HomeMy WebLinkAboutcoa.lu.sm.Maroon Creek Pedbridge.A03702
r"'5
CASE NUMBER
PARCEL ID #
CASE NAME
PROJECT ADDRESS
PLANNER
CASE TYPE
OWNER/APPLICANT
REPRESENTATIVE
DATE OF FINAL ACTION
CITY COUNCIL ACTION
PZ ACTION
ADMIN ACTION
BOA ACTION
DATE CLOSED
BY
/
o
A037 -02
2735-142-00851
Maroon Creek Pedestrian Bridge Stream Margin Exemption
James Lindt
Stream Margin Exemption
City of Aspen Parks Department
Tom Newland
5/14/02
Approved
5/17102
J. Lindt
n
tl
,
(\. 0 fir <.0 .. .
' d dec( SICJq-Vt ( rff
Q-kY,w t- I v 5 +TI you:5 ~/- :co '31.\8
6 1(\ V\ e-d. ~"\ 0. [] o^,,~ "0, e ~d
::J Lc'lA.cn 0(,,( '0 , * ..
' c; @ tl\.Sr 1/ ~i q 2i 1;<'=> V\ /<<"
c "3:d. i /l
I ~'I{t
Ha~ 14 02 OS:53a NPR inc
MAY-14-2002 TUE 08:36 A~.
S?OS2?BI4B
r"l
FAX NO,
MEMORANDUM
TO:
Joyce Ohlson, Community Development Deputy Director
James Lindt, Planner l51--
fROM:
RE:
Maroon Creek Pl....eslrilln Bridge Slr~m Margin Review Exemption
PATR:
May 14,2002
SIIMM4RV:
The City of Aspen Parks Depal'Lmenl, OWner, h.1S applied for an exemption from
tl,e Stream Margin Review to construct a pedestrian bridge over Maroon Creek
trom tbc Iselin Park Recreation Complex parcel 10 Common Lot Q of lhe Maroon
Creek Club SubdivisionIPUD. The pedestrian bridge is proposed to span aboul
606 feet and be 16 feet wide. The locatioll of the proposed bridge was approved
ill both the Iselin Park PUD and the Maroon Creek Club PUD.
An easement to land the bridge on Common Lot Q was dedicated to Pitldn
County and subsequently transferred to the City of Aspen when the Maroon Creek
Club Subdivision was a.nncxed into the City. The City ,)f Aspen has entered into
a Construction Licensc with the Maroon Creek Club MasICrs Association as is
required by the Maroon Creek Club Subdivision Improvements Al!'eemellL TI,e
proposed pedestrian bridge is intended to provide a year round trail connection
between the base of Tiehack Ski Area and the Iselin Park Facility lIS is envisioned
in the 2000 Aspen Area Comm,n,ily Plan's Opcn Space and Trails Map.
Pursuant to Land Use Code Section 26.435.040(B)(I), Slream Margill
Exemptions, tile Community Development Direclor may exempt construetioll of
pedestrian bridges if it is found thatlhe proposal docs not block drainoge elullUlels
during peak now~ and lhat the Stream Margin Review Standards arc adhered to
tho extent practical.
ApPLICAN'n
City of Aspen Parks Department. Represcnted by Tom Newland, Newland
Projcct Resources. Inc.
LOCATION:
Iselin Park Rccrcation Complex to Commolll.ol Q, Maroon Creek Club
Subdivision/PUn
ZONIN(;;
Iselin Park Complex Parcel- Park PUDISP A
Lot Q, Mittoon Creek Club Subdivision- Wildlife PreStlrve PUD
1
p.2
P. 02/07
Ma~ 14 02 09:53a NPR inc
MAY-14-2002 rUE 08:36 A~
9709278148
.~
FAX NO.
REVIEW PROC.;nlJRIi::
Pevelopmcnlthat meets the criteria in Exhibit" A" may he approved by the
Community Development Director.
STAFF COMMENTS:
Review criteria and StaffPindings have been included a.~ Exhibit "A." The
application bas been included as Exhibit "1'1."
RECOMMI',I';I)ATION:
Slaff recommends the Community l>cvclopmenl Oirector approve tbc proposed
Stream Margin Exemplion with the following condilions:
1. The development shall OCCUI as represented in this application.
2. If lighting is propo...:l 011 the bridge in thc future, the Iigllting shall comply wid, the City of
Aspen's Lighting Ordinance. Th. Applicant shall s\lbmit a de~,i1cd lighting plan to be
approvcd by the City of Aspen Zoning Ofticer prior to placing any lighting on the bridge.
3, Usc of mOlor vehicles on Ihe bridge shall bo poohibilCd except for the pU!')lose of
maintenanec and emergency serv iecs.
iI. rhe Applicanl shall s\lbmit lU1 erosion control plan to the City of Aspen Ellglneering
Department for approval prior to conslrllelion. The Applic.nt shall rcvegetate any aroos
dlstur~ed during eonslruetion.
S. The proposed bridge sholl remain in compliance with MSHTO rcqnirements throllghout thc
construction process.
A"PROV AL
I hereby approve this Stream Margin Exemption for d,e construction of a pedestrian
bridge from the Iselin Park Rccreation Complex to COIDlIlon Lot Q, of the Maroon Creek
Clllb Subdivision with the .bove conditions.
. date5/'r7102.
hlson, Community Development DCtu\Ybirector
AC(:F.PTANCE:
I, ns II person being or repre,~ming the applicant, do hereby undcrstand and agree to
Ihe conditions of this approval and certify the in natio ovidcd in this
application is correct to the best 0 know c,
date~)'Ji/OZ-
, d, rcprcsc tin City of Aspen ~ks Dcpartment.
A'ITAClIMENTS
ElIhibit A-StaffComments
Exhibit B-Application
Exhibit C-..Referral Comments
Exhibit D...MlU'ooll Creek Club Master's Associalion Construction Lieen,~e
2
p.3
P. 03/07
Ma~ 14 02 09:54a NPR inc
MAY-14-2002 rUE 08:36 A~i
FAX NO,
9709278148
r\
EXHIBIT A
REVIEW CRITERIA AND STAFF FINDINGS:
An application for a strcam margin exemption for the construction of a pedcstl'ian bridge
may be appnweu if it complies with the following criteria to the extent practical.
1. II can be demonslrored Ih,,1 any proposed developmem which is in the Speci,,1
Flood Hazard Area will nOI increase the base flood elevalion on the parcel
proposed for development, 7'111s ,rhull be demonstrared by <m engineering
study prepared by a pr~{essionaJ engineer registered to prc":lice in Ihe Srore
of Colorado which shows Ihat II,e hose .flood elevat;on will not be ralseli.
including, hut not limited to. proposing mitigation techniques on or off-site
which ct>mpensole for Imy iJase flood elevation increase caused by the
development; and
!illl.lJ Findine
Staff dlles not believe that the proposed pedestrian bridge will increase the base J100d
elevation. The bridge's support beams are proposed 10 be located 105 feet in clevation
above the high waler line of Maroon Creek, Therefore, Staff feels thatlhe proposed
blidge will not effect the base flood elevation. Additionally, Starr has proposed a
condition of approval that requires the Applicant to submit a detailed erosion control plan
to the City Engineering for approval prior to starting construction. Staff finds this
criterion to be met.
2. The recommend"tian.l' of the Aspen Area Community Plan.'
l'arkslR,,'rel/lionlOpen Space/Trai/.r Plan ane/the Roaring Fork River
Greenway Plall are implemented in the pyoptmd pl/ll1/or development. lrJ the
greotcst extent praclicaiJle. Areas o/hislOric jmblic use or l/,'ce.tr shall be
dedicated viu a recorded eosement Jil" public use. A fishe,.man 's easemellt
granting public fishing acce.rs within Ihe high water boundaries of the river
course shall be gra",ed tQ Ihe greatesl eXlelll1'".\'.,ibl. via a ,.ecorded
"Fisherman's Easement;" and,
SlafUJndine
Staff believes that the proposed bridge is cC>I1sistent with the 2000 Aspen Area
Community Plal1. The MCr's Open Space and Trails map identifies the prllposcd uail
C(lIlllcclion between Iselin Park and the base of TichacklBullermilk Mountain that tbe
proposed pedcstrian bridge will allow 10 become reality. Additionally, the AACP
includes as an objcctive to "improve public access 10 parks and recreation facilities".
Staff believes that the proposed bridge is in keering with the lIforl'menti()ned conlmllnily
goal. Stafffillds this criterion to be met.
3. There is no vegetation removed or damaged or sl"pe grade changes (CUI or
fill) made olltside of a specifically definecl bllilcfin,~ envelope. A building
ClIve/ope shall be designated iJy Ihis review arid ..ald envelope shall be
,'ec,Jrl/ed on a plat pur.ruantto Seclio" 26,435.040(1")(1).
p.4
p, 04/07
Ma~ 14 02 09:54a NPR inc
MAY-14-2002 TUE 08:36 A~
FAX NO,
9709278148
o
~lalT Findin!!
There is no specifically defined building envelope, but the proposed bridlle is to be
located within the confines of the designall:d casements. A slight change in grade is
proposed for the arch supports. Staff has proposed a condition of approval thai requires
the Applicant to revegetate the disturbed area with natural vegetation. Staffbeleives that
the proposed regrading will not negatively impact tbe riparian area because the regrading
will OCCllr 10S feet above the mean high water line of Maroon Creek. Staff finds this
criterion to be met.
4. The proposed development dllcs no/ pollule or inlerfere with the nalural
changes of Ihe river, slream or olher tribulary, including erosion andJ()J'
sedimenlation during cOI1structio/l Increased on-site Ilrainage shall be
I,ccommodated within Ihe pi//'cel to pre"ent enlry into the river Or onlo iLl'
banks. Pools or hollubs cOllnot be drained oulside of lhe designuled bllilding
envelope; and.
Staff Findinll
Stafr does not belicve that the proposed bridge willl'ollutc or interfere with the nlltunll
ehan8e~ of tho rivor due to the fact Ih:11 the hridGo is to be located a considerable dist:mco
ahove Maroon Creek. Additionally, Staff has proposed a condition of approval that
requires the Applicant to submit a detailed erosion control plan to the Cily Engineering
Departll1ent for approval prior to construction, Staff finds tlus criterion to be met.
5. Wrlrren nOllce is given tlllhe Colorado Water Conservl/lilm Board prill,-Io
any alteralion (JI' relocalion of a waler course. and a copy of saM not/ce
submit/cd to the Federal Emergency Mlml/gemtnl Agency; and,
Slllf!!lndinl1:
Thero is no a1temtion or relocation of a watercourse being proposed, Staff finds this
criterion to be met.
6. A gUl/rantce is provided in the evenl a waler cour.~e i.r altered O/' relocaled
Ihal applies II) ,h. developer and his heirs, successors ,mtl assigns Ihal
en.<ures (hal/he flood carrying capacity on Ih. parcel i.1 nol diminished; and.
Stafl' Findinl!
A WaleI' course will not be altered or rel(lcated. Therefore, II guarantee is 110t reqllired.
SlatT /inds this criterion to be met.
7. Copies are provided of 01/ necessary felleml and Slllle permits relating to
wCl1'k within Ihe one.hundred-yel" floodpl{lin; {lnd,
p.5
P. 05/07
. ,
Ma~ 14 02 09:54a NPR inc
MAY-14-2002 rUE 08:37 A~
FAX NO,
9709278148
f"'}
Staff Filldin2
Tile 100 year floodplain is very narrow ill the area proposed for the pedestril\ll bridlle dlle
to the steep slopes Ihal exist on both side. of MaroOll Creek. Therefore, the bridge is
proposing no developmeullhat will conlact lhc ~rounc1 within the 100 year floodplain as
is designated on the FEMA Flood J nsurance Map. Staff finds this criterion to be met.
8. Thore is no developmen/ o/hor /hon approved no/Iv. vege/allon planling
witilin fifteen (15) je.t hock of the lop of slope or the high wl1terline.
whichever is mO.51 rUlrictive. This is an ~ffort to prolecl the exl.5/ing riparian
vege/llllon IInel bank stabililY. New plantlnlls (Including /rees. shnlbs. jlowers.
and grasses) olltside of Ihe designaled building envelope IIn the riv",. side
shall be nollve riparian vegelulion as approved by Ihe City. A landscape plan
will be sll/Jmilledwilh all development applicallon,5. The top o[slope alld 100
year jlllod plain elevalion of Ihe Roaring Fork River shall be de/ermined hy
the Slream Margin Mal) loea/ed In the Communily Developmenl DepllTlmenl
andjlled althe City Engineering Depurtment.
ShIff Findin2
The City Engineering Departlllent has determined Ihat all proposed grading alld
development tJI.1t is to have contact with the groUlld is located well above the 100 year
floodplain. Land Use Code Section 26.435,040(B)(1), Stream Margin Exemptions,
specifically exempts pedestrian bridges fronl the Stream Margin Review Process given
that the propo~al comJllies with the Stream Margin Review Standards 10 the exlcnl
practical. Staff docs believes that the Top of Slope Setback requirement is intended to be
applied to residences and not bridges. Staff finds this criterion to be met.
