HomeMy WebLinkAboutFile Documents.620 Gillespie St.0033-2020-BCOM (28) Ordinance #1, Series 2020 Page 1 of 7 ORDINANCE #1 (SERIES OF 2020) AN ORDINANCE OF THE ASPEN CITY COUNCIL GRANTING HISTORIC DESIGNATION AND BENEFITS, GROWTH MANAGEMENT, PLANNED DEVELOPMENT, SPECIAL REVIEW, TRANSPORTATION IMPACT AND TRASH STORAGE APPROVAL FOR THE PROPERTY LOCATED AT 620 GILLESPIE AVENUE AND 845 MEADOWS ROAD, ASPEN INSTITUTE PARCEL ID: 620 Gillespie Avenue, Parcel ID: 2735-121-29-809 and 845 Meadows Road, Parcel ID: 2735-121-29-008 WHEREAS, the Community Development Department received an application for Historic Designation and renovation of the Boettcher Building and construction of The Resnick Center for Herbert Bayer Studies and a storage shed from The Aspen Institute, represented by Curtis and Associates, Jeffrey Berkus Architects and Rowland + Broughton Architects, which requires the following land use review approvals: • Historic Designation and Benefits (Section 26.415.030.C) for voluntary historic designation of the Boettcher Building, as an example of AspenModern. • Commercial Design (Section 26.412.040) for remodel of the Boettcher Building, construction of The Resnick Center for Herbert Bayer Studies, and construction of a new storage building. • Historic Preservation Major Development (Section 26.415.070.D) for remodel of the Boettcher Building, construction of The Resnick Center for Herbert Bayer Studies, and construction of a new storage building. • Growth Management Employee Generation Review for an Essential Public Facility (Section 26.470.050.C) to establish employee generation to be used as the basis for affordable housing mitigation. • Planned Development, Project Review (Section 26.445.040.B) for allowed land uses, layout, mass and scale, and dimensions of the project. • Transportation and Parking Management, Special Review (Section 26.515.080) to establish, vary or waive transportation, mobility, or off-street parking requirements to serve the project. • Trash and Recycling Storage (Section 12.10) to incorporate the determination of the Environmental Health Department into the land use review; and WHEREAS, all code citation references are to the City of Aspen Land Use Code in effect on the day of application completeness– December 10, 2019, as applicable to this Project; and, WHEREAS, the Community Development Department received referral comments from City Engineering, Building Department, Environmental Health, Parks, Aspen/Pitkin County Housing Authority, and Zoning as a result of a Development Review Committee meeting; and, Ordinance #1, Series 2020 Page 2 of 7 WHEREAS, said referral agencies and the Aspen Community Development Department reviewed the proposed application and recommended conditions; and, WHEREAS, pursuant to Chapter 26.304.060 of the Land Use Code, the Community Development Director may combine reviews where more than one (1) development approval is being sought simultaneously; and, WHEREAS, all required public noticing was provided as evidenced by an affidavit of public noticing submitted to the record, a summary of public outreach was provided by the applicant to meet the requirements of Land Use Code Section 26.304.035, and the public was provided a thorough and full review of the proposed development; and, WHEREAS, the Historic Preservation Commission reviewed the application at duly noticed public hearing on January 22, 2020, during which the recommendations of the Community Development Director and comments from the public were heard by the Historic Preservation Commission. The Commission granted Conceptual Commercial Design Review and Conceptual Major Development Review and recommended, by a vote of 6 to 0, that Council approve Historic Designation and Benefits, Growth Management, Planned Development, Special Review, Transportation Impact and Trash Storage; and, WHEREAS, the Aspen City Council has reviewed the application and finds that it meets all applicable standards, and that this Ordinance furthers and is necessary for the promotion of public health, safety, and welfare. