HomeMy WebLinkAboutresolution.council.083-26RESOLUTION # 083 (Series of 2026) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT BETWEEN THE CITY OF ASPEN AND STUTSMAN GERBAZ INC. AND AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO, WHEREAS, there has been submitted to the City Council a contract for the construction of Main Street inlets and pedestrian improvements between the City of Aspen and_Stutsman Gerbaz Inc, a true and accurate copy of which is attached hereto as Exhibit "A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Contract for the construction of Main Street inlets and pedestrian improvement in the amount of $697,606.56, between the City of Aspen and Stutsman Gerbaz Inc., a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. RESOLVED, APPROVED, AND ADOPTED FINALLY by the City Council of the City of Aspen on the 23rd day of June 2026. John Doyle, Mayor Yro Tem I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, June 23rd, 20260 Nicole Henning, City Cl Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 AIA 2026-062-001 Design -Build Amendment This Amendment dated the 23rd day of June in the year 2026 (the "Amendment") is incorporated into, and amends, AIA Document A 1410-2024, Standard Form of Agreement Between Owner and Design -Builder for a Traditional Design -Build Project dated the 28th day of April in the year 2026 (the "Agreement") 7n words, indicate day, month, and year.) for the following PROJECT: (Name and location or address) City of Aspen- Main Street Inlet and Pedestrian Improvements Main Street Aspen, CO THE OWNER: (Name, legal status, and address) City of Aspen 427 Rio Grande Place Aspen, CO 81611 THE DESIGN -BUILDER: (Name, legal status, and address) Stutsman-Gerbaz, Inc. 30376 State Highway 82 Snowmass, CO 81654 The Owner and Design -Builder hereby amend the Agreement as follows. TABLE OF ARTICLES B.1 CONTRACT SUM B.2 CONTRACT TIME B.3 INFORMATION UPON WHICH AMENDMENT IS BASED B.4 DESIGN -BUILDER'S KEY PERSONNEL, CONSULTANTS, SUBCONTRACTORS, AND SUPPLIERS 6.5 OWNER'S SEPARATE CONTRACTORS 6.6 COST OF THE WORK ARTICLE B.1 CONTRACT SUM § B.1.1 The Owner shall pay the Design -Builder the Contract Sum in current funds for the Design -Builder's performance of the Agreement after the execution of this Amendment. ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Consultation with an attorney is also encouraged with respect to professional licensing requirements in the jurisdiction where the Project is located. IA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document Intt'al A," "American Institute of Architects," Ini1E. " was produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 The Contract Sum shall be the amount to be paid to the Design -Builder for performance of the Work after execution of the Design -Build Amendment. The Contract Sum shall include Early Release Work but shall not include any other compensation the Owner paid the Design -Builder for Work performed prior to execution of this Amendment. The Contract Sum shall be one of the following: (Check the appropriate box.) [ X ] Stipulated Sum, in accordance with Section B.1.2 below [ ] Cost of the Work plus the Design -Builder's Fee, in accordance with Section B.1.3 below [ ] Cost of the Work plus the Design -Builder's Fee with a Guaranteed Maximum Price, in accordance with Section B.1.4 below (Based on the selection above, complete Section B.1.2, B.1.3 or B1.4 below.) § 8.1.2 Stipulated Sum § 6.1.2.1 The Stipulated Sum shall be Six hundred ninety-seven thousand six hundred six and 56/100 dollars ($ 697,606.56 ), subject to authorized adjustments as provided in the Design -Build Documents. § B.1.2.2 The Stipulated Sum is based upon the following alternates, if any, which are described in the Design -Build Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the Owner is permitted to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the change in Stipulated Sum for each and the deadline by which the alternate must be accepted.) § 8.1.2.3 Unit prices, if any: (Identify the item and state the unit price, and the quantity limitations, y any, to which the unit price will be applicable.) It Units and Limitations § B.1.2.4 Allowances, if any, included in the stipulated sum: (Identify each allowance.) Item Price Light Pole Base Replacement/reset $100,000.00 $20,000 each x 5 Landscaping $55000000 Total Allowances: $10500.00 Price per Unit (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs deleted) (Table deleted) (Paragraphs deleted) § 8.1.4.3.7 To the extent that the Design -Build Documents are anticipated to require further development, the Guaranteed Maximum Price includes the costs attributable to such further development consistent with the Design -Build Documents and reasonably inferable therefrom. Such further development does not include changes in AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on %��✓ 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with 2 7 the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 scope, systems, kinds and quality of materials, finishes, or equipment, all of which, if required, shall be incorporated by Change Order. § B.1.5 Payments § B.1.5.1 Progress Payments § B.1.5.1.1 Based upon Applications for Payment submitted to the Owner by the Design -Builder, the Owner shall make progress payments on account of the Contract Sum to the Design -Builder as provided below and elsewhere in the Design -Build Documents. § B.1.5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § B.1.5.1.3 Provided that an Application for Payment is received not later than the Final day of the month, the Owner shall make payment of the amount certified to the Design -Builder not later than the Final day of the following month. If an Application for Payment is received by the Owner after the application date fixed above, payment of the amount certified shall be made by the Owner not later than forty-five (45 ) days after the Owner receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) � (Paragraphs deleted) § E3.1.5.2 Progress Payments —Stipulated Sum § B.1.5.2.1 Applications for Payment where the Contract Sum is based upon a Stipulated Sum shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § B.1.5.2.2 In accordance with AIA Document A1410-2024, Standard Form of Agreement Between Owner and Design -Builder for a Traditional Design -Build Project, and subject to other provisions of the Design -Build Documents, the amount of each progress payment shall be computed as follows: § B.1.5.2.2.1 The amount of each progress payment shall include: .1 That portion of the Contract Sum properly allocable to completed Work; .2 That portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction, or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; and .3 That portion of Change Directives that the Owner determines to be reasonably justified. § B.1.5.2.2.2 The amount of each progress payment shall be reduced by. .1 The aggregate of any amounts previously paid by the Owner; .2 The amount, if any, for Work that remains uncorrected and for which the Owner has previously withheld a Certificate for Payment as provided in Article 9 of AIA Document A141 2024; .3 Any amount for which the Design -Builder does not intend to pay a Subcontractor, sub -subcontractor, or material supplier, unless the Work has been performed by others the Subcontractor intends to pay, .4 Any amount for which the Owner may withhold payment, or nullify a Certificate of Payment in whole or in part, as provided in Article 9 of AIA Document A141-2024; and .5 Retamage withheld pursuant to Section B.1.5.2.3. § B.1.5.2.3 Retainage § B.1.5.2.3.1 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold the following amount, as retainage, from the payment otherwise due: (Insert a percentage or amount to be withheld as retainage from each Application for Payment. The amount of retainage may be limited by governing law.) Five percent 5% § B.1.5.2.3.2 The following items are not subject to retainage: ����. AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 3 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 (Insert any items not subject to the withholding of retainage, such as Design Se7Tices, general conditions, bonds, insurance, etc.) Insurance, perfoi7nance bonds, payment bonds and 2 year warranty bonds § B.1.5.2.3.3 Reduction or limitation of retainage, if any, shall be as follows: If the retainage established in Section B.1.5.2.3.1 is to be modified prior to Substantial Completion of the entire Work, including modifications for Substantial Completion of portions of the Work as provided in Section B.1.5.2.3.4, insert provisions for such modifications.) § B.1.5.2.3.4 Upon Substantial Completion of the Work, the Design -Builder may submit an Application for Payment that includes the retainage withheld from prior Applications for Payment, except as follows: (Insert any conditions precedent to the release of all or a portion of the retainage, such as correction of the Construction Work, consent of surety, etc.) § B.1.5.2.3.5 Except with the Owner's prior approval, the Design -Builder shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. (Paragraphs deleted) § B.1.5.5 Final Payment § B.1.5.5.