9. All development oulsM. thefifleen (/ 5)footsetbackfrom the top "Is/"pe
does not exceed /I heigh! delineo/ed by a line drawn at aforty.jlve (45) degree
/Ingle frllm ground level at the top of slope. Height shall be mea.\.ured and
delel'mined by the Community Development J);reclor u.,ing the deJinilllmfor
heighl set forth (11 Secllon 26.04. ] on und methm/ of ca/culaling height sel
forth 01 Secllon 26.575.020, /lnd,
Staff Findine
The pr11l'Osal is not fO\' development of a residence or building. The plltpOSC of a bridge
is to cross the river. Therefore, Slaff does not feel that this specific criterion is applicable
and necessary for preserving the ripariallarea in relation to this specific proposal. Slaff
finds this criterion not to be applicable to this applicatiol\.
] O. AU exterior lighting is low and downcmt wilh II<llighl(s) di,e"ted toward Ihe
rive, "r localed down the .1'lope and ..holl he in complianee with secllon
26.575.] 50. A lighting plllll will be submitted with all developmenJ
01'1'1 ieal jans; and,
p.s
P. 06/07
Ma~ 14 02 09:54a NPR ino
, . MAY-]Q-2002 TUE 08:37 AM'""j
9709278148
FAX NO.
:-
C......,:>~
Staff Findiul!
The outd(l(ll' lighting shall comply with the City of Aspen Lighting Code. Staff has
proposed a condition of approval that requires the Applicant to subl1lil a detailed lighting
plUllll) be approved by the City of ASpCJI Zoning Officer prior to erecting allY lighting on
Ihe bridge. Staff finds this criterion to be met.
1/. 17,ere has been accurate identiflcOli()fl of wel/ondr and ripariun zones.
SlaffFi':'.!!i!!!
Aceordingto the FEMA Flood Insul'anee Maps, no portion oflhe proposed bridge makes contact
with the ground within a wetland or Ihe 100 year lIoo<lplain. Staff finds thiHriter;on 10 be mel.
p.7
P. 07/07
(\
MEMORANDUM
A
To: Development Review Committee
From: John Niewoehner, Community Development Engineer
Reference DRC Case load Coordinator
Date: May 1, 2002
Re: Maroon Creek Pedestrian Bridqe
Attendees:
John Niewoehner, Community Deveiopment Department
James Lindt, Community Development Department
Dennis Murray, Building
Brian Flynn, Parks
Phil Overeyner, Aspen Water (and Electric)
Richard Goulding, Engineering
Nick Adeh, Engineering
Tom Newland, Parks
Jeff Woods, Parks
Ben Ludlow, Assets Management
General
On May 1, 2002 the Development Review Committee (DRC) reviewed the Maroon Creek
Pedestrian Bridge. The proposed City project will construct a 600-foot long and 14-foot wide
pedestrian bridge over Castle Creek between Iselin and the Maroon Creek Club.
Sufficiency of Submittal: DRC comments are based on the fact that we assume the submitted
site plan is accurate, that it shows ail site features, and that proposed development is feasible.
The following are the comments of the DRC on the proposed project:
Site Review
1. Enqineerinq Department: Requests a sediment/erosion control plan.
2. Community Development Enqineer: No comments at this time
3. Zoninq: No comments at this time.
4. Housinq Department: No comments at this time.
5. Fire Protection District: No comments at this time.
6. Parks Department: No comments at this time.
7. Buildinq Department: Requests that the walls (handrails) on the side of bridge deck be
verticai to make bridge safer to prevent people from climbing over the rails. Parks Dept.
responded that the walls would be 2-foot higher than required and be made of four-inch
mesh.
8. City Water Department The Water Department is piacing a 12" line under the bridge
deck.
9. Aspen Consolidated Sanitation District; No comments at this time.
10. Environmental Health: No comments at this time.
11. City Community Development - Planninq: No comments at this time.
Page 2 of2
May 1, 2002
DRC for Maroon Creek Pedestrian Bridge
r')
12. City Electric Department: Will place two conduits on bridge. (Holy Cross decided not to
install conduits for future use.)
13. Holy Cross Electric: No comments at this time
14. City Attorney: No comments at this time
15. Streets Department: No comments at this time
16. Historic Preservation Officer: No comments at this time
17. Pitkin County Planninq: No comments at this time
16. County and City Disaster Coordinator: No comments at this time
Approvals
1. Engineering:
The applicant receives approval from the City Engineering Department
(920-5080) for design of improvements, including grading, drainage,
transportation/streets, landscaping, and encroachments within public
right of way.
The applicant receives approval from the Parks Department (920-5120)
for vegetation species and for public trail disturbance.
2. Parks:
3. Streets:
The applicant receives approval from the Streets department (920-5130)
for mailboxes, finished pavement, surface materials on streets, and
alleyways.
4. Permits:
Obtain RO.W. permits for any work or development, involving street cuts
and landscaping from the Engineering Department
D:\DRC\MaroonCrk-Ped-Bridge.doc
r'1
()
"
........
..
James Lindt
Community Dev!,!lopment Departme~t
City of Aspen
130 S. Galena . Street
Aspen, CO 81611
THE CITY OF ASPEN
OFFICE OF THE'CITY ATTORNE'Y
April 10, 2002
RE: DISCLOSURE OF OWNERSHIp:'" MAROON CREEK PEDESTRIAN BRIDGE
Pear James; .
Please accept this letter as demo,nstration of the City of Aspen's ability' to construct a pedestrian
bridge on two parcels of land located within the City of Aspen. . .
The pedestrian bridge will span two properties:
Iselin Park property: This parcel is owned by the City of Aspen as recorded in Plat
Book !i8, Page 13,of tne Pitkin County Clerk and Recorders OffiCe. No mortgages,
judgments, liens, easements, contracts or agreements affect the City's right to use
this property for construction of the pedestrian bridge. .
Maroon Creek Club Common Lot Q. The City of Aspen has been granted an
easement recorded in Plat Book 33, page S of the Pitkin County Clerks Office, to
.place the pedestrian bridge over this commonly held open space parcel. 'No
mortgages, judgments, liens, easements or contracts affect the City's ability to use
this easerrtent for construction of the pedestrian bridge.
I hope this letter is sufficient for your needs. Please contact me if you have Ciny questions.
1)
2)
. Sincerely,
~~
Joh n Worcester, Attorney
130 SOUTH GALENA STREET' ASPEK, COLORADO 81611-1975 . PHO!\':E 970.920.5055 . FAX,970.920.5U9'
Printed on Recycled Paper
f"""'\
"""'
j"
(;;:'X~J'Jo N- "fJ)/
CONSTRUCTION LICENSE
IN CONSIDERATION ofthe sum ofTen Dollars ($10.00) and other good and valuable consideration, the
receipt and sufficiency of which is hereby acknowledged, Maroon Creek Club Masters Association
(HEREINAFTER "Licensor"), does hereby grant to the City Of Aspen, Colorado (hereinafter "Licensee") a
Construction License to use certain portions of its land lying within Section II, Township 10 South, Range
85 West of the 6th Principal Meridian, Pitkin County, Colorado, as more specifically shown on the attached
Exhibit "A" (hereinafter the "property"), under the following conditions:
I. PURPOSE OF LICENSE. The Construction License will permit the Licensee to utilize the
property described in Exhibit "A" for access to, staging and construction of what is known as the
Maroon Creek Pedestrian Bridge project, for which an easement has been recorded in Book 33,
Page 4 of the Pitkin County Clerk and Recorders Office as a part of the plat for the Maroon Creek
Club development. The structure to be placed is a 14-foot wide, arch-deck pedestrian bridge
constructed as shown on Exhibit "B". No structures other than those hereinabove provided and
utility extensions, including a water line extension and conduit for future communication/electrical
lines that are attached to the pedestrian bridge, shall be erected, constructed or placed upon said
property by the Licensee without prior written consent of the Licensor.
2. WORK SCHEDULE. Attached as Exhibit "c" is a construction schedule showing the various
stages of bridge construction and the anticipated construction traffic generated by each stage.
Licensee agrees that no work will be done to erect the bridge on the Tiehack side of Maroon Creek
between May 25, 2002 and September 3,2002. The Licensee and its contractor may apply for
exceptions to this prohibition that will be considered and approved by the MCCMA Board on a
case-by-case basis. Licensee agrees to comply with road weight restrictions imposed on Tiehack
Road from April 15th to June 15th. Compliance with the weight restrictions may include limiting
loads and increasing trips. Work to erect the bridge includes construction access, staging and
erection of the bridge as defmed in Exhibit "A". The Licensor agrees to release the Licensee from
the requirement of the Subdivision Improvements Agreement to have the bridge completed within
18 months of initial construction (April 17, 2003). Work shall not be conducted before 7:00 am or
after 7:00 pm and shall not occur on Saturdays and Sundays unless as provided under this
agreement.
3. ROAD USE FEE. Licensee shall be responsible for, and at its expense provide prior to initiation
of bridge construction from the property, a mutually determined road impact fee of Nine-thousand
($9000.00) dollars. Licensee further agrees to provide an appropriate level of traffic control on
Tiehack Road during the delivery of the steel frame for the bridge (after September 3"'). The
traffic control plan shall include flagmen at intersections during these delivery events and
sufficient notice of construction activities that may impact road use.
4. STAGING AREA. Licensee shall have the ability to use the Tiehack parking areas (Lots 14 and
IS) for construction staging. Lot 14, located south and west of the Construction Area, shall be
used for staging from the initiation of the project until May 25th. Lot 15, located north and west of
the Construction Area, will be used for construction staging and steel delivery after September 3'0.
Access to mail delivery boxes on the north end of the Lot 15 parking lot shall be maintained at all
times. Licensee shall flag and fence as necessary all construction and staging areas during the
course of the work. In return for using the parking lots, Licensee agrees to share equally in the
costs of sealing the asphalt surface of the parking lot in Lot IS after the project is completed. In
an effort to avoid homeowner concerns, Licensee shall not at any time park or idle vehicles, or
store materials on any OF LICENSOR'S roads, driveways or properties other than those
specifically defined herein.
5. TERMINATION. With the exception of Exhibit "D", the Letter of Understanding between the
Licensee and the Licensor, this Construction License shall automatically terminate and be of no
force or effect upon the completion of construction of the Maroon Creek Pedestrian Bridge and
A
n
satisfactory completion of the Landscape Plan for the property. Licensor and Licensee shall make
a mutual assessment of the License Area both prior to initiation of the project after completion of
the project It is acknowledged that the fmal assessment may not occur until July of2003 to verify
road/parking lot damage and the success of the revegetation plan.
6. LANDSCAPE PLAN. A landscape plan for the License area is attached as Exhibit "E".
Licensee shall be responsible for implementing the plan. If any buildings, structures, landscaping,
fences, ditches, or other improvements on the property are damaged or destroyed by the
construction activities of the Licensee, Licensee shall promptly replace, repair and otherwise
restore these improvements to the previous condition.
7. VIOLATIONS OF LICENSE. The Licensee agrees that its contractor shall post a construction
performance bond for an amount of$IOO,OOO that incorporates a daily penalty of$I,150 for
violations of the License. Licensor or any beneficiary of the agreement retains the right to collect
reasonable attorney's fees and costs in the event of enforcement action and also retains the right to
injunctive relief and forfeiture of the performance bond.
8. PUBLIC USE AND MAINTENANCE OF BRIDGE. Upon its completion, Licensee shall be
responsible for maintaining, repairing and otherwise operating the Maroon Creek Pedestrian
Bridge. Licensee and Licensor agree to abide by the terms and conditions of the Letter of
Understanding regarding public use of the Tiehack Parking Lots (Lots 14 and 15 of the Maroon
Creek Club Subdivision) that is attached as Exhibit "D".
9. ADDED SIGNATORY. The Maroon Creek Limited Liability Company is hereby named a
signatory to this License and is deemed a beneficiary of this agreement with complete rights of
enforcement
THIS AGREEMENT shall be binding upon and inure to the benefit of the parties and their successors and
assigns. Nothing herein contained shall be deemed to restrict Licensor in the use and ownership of the
property burdened by the Construction License herein granted, except as any use may be inconsistent with
the rights granted hereunder. This license may be amended or modified only by a writing executed by the
parties hereto, their successors or assigns.
EXECUTED this _day of
,2002.
I
I
I
1
r")
LICENSOR:
MAROON CREEK CLUB MASTER ASSOCIATION
By:
President
Secretary
STATE OF
)
)
)
COUNTY OF
i)
The foregoing instrument was acknowledged before me this _ day of
by
My commission expires
Witness my hand and official seal.