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO THAT: Section 1: Approvals Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code, the City Council hereby grants Historic Designation and Benefits, Growth Management, Planned Development, Special Review, Transportation Impact and Trash Storage approval subject to the following conditions. 1. The designation of the Boettcher building shall include The Resnick Center for Herbert Bayer Studies and the surrounding landscape as depicted on Exhibit A to this Ordinance. Only the Boettcher Building itself will be considered a historic resource. HPC will have purview over the future and current development of this designated area in perpetuity. Temporary tents, artwork and other similar temporary elements and improvements shall be exempted from HPC review. The final historic designation site map to be recorded following HPC Final Review will reflect the findings of the Historic Preservation Commission at that Final Review hearing. 2. Approval of the proposed development and historic designation shall be granted within the AspenModern negotiation period, which has been extended to March 19, 2020 by mutual agreement of the City and the applicant. 3. Building permits for the approved project will be processed according to the Expedited Permit Policy administered by the Building Department. Ordinance #1, Series 2020 Page 3 of 7 4. Approval is granted for the removal or relocation of the Spruce Tree immediately adjacent to the Boettcher Building, subject to additional oversight by the Parks Department. If the tree is relocated, the location must be approved by HPC at Final review. 5. The Park Development Impact Fee and Transportation Demand Management/Air Quality Impact Fee for the approved development shall be waived as a benefit of the AspenModern historic designation. 6. Pedestrian Amenity, as required in the Commercial Design Standards in the Land Use Code, is provided in the form of the open space surrounding the structures in this project. 7. No food preparation or kitchen facilities are permitted in The Resnick Center for Herbert Bayer Studies, but kitchen facilities exist and are permitted in the Boettcher Building. No private events may be held at the Boettcher Building or The Resnick Center for Herbert Bayer Studies. The Resnick Center for Bayer Studies building may host events that are sponsored by the Aspen Institute, whether inside the building or in the patio/lawn art in front of the building. Educational and arts groups do not need to be sponsored by the Aspen Institute. The Boettcher building may host events that are sponsored by the Aspen Institute and Aspen Meadows Resort inside the building or on the lawn area on the North side of the building. All outdoor events must conclude by 10:00 PM, and indoor events must conclude by11PM. 8. The storage shed along Meadows Road adjacent to the tennis facility may be used for storage and for charging electric vehicles only. The structure shall not be heated or plumbed without further land use approvals. The long-standing parking area between the tennis courts, which was paved in 2006 when an associated project was approved via Ordinance #46, Series of 2005, but not fully executed, are incorporated in this approval and may be used for tennis or general parking. 