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Design -Builder not later than 30 days after: .1 the Design -Builder has fully performed the Agreement, except for the Design -Builder's responsibility to correct Construction Work as provided in Article 12 of AIA Document A141-2024, and to satisfy other requirements, if any, which extend beyond final payment; .2 the Design -Builder has submitted a final Application for Payment and, if the Contract Sum is based on the Cost of the Work, a final accounting for the Cost of the Work; .3 a final Certificate for Payment has been issued by the Owner in accordance with Article 9 of AIA Document A141-2024; A other conditions precedent to the Owner's obligations to issue final payment to the Design -Builder: (Insert any other conditions precedent to final paynnent.) (Paragraphs deleted) ARTICLE B.2 CONTRACT TIME § B.2.1 The date of commencement of the Construction Work shall be: (Check one of the following boxes.) [ ] The date of execution of this Amendment. [ X ]Established as follows: (Insert a date or a means to determine the date of commencement of the Construction Work.) Issuance of a Notice to Proceed by the City of Aspen If a date of commencement of the Construction Work is not selected, then the date of commencement of the Construction Work shall be the date of execution of this Amendment. nitinitiai AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on `r 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with Me AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 § B.2.1.1 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Design -Build Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Construction Work. Substantial Completion § 13.2.2.1 Subject to adjustments of the Contract Time as provided in the Design -Build Documents, the Design -Builder shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information.) [ ] Not later than ( )calendar days from the date of commencement of the Work. [ ] By the following date: Substantial Completion date will be indicated in the Notice to Proceed issued by the City of Aspen § B.2.2.2 Subject to adjustments of the Contract Time as provided in the Design -Build Documents, if portions of the Work are to be Substantially Complete prior to Substantial Completion of the entire Work, the Design -Builder shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date § B.2.2.3 Other: (Insert provisions for bonus, shared savings, cost savings, or other incentives, if any, that might result in a change to the Contract Sum or Guaranteed Maximum Price.) ARTICLE 6.3 INFORMATION UPON WHICH AMENDMENT IS BASED § B.3.1 The Contract Sum and Contract Time set forth in this Amendment are based on the following: § 6.3.1.1 The following Supplementary and other Conditions of the Agreement: Document None Title § B.3.1.2 The following Specifications: (Either list the Specifications here or refer• to an exhibit attached to this Amendment.) Specifications will be added as an exhibit via change order at a later date Section Title Date § B.3.1.3 The following Drawings: (Either list the Drawings here or refer to an exhibit attached to this Amendment.) Pages Pages Main Street Inlets and Pedestrian Improvements- Aspen, Colorado drawings dated 6/5/26. 26 sheets Number Title Date § B.3.1.4 The Sustainability Plan, if any: (If the Owner identified a Sustainable Objective, identify the docacment or documents that comprise the Sustainability Plan by title, date, and number of pages, and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures; the Owner's and Design -Builder's roles and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing or metrics to verify achievement initial AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," Init. "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 5 l>v� 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 y each Sustainable Measure; and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C to the Agreement.) Other identifying information: § 8.3.1.5 Assumptions and clarifications, if any: (Identify each assumption and clarification.) See Shitsman-Gerbaz, Inc. Main Street Improvements proposal and cost estimate dated 6/8126 § 8.3.1.6 Deviations from the Owner's Criteria as adjusted by a Modification: None § B.3.1.7 To the extent the Design -Builder shall be required to submit any Submittals to the Owner for review, indicate any such submissions below: (List any Submittals that the Design -Builder is required to submit to the Owner for review.) See Sttitsman-Gerbaz, Inc. Main Street Improvements proposal and cost estimate dated 6/8/26 § 8.3.1.8 Owner's Intended BIM Uses The Owner intends to utilize Building Information Modeling ("Model") on the Project for the following post construction uses. Any use in addition to those identified below shall be at the Owner's sole risk: (Examples include building system maintenance, building system analysis, asset management, space management and tracking, disaster planning and record modeling.) None § B.3.1.8.1 The Owner agrees that the extent of its reliance on any Model, or a portion thereof, shall be in accordance with a BIM Execution Plan agreed to by the Parties. If the Parties do not agree to a BIM Execution Plan, the Owner's reliance on any Model shall be at the Owner's sole risk. ARTICLE B.4 DESIGN -BUILDER'S KEY PERSONNEL, CONSULTANTS, SUBCONTRACTORS, AND SUPPLIERS § 8.4.1 The Design -Builder's key personnel are identified below: (Identify name, title, and contact information.) See Sttitsman-Gerbaz, Inc. Main Street Improvements proposal and cost estimate dated 6/8/26 .1 Superintendent .2 Project Manager .3 Others § 8.4.2 In addition to the persons or entities identified in the Agreement, the Design -Builder shall retain the following Consultants, Subcontractors, and suppliers, identified below: (List name, discipline, address, and other information.) Initial AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," nit. "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with � the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Civil Engineering Consultant CTL Thompson, Inc. 234 Center Drive Glenwood Springs, CO 81601 ARTICLE B.5 OWNER'S SEPARATE CONTRACTORS § 6.5.1 The Owner shall retain the following Separate Contractors to perform construction or operations related to the Project: (List name, discipline, address, and other information for each Separate Contractor and identify the construction or operations to be pefformed by such Separate Contractor.) ARTICLE B.6 COST OF THE WORK § 8.6.1 The term Cost of the Work shall mean costs necessarily incurred by the Design -Builder in the proper performance of the Work. The Cost of the Work shall include only the items set forth in Section B.6.2. § B.6.1.2 Where, pursuant to the Design -Build Documents, any cost is subject to the Owner's prior approval, the Design -Builder shall obtain such approval in writing prior to incurring the cost. § B.6.1.3 Costs shall be at rates not higher than the standard rates paid at the place of the Project, except with prior approval of the Owner. § B.6.2 Cost to Be Reimbursed as Part of the Contract Labor Costs § B.6.2.1.1 Wages or salaries of construction workers directly employed by the Design -Builder to perform the Construction Work at the site or, with the Owner's prior approval, at off -site workshops. § B.6.2.1.2 Wages or salaries of the Design -Builder's supervisory and administrative personnel when stationed at the site and performing Construction Work, with the Owner's prior approval. § 13.6.2.1.3 Wages or salaries of the Design -Builder's supervisory and administrative personnel when performing Construction Work and stationed at a location other than the site, but only for that portion of time required for the Construction Work, and limited to the personnel and activities listed below: (Identify the personnel, type of activity and, if applicable, any agreed upon percentage of time to be devoted to the Construction Work.) § 6.6.2.1.4 Wages and salaries of the Design -Builder's supervisory or administrative personnel engaged at factories, workshops or while traveling, in expediting the production or transportation of materials or equipment required for the Construction Work, but only for that portion of their time required for the Construction Work. § 13.6.2.1.5 Costs paid or incurred by the Design -Builder, as required by law or collective bargaining agreements, for taxes, insurance, contributions, assessments and benefits and, for personnel not covered by collective bargaining agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations, and pensions, provided such costs are based on wages and salaries included in the Cost of the Work under Section B.6.2.1. § 13.6.2.1.6 If agreed rates for labor costs, in lieu of actual costs, are provided in this Agreement, the rates shall remain unchanged throughout the duration of this Agreement, unless the parties execute a Modification. § 6.6.2.2 Consultant and Subcontract Costs. Payments made by the Design -Builder to the Architect, Consultants, Subcontractors, and suppliers in accordance with the requirements of their subcontracts or similar agreements. a itial AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," �ni% "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on I�� 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 § E5.6.23 Costs of Materials and Equipment Incorporated in the Completed Construction § 13.6.2.3.1 Costs, including transportation and storage at the site, of materials and equipment incorporated, or to be incorporated, in the completed construction. § B.6.2.3.2 Costs of materials described in the preceding Section B.6.2.3.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner's property at the completion of the Construction Work or, at the Owner's option, shall be sold by the Design -Builder. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. § B.6.2.4 Costs of Other Materials and Equipment, Temporary Facilities and Related Items § 13.6.2.4.1 Costs of transportation, storage, installation, maintenance, dismantling, and removal of materials, supplies, temporary facilities, machinery, equipment, and costs of hand tools not customarily owned by construction workers that are provided by the Design -Builder at the site and fully consumed in the performance of the Construction Work. Costs of materials, supplies, temporary facilities, machinery, equipment, and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site. Costs for items not fully consumed by the Design -Builder shall mean fair market value. § 6.6.2.4.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Design -Builder at the site, and costs of transportation, installation, dismantling, minor repairs, and removal of such temporary facilities, machinery, equipment, and hand tools. Rates and quantities of equipment owned by the Design -Builder, or a related party as defined in Section B.6.2.7 shall be subject to the Owner's prior approval. The total rental cost of any such equipment may not exceed the purchase price of any comparable item. § 8.6.2.4.3 Costs of removal of debris from the site of the Construction Work and its proper and legal disposal. § B.6.2.4.4 Costs of the Design -Builder's site office, including general office equipment and supplies. § B.6.2.4.