\Comcheck Boettcher REV01.cck 07/21/20Report date: 99 ofPage07/28/2020