9. The applicant’s proposal to mitigate as an Essential Public Facility for a proposed employee generation rate of 2.0 FTEs is approved. Those FTEs shall be mitigated at a rate of 100% through the extinguishment of Certificates of Affordable Housing Credits. A formal employee audit of the Boettcher Building and The Resnick Center for Herbert Bayer Studies operations will be conducted prior to building permit approval and provided to APCHA to review and approve. Additional employee generation audits are required to be conducted two years and five years after Certificate of Occupancy. The auditor and audit will be reviewed and approved by APCHA. Any costs associated with the audit will be at the expense of the applicant. The Housing Authority shall request the audit from the applicant and the applicant shall provide the Housing Authority and the Community Development Department with the audit report. Failure to request the audit shall not render any of the approvals invalid. The Housing Authority and Community Development shall forward the audit to the Housing Board and/or City Council for review, as applicable. 10. Any additional FTE’s over the 2.0 proposed for the Boettcher Building and The Resnick Center for Herbert Bayer Studies will require mitigation through a means approved by City Council if over 0.10, or by the current cash-in-lieu rate established at the time of that specific employee audit if under 0.10 FTEs. APCHA does not recommend anything greater than 0.10 FTE’s to be mitigated by cash-in-lieu. Cash-in-lieu for FTEs in addition to the 2.0 approved in this ordinance and in excess of 0.10 additional FTE requires the approval of City Council. Ordinance #1, Series 2020 Page 4 of 7 11. A Trash Storage and Recycling facility plan acceptable to Environmental Health is included in the approved HPC Final Review documentation and building permit application materials. 12. The Aspen Institute and Music Associates of Aspen have entered into a MOU providing for shared parking in the MAA lot. The MOU details the number of spaces that will be available to users of The Resnick Center for Herbert Bayer Studies, and the dates and times that they may be used. This agreement is subject to renewal every five years and either party may terminate it with no notice to the City of Aspen. The Institute has represented an intention to seek long term cooperation and renewal of the agreement, or an alternative, including the possibility of relocating the parking to the Paepcke Auditorium in the future lot if necessary. If the MOU with the MAA is not renewed or is otherwise terminated, the applicant shall provide to the City an alternative, equivalent transportation plan within 90 days of such non- renewal or termination. Section 2: Subsequent Reviews Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code, the Applicant is required to obtain Planned Development – Detail Review and Final Major Development Review to proceed to building permit. These applications may be combined and shall be made no later than one (1) year following City Council approval of the reviews outlined herein. Failure to file such an application within this time period shall render the Planned Development – Project Review, Conceptual Major Development approval and Growth Management approval null and void. This deadline may be extended by the Community Development Director, pursuant to Section 26.445.090.C of the Land Use Code. In addition to the general documents required as part of a Planned Development – Detail Review, the following items shall be required