Loading...
HomeMy WebLinkAboutFile Documents.975 King St.0089-2022-BCHO (12)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SEE NOTES #1 PLANS It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. bobn 12/08/2022ZONING REVIEWED BY ZONING 12/08/2022 bobn It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Land Use Code requirements. The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 119 South Spring Street | Suite 203 | Aspen, CO T 970.925.3444 C 517.881.5046 www.djarchitects.com 3 November 22, 2022 Brian Beazley City of Aspen 975 King Street Roof deck/ Solar/Driveway Change Order Narrative 1.1-F.A.R. Plans- The deck square footage was revied reflect the roof deck and access stair to the roof omission, the deck extension on the main upper level and the spa and the firepit area being added to the calculation. 2.4-Site Plan-The sheet shows the elimination of the roof deck and associated guardrails. 2.5-Site Plan (Snowmelt)- The sheet shows the modification of the snowmelt due to the omission and addition of decks. 3.2-Main Level Plan- This sheet shows the addition of a firepit. 3.3-Upper Level Plan-This plan shows the deck extension and the elimination of the spiral stair to the roof. 3.4-Roof Plan-Addition of solar (PV) panels and the omission of the roof deck. 4.1-Exterior Elevations-South elevation shows the firepit and deck extension. the north elevation shows the omission of the stair. 4.2-Exterior Elevations-East elevation shows the deck extension and the omission of the stair and roof deck guard rail. 4.3 & 4.4 3D renderings-Updated renderings 5.1 Building Sections- Section A shows the elimination of the roof deck. 5.2 Building Sections- Sections C&D show the elimination of the roof deck. C3 Civil Site Plan- The existing shared driveway was rebuilt with new curb and gutter shown here. C5.3 Civil Detailed Grading Plan- The grading plan was revised slightly due to the new construction of the shared driveway. C7 Civil Horizontal Control Plan- Site Horizontal control points were updated for the revised shared driveway. E.1.004 Roof Power & Systems Plan-Elimination of the roof deck and the layout for 45 panels E.6.001 Electrical One-Line & Panel Schedules-Revised load calcs for 45 solar panels E.6.002 Electrical Panel Schedules-Revised to accommodate the expanded solar array No. DATE BY TO CC PROJECT SUBJECT COMMENTS 12/02/2022 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0089-2022-BCHO 12/9/22 Master permit 0043-2020-BRES 2757 sq.ft. 81 sq.ft. A2.5 98% 14.42 kW PV system JH SEE NOTES #1 PLANS 12/09/2022 justinh APPLICATION ACCEPTED DATE: 2022-12-02 PERMIT NUMBER: 0089-2022-BCHO COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT COVERSHEET PROPERTY INFORMATION ADDRESS: 975 KING ST UNIT: PARCEL ID: 273707400023 LEGAL DESCRIPTION: OWNER: 975 KING LLC PERMIT CONTRACTOR: DESCRIPTION OF WORK -Elimination of the roof deck and spiral access stair. -Addition of solar panels to roof -Extension of rear deck. -Addition of firepit to rear patio. -Driveway revision(shared driveway turning radius at street revised) USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? Yes CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13 D BUILDING TYPE (IRC) One family REQUIRED SPECIAL INSPECTIONS Other CONSTRUCTION TYPE ENERGY CODE COMPLIANCE Prescriptive Table OCCUPANCY GROUP (IBC) R -2 WORK CHANGES BUILDING FOOTPRINT? No CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT. 81 OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. 2,757 HISTORIC PROPERTY? No TOTAL POOL SQ.FT. FIRE SPRINKLER EXISTING? Yes 0089-2022-BCHO 975 King LLC 975 King St 273707400023 1 Master Permit 0043-2020-BRES