Notary Public
SIGNATORY:
MAROON CREEK LIMITED LIABILITY COMPANY
By:
President
Secretary
STATE OF
)
)
)
COUNTY OF
The foregoing instrument was acknowledged before me this _ day of
by
My commission expires
Witness my hand and official seal.
Notary Public
,2002,
,2002,
I")
()
LICENSEE:
CITY OF ASPEN
ATTEST:
STATE OF
COUNTY OF
)
)
)
The foregoing instrument was acknowledged before me this _ day of
by
,2002,
My commission expires
Witness my hand and official seal.
Notary Public
t"")
A
EXHIBIT "A"
DESCRIPTION OF CONSTRUCTION LICENSE AREA
That portion of Parcel Q (Common Area) and Lot 15 (parking lot), Maroon Creek Club as shown on the
attached map; Lot 15, Maroon Creek Club for construction staging only; Tiehack Road from Lot 15 to
State Highway 82 for construction access only.
"Access Areas" on the mapping refers to the public section of Tiehack Road from State Highway 82 to the
eastern Tiehack Parking Lot. This area will be for access only to the Staging Area and Construction Area.
"Staging Area" on the mapping refers to the public parking area on Lot 15 of the Maroon Creek Club PUD.
This area will be for construction-related parking, construction staging and temporary storage of
construction materials.
"Construction Area" on the mapping refers to that portion of Common Lot Q that is required to construct
and gain access to construction of the bridge from the Staging Area and the Access Area.
r-,
EXHIBIT "B"
MAROON CREEK BRIDGE PLANS
f)
~
A
,
EXHIBIT "c"
CONSTRUCTION SCHEDULE AND ANTICIPATED CONSTRUCTION TRAFFIC: GENERATION
FOR THE MAROON CREEK BRIDGE
r'I,
(""\
".1
EXHIBIT "D"
LETTER OF UNDERSTANDING BETWEEN THE CITY OF ASPEN AND THE MAROON CREEK
CLUB MASTERS ASSOCIATION REGARDING THE PUBLIC USE OF TIlE TIEHACK PARKING
LOTS
If"""\
~
.'
City of Aspen
130 S. Galena Street
Aspen, CO 81611
Maroon Creek Club Masters Association and the
Maroon Creek Limited Liability Company
c/o Brian Martin
Maroon Creek Club
10 Club Circle
Aspen, CO 8161J
January 17,2002
Dear Board Members:
This letter is to memorialize our mutual understanding regarding the public use of the Tiehack Base
Parking Lot, located on Lot 14 of the Maroon Creek Club.
The parties agree that:
. The Tiehack base parking lots are available for daytime use by the public to access the Tiehack ski
area, trails and public lands as described within the public easement granted by the Maroon Creek
Club as a part of its development approvaL Attached to this letter is a copy of the public easement
for the Tiehack Base Parking Lots as recorded in Book 730 page 655 of the Pitkin County Clerk
and Recorders Office.
. The Maroon Creek Pedestrian Bridge to be constructed by the City of Aspen will connect the
Tiehack Base area with the Iselin Park property. Upon completion, the bridge will be maintained
and operated solely by the City of Aspen for the primary purposes of connecting pedestrian trails
and Nordic ski trails in the area.
. The City of Aspen and the Maroon Creek Club Masters Association agree to work together to
insure that the use of the Tiehack Lots remain consistent with the use requirements within the
public easement. This will be done through close communication and coordination between the
two entities regarding this issue. The contact person for the City of Aspen will be the Manager of
Parks and Recreation or hislher designee. The contact person for the LICENSOR will be the Club
Manager for the Maroon Creek Club or hislher designee. In addition to providing close
communication and coordination concerning the parking lots, the parties agree to implement the
following:
. The City of Aspen agrees to request the permission of the Maroon Creek Masters Club Board of
Directors to utilize the parking lots for overflow parking related to any special event that may be
conducted at the Iselin Park Recreational Complex. The City shall obtain this approval from the
Board of Directors prior to using the parking lots in this capacity. Any request will include a
description of the need for use ofthe parking 10t( s), a schedule for said use and a parking/traffic
management plan
. If the use of private property or private roads in the Maroon Creek Club occurs by the general
public, the Maroon Creek Club Masters Association agrees that it will be responsible for any
measures it feels is appropriate to stop said use from occurring.
. The City of Aspen agrees to keep the Maroon Creek Pedestrian Bridge nnlighted and to inform
potential users that the bridge is not intended for nighttime use through the placement of
informational signage on either end of the bridge deck.
I""";
. As the Maroon Creek Pedestrian Bridge will be a part of the City of Aspen Trails system, dogs
will be required to be leashed when using the bridge and when accessing public trails from the
bridge.
By signing this letter below, the parties do hereby agree to abide by the conditions of this Letter of
Understanding. Neither the City, the Association nor the Company are waiving their rights regarding the
language and limitations of all previous agreements by signing this Letter of Understanding. Nothing contained
herein shall expand upon the pennitted uses of the Tiehack Parking lots as described within the attached public
access easement
FOR THE CITY OF ASPEN:
Responsible party for the City:
Name
Title
130 S. Galena Street
Aspen, CO 81611
(970) 920-5120)
FOR THE MAROON CREEK CLUB MASTERS ASSOCIATION:
Responsible Party for the Maroon Creek Club Masters Association:
Name
Title
c/o Maroon Creek Club
10 Club Circle
Aspen, CO 81611
(970) 920-1533
"
n
EXHIBIT "E"
Landscape Plan for License Area
The City shall completely revegetate and reclaim all areas disturbed or impacted within the Construction
Area and the Staging Area (see Exhibit "A"). Revegetation of the site shall be accomplished by reseeding
with a native grass mix comparable to those described within the Recommended Plant List below. In
addition, any portion of the Construction Area or Staging Area that is in need of reclamation after the
bridge is constructed will be revegetated with native brush species comparable to those described within the
Recommended Plant List. Placement ofthe shrub species will be determined in the field and based upon
the densities of existing shrubs surrounding the Construction and Staging areas. Preparatory to planting
and seeding, the Construction area will be regraded and shaped to the existing grades arid topography
present prior to construction activities. This work shall be accomplished so that it blends into the existing
topography, concealing the temporary road cuts placed to gain access to the spread footings and abutments
of the bridge. At least four (4) inches of native topsoil shall be placed and tilled to the desired line and
grade. The top four (4) inches of soil shall be free of rocks and other foreign matter before reseeding
begins.
The City shall employ hydraulic or hand broadcast seeding of the topsoil. All seed shall be furnished in bags or
other containers clearly labeled to show the name and address of the supplier, the seed name, the lot number,
net weight, origin, the percent weed content, the guaranteed percentage of purity and germination, and the
pounds of pure live seed of each seed species in the container. All brands furnished shall be free from such
noxious weeds as Russian or Canadian Thistle, European Bindweed, Johnson Grass and Leafy Spurge.
Seed types and amount of pure live seed required per acre shall be in conformance with the surrounding native
grasses and be determined by the applicant. If desired, the Licensor may review the proposed seed mix for its
compatibility with the surrounding vegetation and approve it before use. The applicant shall also be
responsible for assuring the Licensor that the areas to be revegetated will grow and take root to the soils in the
disturbed areas. This will include any watering or fertilizing needed to insure or otherwise promote this growth.
To guarantee the revegetation, the City will provide a bond to the Licensor. The bond will be equal to the costs
of revegetation, and will be released to the City when it is determined by the Licensor that the revegetation of
the disturbed areas has been successfully completed. Payment and Performance Bond for an amount set by the
Licensor shall be provided and secured unto the Licensor, and, if the work is not completed as specified, any
security shall be in default and the Licensor shall recover on the security, provided notice of non-compliance is
given in writing to the City by the Licensor. The surety executing any bond shall continue to be fmnly bound
under a continuing obligation for the payment of all necessary costs and expenses that may be incurred or
expended by the Licensor in causing any unsatisfactory work to be corrected or any unfinished work to be
completed. Securities other than a bond, such as cash payment or letter of credit, shall be approved by the
Licensor prior to permit issuance.
Ifwithin a one-year period from the revegetation effort a successful stand of native shrubs and grasses has not
been accomplished, the Licensor may, at its discretion, retain any and all of the assurance monies necessary in
order to attempt revegetation of the grounds. A successful stand of native grasses is defined as being at a 75%
germination rate andlor having a vegetation cover equal to or greater than the surrounding vegetation cover.
The success of the revegetation efforts will be measured at the end of the summer growing season by the
Licensor who will approve or reject it between that time and the end of the one-year assurance period.
r"\
Recommended Plant List
Trees:
Scrub Oak
Western Juniper
Shrubs:
f"\
, ~
Amelanchier alnifolia - Serviceberry
Artemesia frigida - Fringed Sage
Artemesia tridentate "Vaseyana" - Mountain Sage
Cercocarpus mountanus - Mountain Mahogany
Purshia tridentata - Antelope bitterbrush
Seeding:
Native Seed Mix
Common Name
Scientific Name
Pure Live Seed
LBSI Acre
Western Wheatgrass
Mountain Brome
Slender Wheatgrass
Thickspike Wheatgrass
Indian Ricegrass
Blue Flax
Rocky Mt. Penstemon
Agropyron
Bromus marginatus
Agropyron trachycaulum
Agropyron dasystachum
Oryzopsis hymenoides
Linum lewisii
Penstemon strictus
Total pounds live seed per acre (broadcast)
10
6
6
6
4
.5
I
33.5
Ha~ 14 02 09:53a
NPR ino
9709278148
n
p.1
~
PhOne: (970)927-'1645; Fax: (970)927-8148
Newland Project
Resources, Inc.
Fax
To: )'6-vv\,,/ l \ f'\~'+
From: Tom Newland
Phone:
Pag- J.
Date: .5 \ \ \.( \ 02.-
F.....
Reo
eel
o Urgent 0 For "-vi_ 0 ....... Cw~......IIf: 0 PI_ Reply 0 PlMse Recycle
-----
j 6-.'Mih -
S\C~ v-..d 6--CC.CV< ~ ~ f-
7~ ~~ ~\CA-J'
/
--rJ
(""\
n
130 S. Galena Sf.
Aspen CO 81611
(970) 920-5090
(970) 920-5439, fax
Aspen/Pitkin
Community
Development
Department
Fax
To: Tom Newland From: James Lindt
Fax: 927-8148 Pages:
Phone: Date: 5/14/02
Re: Ped. Bridge Decision Notice CC:
o Urgent
o For Review
o Please Comment 0 Please Reply
o Please Recycle
. Comments:
Hi Tom,
Please find attached the Maroon Creek Pedestrian Bridge Decision Notice. Piease sign the decision
notice and return it to me. Also, at your convenience please get me copy of the signed construction
license for the casefile. Please let me know if you have any questions or concerns about the decision
notice.
Thanks,
James
r"\
()
MEMORANDUM
TO:
Joyce Ohlson, Community Development Deputy Director
FROM:
James Lindt, Planner IJ1,-
RE:
Maroon Creek Pedestrian Bridge Stream Margin Review Exemption
DATE:
May 14, 2002
SUMMARY:
The City of Aspen Parks Department, owner, has applied for an exemption from
the Stream Margin Review to construct a pedestrian bridge over Maroon Creek
from the Iselin Park Recreation Complex parcel to Common Lot Q of the Maroon
Creek Club Subdivision/PUD. The pedestrian bridge is proposed to span about
606 feet and be 16 feet wide. The location of the proposed bridge was approved
in both the Iselin Park pub and the Maroon Creek Club PUD.
An easement to land the bridge on Common Lot Q was dedicated to Pitkin
County and subsequently transferred to the City of Aspen when the Maroon Creek
Club Subdivision was annexed into the City. The City of Aspen has entered into
a Construction License with the Maroon Creek Club Masters Association as is
required by the Maroon Creek Club Subdivision Improvements Agreement. The
proposed pedestrian bridge is intended to provide a year round trail connection
between the base of Tiehack Ski Area and the Iselin Park Facility as is envisioned
in the 2000 Aspen Area Community Plan's Open Space and Trails Map.
Pursuant to Land Use Code Section 26.435.040(B)(1), Stream Margin
Exemptions, the Community Development Director may exempt construction of
pedestrian bridges if it is found that the proposal does not block drainage channels
during peak flows and that the Stream Margin Review Standards are adhered to
the extent practical.
ApPLICANT:
City of Aspen Parks Department. Represented by Tom Newland, Newland
Project Resources, Inc.
LOCATION:
Iselin Park Recreation Complex to Common Lot Q, Maroon Creek Club
SubdivisionlPUD
ZONING:
Iselin Park Complex Parcel- Park PUD/SPA
Lot Q, Maroon Creek Club Subdivision- Wildlife Preserve PUD
I
!)
~
REVIEW PROCEDURE:
Development that meets the criteria in Exhibit "A" may be approved by the
Community Development Director.