as part of the application’s Planned Development – Detail Review: a. An Outdoor Lighting Plan, pursuant to section 26.575.150. b. A Site Development and Landscape Plan. c. A Tree Removal and Mitigation Plan. d. A finalized Transportation Impact Analysis approved by the City of Aspen Engineering Department. e. Demonstrated resolution of Referral Agency comments to the extent possible prior to building permit submittal. Section 3: Engineering Department The applicant must address the following to the satisfaction of the Engineering Department as part of building permit review. Public Improvements: a. All adjacent sidewalks and curb & gutter, as identified by the City Engineer and depicted in HPC Final Review documents must be replaced prior to issuance of a Certificate of Occupancy. The sidewalk along Gillespie St. involves tree conflicts and the final alignment must be approved by the Parks and Engineering Departments. b. Pedestrian circulation facilities throughout the approved project area and adjacent rights- of-way must be upgraded to ADA compliant access facilities. Ordinance #1, Series 2020 Page 5 of 7 c. Curb and gutter are required along Gillespie Street and the parking lot entrance in accordance with Engineering requirements. Drainage Improvements: A detailed drainage, storm water, and water quality plan is required per Engineering Department standards. a. A pervious pavement approved for use within the URMP is required for the parking area and proposed shed location, apron, and access point. b. The existing drywell at the Boettcher Building must be cleaned, and the rim brought to finished grade as part of building permit, or if abandoned, a replacement drainage plan shall be approved by the Engineering Department. c. New asphalt must be treated and/or detained. Develop a plan for treatment of asphalt area. Transportation Impact Analysis: d. The applicant’s Transportation Impact Analysis must be approved by the Engineering Department prior to HPC Final Review. Utilities: e. All ditch modifications or improvements must be coordinated with and approved by relevant City departments and the Si Johnson Ditch Company prior to building permit issuance. f. The water service line may not be aligned within the sanitary easement. Only crossings will be allowed in the easement. g. Fire suppression calculations must be submitted and demonstrate that 2” fails. Prior to building permit submit fire flow calculations and see section 5.4 of the Water Distribution Standards. h. Shared service lines are not recommended, but if allowed, Section 5.5 of the Water Distribution Regulations applies, and a common service line agreement must be entered by the parties. Further review of water service will occur prior to and at building permit. i. An easement is required for the fiber and electrical primary lines on neighboring properties. Section 4: Parks Department The applicant must address the following to the satisfaction of the Parks Department as part of building permit review. a. A tree removal permit is required for the removal of trees and excavation within the driplines of trees. Detailed tree preservation plans and tree mitigation plans with tree ID numbers are required along with shoring plans prior to building permit submittal. b. The two large Cottonwoods on either side of the new entrance at the south east corner of the property are not approved for removal. These trees are identified as tree # 6898 which is a 35” DBH Cottonwood in the city right-of-way, and the large multi-stem Cottonwood between the front lawn and the parking lot. c. Application of fertilizers, growth regulator/inhibitors, and or