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, with the Owner's prior approval. § 13.6.2.5 Miscellaneous Costs § 8.6.2.5.1 Premiums for that portion of insurance and bonds required by the Design -Build Documents that can be directly attributed to the Contract. § B.6.2.5.1.1 Costs for self-insurance, for either full or partial amounts of the coverages required by the Design -Build Documents, with the Owner's prior approval. § 8.6.2.5.1.2 Costs for insurance through a captive insurer owned or controlled by the Design -Builder, with the Owner's prior approval. § 13.6.2.5.2 Sales, use, or similar taxes, imposed by a governmental authority, that are related to the Work and for which the Design -Builder is liable.The Project is Tax Exempt. § 13.6.2.5.3 Fees and assessments for the building permit, and for other permits, licenses, and inspections, for which the Design -Builder is required by the Design -Build Documents to pay. § B.6.2.5.4 Fees of laboratories for tests required by the Design -Build Documents; except those related to defective or nonconforming Construction Work for which reimbursement is excluded under Article 12 of the Agreement or by other provisions of the Design -Build Documents, and which do not fall within the scope of Section B.6.2.6.3. § 8.6.2.5.5 Royalties and license fees paid for the use of a particular design, process, or product, required by the Design -Build Documents. § B.6.2.5.5.1 The cost of defending suits or claims for infringement of patent rights arising from Owner -imposed requirements in the Design -Build Documents, payments made in accordance with legal judgments against the 'tial AIA Document A141 — 2024 Exhibit B. Copyright 92014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Design -Builder resulting from such suits or claims, and payments of settlements made with the Owner's consent, unless the Design -Builder had reason to believe that the required design, process, or product was an infringement of a copyright or a patent, and the Design -Builder failed to promptly furnish such information to the Owner as required by Article 3 of AIA Document A 141-2024. The costs of legal defenses, judgments, and settlements shall not be included in the Cost of the Work used to calculate the Design -Builder's Fee or subject to the Guaranteed Maximum Price. § B.6.2.5.6 Costs for communications services, electronic equipment, and software, directly related to the Work and located at the site, with the Owner's prior approval. § B.6.2.5.7 Costs of document reproductions and delivery charges. § B.6.2.5.8 Deposits lost for causes other than the Design -Builder's negligence or failure to fulfill a specific responsibility in the Design -Build Documents. § B.6.2.5.9 Legal, mediation and arbitration costs, including attorneys' fees, other than those arising from disputes between the Owner and Design -Builder, reasonably incurred by the Design -Builder after the execution of this Agreement in the performance of the Work and with the Owner's prior approval, which shall not be unreasonably withheld. § B.6.2.5.10 Expenses incurred in accordance with the Design -Builder's standard written personnel policy for relocation and temporary living allowances of the Design -Builder's personnel required for the Work, with the Owner's prior approval. § B.6.2.5.11 That portion of the reasonable expenses of the Design -Builder's supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work. § 6.6.2.6 Other Costs and Emergencies § B.6.2.6.1 Other costs incurred in the performance of the Work, with the Owner's prior approval § 6.6.2.6.2 Costs incurred in taking action to prevent threatened damage, injury, or loss, in case of an emergency affecting the safety of persons and property, as provided in Article 10 of AIA Document A141-2024. § B.6.2.6.3 Costs of repairing or correcting damaged or nonconforming Construction Work executed by the Design -Builder, Subcontractors, or suppliers, provided that such damaged or nonconforming Construction Work was not caused by the negligence of, or failure to fulfill a specific responsibility by, the Design -Builder, and only to the extent that the cost of repair or correction is not recovered by the Design -Builder from insurance, sureties, Subcontractors, suppliers, or others. § 6.6.2.6.4 Costs of implementation of, and compliance with, protective safeguards that maybe required under the Design -Builder's or Owner's builder's risk policy. § 13.6.2.7 Related Party Transactions § B.6.2.7.1 For purposes of this Section B.6.2.7, the term "related party" shall mean (1) a parent, subsidiary, affiliate, or other entity having common ownership of, or sharing common management with, the Design -Builder; (2) any entity in which any stockholder in, or management employee of, the Design -Builder holds an equity interest in excess of ten percent in the aggregate; (3) any entity which has the right to control the business or affairs of the Design -Builder; or (4) any person, or any member of the immediate family of any person, who has the right to control the business or affairs of the Design -Builder. § B.6.2.7.2 If any of the costs to be reimbursed arise from a transaction between the Design -Builder and a related party, the Design -Builder shall notify the Owner of the specific nature of the contemplated transaction, including the identity Af the related party and the anticipated cost to be incurred, before any such transaction is consummated or cost incurred. If the Owner, after such notification, authorizes the proposed transaction in writing, then the cost incurred shall be included as a cost to be reimbursed, and the Design -Builder shall procure the Work, equipment, goods, or service, from the related party, as a Subcontractor, according to the terms of Section B.6.5. If the Owner fails to authorize the transaction in writing, the Design -Builder shall procure the Work, equipment, goods, or service from some person or entity other than a related party according to the terms of Section B.6.5. AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 9 %% �' 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 § 8.6.3 Costs Not to Be Reimbursed as Part of this Contract The Cost of the Work shall not include the items listed below: .1 Salaries and other compensation of the Design -Builder's personnel stationed at the Design -Builder's principal office or offices other than the site office, except as specifically provided in Section B.6.2.1 or as may be provided elsewhere in the Agreement; .2 Bonuses, profit sharing, incentive compensation, and any other discretionary payments, paid to anyone hired by the Design -Builder or paid to any Subcontractor or vendor, unless the Owner has provided prior approval; .3 Expenses of the Design -Builder's principal office and offices other than the site office; .4 Overhead and general expenses, except as may be expressly included in Section B.6.2; .5 The Design -Builder's capital expenses, including interest on the Design -Builder's capital employed for the Work; .6 Except as provided in Section B.6.2.6.3 of this Amendment, costs due to the negligence of, or failure to fulfill a specific responsibility of the Agreement by, the Design -Builder, Contractors, and suppliers, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable; .7 Any cost not specifically and expressly described in Section B.6.2; and .8 Costs, other than costs included in Modifications approved by the Owner, that would cause the Guaranteed Maximum Price to be exceeded. § 6.6.4 Discounts, Rebates, and Refunds § B.6.4.1 Cash discounts obtained on payments made by the Design -Builder shall accrue to the Owner if (1) before making the payment, the Design -Builder included the amount to be paid, less such discount, in an Application for Payment and received payment from the Owner, or (2) the Owner has deposited funds with the Design -Builder with which to make payments; otherwise, cash discounts shall accrue to the Design -Builder. Trade discounts, rebates, refunds, and amounts received from sales of surplus materials and equipment shall accrue to the Owner, and the Design -Builder shall make provisions so that they can be obtained. § B.6.4.2 Amounts that accrue to the Owner in accordance with Section B.6.4.1 shall be credited to the Owner as a deduction from the Cost of the Work. § 8.6.5 Other Agreements § 8.6.5.1 Those portions of the Construction Work that the Design -Builder does not customarily perform with the Design -Builder's own personnel shall be performed under subcontracts or other appropriate agreements with the Design -Builder. The Owner may designate specific persons from whom, or entities from which, the Design -Builder shall obtain bids. The Design -Builder shall obtain bids from Subcontractors, and from suppliers of materials or equipment fabricated especially for the Construction Work, who are qualified to perform that portion of the Construction Work in accordance with the requirements of the Design -Build Documents. The Design -Builder shall deliver such bids to the Owner with an indication as to which bids the Design -Builder intends to accept. The Owner then has the right to review the Design -Builder's list of proposed Subcontractors and suppliers and, subject to Section 5.9.1.1 of the Agreement, to object to any Subcontractor or supplier. Any approval or objection by the Owner shall not relieve the Design -Builder of its responsibility to perform the Construction Work in accordance with the Design -Build Documents. The Design -Builder shall not be required to contract with anyone to whom the Design -Builder has reasonable objection. § B.6.5.1.1 When a specific Subcontractor or supplier (1) is recommended to the Owner by the Design -Builder; (2) is qualified to perform that portion of the Construction Worlc; and (3) has submitted a bid that conforms to the requirements of the Design -Build Documents without reservations or exceptions, but the Owner requires that another bid be accepted, then the Design -Builder may require that a Change Order be issued to adjust the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the Owner by the Design -Builder and the amount of the Subcontract or other agreement actually signed with the person or entity designated by the Owner. § B.6.5.2 Subcontracts or other agreements shall conform to the applicable payment provisions of the Design -Build Documents and shall not be awarded on the basis of cost plus a fee without the Owner's prior written approval. If a subcontract is awarded on the basis of