HomeMy WebLinkAboutFile Documents.621 W Francis St.0008-2021-BRES (38)These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0008,0009,0010-2021-BRES
COOK ROBERT C & MARSHA N
621 W FRANCIS STREET A&B
273512426011, 273512426012
06/07/2021
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
95 sq ft
8/27/21
dam
0010-2021-BRES
95 %
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
8/12/21
MCG/DAM
49 sq.ft. exempt spa
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SPECIAL INSPECTION AND TESTING AGREEMENT
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International
Building Code (IBC).
Project Address: __________________________________ Permit Number: ______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the design professional in responsible charge, acting as
the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be
required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for
which they provide special inspections. Special inspectors shall be approved by the building department prior to
performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for
pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official,
when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section
1704. The following conditions are also applicable:
A. Special Inspector Responsibilities:
1. Signify presence at job site. Special inspectors should notify contractor personnel of their
presence and responsibilities at the job site. If required by the building official, they shall sign in
on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for conformance with
the building department approved (stamped) design drawings, specifications, and applicable
workmanship provisions of the International Building Code. Architect\engineer-reviewed shop
drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the
work requiring special inspection. Periodic inspections, if any, must have prior approval based on
a separate written plan reviewed and approved by the building department and the engineer or
architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the
immediate attention of the contractor and note all such items in the daily report. If any item is not
resolved in a timely manner or is about to be incorporated in the work, the special inspector shall
immediately notify the building department by telephone or in person, notify the engineer or
architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports for each
inspection visit and provide the reports on a timely basis determined by the building official. The
special inspector or inspection agency shall furnish these reports directly to the building official,
engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should
be organized on a daily format and may be submitted weekly at the option of the building official.
These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items
5. Provide Final Inspection Report. The special inspector shall submit a written final report
documenting required special inspections and correction of any discrepancies noted in the
inspections prior to the final building inspection.
621 W Francis st, Aspen
01/21/2021
B. Owner Responsibilities:
1. The project owner, the design professional in responsible charge, or an agent of the owner is
responsible for employing special-inspection services. The special inspector/agency shall not be in
the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an
owner/contractor, the special inspector\agency shall be employed as specified by the building
official.
C. Design Professional in Responsible Charge Responsibilities:
Design Professional in Responsible Charge definition: An individual who is registered or licensed to practice their
respective design profession as defined by the statutory requirements of the professional registration laws of the state or
jurisdiction in which the project is to be constructed; who is engaged by the owner to review and coordinate certain
aspects of the project, as determined by the building official, for compatibility with the design of the building or
structure.
1. Prepare statement of special inspections. The registered design professional in responsible
charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for
submittal by the applicant. The statement of special inspections shall identify the following:
a. The materials, systems, components and work required to have special inspection or
testing by the building official or by the registered design professional responsible for
each portion of the work.
b. The type and extent of each special inspection.
c. The type and extent of each test.
d. For each type of special inspection, identification as to whether it will be continuous
special inspection or periodic special inspection.
D. Contractor Responsibilities:
1. Notify the special inspector. The contractor is responsible for notifying the special inspector or
agency regarding individual inspections for items listed on the attached schedule and as noted on
the building department approved plans. Adequate notice shall be provided so the special inspector
has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the special
inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for retaining,
at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators:
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing
members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section
1704.2 shall require special inspection of the fabricated items.
2. Fabrication and implementation procedures. The special inspector shall verify that the
fabricator maintains detailed fabrication and quality control procedures that provide a basis for
inspection control of the workmanship and the fabricator’s ability to conform to approved
construction documents and reference standards. The special inspector shall review the procedures
for completeness and adequacy relative to code requirements for fabricator’s scope of work.
F. Approved Fabricator Responsibilities:
1. Fabrication exempt inspections. Special inspections are not required where work is done on the
premise of a fabricator registered and approved to perform such work without special inspection.
If work is done on site that requires special inspection, special inspection will be required.
2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by an
approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit
certificate of compliance to the building official stating that the work was performed in accordance
with the approved construction documents.
01/21/2021
aec
Architectural Engineering Consultants, Inc.
Mechanical, Electrical, & Lighting Design Services
An Office with LEEDTTMM Accredited Professionals
40801 US Hwy 6 & 24, Suite 214, Eagle-Vail, CO 81620 Post Office Box 8489, Avon, CO 81620
phone: 970-748-8520 email: stan@aec-vail.com web: www.aec-vail.com
April 30, 2021
Will Otte
Rowland + Broughton
1830 Blake St.
Denver, CO 80202
Re: Shuford Residence Garage
Will,
This document is intended to show compliance of the new construction garage located at 621 W. Francis
St. in Aspen, CO with the 2015 International Energy Conservation Code (2015 IECC). We propose to use
a prescriptive approach per sections R402.1-R402.3 and R403.2.1 of the 2015 IECC.
The project is a new garage built on an existing foundation with a total floor area of 803 sf. For heat
load calculations, please refer to the following pages of this document. The heat load calculations are
performed using the Carrier Hourly Analysis Program and provides a more detailed and accurate load
than Manual J. A dewpoint calculation is not included in these permit documents, as the roof assembly
meets the requirements of section R806.5 of the 2015 IRC.
Building Envelope
The following table lists the mandatory minimum insulation and fenestration requirements for the project
in climate zone (7). All new assemblies will meet the following requirements.