root pruning, in coordination with the City Forester and Historic Preservation Officer may be required prior to the start of excavation within the driplines of trees. d. Tree Protection Zones (TPZ) will be required at the drip line of all preserved trees. No storage of construction materials, storage of construction backfill, storage of equipment, Ordinance #1, Series 2020 Page 6 of 7 foot or vehicle traffic is allowed within this TPZ. This TPZ must be inspected and approved by the City Forester or his designee prior to any construction activity commences. e. Proposed sidewalks and curb and gutter shall be of a “floating design” where driplines of trees are encroached upon and may need to be adjusted to achieve appropriate offset to the trees. f. One-sided micro piling walls will be required along the south and west sides of the new Bayer building to prevent impacts to adjacent tree driplines. g. More information is required to be submitted for review and approval by Parks as part of building permit submittal to determine impacts from utility cuts coming in from the north side along the trail. h. More details with regard to the proposed patio on the west side of the new building as they relate to tree roots must be submitted for review and approval by Parks as part of building permit submittal. Sand set pavers on existing grade may be required for this patio. i. The applicant shall provide detailed information regarding the boxing and transplanting of the spruce tree to the courtyards sculpture garden. j. All trenching and excavation for irrigation system installation within the driplines of trees require City Forester approval prior to building permit issuance. k. Shed design and location shall be coordinated with the Historic Preservation Officer and City Forester to ensure compliance with tree preservation requirement. l. If the transplanting of the spruce tree is deemed not feasible by the Parks Dept. then the Applicant has no obligation to plant a spruce tree in the designated location, and if the transplanted spruce tree dies, Applicant has no obligation to re-plant a spruce tree in the designated location. Applicant shall pre-mitigate upfront for the transplanted spruce tree such that Applicant has no obligation to pay a mitigation fee should the spruce tree die. Section 5: Environmental Health Department Environmental Health accepts the applicant’s proposal to pave a portion of the bus lane area on the MAA parking lot, as represented in the application, as a beneficial improvement to fugitive dust concerns on that property. Any future improvements to the MAA parking lot or dust mitigation measures shall be coordinated with the Environmental Health and Community Development Departments. Section 6: Zoning The applicant must address the following to the satisfaction of Zoning as part of building permit review. a. All fencing must comply with LUC section 26.575. All mechanical and venting equipment shall meet the exceptions in 26.575.020.F.5, Allowed Exceptions to Height. Section 7: Material Representations All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Community Development Department, the Historic Preservation Commission, or the Aspen City Council are hereby incorporated in such plan development Ordinance #1, Series 2020 Page 7 of 7 approvals and the same shall be complied with as if fully set forth herein, unless amended by other specific conditions or an authorized authority. Section 8: Existing Litigation This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 9: Severability If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. Section 10: Public Hearing A public hearing