cost plus a fee, the Design -Builder shall provide in the Subcontract for the t AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," ttial "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11 /2026 under Order No.2114456543 which expires on 12/31l2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with Qthe AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Owner to receive the same audit rights with regard to the Subcontractor as the Owner receives with regard to the Design -Builder in this Amendment. § B.6.6 Accounting Records The Design -Builder shall keep full and detailed records and accounts related to the Cost of the Work and exercise such controls, as may be necessary for proper financial management under the Agreement and to substantiate all costs incurred. The accounting and control systems shall be satisfactory to the Owner. The Owner and the Owner's auditors shall, during regular business hours and upon reasonable notice, be afforded access to, and shall be permitted to audit and copy, the Design -Builder's records and accounts, including complete documentation supporting accounting entries, books, job cost reports, correspondence, instructions, drawings, receipts, subcontracts, Subcontractor's proposals, Subcontractor invoices, purchase orders, vouchers, memoranda, and other data relating to this Agreement. The Design -Builder shall preserve these records for a period of three years after final payment, or for such longer period as may be required by law. § B.6.7 Relationship of the Parties If the basis of payment to the Design -Builder is the Cost of the Work plus a Fee without a Guaranteed Maximum Price or the Cost of the Work plus a Fee with a Guaranteed Maximum Price, the Design -Builder accepts the relationship of trust and confidence established by the Agreement and covenants with the Owner to exercise the Design -Builder's skill and judgment in furthering the interests of the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner's interests. The Owner agrees to furnish and approve, in a timely manner, information required by the Design -Builder and to make payments to the Design -Builder in accordance with the requirements of the Design -Build Documents. This Amendment to the Agreement entered into as of the day and year first written above. Signed by: OWNER (Signature) Pete Strecker City Manager (Printed name and title) Kate Johnson City Attorney DocuSigned by: 32737E149ED5457... Signature Signed by: I; al�ic,v� (Signature) Adam Fortier CFO (Printed name and title) r1 ��AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," �-fniiial "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on Qe 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (1181893737) 11 Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Additions and Deletions Report for AIA® Document A 1410 — 2024 Exhibit 8 This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 08:21:46 ET on 06/11 /2026. PAGE 1 This Amendment dated the 23rd day of June in the year 2026 (the "Amendment") is incorporated into, and amends, AIA Document A1410-2024, Standard Form of Agreement Between Owner and Design -Builder for a Traditional Design -Build Project dated the 281h day of April in the year 2026 (the "Agreement") (Name and location or' address) Ci of Aspen- Main Street Inlet and Pedestrian Improvements Main Street Aspen, CO Ci , of Aspen 427 Rio Grande Place Aspen, CO 81611 Stutsman-Gerbaz Inc. 30376 State Highway 82 Snowmass, CO 81654 PAGE 2 [ X ] Stipulated Sum, in accordance with Section B.1.2 below § B.1.2.1 The Stipulated Sum shall be Six hundred ninety-seven thousand six hundred six and 56/100 dollars ($ 697,606.56 ), subject to authorized adjustments as provided in the Design -Build Documents. Light Pole Base Replacement/reset $100,000.00 $20,000 each x 5 Landscaping 5 000.00 Total Allowances: $105,000.00 Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31l2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) 1 Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 • - - ■ •a A• Mrs"PREMP. W.S.11 III HIM -- - III ■_ ■. 01 IN _ ■ NERMPMra11 Fill I III all III FWAM"Maw - • ;K3PrWPMT=P.T".0r.WT, AM am • III w ■ Ni!Knowam ■_ •OR •am Ifte tt r7 flGG , iGe peF Unit ($9:A8} moNo �r•Qs�ra�•■ �'sa�•��•.nu��s�ini�� Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright © 2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31 /2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 - - - • 1lSw 1.JI/�l�I� .sue/—. el I.19�1//9iI.3�II—!�1I9 wZ.l9C!—rI/111 § B.1.5.1.3 Provided that an Application for Payment is received not later than the Final day of the month, the Owner shall make payment of the amount certified to the Design -Builder not later than the Final day of the following month. If an Application for Payment is received by the Owner after the application date fixed above, payment of the amount certified shall be made by the Owner not later than folly -five ( 45 ) days after the Owner receives the Application for Payment. All Alk All AL In M1 WAZIAMAI IF III I Rill IF WA"��w oil Plan IN All M Ana Ana M, Poll - - - - -. „ .. .. - - �-mr�jawl --. .. - --- -- --- -- --- - - - - - - GT��'T �T'Gl 'a:�a•Y!ei•�L�!•: : C•tle: S•t4o:rw•: . . . • . _ . . Fi.:/wa:/r:.�r �...�....:.�..w�:-w: -..•R.—rr�.w�o:r..rr� z Iaa�w..: a:l.!-Jew:..�■ IIIII Mail To - w . . . • . : tw:S�/�a�.lr�•��I..•S:S./�..: S��l:...r—:St1Zli_iR�LIlR:�liV •l!�1'�•1••S!S•S• !� Aft ja ..•r: IS _ . . • . . . .. an Five percent 5% PAGE 4 Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 3 produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) - w . . . • . : tw:S�/�a�.lr�•��I..•S:S./�..: S��l:...r—:St1Zli_iR�LIlR:�liV •l!�1'�•1••S!S•S• !� Aft ja ..•r: IS _ . . • . . . .. an Five percent 5% PAGE 4 Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 3 produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Aft ja ..•r: IS _ . . • . . . .. an Five percent 5% PAGE 4 Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 3 produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Five percent 5% PAGE 4 Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 3 produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Insurance, performance bonds, payment bonds and 2 year warranty bonds lddddl did 0 am a OEM v�amwow, • . • -- -. .... .. . .. .. _ ._ ■. .. .. ffl;l AN MR 0 - ■- did Nor =f/s.'=rfi�� .LT�T^i.• - if:��TiiTiT♦7 LfLT�Ti:TTT.f�rZii���iJiLliff:T♦l i.I•.:. IF I Me did -r Orr . - - • - . - - UP • am W�S IfflimplaqRSI did did ap"WISTVII • ♦ ♦ • ■ - des ■ • III I Ill OF- - ♦ did did ♦ ♦ ■ . ♦ I I IV awl ■did —a w 0 w WE: •RVEMWWO • - ■ - a A•�• WAMIMA�KV wag IF M&A4M�l�ONOW did i ON Ad Ad A A IVA Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 4 produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 to mam a ft�mm��mi a IMN An -No INN V lima. M III III I I 1 _ . . . .. _. _ . .. . .. ... _. .. • .�. 11 "W11111111111M• r _. Mill IINNIPIPIRMAlt MM4 mit a ARM a Am IF Int ... ♦ • .. ..01 ANA - lot, a OR IN IMLZf NO �i • 11111111 mam Iii IN mmmm�m� m�RWA OIL A 11 I swag ill Miami Nil Mr. R .. MWMT"W&OUI _ _ . .. _. .. . . .. . . .. .. I .. will P gill 0 • I - •II / \ • a A III a I Ill morimrMUNLff rMw2jim MIN ... ! I ! I KIAPPIPIRRUMMMPH . .. .. .. Am I .. _ - - . NO I .. ... . ...a Oak . r . .. m.. . • Am Ili. a .. . . .. .. .. .... . _ .. ■ . . . PIMIR,. . OF .. . . �Uo&kUWMN a Al AN Otilillillililleigivil A I Alis IN iiiiliiilllllllliiilL�OMM�WA��OMtM to IN Plik"11 V I ... ♦ . ♦ • .. WAUI awi���Willi Will .. .. . . ... . ..... . IF I oil • I rawavowmAkmam too .. _ • .. PM M41111152 INN th No AN ♦ . ilk ice' ��=rar..rrrt-„-��..�.�...�ar�...�.e�::os•..av:.�a.a. v.� n.�e.�a .. ��� Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 5 produced at 08:21:46 ET on 06/11 /2026 under Order No.2114456543 which expires on 12/31 /2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 • , 0 es : im : : M.1-MIRRIERMPIMIR. AS A AL a . _mA^: i a At Ifill �� puma 1ARVIRiMMMak IIb III • We AIR W"�Ek saffismal At am I N-1140 M.R NOMMERWRTIMMART I PATM ■ AS Ma ft■ as IM ♦ ♦ � ♦ I / ♦ . i el 0 NO • ■ ■ ♦ • ♦ ♦ / A / .. . . . . .owns.. .. . ♦ r . ♦ ♦ . ... ♦ I I AMA - , IN ■ . tItt 11 Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was 6 produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31 /2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 [ X�j Established as follows: Issuance of a Notice to Proceed by the City of Aspen Substantial Completion date will be indicated in the Notice to Proceed issued by the City of Aspen None Specifications will be added as an exhibit via change order at a later date Main Street Inlets and Pedestrian Improvements- Aspen, Colorado drawings dated 6/5/26. 26 sheets PAGE 6 See Stutsman-Gerbaz, Inc. Main Street Improvements proposal and cost estimate dated 6/8/26 None See Stutsman-Gerbaz, Inc. Main Street Improvements proposal and cost estimate dated 6/8/26 None See Stutsman-Gerbaz, Inc. Main Street Improvements proposal and cost estimate dated 6/8/26 PAGE 7 Civil Engineering Consultant CTL Thompson, Inc. 234 Center Drive Glenwood Sminas. CO 81601 PAGE 8 § 6.6.2.5.2 Sales, use, or similar taxes, imposed by a governmental authority, that are related to the Work and for which the Design -Builder is ale -liable. The Project is Tax Exempt. PAGE 11 Pete Strecker City Manager Adam Fortier CFO Additions and Deletions Report for AIA Document A141 — 2024 Exhibit B. Copyright ©2014 and 2024. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11/2026 under Order No.2114456543 which expires on 12/31 /2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) U Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Certification of Document's Authenticity AIA° Document D401 TM — 2003 I, Philip B. Vaughan- President- Phil Vaughan Construction Management, my certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 08*21:46 ET on 06/11/2026 under Order No. 2114456543 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA® Document A141 TM — 2024 Exhibit B, Design -Build Amendment, other than those additions and deletions shown in the associated Additions and Deletions Report. (Signed) (Title) (Dated) AIA Document D401 — 2003. Copyright ©1992 and 2003. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 08:21:46 ET on 06/11/2026 under � Order No.2114456543 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, a -mail docinfo@aiacontracts.com. User Notes: (1181893737) Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 6/8/2026 Main Street Improvements f 00 %cost estimate Bid Breakdown Total cost estimate= Qty Unit Cost Unit Total Cost Comment Mobilization 1 LS @ $ 25,630,00 LS $ 25,630.00 Erosion Control 1 LS @ $ 32250,00 LS $ 31250,00 Inlet protection/ rock soi Removal / Disposal of Asphalt Sheet C3 342 SF @ $ 8,00 SF $ 21736,00 Sheet C4 319 SF @ $ 8,09 SF $ 2$80.71 Sheet C5 251 SF @ $ 8,11 SF $ 21035,61 Sheet C6 241 SF @ $ 8.36 SF $ 21014,76 Sheet C7 289 SF @ $ 8.41 SF $ 23430449 Sheet CS 311 SF @ $ 8,09 SF $ 2,515.95 Total = 1753 Removal and Disposal of curb/gutter Sheet C3 129 LF @ $ 21,74 LF $ 21804,46 Sheet C4 116 LF @ $ 19.47 LF $ 23258.52 Sheet C5 90 LF @ $ 22,57 LF $ 21031,30 Sheet C6 90 LF @ $ 21,20 LF $ 11908600 Sheet C7 98 LF @ $ 20,68 LF $ 2,026.64 Sheet CS 79 LF @ $ 22,87 LF $ 11806,73 Total = 602 Removal and Disposal of Concrete sidewalk Sheet C3 172 SF @ $ 8.18 LF $ 11406,96 Sheet C4 253 SF @ $ 8.61 LF $ 2,178.33 Sheet C5 266 SF @ $ 8,61 LF $ 21290,26 Sheet C6 242 SF @ $ 7,15 LF $ 1,730.30 Sheet C7 285 SF @ $ 8,20 LF $ 2,337.00 Sheet C8 197 SF @ $ 10,44 LF $ 21056,68 Total = 1415 Removal of Existing Combination Inlet $ Sheet C3 2 EA @ $ 5,486.00 EA $ 10,972.00 Removal of Type R Inlet Sheet C4 1 EA @ $ 6,691.00 EA $ 61691,00 Sheet C5 1 EA @ $ 61691,00 EA $ 6,691.00 Sheet C6 1 EA @ $ 6,691.00 EA $ 6,691.00 Sheet C7 1 EA @ $ 6,691,00 EA $ 6,691.00 Sheet C8 1 EA @ $ 6,691.00 EA $ 60691,00 Installation of Type R Inlets $ Sheet C3 2 EA @ $ 23,964.00 EA $ 47,928.00 Sheet C4 1 EA @ $ 23,964.00 EA $ 23,964.00 Sheet C5 1 EA @ $ 23,964,00 EA $ 23,964,00 Sheet C6 1 EA @ $ 23,964.00 EA $ 23,964400 Sheet C7 1 EA @ $ 23,964,00 EA $ 23,964,00 Sheet C8 1 EA @ $ 233964.0o EA $ 23,964.00 Light Pole Base replacment / reset 5 EA @ $ 203000.00 $ 100,000.00 Allowance Item. Landscape allowance 1 LS @ $ 50000.00 1; 5,000.00 Asphalt Paving Prep 1753 SF @ $ 5.12 $ 8,975.36 Asphalt Paving patch / Milling 6 EA @ $ 42500.00 $ 27,000,00 Sidewalk Replacement 1 LS @ $ 1%998.00 $ 19,998.00 See concrete sub break( ADA Ramp w/Truncated domes 1 LS @ $ 33,660.00 $ 33,660.00 See concrete sub break( Curb and Gutter Replacement 1 LS @ $ 35,365,00 $ 352365,00 See concrete sub break( Curb and Gutter prep 602 LF @ $ 26.75 $ 16,103450 Traffic Control 56 Days @ $ 2,598.00 $ 1452488,00 Al Traffic Control Traffic Control Plans / set up 1 Each @ $ 850,00 $ 850,00 Pothole as needed 8 HRS @ $ 500.00 $ 4,000.00 Survey 40 HRS @ $ 240,00 $ 92600,00 $ 686,243.56 Bond Fee = $ 11,363.00 Total Estimate100°hplans= $ 6979606.56 Cost estimate based on l0o Percent plans Light Pate bases may need to be replaced at 5 location due to there location near the new type R inlets. Allowance acoouts for existing light poles to be de energized, removed, new base and reset and re energized. Estimate generated from Plans dated 6/05/2026 Project number GS07103.000. CTLThompson Drawings C-1 Cover Sheet C-2 Notes C3 -C8 Existing conditions and Demolition Plan C9-C14Civil Site Plans 315 -C20 Grading Plan C-21- C23 Storm Sewer Plan & Profile C24-C26 Details. Docusign Envelope ID: FE2864DA-39Al-87E3-83DC-64358EB094D4 Al Estimate $ 75.00 perhr flagger/day $ 85.00 perhr supervisor/day $ 428.00 Traffic Contra[ Devic per day $ 250.00 Traffic Management weeks i 30.00 plan once 5B 20.00 setup once $$$ TC Device 2.00 cones 6.00 signs/saws 6.00 drums 15.00 type 3-barricade 4.00 crowd control 300.00 stop lights (two / one set) 200.00 message boards Emergency Rate $ 100.00 perhr $ 125.00 perhr flagger /day supervisor /day 1 900.00 $ 900.00 1,020.00 $ 11020,00 428.00 $ 428.00 250.00 $ 250.00 13200 $ 150000 $ 0.088 1st Day Billing 20598,00 Totat Project Estimate Daily Billing 1$ $ 2,598.00 2,598.00 * Assumption l2hours / day /5days /week 12 hours / � # of fl'aggers # of supervisors 12 1 1 Personnel TC Devices 40 cones 4 signs 4 drums 0 type 3-barricade 25 crowd control 0 stop light (set) 1 message boards 1020 cost/day $ 80.00 3rd Setup Fee $ 24.00 27 cones $ 24.00 2 signs $ 4 days of management $ 100.00 $ loth $ 200.00 47 cones 2 signs 5 days of management 17th 2 signs 4 days 47 cones Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EBO94D4 Bid Breakdown 1st Street and West Main, Aspen, Colorado Asphalt Demo 315 Wheeled Excavator 938 Loader Saw Cut Labor Trucks Supervision Other Dump fees Asphalt Demo curb and gutter removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo concrete sidewalk removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo Combination Inlet removal Per each 315 Wheeled Excavator shaker plate 938 JJ cc Labor Pipe crew supervisor Supervision Other Export / lipping fee Truck Installation of Type R inlet 315 Wheeled Excavator 938 Shaker plate JJ CC Labor Pipe crew supervisor Supervision Other Export Truck Materials Truck 3/4 Base Steel facing Type R Intel Structure Defvery Non shink grout Unit 1.3 hrs 1.3 hrs 90 If 2.5 hrs 2.28571429 hrs 1 hrs Cost Xtd Cost Comment @ $ 265.00 p/hr $ 344.50 @ $ 265.00 p/hr $ 344,50 @ $ 10.00 p/If $ 900,00 @ $ 105,00 p/hr $ 262,50 @ $ 175,00 p/hr $ 400,00 Export demo @ $ 240.00 p/hr $ 240,00 Total $ 2,491.50 16 tans @ $ 15.60 p/tn $ 249.60 Elam Pit Total $ 2,741.10 Price per s.f. _ $ 8,00 129 I( 1 hrs @ $ 265,00 p/hr $ 265,00 1 hrs @ $ 265,00 p/hr $ 265,00 0.25 hrs @ $ 250,00 p/hr $ 62,50 12 if @ $ 10,00 p/If $ 120.00 2 hrs @ $ 105,00 p/hr $ 210,00 4 hrs @ $ 175.00 p/hr $ 700.00 Export demo 1 hrs @ $ 240,00 p/hr $ 240,00 Total $ 1,862.50 14 tons @ $ 51.75 p/tn $ 724.50 Elam Pit Total $ 2,587.00 Price per I.f. _ $ 21,74 172 sf 1 hrs @ $ 265,00 p/hr $ 265,00 1 hrs @ $ 265,00 p/hr $ 265,00 0.25 hrs @ $ 250,00 p/hr $ 62,50 16 If @ $ 10,00 p/If $ 160,00 2 hrs @ $ 105.00 p/hr $ 210,00 1 hrs @ $ 175,00 p/hr $ 175.00 Export demo 1 hrs @ $ 240.00 p/hr $ 240,00 Total $ 1,377.50 5 tons @ $ 51.75 p/tn $ 258.75 Elam Pit Total $ i,fi3fi.25 Price per s.f. _ $ 8,18 1 ea 4.0 hrs @ $ 265.00 p/hr $ 1,060.00 - 4.0 hrs @ $ 265.00 p/hr $ 1,060.00 0.5 days @ $ 220,00 p/d $ 110,00 12.0 hrs @ $ 105.00 pfhr $ 1,260.00 4.0 hrs @ $ 240,00 p/hr $ 960.00 1.0 hrs @ S 240,00 p/hr $ 240,00 Equip/ Labor Total = $ 41690,00 2 tons @ @ 5 310,50 p/ld $ 621.00 2.0 hrs @ $ 175,00 p/hr $ 350.00 Haul Off Export total = $ 971,00 Total Cost= $ 50661.00 1 ea Day Duration 5 5.0 hrs @ $ 265.00 p/hr $ 1,325.00 5.0 hrs @ $ 265,00 p/hr $ 11325,00 1.5 hrs @ $ 265,00 p/hr $ 397.50 1.0 day @ $ 220,00 p/hr $ 220,00 18.0 hrs @ S 105,00 p/hr $ 10690,00 5.0 hrs @ $ 240,00 p/hr $ 11200,00 2.0 hrs @ $ 240.00 p/hr $ 480,00 Equip/ Labor Total = $ 6,837.50 4 tons @ @ S 7,48 pnd 5 29,90 1.5 hrs @ $ 175.00 p/hr $ 262,50 Haul Off Export total = $ 292,40 1.5 hrs @ $ 175,00 p/hr $ 262,50 8 tons @ S 27,25 p/tn $ 218.00 Moisture conditioned i LS @ $ 10250.00 p/ls $ 11250,00 1 ea @ S 14,693,55 p/ea $ 14,693.55 1 LS @ 5 225,00 pAs $ 225,00 1 LS @ S 185.00 p/ls $ 185,00 MaterialTotal. $ 16,834.05 Total Cost= $ 231963,95 days hrs 8elnlorced Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 6/8/2026 Bid Breakdown Qty Unit Cost Unit Xtd Cost Comment Asphalt Demo 319 sf 315 Wheeled Excavator 1 hrs @ $ 265.00 p/hr $ 265,00 938 Loader 1 hrs @ $ 265.00 p/hr $ 265.00 Saw Cut 92 If @ $ 10,00 p/lf $ 920.00 Labor 2 hrs @ $ 105,00 p/hr $ 210,00 Trucks 1,29 hrs @ $ 175.00 p/hr $ 225,00 Export demo Supervision 1 hrs @ $ 240,00 p/hr $ 240,00 Total $ 22125.00 Other Dump fees Asphalt Demo 9 tons @ $ 15,60 p/tn $ 140.40 Elam Pit Total $ 2/265040 Price per s.f. _ $ 8.09 curh and gutter removal 116 If 315 Wheeled Excavator Price per 1 hrs @ $ 265.00 pRtr $ 265.00 938 Loader 1 hrs @ $ 265.00 p/hr $ 265.00 Hammer 0.25 hrs @ $ 250,00 p/hr $ 62,60 Saw Cut 12 If @ $ 10,00 p/lf $ 120,00 Labor 3 hrs @ $ 105,00 p/hr $ 315,00 Trucks 2 hrs @ $ 175,00 p/hr $ 350,00 Export demo Supervision 1 hrs @ $ 240.00 p/hr $ 240.00 Total $ 11,617.50 Other Dump fees Concrete demo 12 tons @ $ 51,75 p/tn $ 621.00 Elam Pit Total $ 29238.50 l.f.= $ 19.47 concrete sidewalk removal 253 sf 315 Wheeled Excavator 1 hrs @ $ 265.00 p/hr $ 265.00 938 Loader 1 hrs @ $ 265.00 pfir $ 265,00 Hammer 0,25 hrs @ $ 250.00 p/hr $ 62,50 Saw Cut 15 If @ $ 10,00 p/lf $ 150,00 Labor 3 hrs @ $ 105.00 p/hr $ 315.00 Trucks 1 hrs @ $ 175,00 p/hr $ 175.00 Export demo Supervision 1 hrs @ $ 240,00 p/hr $ 240,00 Total $ 11472.50 Other Dump fees Concrete demo 6 tons @ $ 51.75 On $ 328.10 Elam Pit Total $ 1,800.60 Price pers.f.= $ 8.61 Type R removal 1 ea 315 Wheeled Excavator 5.0 his @ $ 265.00 p/hr $ 1,325.00 shaker plate 0.0 hrs @ $ 225.00 p/hr $ - 938 5.0 hrs @ $ 265.00 p/hr $ 1,325.00 JJ Cc 0.5 days @ $ 220,00 p/d $ 110.00 Labor 15.0 hrs @ $ 105,00 p/hr $ 1,575.00 Pipe crew supervisor 5.0 hrs @ $ 240,00 p/hr $ 11200,00 Supervision 1.5 hrs @ $ 240,00 pfir $ 360,00 Equip/ Labor Total = S 5/895400 other Export 2 tons @ @ $ 310,50 pod $ 621,00 Truck 1.0 hrs @ $ 175,00 p/hr $ 175,00 Haul Off Export total = $ 796.00 Total Cost = $ 61691.00 1 ea Day Duration Installation of Type R inlet days 5 hrs 315 Wheeled Excavator 5.0 hrs @ $ 265,00 p/hr $ 1,325.00 938 5.0 hrs @ $ 265,00 p/hr $ 1,325.00 Shaker plate 1.5 hrs @ $ 265,00 p/hr $ 397.50 JJ Cc 1.0 day @ $ 220,00 p/hr $ 220,00 Labor 18.0 hrs @ $ 105.00 p/hr $ 1,890.00 Pipe crew supervisor 5.0 hrs @ $ 240.00 p/hr $ 11200,00 Supervision 2.0 hrs @ $ 240,00 pfir $ 480,00 Equip/Labor Total = $ 6,837.50 Other Export 4 tons @ @ $ 7,48 p/ld $ 29,90 Truck 1.5 hrs @ $ 175,00 p/hr $ 262,50 Haul Off Export total = $ 292.40 Materials Truck 1.5 hrs @ $ 175.00 p/hr $ 262,50 3/4 Base 8 tons @ $ 27,25 phn $ 218,00 Moisture conditioned Steel facing 1 LS @ $ 1,250.00 p/ts $ 11250,00 Type R Inlet Structure 1 eo @ $ 14,693.55 plea $ 14,693.55 Relnfarced Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Stutsmartm erhaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 6/8/2026 Bid Breakdown Cost Unit Xtd Cost Comment Asphalt Demo 251 sf 315 Wheeled Excavator 0,75 hrs @ $ 265.00 plhr $ 198.75 938 Loader 0,75 hrs @ $ 265.00 p/hr $ 198,75 Saw Cut 90 If @ $ 10.00 p/If $ 900,00 Labor 1,5 hrs @ $ 105.00 pfhr $ 157,50 Trucks 1,15 hrs @ $ 175.00 p/hr $ 201.25 Export demo Supervision 1 hrs @ $ 240.00 _ p/hr $ 240,00 Total $ 1,896,25 Other Dump fees Asphalt Demo 9 tons @ $ 15,60 p/tn $ 140.40 Elam Pit Total $ 2,036,65 Price per s.f. _ $ 8,11 curb and gutter removal 90 If 315 Wheeled Excavator 1 hrs @ $ 265.00 p/hr $ 265.00 938 Loader 1 hrs @ $ 265.00 p/hr $ 265.00 