Loading...
HomeMy WebLinkAboutFile Documents.620 Gillespie St.0033-2020-BCOM (25)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 08/26/2020 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 COMcheck Software Version 4.1.2.1 Envelope Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Vertical Glazing / Wall Area:20% Location:Aspen, Colorado Climate Zone:7 Construction Site: 620 Gillepspie Ave Aspen, CO 81611 Owner/Agent: The Aspen Institute 1000 N 3rd Ave Aspen, CO 81611 Designer/Contractor: Craig Lawrence Rowland+Broughton Architecture 500 W Main Street Aspen, CO 81611 craig.lawrence@rowlandbroughton. com Project Information Energy Code: Boettcher Seminar Building 4%Skylight / Roof Area Enhanced Interior Lighting Controls Additional Efficiency Package(s) Building Area Floor Area 1-Office : Nonresidential 6091 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof - Assy R1: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]2489 ---35.0 0.028 0.028 Skylight 2: Vinyl/Fiberglass Frame:Plastic, No Curb, Perf. Specs.: Product ID NA, SHGC 0.50, [Bldg. Use 1 - Office] (b) 32 ------0.500 0.500 Roof - Assy R2: Attic Roof with Wood Joists, [Bldg. Use 1 - Office] : Comment: 422 56.0 0.0 0.018 0.021 Roof - Assy R2b: Attic Roof with Wood Joists, [Bldg. Use 1 - Office] : Comment: 673 28.5 0.6 0.035 0.021 Roof - Assy R3: Insulation Entirely Above Deck, [Bldg. Use 1 - Office]821 ---35.0 0.028 0.028 Skylight 1: Metal Frame with Thermal Break:Glass, No Curb, Perf. Specs.: Product ID NA, SHGC 0.26, [Bldg. Use 1 - Office] (b) 147 ------0.280 0.500 Roof - Assy R5: Attic Roof with Wood Joists, [Bldg. Use 1 - Office]777 56.0 0.0 0.018 0.021 Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Office] : Comment: (c) 358 ------0.730 0.520 NORTH Exterior Wall 1: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 800 0.0 22.0 0.039 0.071 Window 4 copy 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 24 ------0.290 0.290 Window 5 copy 1: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 11 ------0.350 0.370 EAST Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 101 ofPage12/02/2020 01/22/2021 bonniem Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Exterior Wall 2: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 982 0.0 22.0 0.039 0.071 Window 2: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 170 ------0.290 0.290 Window 6: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 56 ------0.350 0.370 Door 4: Wood, Swinging, [Bldg. Use 1 - Office] : Comment:43 ------0.770 0.370 SOUTH Exterior Wall 2 copy 1: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 718 0.0 22.0 0.039 0.071 Window 4 copy 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 98 ------0.290 0.290 Window 5 copy 1: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 21 ------0.350 0.370 Door 2 copy 1: Glass (> 50% glazing):Nonmetal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 43 ------0.770 0.770 WEST Exterior Wall 2 copy 2: Concrete Block:8", Partially Grouted, Cells Insulated, Normal Density, Furring: Metal, [Bldg. Use 1 - Office] : Comment: 982 0.0 22.0 0.039 0.071 Window 4: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.17, [Bldg. Use 1 - Office] : Comment: (b) 176 ------0.290 0.290 Window 5: Wood Frame:Operable, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 56 ------0.350 0.370 Door 2: Glass (> 50% glazing):Nonmetal Frame, Entrance Door, Perf. Specs.: Product ID NA, SHGC 0.45, PF 0.10, [Bldg. Use 1 - Office] : Comment: (b) 42 ------0.770 0.770 Door 3: Wood, Swinging, [Bldg. Use 1 - Office] : Comment:20 ------0.770 0.370 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.2.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 0.4% better than code Project Title: Data filename: Boettcher Seminar Building P:\Proj-2019\21916.00_Aspen Institute - Boettcher Building\02_Project Info\Boettcher.cck 12/01/20Report date: 102 ofPage 2020-12-01Craig Lawrence, Architect 12/02/2020 External Energy Use Approved CREMP PERMIT #:_______________DATE:________ SNOWMELT:____96 sf electric snowmelt_____ POOL: ________0_____________________ SPA: _______0______________________ OFFSET:______none__________________________ REMP SHEET: __BA0.4________________________ REVIEWED BY: ___Bonnie Muhigirwa___________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted (City of Aspen Policy) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2015 IECC Sec. C403.2.4.5 & R403.9) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2015 IECC Sec. C403.2.4.5 & R403.9) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2015 IMC Sec. 1208.1) MINIMUM BOILER AFUE: __n/a_______________ 01/22/2021 bonniem