on this ordinance shall be held on the 25th day of February, 2020, at a meeting of the Aspen City Council commencing at 5:00 p.m. in the City Council Chambers, Aspen City Hall, Aspen, Colorado, a minimum of fifteen days prior to which hearing a public notice of the same shall be published in a newspaper of general circulation within the City of Aspen. INTRODUCED, READ AND ORDERED PUBLISHED as provided by law, by the City Council of the City of Aspen on the 28th day of January, 2020. Attest: ______________________________ ____________________________ Nicole Henning, City Clerk Torre, Mayor FINALLY, adopted, passed and approved this ____ day of _____________, 2020. Attest: ______________________________ ___________________________ Nicole Henning, City Clerk Torre, Mayor Approved as to form: ______________________________________________ James R. True, City Attorney Attachments: Exhibit A: Approved plans and elevations Exhibit B: Map of Boettcher designation area 02/11/2020 Boettcher & Bayer | Rendered Site Plan Gi l l e s p i e A v e n u e CENTER FOR HERBERT BAYER STUDIES BOETTCHER SEMINAR BUILDING PODS Walkway to Music Tent / Paepke Building Walkway to Music Tent / Paepke Building N 5TH Street Bus Lane N 1 1 2 2 3 3 34 4 5 5 6 6 9 7 6 7 8 9 10 11 12 12 10 11 11 LEGEND Central Lawn Existing Entry Walk Perimeter Hedge Gateway Sculpture Benches Perimeter Fencing Reception Plaza North Meadow to Remain North Meadow Perimeter Walk Event Lawn 20x20 Event Tent 20x30 Event Tent AMFS Parking Lot 8 EXHIBIT A 01/22/2020 Boettcher & Bayer | Aspen Music Access Section A 01/22/202001/22/2020 01/22/2020 Boettcher & Bayer | 1/16”=1’-0” Partial Site Section Looking West LEVEL ONET.O. EXST BOND BEAMT.O. EXST ROOF PLYT.O. EXST PARAPETT.O. EXSTPARAPETT.O. EXST T.O. PARAPETEXST PARAPETT.O. EXST 13 ' - 1 1 / 2 " 18 ' - 0 " 11 ' - 0 " 17 ' - 4 " BAYER CENTER MAIN LEVEL 7885' - 6" BOETTCHER SEMINARMAIN LEVEL 7885' - 0" BA Y E R H I G H E S T P O I N T BO E T T C H E R BAYER CENTER BOETTCHER SEMINAR BUILDING BAYER CENTER UPPER ROOF 7900' - 6" 4' - 0 " PARAPET 7903' - 0" BOETTCHER T.O. EXST 15 ' - 0 " 2' - 4 " STORAGE 12 ' - 6 " BAYER CENTER LOWER LEVEL7873' - 0" CREATIVE LAB LOBBY ENCLOSED COURTYARD HUDSON ROOM 7885' - 0" 7894' - 9 1/2" 7895' - 11" 7898' - 1 1/2" 7903' - 0"7902' - 10" BAYER CENTER HIGHEST POINT 2" BAYER CENTERMAIN LEVEL 7885' - 6" 6" 11/11/2019 Boettcher Seminar Building | Existing Building and Proposed Scope PROPOSED SCOPE NOTES EXISTING ROOFTOP MECHANICAL UNITS TO BE REMOVED, ROOFS AT THESE LOCATIONS TO BE INFILLED WITH LOW-SLOPE ROOF (2” RISE) BUILDING MASSING, ENTRY LOCATIONS, ETC. TO REMAIN. ALL ROOF FORMS TO REMAIN. FASCIA AND STRUCTURE TO BE REPAIRED/ REPLACED AS REQUIRED EXISTING CONCRETE PLINTH, CMU BLOCK, AND CONCRETE BOND- BEAM TO REMAIN ALL EXISTING WINDOWS TO BE REPLACED WITH NEW ALUMINUM CLAD WOOD WINDOWS IN CONFIGURATIONS, PROFILES, AND TRIM DETAILS SIM. TO EXISTING NEW DOORS TO MATCH EXISTING EXPOSED CONDUIT, WIRING, BOXES, ETC. TO BE REMOVED AND RELOCATED TO INTERIOR OF BUILDING PROPOSED GRADE TO EMPHASIZE CONCRETE PLINTH AT ENTRY AND MEET BUILDING IN SIMILAR MANNER AS EXISTING FOR REMAINING BUILDING WOOD FLOOR FINISH ON “BRIDGE” ELEMENT TO BE REPLACED WITH DRIP-THROUGH GRATE. WOOD FASCIA TO REMAIN, REPAIR/ REPLACE AS REQUIRED STAINED WOOD DECK TO BE REPLACED WITH SIMILAR-SIZED DECK, BENCH TO BE REMOVED NEW VESTIBULE LINKING POD ENTRIES AT BRIDGE TO BE ADDED FOR GREATER ENERGY EFFICIENCY AND ACCESSIBLE ACCESS NEW OVERFRAMED ROOFS TO HOUSE MECHANICAL BEYOND. NEW SLOPED INSULATION TO BE ADDED TO FLAT ROOF BEYOND PARAPET. ALL NEW ROOF RIDGES SHALL BE LOWER THAN EXISTING PARAPET HEIGHTS. NEW SKYLIGHT TO BE ADDED, PEAK IS MINIMALLY VISIBLE (APPROX. 