Hammer 0,25 hrs @ $ 250.00 p/hr $ 62.50 Sav/ Cut 12 If @ $ 10.00 p/If $ 120,00 Labor 3 hrs @ $ 105.00 p/hr $ 315,00 Trucks 2 hrs @ $ 175.00 p/hr $ 350.00 Effort demo Supervision 1 hrs @ $ 240,00 _ p/hr $ 240,00 Total $ 15617,50 Other Dump fees Concrete demo 9 tons @ $ 51,75 p/tn $ 465.75 Elam Pit Total S 21083,25 Price per I.f. = S 22.57 concrete sidewalk removal 26fi sf 315 Wheeled Excavator 1,25 hrs @ $ 265.00 p/hr $ 331,25 938 Loader 1.25 hrs @ $ 265,00 p/hr $ 331.25 Hammer 0,25 hrs @ $ 250,00 plhr $ 62,50 Saw Cut 10 If @ $ 10,00 p/lf $ 100,00 Labor 3 hrs @ $ 105.00 p/hr $ 315,00 Trucks 2 hrs @ $ 175,00 p/hr $ 350.00 Export demo Supervision 1 hrs @ $ 240,00 p/hr $ 240,00 Total $ 11730.00 Other Dump fees Concrete demo 7 tons @ $ 51,75 p/tn $ 336.38 Elam Pit Total $ 21066,38 Price per s.f. _ $ 8,61 Type R removal 1 ea 315 Wheeled Excavator 5.0 hrs @ $ 265,00 p/hr $ 11325,00 shaker plate 0.0 hrs @ $ 225.00 p/hr $ - 938 5.0 hrs @ $ 265,00 p/hr $ 11325.00 JJ CC 0,5 days @ $ 220.00 p/d $ 110,00 Labor 15.0 hrs @ $ 105.00 p/hr $ 11575,00 Pipe crew supervisor 5.0 hrs @ $ 240,00 p/hr $ 19200,00 Supervision 1.5 hrs @ $ 240.00 purr $ 360.00 Equip/ Labor Total = $ 50895,00 Other Export 2 tons @ @ $ 310,50 plld $ 621.00 Truck 1.0 hrs @ $ 175,00 p/hr $ 175,00 Haul Off Export total = $ 796,00 Total Cost = $ 6,691.00 1 ea Day Duration 1 ea Day Duration Installation of Type R inlet 5 315 Wheeled Excavator 5.0 hrs @ $ 2fi5.00 p/hr $ 1,325.00 Materials Truck 1.5 hrs @ $ 175.00 p/hr $ 26250 3l4 Base B Ions @ $ 27.25 plln $ 218.00 Moisture conditioned Steel facing 1 lS @ $ 1,250.00 pAs $ 1,250.00 Type R inlet Structure 1 ea @ $ 14,693,55 plea $ S4,fi93.55 Delivery 1 LS @ $ 225.00 pfts $ 225.00 Non shink grout 1 LS @ $ 185.00 efts $ 185,00 Material Total = $ 16,834,05 Total Cost= $ 23,963.95 days hrs Reinforced Total Cost= $ 23,963.95 days hrs Reinforced Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Bid Breakdown Asphalt Demo 315 Wheeled Excavator 938 Loader Saw Cut Labor Trucks Supervision Other Dump fees Asphalt Demo curb and gutter removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo concrete sidewalk removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo Type R removal Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923=2734 6/8/2026 Unit 241 sf 0.75 hrs @ 0.75 his @ 92 If @ 1.5 hrs @ 1.00 hrs @ 1 hrs @ Cost Unit Xtd Cost Comment $ 265.00 p/hr $ 198.75 $ 265,00 p/hr $ 198.75 $ 10,00 p/If $ 920,00 $ 105,00 p/hr $ 157.50 $ 175,00 p/hr $ 175.00 Export demo $ 240,00 p/hr $ 240,00 Total $ 1,890.00 8 tons @ $ 15.60 p/tn $ 124.80 Elam Pit Total $ 2,014.80 Price per s.f. _ $ 8.36 1 hrs @ $ 265.00 p/hr $ 265.00 1 hrs @ $ 265.00 p/hr $ 265.00 0.25 his @ $ 250.00 p/hr $ 62,50 12 If @ $ 10,00 plf $ 120,00 3 hrs @ $ 105.00 p/hr $ 315,00 2 hrs @ $ 175.00 p/hr $ 350.00 Export demo 1 hrs @ $ 240.00 p/hr $ 240,00 Total $ 1,617.50 10 tons @ $ 51.75 p/tn $ 517.50 Elam Pit Total $ 2,135.00 Price per I.f. _ $ 21.20 242 sf 1 hrs 1 hrs 0.25 hrs 15 If 2 hrs 1 his 1 his @ $ 265.00 p/hr $ 265.00 @ $ 265.00 p/hr $ 265.00 @ $ 250.00 p/hr @ $ 10,00 p/If $ 150,00 @ $ 105.00 p/hr $ 210,00 @ $ 175.00 p/hr $ 175.00 Export demo @ $ 240,00 p/hr $ 240,00 Total $ 11367.50 7 tans @ $ 51.75 p/tn $ 362.25 Elam Pit Total $ 1,729.75 Price per s.f. _ $ 7.15 1 ea 315 Wheeled Excavator 5.0 his @ $ 265.00 p/hr $ 1,325.00 shaker plate 0.0 hrs @ $ 225.00 p/ht $ - 938 5.0 hrs @ $ 2fi5.00 p/hr S 1,325.00 A cc 0.5 days @ S 220.00 p/d $ 110,00 Labor 15.0 his @ $ 105,00 p9v S 1,575.00 Pipe crew supervisor 5.0 his @ $ 240,00 p/hr $ 1,200.00 Supervision 1.5 his @ $ 240,00 p/hr $ 360,00 Equip/ Labor Total = $ 5,895.00 Other Export 2 tons@ @ $ 310.50 plld $ 621,00 Truck 1.0 his @ S 175.00 p/hr $ 175.00 Haul Off Export total = $ 796.00 Total Cost = $ 61691,00 1 ea Day Duration Installation of Type R Inlet days 5 his 315 Wheeled Excavator 5.0 his @ $ 265.00 p/hr $ 1,325.00 938 5.0 his @ $ 265,00 p/hr $ 1,325.00 Shakerplate 1.5 his @ $ 265,00 p/hr $ 397,50 JJ cc 1.0 day @ $ 220,00 plhr $ 220,00 Labor 18.0 his @ $ 105,00 p/hr $ 1,890.00 Pipe crew supervisor 5.0 his @ $ 240,00 p/hr S 11200,00 Supervision 2.0 his @ $ 240.00 p/hr $ 480,00 Equip/Labor Total = $ 6,837.50 Other Export 4 tons @ @ $ 7.48 p/ld $ 29,90 Truck 1.5 his @ $ 175,00 p/hr $ 262.50 Haul Off Export total = $ 292,40 Materials Truck 1.5 his @ $ 175,00 p/hr $ 262,50 314 Base 8 tons @ $ 27,25 p/tn $ 218,00 Moisture conditioned Steel facing 1 LS @ $ 1,250.00 p/ls $ 1,250,00 Type R In let Structure 1 ea @ $ 14,693,55 plea $ 140693,55 Delivery I IS @ $ 225,00 PAS $ 225.00 on shank grout 1 LS @ $ 185,00 p/LS $ 185,00 Material Total= $ 160834,05 Total Cost= $ 232963,95 8einforcec Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 LI[I Asphalt Demo 315 Wheeled Excavator 938 Loader Saw Cut Labor Trucks Supervision Other Dump fees Asphalt Demo curb and gutter removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo concrete sidewalk removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo Type R removal 315 Wheeled Excavator shaker plate 938 JJ cc Labor Pipe crew supervisor Supervision Other Export Truck Inslallallon of Type R Inlet 315 Wheeled Excavator 938 Shaker plate JJ CC Labor Pipe crew supervisor Supervision Other Export Truck Materials Truck 3l4 Base Steel facing Type R Inlet Structure Delivery Nonshinkgrout Stutsman4erbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923=2734 618/2026 Unit 1 hrs @ 1 hrs @ 117 If @ 2 hrs @ 1.43 hrs @ 1 hrs @ Cost Unit Xtd Cost Comment $ 265.00 plhr $ 265.00 $ 265.00 p/hr $ 265,00 $ 10,00 p/11 $ 1,170,00 $ 105,00 p/hr $ 210,00 $ 175,00 p/hr $ 250.00 Export demo $ 240,00 p/hr $ 240,00 Total $ 2,400.00 10 tons @ $ 15.60 p/tn $ 156.00 Elam Pit Total $ 2,556,00 Price per s.f. _ $ 8.41 1 hrs @ $ 265.00 p/hr $ 265.00 1 hrs @ $ 265.00 p/hr $ 265.00 0.25 hrs @ $ 250.00 p/hr $ 62,50 12 If @ $ 10.00 pllf $ 120,00 3 hrs @ $ 105.00 p/hr $ 315,00 2 hrs @ $ 175.00 p/hr $ 350.00 Export demo 1 hrs @ $ 240.00 p/hr $ 240,00 Total $ 1,617.50 11 tons @ $ 51.75 p/ln $ 543.38 Elam Pit Total $ 2,160.88 Price per Lf. _ $ 20,68 285 sf 1.25 hrs 1.25 hrs 0.25 hrs 20 If 3 hrs 1 hrs 1 hrs @ $ 265.00 p/hr $ 331.25 @ $ 265.00 p/hr $ 331.25 @ $ 250.00 p/hr $ 62.50 @ $ 10,00 p/If $ 200,00 @ $ 105.00 p/hr $ 315,00 @ $ 175.00 p/hr $ 175.00 Export demo @ $ 240.00 p/hr $ 240,00 Total $ 11655a0 6 tons @ $ 51.75 p/tn $ 310.50 Elam Pit Total $ 1,965.50 Price per s.f. _ $ 8.19 1 ea 5.0 hrs @ $ 265.00 p/hr $ 11325.00 0.0 hrs @ S 225.00 p/hr $ - 5.0 hrs @ 5 265.00 p/hr $ 1,325.00 0.5 days @ $ 220.00 pld $ 110,00 15.0 hrs @ $ 105,00 p/hr $ 1,575.00 5.0 hrs @ $ 240.00 p/hr $ 10200.00 1.5 hrs @ $ 240,00 pft $ 360,00 Equip/ Labor Total = $ 5,895A0 2 tons @ @ $ 310,50 pod $ 621,00 1.0 hrs @ S 175.00 p/hr $ 175.00 Haul Off Export total = $ 796,00 TolalCost= $ 6,691.00 1 ea Day Dural]on days 5 hrs 5.0 hrs @ $ 265.00 p/hr $ 1,325.00 5.0 hrs @ $ 265,00 p/hr $ 1,325,00 1.5 hrs @ $ 265,00 p/hr $ 397,50 1.0 day @ $ 220,00 p/hr $ 220,00 18.0 hrs @ $ 105,00 p/hr $ 11890,00 5.0 hrs @ $ 240,00 p/hr $ 11200.00 2.0 hrs @ $ 240,00 p/hr $ 480,00 Equip/ Labor Total = $ 61837*50 4 tons @ @ $ 7.48 pAd $ 29.90 1.5 his @ $ 175,00 p/ht $ 262.50 Haul Off Export total = $ 292,4o 1.5 hrs @ $ 175.00 p/hr $ 262.50 8 Ions @ $ 27.25 plln $ 218.00 Moisture conditioned 1 LS @ $ 1,250.00 p/Is $ 1,250.00 1 ea @ $ 14,693.55 plea $ 14,693.55 1 LS @ § 225.00 pfts $ 225.00 1 LS @ $ 185,00 p/Is $ 185,00 Material Total= $ 16,834.05 Total Cost= $ 23,963495 Reinfarcet Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 618/2026 Bid Breakdown t1ry Unit Cost Unit Xtd Cost Comment Asphalt Demo 315 Wheeled Excavator 938 Loader Saw Cut Labor Trucks Supervision Other Dump fees Asphalt Demo curb and gutter removal 315 Wheeled Ezcavalor 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo concrete sidewalk removal 315 Wheeled Excavator 938 Loader Hammer Saw Cut Labor Trucks Supervision Other Dump fees Concrete demo Type R removal 311 sf 1.25 hrs @ 1.25 hrs @ 89 If @ 2.25 hrs @ 1.71 hrs @ 1 hrs @ $ 265.00 plhr $ 331.25 $ 265,00 p/hr $ 331,25 $ 10,00 p/If $ 890,00 $ 105,00 p/hr $ 236,25 $ 175,00 p/hr $ 300.00 Export demo $ 240.00 p/hr $ 240,00 Total $ 2,328.75 12 tons @ $ 15.60 p/tn $ 187.20 Elam Pit Total $ 2,515.95 Price per s.f. _ $ 8.09 0.75 hrs @ $ 265.00 plhr $ 198.75 0.75 hrs @ $ 265.00 p/hr $ 198.75 0.25 hrs @ $ 250,00 p/hr $ 62,50 12 If @ $ 10,00 p/If $ 120.00 2 hrs @ $ 105,00 p/hr $ 210,00 2 hrs @ $ 175,00 p/hr $ 350.00 Export demo 1 hrs @ $ 240,00 p/hr $ 240,00 Total $ 11380.00 8 tons @ $ 51.75 p/tn $ 388.13 Elam Pit Total $ 1,768.13 Price per U. _ $ 22.87 197 sf 1 hrs 1 hrs 0.25 hrs 10 If 2 hrs 1 hrs 1 hrs @ $ 265.00 p/hr $ 265.00 @ $ 265.00 p/hr $ 265.00 @ $ 250.OD p/hr @ $ 10,00 p/If $ 100,00 @ $ 105,00 p/hr $ 210,00 @ $ 175,00 p/hr $ 175.00 Export demo @ $ 240,00 p/hr $ 240,00 Total $ 11317950 4 tons @ $ 51.75 p/tn $ 207.00 Elam Pit Total $ 1,524.50 Price per s.f. _ $ 10.44 1 ea 315 Wheeled Ezcavalor 5.0 hrs @ $ 265.00 p/hr $ 1,325.00 shaker plate 0.0 hrs @ $ 225.00 p/hr $ - 938 5.0 hts @ $ 265.00 p/ht $ 1,325.00 JJ cc 0.5 days @ $ 220.00 p/d $ 110,00 Labor 15.0 hrs @ $ 105,00 p/hr $ 1,575.00 Pipe crew supervisor 5.0 hrs @ S 240,00 p/hr $ 10200,00 Supervision 1.5 hrs @ S 240.00 p/hr $ 360,00 Equip/ Labor Total = $ 5,895.00 Other Export 2 tons @ @ S 310.50 p/ld $ 621.00 Truck 1.0 hrs @ $ 175,00 p/hr $ 175.00 Haul Off Export total = $ 796,00 Total Cost= $ 6,691.00 1 ea Day Duration Installation of Type R inlet days hrs Relnferced Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 utsman=Gerbaz 30376 Highway" Snowmass, CO 81654 970 • 6/8/2026 Qt�/ Unit �►sphalt Prep 1753 sf Tracked Skidsteer 8 hrs @ $ 200.00 304 Excavator 8 hrs @ $ 215.00 Labor 2 ea 16 hrs @ $ 105.00 Trucks 8.62 hrs @ $ 175.00 Supervision 1 hrs @ $ 240.00 Materials Class 6 Roadbase 80 tons @ $ 27.75 Tracked Skidsteer 20 hrs @ $ 200.00 304 Excavator 20 hrs @ $ 215.00 Labor 2 ea 40 hrs @ $ 105.00 Trucks 6.00 hrs @ $ 175.00 Supervision 4 hrs @ $ 240.00 56 tons @ $ 27.75 p/hr $ 1,600.00 p/hr $ 11720600 p/hr $ 11680000 p/hr $ 1,508.44 p/hr $ 240.00 Total $ 6,748.44 p/tn $ 2,232.49 p/hr $ 4,000.00 4,300.00 p/hr $ 41200000 p/hr $ 1,050.00 p/hr $ 960.00 Total $ 14,510.00 p/tn $ 1,554.00 Export dei Elam Pit Export dei Elam Pit Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 6/8/2026 Bid Breakdown Times move Hours Total Cost Unit Xtd Cost Comment During proje for move Hours