STAFF COMMENTS:
Review criteria and Staff Findings have been included as Exhibit "A." The
application has been included as Exhibit "B."
RECOMMENDATION:
Staff recommends the Community Development Director approve the proposed
Stream Margin Exemption with the following conditions:
J. The development shall occur as represented in this application.
2. If lighting is proposed on the bridge in the future, the lighting shall comply with the City of
Aspen's Lighting Ordinance. The Applicant shall submit a detailed lighting plan to be
approved by the City of Aspen Zoning Officer prior to placing any lighting on the bridge.
3. Use of motor vehicles on the bridge shall be prohibited except for the purpose of
maintenance and emergency services.
4. The Applicant shall submit an erosion control plan to the City of Aspen Engineering
Department for approval prior to construction. The Applicant shall revegetate any areas
disturbed during construction.
S. The proposed bridge shall remain in compliance with AASHTO requirements throughout the
construction process.
ApPROVAL
I hereby approve this Stream Margin Exemption for the construction of a pedestrian
bridge from the Iselin Park Recreation Complex to Common Lot Q, of the Maroon Creek
Club Subdivision with the above conditions.
~)~1)1h---- date 5/0 /o?..
Joyc Ohlson, Commumty Development ~lrector
ACCEPTANCE:
I, as a person being or representing the applicant, do hereby understand and agree to
the conditions of this approval and certify the information provided in this
application is correct to the best of my knowledge.
date
Tom Newland, representing City of Aspen Parks Department,
owner.
ATTACHMENTS
Exhibit A-Staff Comments
Exhibit B-Application
Exhibit C---Referral Comments
Exhibit D---Maroon Creek Club Master's Association Construction License
2
t"""\
f\
EXHmlT A
REVIEW CRITERIA AND STAFF FINDINGS:
An application for a stream margin exemption for the construction of a pedestrian bridge
may be approved if it complies with the following criteria to the extent practical.
1. It can be demonstrated that any proposed development which is in the Special
Flood Hazard Area will not increase the base flood elevation on the parcel
proposed for development. This shall be demonstrated by an engineering
study prepared by a professional engineer registered to practice in the State
of Colorado which shows that the base flood elevation will not be raised,
including, but not limited to, proposing mitigation techniques on or off-site
which compensate for any base flood elevation increase caused by the
development; and
Staff Finding
Staff does not believe that the proposed pedestrian bridge will increase the base flood
elevation. The bridge's support beams are proposed to be located 105 feet in elevation
above the high water line of Maroon Creek. Therefore, Staff feels that the proposed
bridge will not effect the base flood elevation. Additionally, Staff has proposed a
condition of approval that requires the Applicant to submit a detailed erosion control plan
to the City Engineering for approval prior to starting construction. Staff finds this
criterion to be met.
2. The recommendations of the Aspen Area Community Plan:
Parks/Recreation/Open Space/Trails Plan and the Roaring Fork River
Greenway Plan are implemented in the proposed plan for development, to the
greatest extent practicable. Areas of historic public use or access shall be
dedicated via a recorded easement for public use. A fisherman's easement
granting public fishing access within the high water boundaries of the river
course shall be granted to the greatest extent possible via a recorded
"Fisherman's Easement;" and,
Staff Finding
Staff believes that the proposed bridge is consistent with the 2000 Aspen Area
Community Plan. The MCP's Open Space and Trails map identifies the proposed trail
connection between Iselin Park and the base of Tiehack/Buttermilk Mountain that the
proposed pedestrian bridge will allow to become reality. Additionally, the AACP
includes as an objective to "improve public access to parks and recreation facilities".
Staff believes that the proposed bridge is in keeping with the aforementioned community
goal. Staff finds this criterion to be met.
3. There is no vegetation removed or damaged or slope grade changes (cut or
filV made outside of a specifically defined building envelope. A building
envelope shall be designated by this review and said envelope shall be
recorded on a plat pursuant to Section 26.435. 040(F)(I).
~
(\
Staff Finding
There is no specifically defined building envelope, but the proposed bridge is to be
located within the confines of the designated easements. A slight change in grade is
proposed for the arch supports. Staff has proposed a condition of approval that requires
the Applicant to revegetate the disturbed area with natural vegetation. Staff beleives that
the proposed regrading will not negatively impact the riparian area because the regrading
will occur 105 feet above the mean high water line of Maroon Creek. Staff finds this
criterion to be met.
4. The proposed development does not pollute or interfere with the natural
changes of the river, stream or other tributary, including erosion and/or
sedimentation during construction. Increased on-site drainage shall be
accommodated within the parcel to prevent entry into the river or onto its
banks. Pools or hot tubs cannot be drained outside of the designated building
envelope; and,
Staff Finding
Staff does not believe that the proposed bridge will pollute or interfere with the natural
changes of the river due to the fact that the bridge is to be located a considerable distance
above Maroon Creek. Additionally, Staff has proposed a condition of approval that
requires the Applicant to submit a detailed erosion control plan to the City Engineering
Department for approval prior to construction. Staff finds this criterion to be met.
5. Written notice is given to the Colorado Water Conservation Board prior to
any alteration or relocation of a water course, and a copy of said notice
submitted to the Federal Emergency Management Agency; and,
Staff Finding
There is no alteration or relocation of a watercourse being proposed. Staff finds this
criterion to be met.
6. A guarantee is provided in the event a water course is altered or relocated,
that applies to the developer and his heirs, successors and assigns that
ensures that the flood carrying capacity on the parcel is not diminished; and,
Staff Finding
A water course will not be altered or relocated. Therefore, a guarantee is not required.
Staff finds this criterion to be met.
7. Copies are provided of all necessary federal and state permits relating to
work within the one-hundred-year floodplain; and,
1""'\
~
Staff Finding
The 100 year floodplain is very narrow in the area proposed for the pedestrian bridge due
to the steep slopes that exist on both sides of Maroon Creek. Therefore, the bridge is
proposing no development that will contact the ground within the 100 year floodplain as
is designated on the FEMA Flood Insurance Map. Staff finds this criterion to be met.
8. There is no development other than approved native vegetation planting
within fifteen (15) feet back of the top of slope or the high waterline,
whichever is most restrictive. This is an effort to protect the existing riparian
vegetation and bank stability. New plantings (including trees, shrubs, flowers,
and grasses) outside of the designated building envelope on the river side
shall be native riparian vegetation as approved by the City. A landscape plan
will be submitted with all development applications. The top of slope and 100
year flood plain elevation of the Roaring Fork River shall be determined by
the Stream Margin Map located in the Community Development Department
andfiled at the City Engineering Department.
Staff Finding
The City Engineering Department has determined that all proposed grading and
development that is to have contact with the ground is located weIl above the 100 year
floodplain. Land Use Code Section 26.435.040(B)(I), Stream Margin Exemptions,
specificaIly exempts pedestrian bridges from the Stream Margin Review Process given
that the proposal complies with the Stream Margin Review Standards to the extent
practical. Staff does believes that the Top of Slope Setback requirement is intended to be
applied to residences and not bridges. Staff finds this criterion to be met.
9. All development outside the fifteen (J 5) foot setbackfrom the top of slope
does not exceed a height delineated by a line drawn at aforty-jive (45) degree
angle from ground level at the top of slope. Height shall be measured and
determined by the Community Development Director using the definition for
height set forth at Section 26.04.100 and method of calculating height set
forth at Section 26.575.020, and,
Staff Finding
The proposal is not for development of a residence or building. The purpose of a bridge
is to cross the river. Therefore, Staff does not feel that this specific criterion is applicable
and necessary for preserving the riparian area in relation to this specific proposal. Staff
finds this criterion not to be applicable to this application.
10. All exterior lighting is low and downcast with no light(s) directed toward the
river or located down the slope and shall be in compliance with section
26.575.150. A lighting plan will be submitted with all development
applications; and,
,....",
r\
,
Staff Finding
The dutdoor lighting shall comply with the City of Aspen Lighting Code. Staff has
proposed a condition of approval that requires the Applicant to submit a detailed lighting
plan to be approved by the City of Aspen Zoning Officer prior to erecting any lighting on
the bridge. Staff finds this criterion to be met.
11. There has been accurate identification of wetlands and riparian zones.
Staff Finding
According to the FEMA Flood Insurance Maps, no portion of the proposed bridge makes contact
with the ground within a wetland or the 100 year floodplain. Staff finds this criterion to be met.
J"
r>.
MEMORANDUM
f"")
To: Development Review Committee
From: John Niewoehner, Community Development Engineer
Reference DRC Case load Coordinator
Date: May 1, 2002
Re: Maroon Creek Pedestrian Bridlle
Attendees:
John Niewoehner, Community Development Department
Dennis Murray, Building
Brian Flynn, Parks
Phil Overeyner, Aspen Water (and Electric)
Richard Gouiding, Engineering
Nick Adeh, Engineering
Tom Newland, Parks
Jeff Woods, Parks
Ben Ludiow, Assets Management
General
On May 1, 2002 the Development Review Committee (DRC) reviewed the Maroon Creek
Pedestrian Bridge, The proposed City project will construct a 600-loot long and 124-foot wide
pedestrian bridge over Castle Creek between Iselin and the Maroon Creek Club.
Sufficiency 01 Submittal: DRC comments are based on the fact that we assume the submitted
site plan is accurate, that it shows all site features, and that proposed development is feasible.
The following are the comments of the DRC on the proposed project:
Site Review
1. Enqineerinq Department: Requests a sediment/erosion control plan.
2. Community Development Enqineer: No comments at this time
3. Zoninq: No comments at this time.
4. Housinq Department: No comments at this time.
5. Fire Protection District: No comments at this time.
6. Parks Department: No comments at this time.
7, Buildinq Department: Requests that the walls (handrails) on the side of bridge deck be
vertical to make bridge safer to prevent people from climbing over the rails. Parks
responded that the walls would be 2-foot higher than required and be made of four-inch
mesh.
8. City Water Department The Water Department is placing a 12" line under the bridge
deck.
9. Aspen Consolidated Sanitation District; No comments at this time.
10, Environmental Health: No comments at this time.
11. City Community Development - Planninq: No comments at this time.
,
.!'
~
n
Page 2 of2
May 1,2002
DRC for Bavarian Inn
12. City Electric Department: Will place two conduits on bridge, (Holy Cross decided not to
install conduits for future use.)
13. Holy Cross Electric: No comments at this time
14. City Attorney: No comments at this time
15. Streets Department: No comments at this time
16. Historic Preservation Officer: No comments at this time
17, Pitkin County Planninq: No comments at this time
16. County and City Disaster Coordinator: No comments at this time
Approvals
1. Engineering:
The applicant receives approval from the City Engineering Department
(920-5080) for design of improvements, including grading, drainage,
transportation/streets, landscaping, and encroachments within public
right of way.
The applicant receives approval from the Parks Department (920-5120)
for vegetation species and for public trail disturbance.
2. Parks:
3. Streets:
The applicant receives approval from the Streets department (920-5130)
for mailboxes, finished pavement, surface materials on streets, and
alleyways.
Obtain R.O,W. permits for any work or development, involving street cuts
and landscaping from the Engineering Department
4. Permits:
D:\DRC\MaroonCrk-Ped-Bridge.doc
1"",: Q
Nr;. ,'lLANO Pim.Jr;.cr lZLMUI<Cr;..6. INC.
PiU'-1-.cr 1>1A/'Jtu;r;.I>1I;.NT "01;. VI;.UJPf>1I;.NT PI;.IZI>1/TT/NC; "TIZAN::,Pi712.TA T/ffl "LAND U::,I;. APPI217VAl::,
(970) 927-4645 VOlel;.
(970) 927-8148 FAX
4170IZk:;It.JAlI2.OAO
e>~AL T. CO 81621
April 18, 2002
James Lindt
Community Development Department
City of Aspen .
130 South Galena Street
Aspen, CO 81611
RE: SUBMITTAL OF REQUEST FOR,ASTREAM MARGINREVIEW EXEMPTION,
MAROON CREEK PEDESTRIAN8~IDGE ..
Dear James;
Attached for your review and consideration please find 5 copies of a request for the
Maroon Creek Pedestrian Bridge project to be exempted from Stream Margin Review.
I hope the application is complete and contains all of the information required. If
not, please call me at 927-4645 and I will be happy to provide any further materials
that are required.
Sincerely,
cc: Jeff Woods
l"-TT!;.12. PA<:;"-'
, ~
'1
':-'"
'co
(""""
FEB U 1999
1....,;;,-.::\1 j i~i i ."i:'"J
COMMUl\;TY Da.'2LU::r~"~r:r~T
Memorandum
TO: John Kreuger, Parks Dept.
Jeff Woods, Parks Dept.
Amy Margerum, City Manager
Sara Thomas, Community Development Dept.
Julie Ann Woods, Community Development Dept.
Randy Ready, Asst. City Manager
FROM:
John P. Worcester
DATE:
January 29,1999
RE:
Maroon Creek Bridge and Underpass
...................................~..............................