100’ TO NORTH AND 200’ TO SOUTH). 01/22/202001/22/2020 11/11/2019 Boettcher Seminar Building | Existing Plan + Roof Plan - 6,090 S.F. (Main Bldg, incl. Courtyard) - 1,478 S.F. ([2] Pods) EXISTING GROUND FLOOR PLAN EXISTING ROOF PLAN ENTRY ENTRY LOBBY EXTERIOR COURTYARD HUDSON ROOM HARRIS ROOM DINGMAN ROOM POD POD BRIDGE STO. MECH. LINE OF EXISTING ROOFTOP MECHANICAL EQUIPMENT, TYP. MISC. EXISTING MECHANICAL VENTS AND PENETRATIONS (NOT ALL SHOWN) LINE OF EXISTING ROOF ABOVE FLAT ROOF (NO SLOPE) SKYLIGHTS KIT. TRANS- FORMER STORAGE DECK OFFICE OFFICE COPY RMOFF. OFF. RR RR OFFICE OFFICE OPEN TO BELOW scale: 3/64” = 1’-0”scale: 3/64” = 1’-0”north north 01/22/202001/22/2020 11/11/2019 Boettcher Seminar Building | Proposed Plan + Roof Plan PROPOSED GROUND FLOOR PLAN PROPOSED ROOF PLAN ENTRY ENTRY LOBBY CREATIVE LAB RR RR RR ENCLOSED COURTYARD HUDSON ROOM HARRIS ROOM DINGMAN ROOM POD POD NEW VESTIBULE BRIDGE MECH. IT KIT. EXTERIOR TRASH & MECHANICAL STORAGE STO. DECK PREP / STORAGE EXISTING SKYLIGHTS LOW SLOPE INSULATION LOW-SLOPE INFILL ROOF TO CONCEAL NEW MECHANICAL EQUIPMENT (2” TOTAL RISE) NEW SKYLIGHT, RISE IS APPROX. 3’ ABOVE PARAPET WALLS (MINIMAL VISIBILITY) OVERFRAMED ROOF, RIDGE IS LOWER THAN PARAPET WALLS HUDDLE scale: 3/64” = 1’-0”scale: 3/64” = 1’-0”north north - 6,090 S.F. (Main Bldg, incl. Courtyard) - 1,519 S.F. ([2] Pods + New Vestibule)01/22/202001/22/2020 01/22/2020 Boettcher & Bayer | MAIN LEVEL0' -0" 01 Plate9' -6" UPPER ROOF15' -0" MAIN ROOF11' -0" 15 ' - 0 " 4' - 0 " 11 ' - 0 " WHITE PRECAST CONCRETE PANEL PTD. STEEL WINDOW FRAMES W/ TRIPLE GLAZING WHITE PRECAST CONCRETE PANEL PTD. STEEL FASCIA ROOF MONITOR site grade-0' -7" MAIN LEVEL0' -0" 01 Plate9' -6" UPPER ROOF15' -0" MAIN ROOF11' -0" PTD. STEEL CHANNEL FASCIA CONDENSERS IN ACOUSTICAL ENCLOSURE WHITE PRECAST CONCRETE PANEL 15 ' - 0 " 4' - 0 " 11 ' - 0 " PTD. MECH. LOUVER WHITE PRECAST CONCRETE PANEL ROOF MONITOR BEYOND WHITE MASONRY PANEL FASCIA & SOFFIT BLACK MASONRY PANEL BLACK MASONRY PANEL site grade-0' -7" Exterior Elevations (East & West) West Elevation East Elevation 1/8”=1’-0” 01/22/2020 Boettcher & Bayer | Exterior Elevations (North & South) MAIN LEVEL0' -0" 01 Plate9' -6" UPPER ROOF15' -0" MAIN ROOF11' -0" PTD. STEEL WINDOW FRAMES W/ TRIPLE GLAZING PTD. STEEL CHANNEL FASCIA WHITE MASONRY PANEL FASCIA & SOFFIT WHITE PRECAST CONCRETE PANEL WHITE MASONRY PANEL ROOF MONITOR 11 ' - 0 " 4' - 0 " BLACK MASONRY PANEL site grade-0' -7" MAIN LEVEL0' -0" 01 Plate9' -6" UPPER ROOF15' -0" MAIN ROOF11' -0" 15 ' - 0 " 4' - 0 " 11 ' - 0 " CONDENSERS IN ACOUSTICAL ENCLOSURE WHITE PRECAST CONCRETE PANEL ROOF MONITOR PTD. STEEL CHANNEL FASCIA BLACK MASONRY PANEL WHITE MASONRY PANEL FASCIA & SOFFIT WHITE PRECAST CONCRETE PANEL PTD. STEEL CHANNEL FASCIA BLACK STONE VENEER WHITE MASONRY PANEL PTD. STEEL WINDOW FRAMES W/ TRIPLE GLAZING BLACK MASONRY PANEL BLACK MASONRY PANEL site grade-0' -7" North Elevation South Elevation 1/8”=1’-0” 01/22/2020 Boettcher & Bayer | Entry Level Floor Plan - 3,121 S.F. 1/8”=1’-0” TERRACE ELEVATORSTAIR 1 MEN'S RESTROOM GALLERY 3 GALLERY 2 / HISTORY GALLERY 1 ENTRY VESTIBULE GALLERY 4 BRIDGE GALLERY 5 / LOUNGE WOMEN'S RESTROOM RE T A I L S H E L V I N G MECHANICAL ENCLOSURE WITH LOUVERED DOORS VI T R I N E DN DN STAIR 2 BE N C H BE N C H MECHANICAL ENCLOSURE WITH LOUVERED DOORS 01/22/2020 Boettcher & Bayer | 1/8”=1’-0” Lower Level Floor Plan - 4,415 S.F. UP UP GALLERY 10 STORAGE ARCHIVE GALLERY 6ELEVATOR GALLERY 8 GALLERY 7 STAIR 1 PASSAGE GALLERY 9 ELECTRICAL WATER ENTRY / MECHANICAL GALLERY 11 STAIR 2 VEST. VEST. ELEV. EQ. 8' - 0 " H I G H S T O R