Fenestration
U-factor
Skylight
U-factor
Ceiling
R-value
Wood frame
wall U-value
Floor
R-value
Basement
wall R-value
Slab
R-value
Code
Minimums
0.28 (1) 0.55 49 0.045 38 (2) 15/19 (3) 10 (4)
Notes: 1) Fenestration SHGC requirements do not apply in climate zone (7)
2) Or insulation sufficient to fill the framing cavity, R-19 minimum
3) R-15 continuous insulation on the interior or exterior or R-19 cavity insulation on the interior
of the wall. Can be satisfied with R-13 cavity plus R-5 continuous.
4) Existing slab to remain
Sincerely,
Mark Sorensen
05/09/2021
8/12/21
MCG/DAM
aec
Architectural Engineering Consultants, Inc.
Mechanical, Electrical, & Lighting Design Services
An Office with LEED TTMM Accredited Professionals
40801 US Hwy 6 & 24, Suite 214, Eagle-Vail, CO 81620 Post Office Box 8489, Avon, CO 81620
phone: 970-748-8520 email: stan@aec-vail.com web: www.aec-vail.com
April 30, 2021
Will Otte
Rowland + Broughton
1830 Blake St.
Denver, CO 80202
Re: Shuford Residence
Will,
This document is intended to show compliance of the remodel construction residence located at 621 W.
Francis St. in Aspen, CO with the 2015 International Energy Conservation Code (2015 IECC). We
propose to follow the prescriptive requirements for alterations approach per sections R503.1-R503.2 of
the 2015 IECC.
The project is an existing residence with a total floor area of 3,478 sf. For heat load calculations, please
refer to the following pages of this document. The heat load calculations are performed using the Carrier
Hourly Analysis Program and provides a more detailed and accurate load than Manual J. A dewpoint
calculation is not included in these permit documents, as the roof assembly meets the requirements of
section R806.5 of the 2015 IRC.
Building Envelope
The following table lists the mandatory minimum insulation and fenestration requirements for the project
in climate zone (7). All new or altered assemblies will meet the following requirements.
Fenestration
U-factor
Skylight
U-factor
Ceiling
R-value
Wood frame
wall R-value
Floor
R-value
Basement
wall R-value
Slab R-
value
Code
Minimums
0.28 (1) 0.55 (2) (3) 38 (4) 15/19 10, 4 ft
Notes: 1) Fenestration SHGC requirements do not apply in climate zone (7)
2) R-49 cavity insulation in new or insulation sufficient to fill the existing framing cavity
3) U-0.045 in new or insulation sufficient to fill the existing framing cavity
4) Or insulation sufficient to fill the framing cavity, R-19 minimum
Sincerely,
Mark Sorensen
05/09/2021
8/12/21
MCG/DAM
G. Building Department Responsibilities:
1. Approve special-inspection program. The building department shall approve all special
inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building inspector shall
monitor the performance of special inspectors. His/Her approval, in addition to that of the special
inspector, must be obtained prior to placement of concrete, covering of structural steel, or other
similar materials.
3. Review inspection reports. The building official should review special-inspection progress and
final reports.
4. Perform final inspection. The building official should perform the final inspection and approval
for a project [IBC Sec. 109.3.1] after the final special-inspection report has been reviewed and
approved.
Project Address: 621 W Francis St, Aspen Permit Number:
ACKNOWLEDGMENTS
I have readLand agree to compW with the conditions of this agreement.
Special Inspectio(
Agency***
SignatureOwner*
rowland+broughton
Design Professional in Signature
Responsible
Charge*/**
HD Construction
Contractor
Email
Signature
Printed Name Date
Will Qtte
Printed Name
Hugh Marsh
Printed Name Date
Email
12/16/20 will@rowlandbroughton.com
Date Email
12/16/20 hmarsh@hdaspen.com
Email
Approved
Fabricator***
Inspected
Fabricator***
City of Aspen Building
Department: Signature Printed Name Date Email
*Either the Owner or the Design Professional in Responsible Charge must sign.
"The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above.
*** Either the Approved Fabricator or Inspected Fabricator must sign. If all work is performed in the shop of an Approved Fabricator, the Special
Inspection Agency signature is not required (no field work).
•?0.5!
0008-2021-BRES
0009-2021-BRES
0010-2021-BRES
Justin Hahn 9/27/21 justin.hahn@cityofaspen.com
8/12/21
MCG/DAM
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
621 W. Francis St A & B 0008,0009,0010-2021-BRES
Will Otte will@rowlandbroughton.com
James and Josie Shuford
621 W. Francis St Aspen CO 81611
jshuford@shurtape.com
Will Otte (rowland+broughton)970.379.6962
500 W. Main St.Aspen CO 81611
will@rowlandbroughton.com
970.544.9006Sarah Broughton
500 W. Main St Aspen CO 81611
sarah@rowlandbroughton.com
970.945.8676Roger Neal
1517 Blake Ave, STE 101 Glenwood Springs CO 81601
rneal@hceng.com
Dustin Wheatley 319.721.9334
1040 Main Street Carbondale CO 81623
dustin@evolvestruct.com
970 3794009Hugh Marsh, HD Construction 907 3794009
PO Box 4782 aspen co 81611
hmarsh@hdaspen.com
12/23/20
01/21/2021