Attached please find a draft letter to Chuck Vidal and a copy of the proposed amendments to the
Maroon Creek SIA. Let me know asap if this is OK as I'd like to get this going asap. Thanks
1
I"""',
,
~
'---0 I~ ;+r:-r
~h t-
January 29, 1999
Chuck Vidal
Real Estate Affiliates
117 S. Monarch
Aspen, Colorado 81611
Re: Maroon Creek SIA
Dear Chuck:
Following our various conversations and communications I have again checked with our
Community Development Department and have been advised that the SIA amendments
you proposed in your November 3, 1998, letter could proceed as an insubstantial
amendment. This means we would not be required to take the agreement to Council, but
could be signed by the Community Development Department Director. In.that this matter
is of some concern to the Aspen City Council, the City Manager has informed the
Council of the proposed amendments as set forth in your letter and they seem agreeable to
the terms. Accordingly, I would suggest that we schedule a meeting with Julie Ann
Woods of the Community Development Department at your earliest convenience so we
can finalize the process.
The only change I would request on your proposed amendment to the SIA is that the
"Pitkin County Open Space Board referenced on the second page be changed to the "City
of Aspen Parks Department."
I'm sorry it has taken me so long to come to these conclusions. My only excuse is that
various City departments had to be briefed on the merits of your proposal and their input
sought.
Hoping to hear form ,you soon, I remain,
Sincerely,
John P. Worcester
City Attorney
,-..,
Chuck Vidal
January 29, 1999
Page 2
cc: John Kreuger, Parks Dept.
Jeff Woods, Parks Dept.
Amy Margerum, City Manager
Sara Thomas, Community Development Dept.
Julie Ann Woods, Community Development Dept.
JPW -0 1I29/99-G:~ohn\wordllene,,\vidalS.doc
f"'\
-. -, ...,.,.....,
-< -.. -'L
:~.:H; ~~>':'~:::->.:. -:':
(").
o'clock _.M.
Recorder
Draft
1 0/28/98
Recorded at
Reception No
RECORDING REQIJESTED BY
WHEN RECORDED RETURN TO:
Andrew V. Hecht, Esq.
Garfield 8. Hecht. P.C.
S01 East Hyman Avenua
Aspen, CO 81611
AMENDMENT TO SUBDIVISION IMPROVEMENTS AGREEMENT FOR
MAROON CREEK CLUB
This AMENDMENT TO SUBblVrSION IMPROVEMENTS AGREEMENT FOR
MAROON CREEK CLUB (the "A.rnendment") is made this _ day of . 1998
1. RECITALS.
1 .1 Declaration.
fa) . Pearce Equities Group II Limited Liability Company ("Pearce"). a Utah
limited liability company and County of Pitkin. Coiorado ("County") are parties to that
certain agreement dated September 2, 1993 entitled '.Subdivision ImproVements
Agreement for Maroon Creek Club" recorded November 12. 1993 in Book 730 at Page
608 ofthe real estate records for the County (the "SIA").
(b) The City of Aspen (the "City") has annexed the Property (as defined in the
SIA) from the County, and in connection with such annexation. the County assigned all
of ils rights under the SIA to the City and the City assumed all of the County.s
obligations under the S IA.
1.2 Amendmenlto SIA. Pearce and the City desire to a'1lend the SIA as set forth
in thiS Amendment
2. AMENDMENT. The SIA is hereby amended as follows:
2.1 Amendmenlto ParaaraDh 7.
......'-
- .'1' !
:-;"d. .;..:'
-...... .',
,-, r"'i..'"
, i
(a) Pearce shall be relieved of all obligations to construct a pedestrian
underpass, as described In subparagraph 7(a) of the SIft.. Therefore, the text of
subparagraph 7(a) of the SIA is hereby deleted in its entirety and the phrase
"Intentionally left blanl< substituted therefor.
(b) The $175,000 that Pearce has provided as "Security" (as defined in
Paragraph 15 of the SIA) for the construction of the pedestrian underpass shall be used
by the City as add~ional funds toward the cost of the Maroon Creek pedestrian bridge
in accordance with Paragraph 2.2(b) below.
2.2 Amendmentto ParaaraDh 8.
(a) Paragraph 8 of the SIA is hereby deleted in its entirety and the following
substituted therefor:
Maroon Creek Pedestrian Bridae. Pearce shall contribute Three Hundred Thousand
and NO/1 00 Dollars ($300,000.OO)t6wards construction of a public pedestrian bridge across
Maroon Creek to connect the Tiehack base area with Iselin Park. The Crty shall be responsible
for the construction of the bridge, obtaining all requisite permits and agrees that construction
of the bridge will no commence until one hundred percent (100%) of the fUnding .is available
and that construction wiil be completed within one (1 i year of commencement. The City shall
be responsible for obtaining any access easements required on the east side of the bridge.
The contributions due from Pearce will be due within thirty (30) days after written notice is
given by the City to Pearce that the bridge is completed. Use of the bridge by motor vehicles
except for maintenance purposes shall be prohibited. On the west side of the bridge, Pearce
shail provide any required access easements on Common Parcel Q as shown on the Final Plat.
The consent of Pearce to the design and location of the bridge shall be obtained. which
consent shall not be unreasonably withheld or delayed. Prior to any construction, the parties
shall agree on the provision of a construction license over lands of Pearce to allow for work en
the bridge; provided. however, work on the bridge shall not hinder or interfere wrth any
development of the Project or adversely affect any elements of the Project that have already
been constructed. The City shall be responsible for the operation, maintenance and repair of
the bridge. If construction of the bridge does not commence before December 31,2000. then
in full satisfaction of any obligation to contribute towards construction of the bridge, Pearce
shall make an unrestricted donation of One Hundred Thousand and No/100 Doliars
;1 . . - ($100,000.00) to the Pitkin County Open Space Board and any "Security" provided by Pearce
C/./.' r.;? in accordance with Paragraph 14 for the construction of the bridge (including the $175.000
vlt (~ which was initially earmarked for construction of the pedestrian underpass) shall be returned
M to Pearce.
(b) The C~y acknowledges a.nd the parties agree that
upon execution of this Amendment Pearce wili have provided an aggregate of $275.000 as
Security (as defined in Paragraph 15 of the SIA) for the construction of the Maroon CreeK
pedestrian bridge (Le.. $100,000 that has always been earmar~ed fer the pedestrian bridge
2
_I."."
":'~
:p"j:~ :
f)
: ~ :;'
pillS the $175,000 described in Paragraph 2.1(b) above that was initially earmarked for
construction of a pedestrian underpass), but that only $100,000 of such amount shall count
towards satisfaction of Pearce's obligation under the first sentence of Paragraph 8 of the SIA.
As an example and for the avoidance of doubt, upon completion of the bridge in accordance
with Paragraph 8 of the SIA, the City shall use the $275,000 provided by Pearce as Security
and Pearce shall pay the City an additional $200,000. if construction of the bridge does not
commence by December 31, 2000, the C~ shall return $275,000 to Pearce and Pearce shall
make an unrestricted donation of $1 00,000 to the Pitkin County Open Space Soard.
2.3 Relocation of Governmellt Trail. Notwithstanding anything to contrary in the
SIA, Pearce shall meet with the United States Forest Service (the "USFS") with respect to the
proposed relocation of the Government Trail as shDwn Dn Exhibit A heretD, in Drder to develop
specifications for the trail (e.g., alignment, dimensiDns, etc.) that will be apprDved by the USFS
(and any Dther govemmental agency or agencies whose consent may be required). Promptly
after Pearce notifies the City that USFS. approved specificaticns have been developed, the
City shafl prDcure, at the City's CDst and expense, any and all access easements that may be
required to relocate the Govemment Trail accDrdingly (whether Dr nDt such easements are
IDcated Within the City). After all required consents. agreements and access easements have
been obtained and/or prDcured, Pearce shall be responsible, at Pearce's cost and expense,
fDr relocating the Government Trail in accordance with the USFS.approved specifications.
3. MISCELLANEOUS.
3.1 ReDresentations. The City represents to Pearce that the City has full authority
to enter into this Amendment and that the recitation in Paragraph 1.1 (b) is true
3.2 Defined Tenns. Capitalized words and phrases used in this Amendment and
not otherwise defined shall have the meanings given to such words and phrases in the SIA
3.3 CounterDarts. This Amendment may be executed in any number of
cDunterparts and each such counterpart shall be deemed to be an original.
3
::'.:.;8 ~:,~ Fl.:'!.-{:
"'.)
;-":'~ ~ - - ~ ;"
,-" ,<
n
":.~ "'. " ',-
IN WITNESS WHEREOF, this Amendment to the Subdivision Improvements
Agreement for Maroon Creek Club is executed the day and year first above written.
CITY OF ASPEN, COLORADO
ATTEST:
By:
Name
Title
By:
Name
nle
PEARCE EQUITIES GROUP II LIMITED
LIABILITY COMf>ANY, a Utah limited
liabiltty company
By:
James T. Pearce, Jr., Member
snn or COLO~DO )
)65
COU\lTl' or Plnllll )
The foregoing Instrument was acknowledged before me this _ !Ia,. of
, 1998 b)' as for the Clt~ of 4spell, Colorado.
WlTIlI[S8 my hand and olTlclal seal.
I'1y commission expires:
Notary PUblic
8TATrorCOLO~ADO )
)ss
4
.,--.~,
.. _.. -f'.,f
,. '"
=F.Ol{;
S<~~':: """
- I::'
.'~
rf."
COU"ITl'or PITKI~ )
The foregoing Instrument was acknowledged before me thls_ day of
, 1998 by James T. Pearce. Jr., ~ember of Pearce [quitles Ciroup " Limited Liability
Company, a Utah limited liability company.
'It1T~[88 my hand and oMclal seal.
i'1y commIssion expires:
~otary Public
s
~,
~
- t '1-.....
r'i.
rxNIBIT A.
DescrIption of Government Trail as relocated
M:U<tt1"O'lf!l'\Vy;S"';'\!HIMA'lOO\'IDCCS'lGia. al'l'ln3 'M:d
6
.~ ,......".
v " J :'.- . ',~
:...-.."\........ 1/
1~u,(X)
0 1/
. lJ1 .~ r
I ~,p~~ "7" _ /
- Ell
~ ~Ii lDC'.l
EAST - dJ
1'23-<::0 ~II -..::r .
- -
,,~I r ~~
KRES ~~
IB2jO 112.,
---~---_.,-_._._.,--- - --.-.--
e>'lo48'2d'W 1294-43
::5 I \i\\
l-Ef\SEMENT
<r> n ..... 0 EOJK 122, 1 "
~l~ ~ '\ v FA6E. 5. Ii 1\
01.- 01 I if? {:I II 1\
l~ I I
I I I
I ~I I I I
1 .~
, (J. / 1
I / I
/ / I
I I
I I I
+ f!J I I
I 1
/ , I
~ '0' I
I /iJ ,
a 'cf I
cO' I
~ I /v I
/ ") . \
, "- $1 /"'- I
\ .I I
\ I If)
\ I I
\ I I /~ I
"- I I
\ I II( I
~\ ~, I I I
e-ll 1Cf) I
r;:: " , ::i I
Bi ~~I ~I /\:. I
"-
~I "'I I \
) ~I , ~i I I
R' LlJh, I 1
... \
I ~~' ~\ \
I lQ' 0- \
)9 ACRES ~l lQ " \
0- ."
II \
,,, ~I .
...
\.)1 Il(l c::--l \
~I ~I ., ...
~ 1\ ...
I ~~l ,
::)1 31 ,
<1)/ ~: :::::,., .\ ...
1\ /t ,
\
~; I \
!:J&1 w I . \
/.:,; I \ ,
"-
~^ ; "~ '= \ "-
>= I 8 \ '" "-
~~l- I ,
"-
I I \ "-
I ,
U'!~ 'b +, , .
~. , '.
'-..1 \ ,
Il( I 0 \.... . ,
I ',",
0 '''' .,
~:) .'