A G E 8' - 0 " H I G H S T O R A G E DESK WITH OPEN SHELVES ABOVE UNISEX ACCESSIBLE RESTROOM JANITOR CLOSET 11/11/2019 Service Yard Shed Structure | Site Plan PROPOSED SERVICE YARD SHED EXISTING SERVICE YARD EXISTING TENNIS COURT EXISTING TENNIS COURTSEXISTING TENNIS COURTS north EXIS TING S ERVIC E YARD 01/22/202001/22/2020 11/11/2019 Service Yard Shed Structure | Proposed Plan PROPOSED AXONOMETRIC LOOKING NORTHEASTPROPOSED AXONOMETRIC LOOKING NORTHWEST scale: 1/16” = 1’-0”scale: 1/16” = 1’-0” 01/22/202001/22/2020 11/11/2019 Service Yard Shed Structure | Proposed Plan            /,1(2)($9($%29( ('*(2)&21&5(7(3$' 6/23($1''5$,1$*(7%' :6,7(6859(< 67((/&2/801 ;+66 78%($6680(' 7<3 (;,67,1*&+$,1/,1.)(1&( :,7+35,9$&<1(77,1* (;,67,1*(/(&75,&$/ (48,30(17725(0$,1 (;,67,1*6(59,&(<$5' (;,67,1*7(11,6&2857 352326('6(59,&( <$5'6+(' 6))/225$5($ %8,/',1*3$'         (;,67,1*3$5.,1*/27   $3 3 5 2 ;          5$&(75$&.23(163$&( %2//$5'7<3  &21&3$'        & 2 1 &   3 $ ' scale: 3/32” = 1’-0” north 01/22/202001/22/2020 11/11/2019 Service Yard Shed Structure | Proposed Elevations & Section PROPOSED WEST ELEVATION PROPOSED EAST ELEVATION PROPOSED SECTION (;,67,1*)(1&(   72 725,'*(%($0   0$,1/(9(/   726/$%       /,1(2)*5$'( *$1*(/(&75,&$/287/(7 (;,67,1* (;,67,1*7(11,6&2857)(1&(:,7+35,9$&<1(77,1*             35(/,0,1$5<%5$&,1*6+2:17%': 6758&785$/&225',1$7,21 )$%5,&6&5((1,1*$7*$%/(63$&( (;,67,1*)(1&(   72 725,'*(%($0   0$,1/(9(/   726/$%       /,1(2)*5$'((;,67,1*7(11,6&2857)(1&(:,7+35,9$&<1(77,1*             (;,67,1*)(1&(   72 725,'*(%($0   0$,1/(9(/   726/$%          67$1',1*6($00(7$/522) /,1(2)*5$'( 3$,17('67((/ 6758&785($1')$6&,$ (;,67,1*)(1&(             scale: 3/32” = 1’-0” scale: 3/32” = 1’-0” scale: 3/32” = 1’-0” 01/22/202001/22/2020 01/22/2020 Boettcher & Bayer | 3 Phase Power 3 Phase Power & Fiber Optic Lines Fiber Optics Wildlife Protection Zoning Amy’s Meadows Conservation Easement Wildlife Protection Zoning Amy’s Meadows Conservation Easement Fiber Optics 3 Phase Power 01/29/2020 Boettcher & Bayer | Prop e r t y L i n e Pr o p e r t y L i n e 1 8 5 . 8 ’ G i l l e s p i e A v e n u e Physics Boettcher Seminar Building Physics Amy’s Meadows Conservation Easement 1992 Preservation Zoning Boundary Line1992 Preservation Zoning Boundary Line Amy’s Meadows Conservation Easement Irrigated Lawn Physics Volleyball Property Line 411.0’ Prop e r t y L i n e Pr o p e r t y L i n e 1 8 5 . 8 ’ Property Line 411.0’ Property Line 458.41’ Irrigated Lawn 368.0’ to Zoning Boundary Property Line 458.41’ 368.0’ to Zoning Boundary 368.0’ to Zoning Boundary368.0’ to Zoning Boundary Proposed Context Site Plan Bayer Center New PathNew Path Notes: 1. Only the Boettcher Seminar Building is hereby designated to the City of Aspen Inventory of Historic Landmark Sites and Structures, but the HPC shall have review over any permanent changes to the buildings or grounds in the designated area, except as noted below. 2. There shall be no HPC review of outdoor art installations; movable objects such as tables, chairs, or umbrellas; temporary tents; or similar temporary elements. These elements may not be permanently attached to the Boettcher Seminar Building. Red dashed line indicates extents of historic designation, see notes for further information. (see notes) Proposed Historic Designation Map FINAL MAP WILL BE ADJUSTED AND RECORDED AT THE TIME OF RECORDING APPROVAL DOCUMENTS BASED ON HPC PLANNED DEVELOPMENT - DETAIL REVIEW AND FINAL MAJOR DEVELOPMENT REVIEW AND APPROVALS DRAFT MAP 01 / 29 / 2020 Northern limits of Historic Designation correspond to northern edge of site disturbance, exclusive of proposed path through Amy's Meadow EXHIBIT B