Mobe Heavy Transport 0 4 0 hrs @ $ 320.00 p/hr $ 336 Pilot cars/labor 0 8 0 hrs @ $ 115.00 p/hr $ - 336 Heavy Transport 0 3 0 hrs @ $ 320.00 p/hr $ 963 Heavy Transport 0 3 0 hrs @ $ 320.00 p/hr $ 320 Pilot cars/labor 0 6 0 hrs @ $ 115.00 p/hr $ 320 Transport 0 3 0 hrs @ $ 190.00 p/hr $ D61 939 & 953 Transport 6 3 18 hrs @ $ 190.00 p/hr $ 30420,00 308 & 314 Transport 0 3 0 hrs @ $ 190.00 p/hr $ 938 & 924 Transport 0 3 0 hrs @ $ 190.00 p/hr $ 323 Compactor Dually Transport 6 3 18 hrs @ $ 150.00 p/hr $ 21700,00 301, 302 & 303 Duelly Transport 0 3 0 hrs @ $ 150.00 p/hr $ - skid loader Total $ 6,120.00 Porta Potty 1 ea $ 200.00 $ 200.00 delivery two each 3 mo $ 400.00 $ 1,200.00 Private Locates 7 ea $ 500.00 $ 3,500.00 Fontier Paving Mobilization 1 ea $ 21250,00 $ 21250900 Ashley Concrete Strutures mobilization 1 ea $ 10,560.00 $ 10,560.00 Fencing 6 Is $ 300.00 $ 1,800.00 $ 25,630.00 Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EE094D4 ASHLEY CONCRETE STRUCTURES T®tal Markup SG 10 C&G and fillets 125 LF $ 6,250.00 $ 63875.00 ADA Ramp 2 EA $ 33600400 $ 31960400 Sidewalk 125 SF $ 21500000 $ 2,750.00 Mobilization 1 EA $ 11600000 $ 11760600 South 2nd Str@et C&G and fillets 114 LF $ 53700600 $ 61270000 ADA Ramp 3 EA $ 53400000 $ 53940000 Sidewalk 166 SF $ 33320000 $ 33652000 Mobilization 1 EA $ 1,600.00 $ 13760000 South 3rd Street C&G and fillets 93 LF $ 43650.00 $ 53115.00 ADA Ramp 3 EA $ 5,400.00 $ 51940000 Sidewalk 200 SF $ 4,000.00 $ 4,400.00 Mobilization 1 EA $ 11600000 $ 17760.00 South 4th Street C&G and fillets 101 LF $ 5,050.00 $ 53555.00 ADA Ramp 3 EA $ 51400000 $ 51940600 Sidewalk 137 SF $ 21740000 $ 3,014.00 Mobilization 1 EA $ 11600000 $ 11760000 South 5th Street C&G and fillets 105 LF $ 51250000 $ 57775.00 ADA Ramp 3 EA $ 51400000 $ 51940600 Sidewalk 186 SF $ 31720000 $ 47092600 Mobilization 1 EA $ 11600000 $ 11760/00 South 6th Street C&G and fillets 105 LF $ 5,250.00 $ 55775000 ADA Ramp 3 EA $ 51400000 $ 51940000 Sidewalk 95 SF $ 17900000 $ 21090000 Mobilization 1 EA $ 1,600.00 $ 17760000 Total Concrete = Totals = C&G and fillets 643 LF ADA Ramp 17 EA Sidewalk 909 SF Mobilization 6 EA Totals = $ 90,530.00 $ 99,583.00 $ 32,150.00 $ 35,365.00 $ 30,600.00 $ 33,660.00 $ 18,180000 $ 19,998600 $ 91600000 $ 10,560000 $ 90,530000 $ 99,583.00 Docusign Envelope ID: FE2864DA-39Al-87E3-83DC-64358EB094D4 Graduated Tier $ 100,000.00 $ $ 400,000.00 $ $ 2,000,000.00 $ $ 2,500,000.00 $ $ 2,500,000.00 $ > $735003000,00 $ Maintenance Tier $ 100,000.00 $ $ 400,000,00 $ $ 23000,000.00 $ $ 2,500,000.00 $ $ 2,500,000.00 $ > $7,5001000.00 $ Project Estimate $ Band Premium per $ 100,000.00 $ 21.25 $ 4001000,00 $ 12.75 $ 186,243.00 $ 8.50 $ $ 6.38 $ $ 5.95 $ $ 5.53 $ 686,243.00 $ 100,000.00 $ 2.50 $ 400,000.00 $ 2.25 $ 1862243.00 $ 2.00 $ $ 1.75 $ $ 1.50 $ $ 1.40 $ 6861243,00 $ 686,243 1,000 2,125.00 5,100,00 1,583.07 8,808907 250.00 900.00 372.49 1,522.49 TOTAL PREMIUM $ 10,330.55 Markup $ 1,033.06 10% Markup% Performan $ 11,363.61 Jw1 Markup $ 697,606.61 NEW TOTAL ESTIMATE W/ MARKUP 0.071o/a 7250000 5178.571 Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 STUTSMAN� GERBAZ inc. EARTHMOVING `ASPEN, COMM.) Seca l960 STUTSMAIN GERBAZ, INC. TEAM PROFILE Stutsman Gerbaz, Inc. is afamily-operated business with over 65 years of experience serving Aspen, Snowmass, and the greater Roaring Fork Valley. Founded in 1960, the company is now led by third - generation owner and President Shay Stutsman. Over the decades, Stutsman Gerbaz has contributed to many of the region's most prominent developments, including custom residences and complex projects involving sensitive environmental and historic considerations. We take pride in having played an instrumental role in the growth and evolution of the Roaring Fork Valley. Our longstanding reputation is built on a deep commitment to safety, quality, and environmental responsibility. In the past five years alone, we have successfully completed 97 contracted projects and currently hold 41 active contracts. Stutsman-Gerbaz, Inc. 970-923-2734 30376 State Highway 82 Snowmass, CO 81654 www.sgearthmoving.com Shay Stutsman, President and Project Manager —shays@sgearthmovin�.co 20 years working with Stutsman-Gerbaz, Inc. Position Summary: Oversees daily field operations including personnel management and company operations. Meets with current and potential clients to discuss project management. Reviews and negotiates contracts and signs and guarantees contract performance. Verifies accuracy of all project management, in conjunction with ensuring safety and quality of the company. In charge of all aspects of completing a project including working with cities and counties for permits and approvals. Dave Stutsman, Vice President — dave.s@s�earthmovin�.co 48 years working with Stutsman-Gerbaz, Inc. Position Summary: Direct administration of operations; oversees the estimating department, reviews and negotiates contracts, signs and guarantees contract performance, executes change orders, creates and processes monthly pay applications and meets with clients and contractors. Other duties include the verificafiion of all field operations and company maintenance; equipment and material management, trucking, layout and grading, excavations and backfill, personnel management. Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 STUTSMAN GERBAZ inc. EARTHMOVING ,ASPENd COLORADO, Slcce 1960 Jake Kinney, Vice President of Field Operations/ Safety Officer— jake.k@sLearthmovin.co 10 years working with Stutsman-Gerbaz, Inc. Position Summary: Oversees field supervisors, maintains jobsite safety and safety records. Performs all supervision duties on a project, specializing in residential, including but not limited to layout, scheduling and coordinating. Eddie Aragon, Project Manager /Estimator — eddie.a@s�earthmovin�.co 3.5 years working with Stutsman-Gerbaz, Inc. Position Summary: Oversees and performs estimating of commercial, residential, and municipal projects. Project management, scheduling, and budgeting of all scopes of Civil Construction projects. Value engineering as needed to provide cost savings. Prior to Stutsman-Gerbaz, Inc., Eddie worked for notable excavations companies throughout the Roaring Fork Valley and is a well -respected Project Manager / Estimator in the industry with over twenty-five years of experience. Jesus Lopez, Utility Supervisor — jesus.l@sgearthmovin�.co 6 years working with Stutsman-Gerbaz, Inc. Position Summary: " Oversees Utilities crews and performs all supervision duties on a utility project, including but not limited to layout, scheduling and coordinating. Utility experience includes wet and dry utilities ranging from 4 inch to 48 inch in diameter as well as shallow and deep utilities ranging from 1 foot to 40 feet in depth. Prior to Stutsman-Gerbaz, Inc., Jesus worked for Western Slope Utilities a.k.a. Western Pipe Way. He has worked in most towns and cities in Colorado as well as New Mexico, Arizona, and Kansas. Jesus has a long-standing reputation in the industry as being one of the best and most respected Utility Supervisors with over twenty years of experience. Jr Flores, Field Supervisor — �abejr.f@s�earthmovin�.co 11 years working with Stutsman-Gerbaz, Inc. Position Summary: Performs all supervision duties on a project, specializing in complex, detail -intensive projects that demand the highest level of precision and strong collaborative skills. Handles all scheduling and coordinating. Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 �STUTSMAN GERBAZ inc. EARTHMOVING ASPEN, C0100A00 Seca / 960 Jenah Fuechsel, Project Engineer — jenah.f@s earthmoving.co 5.5 years working with Stutsman-Gerbaz, Inc. Position Summary: Responsible for all permitting, assists in pre -construction coordination and jobsite setup to support smooth project execution. Supports Field Supervisors and Project Managers in daily field operations as well as scheduling and managing our partner traffic control company. Raul Silva, C®nstructi�n Survey Engineer — raul.s@s�earthmovin�.co 5 years working with Stutsman-Gerbaz, Inc. Position Summary: Performs all layout for projects from foundation/footer layouts to alignments for water lines, sewer lines, electrical lines and foundation drains. Uses Trimble Construction Survey Technology and GPS. Records all piping, sitework, elevations and completes as-builts for projects while checking plans and calculating plan elevations to real elevations to ensure quality control. Also creates and designs 3D models and manages any design plan changes for excavation and finishing grades. Other duties also include managing the machines and status with the Global Positioning System (GPS). The core project team —Shay Stutsman, Eddie Aragon, and Jenah Fuechsel—will be dedicated to the project from pre -construction through the warranty period. Their efforts will be supported by additional expertise from the broader Stutsman Gerbaz team, including Dave Stutsman, Jake Kinney, Jesus Lopez, Jr. Flores, and Raul Silva, ensuring a seamless and successful project delivery. Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 Project Management Team Belling Rates: Senior Project Manager- Shay Stutsman Senior Estimating- Dave Stutsman Project Superintendent Project Manager &Estimating- Eddie Aragon Project Engineer- Jenah Fuechsel $275.00/hour $275.00/hour $225.00/hour $225.00/hour $150.00/hour fSTUTS GERI SPEN, CDLODAD Slree t 960 Docusign Envelope ID: FE2864DA-39Al�87E3-83DC-64358EB094D4 rSTUTSMAN GERBAZ inc. EARTHMOVING ,ASPEN0 C0100A00 SGcce l960 EXPERIENCE Basalt Midland Streetscape- CMGC and Construction ® Midland Ave. Basalt, C® 81621 • Consultant during the Design phase, assisted in project scheduling and value engineering. Coordination with businesses and building owners. • Replacement of all infrastructure, including all utilities and hardscape from edge of building to edge of building. • The CM/GC portion of this project started in March 2022 • Construction started in March 2023. Substantial completion of construction was in November 2024 • Final Contract Amount $13,053,727 • Construction phases were added as change orders; all change orders were owner -directed. • See https://youtu.be/pKdiHlShxKl?feature=shared as an example of our ability to accomplish many tasks in short duration utilizing night work to minimize public impact. • The Midland Streetscape Project won the Best Place Small Community Award as part of the 2025 Colorado Downtown Excellence Awards, 2025 APWA Colorado Sustairability Award and the 2025 American Planning Association Colorado Merit Award for Resilience, Sustainability and Environmental Design • Watch the Midland Streetscape Final Video to see the project from design to completion. • Sopris Engineering o Yancy Nichol 970-704-0311 ynichol@sopriseng.com • Town of Basalt o Catherine Christoff 970-279-4384 catherine.christoff@basalt.net Brush Creek & Ke��rns Rd Emergence Culvert Replacement • Kearns Rd, Snowmass Village, C® 81615 • Stabilize and protect live utilities running above Brush Creel, consult in design, widen traffic lanes, execute safe installation of box culvert and restore the site. • This project demonstrates our experience working on a main road while maintaining free - flowing traffic with minimal disruptions. • Construction started in August 2023. Substantial completion was in September 2024 • Starting budget $5,749,945 • Final Contract Amount $6,094,738 • All change orders were owner -directed. • SGM o Mike Fowler 970-9454004 mikef@sgm-inc.com o Mark Frymoyer 970-384-9003 markf@sum-inc.com • Town of Snowmass Village o Mike Horvath 908-581-3892 mhorvath@tosv.com Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 STUTSMAN GERBAZ ME EARTHMOVING ASPEN, COLORA00 SCKce 1960 Hallam &Garmisch Storm Sewer and Waterline Replacement ® 100 Block of N Garmisch and E Hallam, Aspen, CO 81611 ® Replace and extend storm and water infrastructure. Regrade and repave roads and crosswalks. ® This work was completed in a high density, heavily trafficked area. Stutsman Gerbaz was able to maintain safe, continuous access for residents and pedestrians. © Construction started in May 2024. Substantial completion was in September 2024 • Starting Budget $2,946,629 © Final Contract Amount $3,477,083 All change orders were owner -directed. o City of Aspen Engineering o Hailey Roedel 970-309-0771 hailey.roedel@aspen.gov Brush Creek Waterline Replacement • 20 mph Curve, Snowmass Village, CO 81615 • Replace 1000ft of water main in Brush Creek Rd. • This project demonstrates our ability to coordinate with the Town of Snowmass Village and Snowmass Water and Sanitation. • Construction started in June 2020. Substantial completion was in October 2020 • Starting Budget $720,413 ® Final Contract Amount $853,022 • All change orders were owner -directed. • Snowmass Water & Sanitation o Kit Hamby 970-923-SOS6 1<hamby@swsd.org City of Aspen Electric Circuit Replacement Project • Downtown Aspen, CO 81611 ® Install electrical conduit to replace direct bury lines within downtown core. This project was located in extremely high traffic areas. We maintained the flow of traffic for vehicles, bicycles and pedestrians. • This phase of the project started in April 2023. Substantial completion in October 2023 • Starting Budget $2,304,063 • Final Contract Amount $2,422,295 • All change orders were owner -directed. • City of Aspen Utilities o Andy Rossello 970-4S&3025 andy.rossello@aspen.gov Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 STUTSMAN GERBAZ inc. EARTHMOVING ASPEN, COLORADO 00 .Sfac ! 960 REFERENCES - Tyler Christoff: Assistant City Manager for the City of Aspen 0 970.920.5118 o Tyler.Christoff@cityofaspen.com - Anne Martens: Town of Snowmass Public Works Director 0 970-923-5110 o AMartens@tosv.com - Trish Aragon P.E.: City Engineer for the City of Aspen o 970.429.2785 o Trish.Aragon@citvofaspen.com - Kit Hamby: Snowmass Water and Sanitation District o 970.923-2056 o KHamby@swsd.ore - Ham Tharp: Aspen Consolidated Sanitation District 0 970429-5411 o htharp.aspensan@�mail.com - Catherine Christoff: Town Engineer for the Town of Basalt 0 970-279-4384 o Catherine.christoff@basalt.net Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 SUBC®NTRACTOR AND MATERIALS SUPPLIER LIST Traffic Control Al Traffic Control &Barricade Landscaping Rocky Mountain Custom Landscapes Paving 970-618-7545 970-748-8461 Frontier Paving Inc. 970-625-2224 Concrete Ashley Concrete Structures 970-989-4412 Pre -Cast Materials Rinker Materials 970-245-9301 Conduit Core &Main 970-434-4817 Ferguson 970-963-5700 Potholing Brand X 970-876-2251 Badger Daylighting 970-309-6331 STtJTSMAN GERBAZ inc. EARTMOVING ASPEN, COLORADO .SGrce 1960 32597 US-6 #6, Silt, CO 81652 351 Airpark Dr, Gypsum, CO 81637 854 Bedrock Ln, Rifle, CO 81650 PO Box 2064, Glenwood Springs, CO 81602 2311 River Rd, Grand Junction, CO 81505 3026 I-70 B, Grand Junction, CO 81504 704 Hwy 133, Carbondale, CO 81623 1819 Airport Rd, Rifle, CO 81650 1936 CO Rd 319, Rifle, CO 81650 3 3 I I I I I i I I I II- I I I l , I I I , I I.; I I � � � I ,___•.a r s s a g b S E S g K S W W W c: W F O 7 W 5 c: F < N1011W W aiVa ❑ z 0 u aaJUEDIN U z, aida .Le a3a33N lvmglvl\ `c E >` F E � ❑ 033N lVAG)lcldV u Z � p � U C < Z Siva lv amTens G a h 3 Le a3wlna3a 0 M3I,\n U s< am � �J ° � c F m � � •- c yctUp a U U-- N 'O `r " ' u eFi GF r^ii C- • cFi O p, F U z O On �.., Q F F •� U U C1 'D 0. 'O F, cFd U `• r Q O F u ~ F F v ro o d C7 0 o N U F A F o .— O G cz F u F U u F U U U i3 caGC-` F W r~j tD p c r G tGo w Q F a Ln C N q iin F U U w W ¢� < G c°i G- U W U C-i o p U w .4 U cr .F .F 0 N 00 O � Q U M @ O U L)� F J W o eFi W c cokn N C U '.-� vl r OG (! C O •� ran p CA r`1 f`1 N f 1 o c rn o �o �o rn r%i rn M o c rV O o o rn �c o ._. .� .� ,� ., O o O O ^' N N N N N N N rn IIATT d0V'NVd xOI.LVJdIJ3dS M (n rn U cn rn M rn M M rn rn rn M O �fi ►a rn I Q F N k N O O d ON wail n.u.nAjans r., W) � as LLIAUJvaaznase.3S Docusign Envelope ID: FE2864DA-39A1-87E3-83DC-64358EB094D4 www.invarion.com Date:111612025 Author: Jared Dahlstedt Project; StutsmanGerbaz Comments: COA main street storm survey 7th st,-2nd st, 1 block at a time right lane closure MUTCD TA(22) 3 M�■�ifest 25 x 36" cones 2 x 36" W20=5 right lane closed ahead 2 x 36" W4=2 merge left Closure shifting one block at a time from 7th-2nd St i i S 1 Ilk, IL r ' RAFFIC CONTROL 1lared Dah1sled, . M try � 1 This and certtfla That per [he Western Cobrado Contractors AuoBadon (WCU( Traffic Control SupeMsorToining program, ta.a whiatdt hu mmpleted the requ4ements set forth by ColoradoD artmeatol Transport3don. 7-11 -�?o 3 a Grige iEnecutivc Diredw �?docusign. Certificate Of Completion Envelope Id: FE2864DA-39A1-87E3-83DC-64358EB094D4 Status: Completed Subject: Complete with Docusign: 2026-06-23-City_of_Aspen-Main_St_Inlet-A141-ExhibitB-2024-Design-Build_... Source Envelope: Document Pages: 42 Signatures: 2 Certificate Pages: 5 Initials: 0 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-07:00) Mountain Time (US & Canada) Record Tracking Status: Original 6/24/2026 11:09:39 AM Security Appliance Status: Connected Signer Events Katharine Johnson kate.johnson@aspen.gov City Attorney Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Accepted: 12/6/2021 3:40:29 PM ID: 356e51 a4-82fd-4dce-a85a-53a27dca34ba Pete Strecker pete.strecker@aspen.gov City Manager Pete Strecker Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Accepted: 6/24/2026 5:46:02 PM ID: 9be67f89-608b-4435-878e-3e407091 c12c In Person Signer Events Editor Delivery Events Agent Delivery Events Intermediary Delivery Events Certified Delivery Events Carbon Copy Events Witness Events Notary Events Envelope Summary Events Envelope Sent Holder: Nicole Henning nicole.henning@aspen.gov Pool: StateLocal Signature DocuSigned by: Pin 32737E 149ED5457... Signature Adoption: Pre -selected Style Using IP Address: 64.39.229.1 Signed by: P� SfVY-G�t.l� 7763E0500940430... Signature Adoption: Pre -selected Style Using IP Address: 64.39.229.1 Signature Stafius Status Status Status Status Signature Signature Status Hashed/Encrypted Envelope Originator: Nicole Henning 427 Rio Grande Place Aspen, CO 81611 nicole.henning@aspen.gov IP Address: 64.39.229.1 Location: DocuSign Timestamp Sent: 6/24/2026 11:11:01 AM Viewed: 6/26/2026 11:29:31 AM Signed: 6/26/2026 11:29:43 AM Sent: 6/24/2026 11:11:00 AM Viewed: 6/24/2026 5:46:02 PM Signed: 6/24/2026 5:46:18 PM Timestamp Timestamp Timestamp Timestamp Timestamp Timestamp Timestamp Timestamp Timestamps 6/24/2026 11:11:01 AM Envelope Summary Events Status Timestamps Certified Delivered Signing Complete Completed Security Checked Security Checked Security Checked 6/24/2026 5:46:02 PM 6/24/2026 5:46:18 PM 6/26/2026 11:29:43 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check -box indicating you wish to withdraw your consent, or you may; ii. send us an email to tara.nelson@cityofaspen.com and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusi n om/guides/signer- ig� ide_ si nig ng-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (1) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check -box next to `I agree to use electronic records and signatures' before clicking `CONTINUE' within the DocuSign system. By selecting the check -box next to `I agree to use electronic records and signatures', you confirm that: • You can access and read this Electronic Record and Signature Disclosure; and • You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and • Until or unless you notify City of Aspen as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Aspen during the course of your relationship with City of Aspen. Electronic Record and Signature Disclosure created on: 5/27/2020 1:57:50 PM Parties agreed to: Katharine Johnson, Pete Strecker ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Aspen we, us or Company) maybe required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check -box next to `I agree to use electronic records and. signatures' before clicking `CONTINUE' within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per -page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions. with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given is. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Aspen: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: tara.nelson@cityofaspen.com To contact us by paper mail, please send correspondence to: City of Aspen 130 S Galena Aspen, 81611-1902 To advise City of Aspen of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at tara.nelson@cityofaspen.com and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Aspen To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to tara.nelson@cityofaspen.com and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Aspen