I It\( I
r--l If) ~',\ h, /
("\\ /
V..e(/- I c~ !' c:\ ~.1 / ~
. ~ ~ofn/f( ,\~~hi~n~~~~ ~
<-
fv:~I}&~''^WaJ-€-v P~~t-M<e~ {-
vi Cc",d!u \ +- Co";n,.,,d,~
~.. S/lI2LfV'('c. C60d CA.(';
~. C 8 '-'\ + QCf:'~ l-! ofy Lv'c:> <C:'i
L~aJ f--'{ 5 ? 1- ~vv\~Lf~~,LA-CY Ue~'ic/~
c.ee V\. ace esS
M t G dC/uti ~~
n'I~' ~ \ ( /)/ Q(A +-6
C()~cy~oE 11'05 r ()~. Coy.lrri5! r;, I' L
~ \1><0- o.ppfo~e& /6V IV i Cf\
)f - (;V\ ~~ f A .s 1-//0 C0J J ~.
f""'"
,
t"""l
MEMORANDUM
TO:
Plans were routed to those departments checked-off below:
X ........... Community Development Engineer
X......... City Engineer
o ........... Zoning Officer
o ........... Housing Director
o ........... Parks Department
X ........... Aspen Fire Marshal
o ........... City Water
o ........... Aspen Consolidated Sanitation District
X ........... Building Department
0........... Environmental Health
o ........... Electric Department
o ........... Holy Cross Electric
o ........... City Attorney
0........... Streets Department
o ........... Historic Preservation Officer
o ........... Pitkin County Planning
FROM:
James Lindt, Planner
Community Development Department
130 So. Galena S1.; Aspen, CO 81611
Phone-920.5095 Fax-920.5439
RE:
Maroon Creek Pedestrian Bridge Stream Margin Review Exemption
Parcel ID. 2735-142-00-851.
2735-112-09-055
DRC DATE: May 1, 2002
DATE OF REFERRAL: April 25, 2002
COMMENTS DUE: May 10, 2002
~
LAND USE ApPLICATION
PROJECT:
f')
~:
Name:
Location:
Maroon Creek Pedestrian Bridge
Iselin Park Recreation Complex
(Indicate street address, lot & block number, legal description where appropriate)
ApPLICANT:
Name: City of Aspen Parks & Recreation Department
Address: c/o Jeff Woods, Manager, 585 Cemetery Lane, Aspen, CO 81611
Phone #: 920-5129
REPRESENTATIVE:
Name: Tom Newland, Newland Proiect Resources, Inc.
Address: 417 Original Road, Basalt, CO 81621
Phone #: 927-4645 or 618-9922
TYPE OF ApPLICATION: (please check all that apply):
o Conditional Use 0 Conceptual POO
o Special Review 0 Final POO (& POO Amendment)
o Design Review Appeal 0 Conceptual SPA
o GMQS Allotment 0 Final SPA (& SPA Amendment)
~ GMQS Exemption 0 Subdivision
ESA - 8040 Greenline, Stream 0 Subdivision Exemption (includes
Margin, Hallam Lake Bluff, condominiumization)
Mountain View Plane
o Lot Split
o Lot Line Adjustment
o Temporary Use
o Text/Map Amendment
o Conceptual Historic Devt.
o Final Historic Development
o Minor Historic Devt
o Historic Demolition
o Historic Designation
o Small Lodge Conversion!
Expansion
o Other:
EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.)
PUD and the final plat of the Maroon Creek Club.
Vacant land approved for the placement of a pedestrian bridge through the Iselin Park
PROPOSAL: (description of proposed buildings, uses, modifications, etc.)
ski area.
Placement of a arch-deck pedestrian bridge between Iselin Park and the Tiehack
Have you attached the following?
o Pre-Application Conference Summary
o Attachment #1, Signed Fee Agreement
o Response to Attachment #2, Dimensional Requirements Form
o Response to Attachment #3, Minimum Submission Contents
o Response to Attachment #4, Specific Submission Contents
o Response to Attachment #5, Review Standards for Your Application
FEES DUE: $
r-,
j
()
ATTACHMENT 1
ASPEN/PITKIN
COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen Development Application Fee Policy
The City of Aspen, pursuant to Ordinance 57 (Series of 2000), has established a fee structure for
the processing ofIand use applications. A flat fee or deposit is collected for land use applications
based on the type of application submitted. Referral fees for other City departments reviewing
the application will also be collected when necessary. One check including the deposit for
Planning and referral agency fees must be submitted with each land use application, made
payable to the Aspen/Pitkin Community Development Department. Applications will not be
accepted for processing without the required application fee.
A flat fee is collected by Community Development for Administrative Approvals which
normally take a minimal and predictable amount of staff time to process. The fee is not
refundable.
A deposit is collected by Community Development when more extensive staff review is required,
as hours are likely to vary substantially from one application to another. Actual staff time spent
will be charged against the deposit. Several different staff members may charge their time spent
on the case in addition to the case planner. Staff time is logged to the case and staff can provide
a summary report of hours spent at the applicant's request.
After the deposit has been expended, the applicant will be billed monthly based on actual staff
hours. Applicants may accrue and be billed additional expenses for a planner's time spent on the
case following any hearing or approvals, up until the applicant applies for a building permit.
Current billings must be paid within 30 days or processing of the application will be suspended.
If an applicant has previously failed to pay application fees as required, no new or additional
applications will be accepted for processing until the outstanding fees are paid. In no case will
Building Permits be issued until all costs associated with case processing have been paid.
When the case planner determines that the case is completed (whether approved or not
approved), the case is considered closed and any remaining balance from the deposit will be
refunded to the applicant.
Applications which require a deposit must include an Agreement for Payment of Development
Application Fees. The Agreement establishes the applicant as being responsible for payment of
all costs associated with processing the application. The Agreement must be signed by the
party responsible for payment and submitted with the application and fee in order for a
land use case to he opened.
The current complete fee schedule for land use applications is listed on the reverse side.
r'1
1'1
ASPEN/PITKIN COMMUNITY DEVELOPMENT
2001 LAND USE APPLICATION FEES
CA TEGORY
Major
Minor
Staff Approvals
Flat Fee
Exempt HPC
Minor HPC
Significant HPC <1000 sq. ft.
Significant HPC >1000 sq. ft.
Demolition, Partial Demolition, Relocation
Referral Fees - Environmental Health
Major
Minor
Referral Fees - Housing
Major
Minor
Referral Fees - City Engineer
Major
Minor
Hourly Rate
HOURS
DEPOSIT
12
6
2,405.00
1,205.00
500.00
500.00
1205.00
2405.00
2405.00
FLAT FEE
280.00
70.00
345.00
180.00
345.00
180.00
345.00
180.00
205.00
n"
~
ASPENIPITKIN
COMMUNITY DEVELOPMENT DEPARTMENT
Agreement for Payment of City of Aspen Development Application Fees
CITY OF ASPEN (hereinafter CITY) and
(hereinafter APPLICANT) AGREE AS FOLLOWS:
1. APPLICANT has submitted to CITY an application for
(hereinafter, THE PROJECT).
2. APPLICANT understands and agrees that City of Aspen Ordinance No. 57 (Series of 2000)
establishes a fee structure for Land Use applications and the payment of all processing fees is a condition precedent
to a determination of application completeness.
3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed project, it
is not possible at this time to ascertain the full extent of the costs involved in processing the application.
APPLICANT and CITY further agree that it is in the interest of the parties that APPLICANT make payment of an
initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis.
APPLICANT agrees additional costs may accrue following their hearings and/or approvals. APPLICANT agrees he
will be benefited by retaining greater cash liquidity and will make additional payments upon notification by the
CITY when they are necessary as costs are incurred. CITY agrees it will be benefited through the greater certainty
of recovering its full costs to process APPLICANT'S application.
4. CITY and APPLICANT further agree that it is impracticable for CITY staff to complete
processing or present sufficient information to the Planning Commission andlor City Council to enable the Planning
Commission and/or City Council to make legally required findings for project consideration, unless current billings
are paid in full prior to decision.
5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect
full fees prior to a determination of application completeness, APPLICANT shall pay an initial deposit in the
amount of $ which is for hours of Community Development staff time, and if actual
recorded costs exceed the initial deposit, APPLICANT shall pay additional monthly billings to CITY to reimburse
the CITY for the processing of the application mentioned above, including post approval review at a rate of $205.00
per planner hour over the initial deposit. Such periodic payments shall be made within 30 days of the billing date.
APPLICANT further agrees that failure to pay such accrued costs shall be grounds for suspension of processing,
and in no case will building permits be issued until all costs associated with case processing have been paid.
CITY OF ASPEN
APPLICANT
Julie Ann Woods
Community Development Director
." ~G(J,
Date: ~c/ i S.)()Z
/
By:
Mailing Address:
g: Isupport\forms\agrpayas.doc
1/10/01
I)
1""'\
"",}
ATTACHMENT 2
DIMENSIONAL REQUIREMENTS FORM
Project:
Applicant:
Location:
Zone District:
Lot Size:
Lot Area:
Maroon Creek Pedestrian Bridge
City of Aspen Parks & Rec. Dept.. c/o Tom Newland
Iselin Park Recreation Complex
East side: P (Park); west side WFPD (Wildlife Preserve, PUD)
not annlicable - no floor 8rea to c.8111C'l.qtp.
not applicable - no floor area to calculate
(for the purposes of calculating Floor Area, Lot Area may be reduced for areas
within the high water mark, easements, and steep slopes. Please refer to the
definition of Lot Area in the Municipal Code.)
Commercial net leasable:
Number ofresidential units:
Number of bedrooms:
Existing:
Existing:
Existing:
Proposed:
Proposed:
Proposed:
***
***
***
Proposed % of demolition (Historic properties only): n/ a
:**
Allowable:
Allowable:
Allowable:
Required:
Required:
Required:
Required:
Required:
Required:
Required:
Required:
Combined Sides: Existing: Required:
These dimensional requirements pertain primarily to buildings and are not applicable
to this pedestrian bridge.
Existing non-conformities or encroachments: None.
DIMENSIONS:
Floor Area: Existing: 0
Principal bldg. height: Existing: 0
Access. bldg. height: Existing:
On-Site parking: Existing:
% Site coverage: Existing:
% Open Space: Existing:
Front Setback: Existing:
Rear Setback: Existing:
Combined FIR: Existing:
Side Setback: Existing:
Side Setback: Existing:
Proposed: 8,400 sf (bridge deck
Proposed: 170 ft. (above creek)
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Proposed: ***
Variations requested: None.
t"")
'"
,. .1
, .",/
ATTACHMENT 3
MINIMUM SUBMISSION CONTENTS
I. Applicant's name, address and telephone number, contained within a letter signed by the
applicant stating the name, address, and telephone number of the representative
authorized to act on behalf of the applicant.
2. The street address and legal description of the parcel on which development is proposed
to occur.
3. A disclosure of ownership of the parcel on which development is proposed to occur,
consisting of a current certificate from a title insurance company, or attorney licensed to
practice in the State of Colorado, listing the names of all owners of the property, and all
mortgages, judgments, liens, easements, contracts and agreements affecting the parcel,
and demonstrating the owner's right to apply for the Development Application.
4. An 8 I/2" x II" vicinity map locating the subject parcel within the City of Aspen.
5. A site improvement survey including topography and vegetation showing the current
status of the parcel certified by a registered land surveyor, licensed in the State of
Colorado. (This requirement, or any part thereof, may be waived by the Community
Development Department if the project is determined not to warrant a survey document.)
6. A site plan depicting the proposed layout and the project's physical relationship to the
land and it's surroundings.
7. A written description of the proposal and a written explanation of how a proposed
development complies with the review standards relevant to the development application.
,.....,
(")
1. Authorization to Represent
r-,
I""'j
, jj
April 10, 2002
Tom Newland
Newland Project Resources, Inc.
4 17 Original Road
Basalt, CO 81621
RE: PERMISSION TO PURSUE LAND USE APPROVALS FOR THE MAROON
CREEK PEDESTRIAN BRIDGE
Dear Tom;
The City of Aspen is the owner of property known as Iselin Park and the holder of an
easement to construct a pedestrian bridge on Common Lot Q of the Maroon Creek Club
PUD located within the City of Aspen, Colorado.
The State Parcel Identification Numbers for these parcels are 2735-142-00-851 and 2735-
112-09-055.
Please accept this Jetter as formal permission for Newland Project Resources, Inc. to
represent the City of Aspen in pursuing a Stream Margin Review Exemption for the
Maroon Creek Pedestrian Bridge Project.
I hope this letter is sufficient for your needs. If you should have any questions, please
contact me at 920-5129.
Sincerely,
~ctJ'EN PARKS AND RECREATION DEPARTMENT
~OdS' Director
cc: City of Aspen Community Development Department (attachment to land use
application)
,I"""\,
n"
, j
2. Maroon Creek Pedestrian Bridge Address and Legal Description
Street Address: Located on the west side of the Iselin Park Recreation Center
approximately 0.80 miles from Highway 82 on Maroon Creek Road, Aspen, Colorado.
Leaal Descriotion of Prooertv:
Iselin Park Property: Parcels of land as depicted on the Iselin Park PUD Final
Plat, recorded in Book 58, Page 13 of the Pitkin County Clerks Office
(attached).
Maroon Creek Club Property: An easement as depicted on the Maroon Creek
Club PUD Plat, Book 33, PageS SOf the Pitkin County Clerks Office, more
specifically located on Common Parcel Q of the Maroon Creek Club PUD.
,
1"""'\
'';J-')'':$~
.;"~t
PLAT\. NOTES
~lArlO'6,
lENT
R:><Tlo-J5
RO'.C\5,
!-'\ENT TO
oIER AND
ENI/El..Cf"E5
~5 ,~ND
56 oIeR:
IaOES5
:yFOR:
iN, lr.5€,..
