PLAN REVIEW REPORT
PROJECT
Shuford Residence
PROJECT LOCATION
621 W Francis St, Aspen
DATE OF REVIEW
4/16/21
REVIEW BASED ON PLANS DATED
10/21/20
REVIEW CONTACT
Shaunna Mozingo
sdmozingo@shaunnamozingo.com
4/16/2021
2 | P a g e
Mozingo Code Group, LLC
PROJECT INFORMATION
ARCHITECT: Rowland and Broughton
STRUCTURAL ENGINEER: Evolve Structural Design
MECHANICAL ENGINEER: Architectural Engineering Consultants
ELECTRICAL ENGINEER: Architectural Engineering Consultants
CODES USED FOR REVIEW
2015 International Building Code
2015 International Mechanical Code
2015 International Plumbing Code
2015 International Energy Conservation Code
2020 National Electrical Code
BUILDING INFORMATION
Occupancy Classification: SFA-Duplex w det
garage/ADU
Type of Construction: VB
Total Floor Area:
Height (Stories/Feet):
Notice
This cursory plan review is based on the codes noted herein and represents a list of corrections
necessary to comply with the requirements contained within them. This review is not a building
permit. The local jurisdiction is responsible for issuing the appropriate permits based on this
review. The approval of plans and specifications does not permit the violation of any section of
any federal, state or local regulations. All comments in this report are based on the information
provided on the drawings and supporting documentation provided for review. The Mozingo
Code Group, LLC does not accept any responsibility for any condition that was not known at the
time of this report. We reserve the right to amend this report if additional information is received.
This report does not purport to review, interpret, apply, or certify compliance with the
accessibility requirements set forth within the Americans with Disabilities Act (ADA). The
application, interpretation and enforcement of the ADA are vested with the Federal Department
of Justice. Applicants are encouraged to seek professional review to ensure compliance with
the ADA.
4/16/2021
3 | P a g e
Mozingo Code Group, LLC
REVIEW COMMENTS
The items noted below with a comment number (B-1, B-2 etc.) are items that need to be
corrected to show compliance with the applicable codes. Please provide a written response
indicating where the corrections are made on the plans. This will speed up the review process.
Additional plan review comments may be added when revised plans and documents are
received.
BUILDING CODE COMMENTS
B-1 Please specify how you will meet the Carbon Monoxide Detector requirements of Aspen
Municipal Code Section 8.15
B-2 Refer to Electrical Plans and Architectural Plans: The electric load calculations
reference an EV Car Charger but there is no other mention of it in the plans. Please
specify how you will meet all of the requirements of EV charging per IRC R309.6 as
amended by the City of Aspen.
B-3 Refer to Sheet A7.2: Please specify how the roof coverings and the roof profiles meet
the requirements of IRC R902.1 as amended by the City of Aspen.
B-4 Refer to Architectural plans: Please specify how the roofs will mee the snow shed
design of IRC R910 as amended by the City of Aspen.
B-5 Please provide air sealing details for the garage/ADU and for any envelope changes to
the duplex.
B-6 Please specify how you will meet the smoke alarm requirements of IRC R314
STRUCTURAL COMMENTS
Geotechnical Report:
S-1 Please provide a copy of the project geotechnical report, sealed and signed by the
engineer in responsible charge, for review and verification of design values.
Structural Plan Comments:
S-2 Sheet S2.001: At the west end of the south primary structure foundation wall, section
3/S6.003 indicates that this condition does not achieve frost depth. Please revies.
S-3 Sheet S2.001: Between gridlines 3 and 4 at the west side of the foundation, section
6/S6.001 and associated grade beam note indicates it is not the intent to provide frost
depth. Please revise.
S-4 Sheet S2.001: Section 3/S6.001 at roughly A.2-2.2 indicates a new thickened slab
footing is to be doweled into the existing slab. Please verify the project geotechnical
report does not indicate that foundation elements are to be isolated from the slab-on-
grade. 4/16/2021
4 | P a g e
Mozingo Code Group, LLC
S-5 Sheet S2.002: Please verify an HSS column is not needed at the east C12x20.7 bent
supporting the walkway from the primary structure to the garage similar to the column
provided for the west C12.
S-6 Sheet S2.004: Please verify the garage ridge beam is sufficient with the applied 20 psf
DL + 70 psf SL.
S-7 Sheet S2.004: Moment frames are provided on gridlines 1 and 4. Please verify the drift
limits recommended in ASCE 7-10 Commentary Appendix C, Section CC.1.2 are met.
S-8 Sheet S6.001: Please verify if it is the design intent not to provide some kind of corrosion
protection for the steel in contact with soil below the slab-on-grade.
Structural Calculations:
S-9 Please provide a complete set of structural design calculations sealed and signed by the
engineer in responsible charge.
MECHANICAL CODE COMMENTS
M-1 See Energy Code Comment #B3
PLUMBING CODE COMMENTS
P-1 None at this time
ENERGY CODE COMMENTS
EN-1 Refer to REScheck and architectural plans: The REScheck states that it is meeting
prescriptive requirements but also says that it is used to comply with the UA alternative
approach. You only need to comply with one pathway through the code. If you are
going prescriptive there is no need for a REScheck. If you are using the UA Alternative
approach, you must show how you exceed the prescriptive design by at least 2%
because the 2015 REScheck does not account for Aspen’s amended U-Factors for
windows (See IRC R402.1.5 as amended by the City of Aspen). Also, if you stay with
the REScheck, you will need to provide one just for the detached garage/ADU and then
one for the Duplex. You will need to include all components being constructed or
altered. The REScheck for the garage will be “new construction” and must include the
roof, walls, floors, windows, doors, etc. The REScheck for the duplex, if used, would
need to include the basement walls, windows, and any changes in roof insulation.
EN-2 Refer to current REScheck: It shows a roof insulation value of R49 +3continuous. The
roof details on Sheet A7.2, show one roof of R49 and one at R49 +10 for the flat roof.
Please split the square footages out in the RESchecks to account for each assembly.
4/16/2021
5 | P a g e
Mozingo Code Group, LLC
EN-3 Refer to Mechanical Plans: Please specify how the Garage ADU will meet the Whole
House Mechanical Ventilation requirements of IECC R403.6
ELECTRICAL CODE COMMENTS
Note: Drawings are incomplete to verify loads
E.6.001
Electrical One-Line Diagram does not show required Emergency Disconnect for the service per
230.85.
From Architectural Plans Unit B appears below grade (basement). All new receptacles are to be
GFCI protected per 210.8 (A)(5).
E-1