CE THE 6OlF,
:0 eeNEF'T
,ERMANf:NT
'o/T5AND
,~M"" -'REA
IL Y lOTS ""
f5 17, 18 A'JD
A5 &H:>WN
E (O.l5TRtOiO<.
o liVlXE>1ENf
. LIMITeD TO...
GREEN:; ,wv
_F - ~t..ATeO
;ART....O
FLA65
LIKE ('rHE
R'5 rF ,<=.;.lNGU
'e NO RI""'T5
,; IN 11-lE
:~,
jT DVLY
rPrT'ldN~
GES d' NAMES
, THIS PLAT
<Y CT PF15reJ<
::J# COURT,
0' neWGI<
!:RIve
'-'5E>1eNT5 fOI<
r-lERIFF, FIRE
:MllAR
, THE L-\ND5
f5 WHICH .
o ENreR UI"Cr"
T'5 AND
IN Tl-1E LA\v'fIJl
IE FCUD'^'lNG
LL'( TfJn.1iN'1TCO
I PLAT5
( 1l41~ PlAT'
~.,~K
PAG!: 160
,'IN f'VIT e<D1<
.e 1I!'ll:Xl>'l
~ AT PAlSE
~"",~D
F.l'.N6 No. 2
"';ANO,>t1~
'61: .., 15
ml5 PlAT
(E) LICEN5J;. -'6R:EEMENT .~ 5T}'6E r<o0 R~O
IN ecoo:..'1lI'IAT p~ .UA.
~k;'~:n~ "''''''ME....,. RECORPEO, IN e<::oK'13!;IAT
(6) FlfMr~ eASEMENT ~ ~FD::N CREEK m:oRO:D
IN eaJK,:JQAT P;'6E -'o!.I!L..
,
(H)J'6R~.1OREa2N"I'YMe.: T'V,.l RE::OROED
IN =j<'~3A.AT PI6E~.~_..
(,) ~OIC TRAIL ~l'IENT R:::R col.f a:xJr<:eE
m::CJ?CED IN e.:::a<:1>>AT r'AGE~Il~L
(j)1<O'\D EA5e>1ENT ,..,..;ee>1ENT GRANTING ,..,.""""lLJSNE
EASEMeNT OVER TIE' lACK ~D "'" lH: USE ,.....p
eENEeT ry' aJi"1Mt..NlIl' HeALTH ~S, ,,,,,",,,,
~D IN ea:x!L5iMT P~="..
22.
ro:: ~ ~,J.!:tI5l1.AT ~~g_~ ~Q~ ....ND
RE;eEF:.\I\,,ONe V"'; I n::::RTH nL-N::IN, CWf"CR ~u.
MEAN ""D I1EFER 10 PeAJll::~ eaUITIES GR:Lf"1I
UMITeD UAe>ILIT"f COMf'l',N1' I'ND A 5lJCCE55CIR AND
",*"IGN OF ONNER 8H'\LL ee DEeMeD A 'Si~
AND A551GN.9'::!l'(.Jh~I~resI6N1'\reu P.>Y
~ ~ ''''''~W'L''' RCCOR IN 11-lE REAl ESTATE
RI"'CClRD5 a PITKIN 0:Ji.h.m' IX> ,...0 CNl.Y
WITH RESPlXT TO THe pm.cUlJ'R 1<lGHT6 CI< ~RI51'5
5I'!:CIFICALl Y QE5lGWITEO Tl-1!:1':r'N.
23
o.vNef<.<...!'T5 5lXCE~,....o J65l6N5, ~E5 THE
.._T 1U f<E\.cX;I'J'!: AN'(~M~ RJ6HT5-cf'-WA'(
~ ~ FI:A~ ~ aol THG:> Pl.AT 10 HaRE'
ICCliRATELYte'ICT THE A5-elJILT ~~,
IF I"NY IiD'>05 ~ DRIII!:WAY'!' _ e)iXJ:T ~
UIO-l ,oN( lOT 16 A I1eaJLT CF THe Cl:J'6rRU::f.CN
~ A VALID ~eNT FOt SlXI-I ~I'1ENT
;NO rv< THE MAI~,~" If'CJ REf'I.J'OCEMENl'
THE"""'" ~ e"~ R:lI': so LONG A5 .5UC'" IIO'D
titW.L E><15T; IN;) tu:H ~MaolTAND~l!'
5tW.L t-Dr I>1PAlR THE K<\RI<ET_LITY OF TttU: 'i:>
aa; lDI". ,06 'i:> u:>r 4'l CNLY SI..CH e...c~H>1ENT
~ 5A.5EMENT 15 w>1lreo TO i-i.w T'E> "CI< f1Cl'D
AND THE P^""INIS flAC'LIT'f 10 foe Q:>N5TR\_lCl'eo co..
lDI" 14-,
24
o.vNER ~ THE RIGHT 10 ReLOCATE THE
EA~T ~ THE ~ ~ F\':OE5~lAN
~IOOI: AND TRA'L5 LINKING 'mE el<1D\Se 10 THe
Zl'\BE a THE TIeWGI< 6KI.1---' ""'D PU&UG TRAILS
ALL 16 5K>WI'l CN e.-ieET.3-CF TI41e. PlAT - H:WEIi~
AN'( REl.CO'Tia..J HV5T Rel"IAIN IN COMMoN'~PAICEL Q
rN:J WI11'lIN IoN I'REI' 5EVf:N1Y-FIVE' FEET 05'
XVTHCF 11-lE)=am-I LINt'. CF LOT I.. AND - NT1'-
FIVE FEET (75' l'<:Jf<TH ex' ne >OtTH LlN!:. a lOT e
AND "'....LL I'OT 1NT!:RFEl<E WlTl-1 TH!: Aef"EN ei<11 NG
QJMPANi ~MP STtVlON c~ "CCE55 ~ero
25
()Y'{NEf<5HIPCl" AN'( 51Nc>LJ: !;'.H.L'( LOT, ~E ~
~ fO,Je<N1S IC'T El<CLuDE5 AlL WA1'5: AND
WATEI< 1I\6HT5, D11l::H ,<\ND DITCH RlGHT5., SFRINIS
!NO .;FRlhG ...6I-I~...!~0 _Tl'R IH) ~O
WAre.. R16I-I1'5, r=:;>CJ<VVlI't AND ~R ~
RIGHTS,...u CF I'Ml;H ARe J<E5eRVEO 'It)~, 1'0
INDIVlol.l^L WELL& MAY ee ~ILLC!O aoll'N'r ;SiNGLE
~~.'6: lDT~ CF .5INGlZ fl'IMIl Y' wr5
ee =~IP.>Le R::f(ll'E a<~a WAT"'"
5EWER, I'NDAU O!'HER UTILITIes r'I'.'OO1 TIOUNI< LINes:
f'E[:E5];4l.5 ~ V.....LT5 10 "TlJIt. evlLOlNG SITE':>
26
ne fOUDWlNGo 5HOlL a;:N!>TITtJI'E lOT, ~ H'O FDOO
l%5I6NI'\TlON6 R:lI': '!He ",",,",1<fT' A5 6HCWN aol TH'S
.v.T' ..
(A)6INGLE !;'.HILY' 1.0'\'5 I Tl-1~H '2, 1(., ...ll'l""'-"H
~,.,..o)2 ~4&
(..)~ l-\:lU6INIS' LOTS I~ANO'"
27
LOTS 1 n..i,R(A..,(ft-i ...loB AND ~ THF<Ot..6H 52 ,AND ~L5
A THF<D...-\:JH U ARe ALL PART CF THE COt-1~ iNTERE51
COMMt..NITY (A5 TWlf IER<1 15 reFINED IN THE
= aJMi'1CN INTEREST c:wr-.€I<5HIP ^,,-T) TDP-E
t<N?VVN K) ~Fa::J::::N CReEK Cll..Jf!> LOT" 44 15 N:JT ^
f?'IRT CF THECDI"IMcN INTEREST QJt-1MUNITY fO ['f"
l<N?NN ,NO W>RcOJ C.REEK CLcA;,
28
LOTS 1 T~ IGo, 41 rH~H 48, 5l AND 5'2,r\NO
fl'RCEL5 A Tl-1=x.H .,) AND 0 THRDlGH U ,ARE ALL
1l4E REAL E5TATe NOT 5UP.>JECT TO revElOP>1eNT
RI0HT5 (If"> T""T TERI"I 1& DEFINEO IN THE COlORADO
COM~ INTEREST CWNER&HIP,ACT ), THe lDCt'>T ION5
""'D Di""~ ex' \IIH ICH ARE 6H:JWN ON
8HEE"T5. _1l-R:>l.t::1H~_a THI5f't...A.T. LoT~ 17 i5,
ItJO 1"1 -<>,~O 5:>. !\NO P.'~~5 ~ TH~
N ,AKf' A.!..!. n-Ie ~cAi.. E,:,IATe ~ 10 rev'E~MENT
i'1GHT5, THE =^1'iONS ^",D DI"'E~5 CF WHiCH
I'f:e 5H7NN CN 5HEEr&_L~-~--.O' THIS PlAT
F ",\
t E 8~ ~! ~
'"
E. '" . i
I
""
i ~
i '"'
r
r .,.,
"","
v
., ~.
~@
J ~
I
~
l.
,. "',.
~
...
-i
"'-.
,~ ;l
~ "
...";1
s ~
~ ==
c ~
-
.-,
e"'
@ " OJ
.~ ~2 e.2
r .~..~
~..8~~
,. ,.ll;,":(
i: i: i
"
~@iS
('~ .; .'2
~~ , ~. O]w
'''ii,
~ ~1e.v-; @I
- ~ ~8
,,~~ ~,"'~ ,~
~. ~ 0 ~~~~,~~~ ~~
1;~~ ,. T~/, (-'l...~,
t,;. -'l~YEHI$t-t 'l/~
.~rz-,o:' M-f'f,... '7""",
<cc,~""""_,, "
q".-...-...
. -(J r
/.'
'.
"<G~'O
-11'.?,;....
It
,s
'~
I.
"
,.
:\"
~ !.~
,
-5c0"q'2c,'....,
-",
~i;fl
~tt~
"'l"~
~, "';
~i~ I"
i"
~g'~'~'~2ilJOW 1~15
~~~-;~;:~;;:~,'t.!l~~~ I ~
iia.' z~~~~,€:~~f-U ....
..~,~'..,V" , 'I ~
~. ~'" ...,....,,~=t\I~.... "'<.
~~J~..:8.~,,2,"~~a" ,;
." .".".".8.S I'll
. '" . _ '.~ . '" ..... 's;.~!
"'".. ~:t:.'+',:""'''
'!j~ ~*" -='8;; -~ ~~~
.. ~ - ~
)
::'<
0:
.c
iC
'"
'"
f-
"-
o
'f-
(f)
'"
'"
^
j
r)
.i! I'!
:i!i.:IiI!
'ilih!i~i
! "~I'l"
"ii~t I!:..01
I'!~ .,
,UEli!='
=l'~E'I,i
i!~!~~l~!,
1,.lI. ,!
a:m;llit. ~ a
~"3!!!'."~ i:
"'I i Eo. ,
~hliU!U! i
p '-(
I,t i,. II,
!i~ III ,~;
~.. II ~
"", I"~
:1:11 ~~ t"
1'1 IIi!'"
, '!ij '::.~ 5
.. ~ ~; q
N i" ih, ,
'''I ,l' ild ,
I'! ill!T ~!
1!.III.!!..l "
I~!I ,,"111\ :iilll"l;,ll
II ~~Il II ..!t I ~~l~Il.U~ ~-
I ';' : · ~'!'i> ,
,',I I""',' ,
:1:; I'ill:l I I,
I Ii! '1' !!I I i Iii!
. "1"111111', '",.
~ ,I t - t .. << H
I ! !:i' !II! \-; ! !~:il:II!1I111
,...II""'I,,',mu!11
i!:~!g~I!~~!;hmn ~~~
; !
. '
II E
~; II
..
iI E
~I !
31 I t;;
ill I
I ~I
r 'l"
, !
u
,
I
~
,
II
~~
"
~l
ii; ~
,J t;~
Ii I I,
i ~
a, ' ;,
f. ~E
~=~
t!ilU
, .1
I i.
, ii'
I all
"'
. '"
. '"
" "
~ z
.. '"
~ '"
>oj :riO
) E-~
, ::> '"
.. 00
:oJ U)~
00
> _u
'lo."-
::71 -::>
"'",
~....
-t i3=~
~ O(f)
" ....
~ :~~
'" '" "-
_0
7' - ,
- ,..
7' (f)....
- zz
eC 0::>
~ E8
l..."'.
If.;z
,"" ,,-'"
~ o~
:t:: z'"
~ 9~
l... ....0
"',..
0....
z: c...o
....'"
-< z
~-
/) Cl Sl Sl Ill. e
~ ~ ~ '!I 11 I! ~ .. .. !l~
-.j r- ~.. ~ '!I' i dll'~I~I~I:~ rll !.. =!~ il~
:3 l I I ill Il' "!i'.l.i..: Ilnl Ill;11 i! 1 II
1;3 il!! :hll:li~l~li!mi!I'illlm I:I:~,li.l!~ if Iii
'" "" '!';'~'l~'l 'l"" Ill.," I' Iii E =D! P
~ i:l I !'\ll,!!'!;.II"',I','-l,il"!' 'Il!' ,i !I i',l
-' ".,,' 'I' ,:",..1'1 11,'\11: ' ,D I' "l i
E~l~ i! u~!f~:'~:~:1 ~~!;r.ot.~ !!~I · 1"1 I 1ii4!! t!
c.... :::.~ '~'!I~ !~,,~. ~l!l .:t~QU ;1 . Ii' i .
o I':!! !!!il'I~:lgl~;~m:!"!':: ' ! I !~!
;j iI,~! ~;':!l,I!~i!:il!I!:ll:h'l !! !'! ,!I
~ ::1t;1 i~ :::~!~lt;l~l!~~iiii:!~\lla; s! ci ~Sl
0: ill!', ;:!I;!'!!~m;!!!!i:l;l!!i .!. I.l i'l,
'" !l~! II li:i!;liill\:i!I',ili!',';i!:','! m! ..1. !I.~ !i~i.'
~ "" " '~"li!!'I'II' "I"'! .Ii.' , i ! I'
a i~;; d lNI,:iihii;:i:imi'!'ii: !1!!I!hl iil' I!!i
l';~ :: :,i..~mil~..I'I-I'~' :11 ili.1111 !. .' ~!I
;!i! ;1 '1:l!!l~~:Il;!!!!!!!iih:: i,lj'l ;'I!.I I '. 1111
:~il !: l~h!!\!!;h::~:I!:I!I'I!!!li I;N!~II' i!~ ~ II ' 'j!1
~~a, _ll!~it!.~!!_~lIl'!~ ~ ~i~ hSIl! Ilt~~ iii I ! , ! I'
1;" I! i!!;;~,:m:l iiiii !,Iii : .IEI~ , , !~ : I ,,' . M1 , ,It
..;;i~ i~ It<"! ~~l' !~~'Y'~ ~,i~al~ Stii i ..ill!! ~ t ~. ; ~ ~~
.51,:: l!::;lli,bll,Mill!: I. liluMI ,1'1 . E E ! Ii !all
~
:~
b
!!
'.
lu
I;"
, I
i ;~
5 a.,.
---I-~-;-fl
I' !n! i 5
ill~ i I
! hl!IL
l,
r
II
/,
I
il i
I: '
ll-
!,
! I'
il I
II'
.1.1,
II
I'
Ii
,.
f
J-
,
~ '
~.( it
a"
: I
I 'Ii
I,
IiI
l ·
"lli
.Hh,
! i I 1 i II I I i
~ ~il
I .
\1 ~~~=
I !~~~
t:l t,l~ -"...
ffi~d;
f!l N~
g: Su
g
~ I .
-- -I
o I.
~1
~ .
.
[\
(,1.
~~
I'
!~
~~ ..
....
g.
~::
JI!i
lill
lUll
U!~I
!!111
Ill!.
"1\:
II Ii':
.11
net!
.
i
~.
~
I-
I
i
I
l-i .-
-:::c::'"
E-
0-0
lZo..
~ 4:~
_0
. _ Ul
, :>-<
. UJE-
~ ZZ
-l O::J
-0
Q t; u
~ ~ .
UJz
p..,~
~ O~
.~ Z<
f'l O~
~ -0
-4 E-<
8~
~ 0.._
-4 U
-4 4:
~ Z
~ -
Q &3
~ ~
::J
E-<
-
UJ
o
Z
j
p..,
o
....:J
~
u
0::
4:
0..
4:
~
n" -~ I
. ..~.
ii '
~IL
~ '\
\
~i;,
el;
~
i
-'-
....~.-.
,
~
~-~" ~-
~~
r
d
::::.-----~~~
r
II
,
I
,i
~; Ii
r'
~LI~
I
I
~; i
h I
~i
s!!=
C-~
~ !l\.
~
~ 1:; ~ ~ e..e..~ . I!:" ;:'"
~ ~ .~. ~ 5!:;~5"'j~!hi~~ ",5 ~.. =:l::i
:l I : ~il ~~i!! ~~I~~Si~i~~~ 11i!!;' ~~~~ia ~~~
~ i ~ :~ ~~:b~~",h:~~I<~~;;i!!~ e~~ ~i~~~~!!~ "i~
..~~ ~ '1~~!~.S."d'Au~Ami.~ih~ ....tl.... \:i ~il"
;~ i ~ ~i~~I~h:~iih!H~II~i!~~: ;:I;I~i; !=i
!; I I.. ~in~i~~~;l<li~i~li~Ii!!~=~ii~~ ~~;~~~i~ ~h
..~ Ii d i!!'~n ~:d:!!~111 .~~!11~8 Il;~ ;=~,,~ t:'"
Ell ~ ~~ u~&~~~~~i:~:1i\ ~i!!~i!!;~~'~~~1 !&:~~~=;r! =,g
..= l ~~ ~~~~~".~i!! " !lh II ~,;~hQ~ !Jj!Jj;il~I!!~~ Il...
~"I< 5Q ~~I~~~~a5~~~h~~~~~~'e!~~" "'lU\~a::j"'!II ~~..
=~ ~ ~.. ~~ ~&~~'~~'~h~~~u~~llll..a !:l"i1~~~~a ~e
~~ I :~ ~~i!!a~l;;I!~;~aii!i!~U~;;~~ i~I~~=~21" hi
~~..- ~~. .::tl!s~ia: er."~w~..."'''t''''t "t ....'l:~..! :! '-= ~.,~; =~a
~ .1. i~ ~~:,!!,~~~~~~,'I~lle.r~~~1i ;:1: st~f; ..~=
il!1 :1 ~~!i~!h~~~~i;~i~!U~;b!~ i~i!lhe= e:1
E~ li ~I li~~i:iii~!J;~i~i~~~;!I~~ r;;=E~U~U 3~
eo: I~ ~l :: ..~~~s~~~~i~i~in!~i~;~~i!!i!! :~"iEiEh =~e
.:l ~~ ~ ~~~~~f~"a ~~ijhh~~all~~ee ~~"!i"il!~~~ ~1lA; '"
E~~! ~i Ul<i~~aih~~~;i!!!i!!!i!!l<i;~m~~ ~:~~:i~80 t!~ t~E ~
It; ~~ :a ~~I~:~~H~~~;~!~!~!l!~~~~~ ~=~~~iBll e~ ~ ~
!Jj~ I~ ~! ~huU..~II:,i~~~~d5h.i!!a ~~~~~~!I>i~ EE~ ~
EE~I< h h~~~hSS~~..~!~I~I~Q.!~~~~ !Jjb~t~.; ~ ~~il tl
.... Q~ ~~ .",~~~hn~'!i~ hh~~~ ~~~'t ~..;o:t"i!;~.... ..a ..
..~ -~ .~ ~~~~~i!!~~~;:~S"~~''''~ij~~~a!~ ~~"""a"~ tlE,g ~
n I, ~~ i!!~~~~~~~~~~e;!~ft~ftl~~~~S'i!! a~~~t!~~~tl 2 ~ . ~
~~;~ is ;ii;~~~~i~~i!i~I~1 ~:~~k~~ :hE~~~~~ !~~~ ~ ;
lib ;~ ni~Hdi:!!ni:i:lnn~U~ ~~UiE~iE ii:~ ~ ~ ~
~
~
*'
~ ~
~ i:
" "
.... ..
Cl ~ ~..
t ~ II'"
e a \:i!
~
b
ii
b
r
II
~~...
=~
E~
~.~
d!!!
l:!"'0l
..~..
l".I~_
i!; ..
=e~
.E~:g
tl:ltl
~~~
iilt::;.1
el::~
~=I::
.."I::
c>-.~
t....
\::=~
ilrz1:;,
:;&.1....\
..:!",
......'
l!: ~,
UI:;,
=iE:
ia..
~~~:
~!;!.i..'
.1..l;l ,
El '
..~ '
;~~
i~1
~=~
Ut
..!:l
Ed
1""'\
i
f)
3. Disclosure of Ownership
~
fJ
(Signed Letter Forwarded Directly from City Attorneys Office)
James Lindt
Community Development Department
City of Aspen
130 S. Galena Street
Aspen, CO 81611
February 16, 2002
RE: DISCLOSURE OF OWNERSHIP - MAROON CREEK PEDESTRIAN BRIDGE
Dear James;
Please accept this letter as demonstr<ltion of the City of Aspen's ability to construct a
pedestrian bridge on two parcels of land located within the City of Aspen.
The pedestrian bridge will span two properties:
1) Iselin Park property: This parcel is owned by the City of Aspen. No
mortgages, judgments, liens, easements, contracts or agreements affect
the City's right to use this property for construction of the pedestrian
bridge.
2) Maroon Creek Club Common Lot Q. The City of Aspen has been granted
an easement to place the pedestrian bridge over this commonly held open
space parcel. No mortgages, judgments, liens, easements or contracts
affect the City's ability to use this easement for construction of the
pedestrian bridge. The Subdivision Improvements Agreement as
amended for the Maroon Creek Club PUD lays out the procedures required
for the City to utilize the easement. This agreement is attached for your
information. The City has gained approval for the design of the bridge
and has entered into a Construction License with the Maroon Creek Club
Masters Association as required by the terms of the Subdivision
Improvements Agreement.
I hope this letter is sufficient for your needs. Please contact me if you have any
questions.
Sincerely,
John Worcester, Attorney
4. Vicinity Map
t""'l
f)
--""
'\
r~ /
,
~
I r
IV
./"""\
\ j
-'1
~1
~~
,~
\]
-I
~,
~.,
-~',"
')1:
,
,
"
II
]
~
'"
o[
! iHl
g ~H,
, tin
1:},n !~
r< I H~ BI
I f ldi !] i
"""-r
z~ ~
..""".",
I
o
r)
..,)
i~
" ,.
__'O:~ "Y_.i_-::;~~_""~,,,,~
'-..
~,
"
-""~...
('""I
t""')
5. Site Improvement Survey
0
<:
0
~
:::s:::
u l.LI
.....J <: I.-' Vl ~
:c 0 l.LI l.1.J
~ l.1.J l.LI >
~ ~
l- I- ce l- 0::
IIII
C>''''"'
. .,.".'..~...^.,:,.~.<. .
.,.,~;,.-,.:
/<
}/
r-I
/-.- III /~? A1~' /
( j' ~/;'1f /f/,/?/f
\ l 1'-11('/
I I '~'?./'
~t ~ 1/('''' / /
'" ~,\ I~. (--~J
~ --..
".... ':z.~~/8"Cf~:;;;---.,_._
.... ~. "",*"'i:..;.~_
....... ,~. '.,"...'S-
........
'~
----
---'''---
~-,~-
""''''''-,*",..
-.
--
......-.........
----.....
----.
I J
-'
....~, /'-
:::'~--J tzZ2 ____t"' _
~ ~--
7--- ~ ~ ~
- ---~~-=----
:=;.;;r""~ -.~
..--_-:-.r:r JI6... ---~.
:=- - --:::=---... ....~ ---= --
~---.,...:::.:-::--.... ..---------
-~-.--...-~-
..- ......""--- .::.:r
-----............... --~
----~ - -
---.-- - =--- ------.::::. -
--.--'""- --- --:..::::.---- - 7
-- ~ \
--
~:.-=<~.L-
,-' ------" ",
~-
--- -..:.:-...
----- ...._----.......
.:::::r ..-..-......
--
~
---~
--
'ac~ U:~------- ~~ .
-.... \ ---..:::.-....
/ .... ---- ....-=:.., "
.-..~....-:: _ .!:...~ ~ .'"_~- 7""'-:-::,::~:;
..~~--- '- --/"-----'":..--.;--~
- --.... '- --- ... -...
"':::"_'_ ......~........--... -__ "...-7 c..-----
"'...... ----- --- " .:~--...
"~ ---~;1- i -----::::. -:
--- ~..
'- -~-------.~ ~ ---"--
...... i" . ..- -----
-- ......._---..".-~ ..~.....
--.... ....- .......------
........ .UL.' .-' -' -...- --
------ --. - _..--/" ....----"
'" U 0 W U. " or
" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "
..0-,91 ~ "' ~ ~ N ;; " ~ ro ~ ro "' ~ ~ N 0; " ~ ro ~ ~ VI
" 0 0 " " " ~ ~ ~ ~ ~ ~ ~ ~ ~ ro ro ro ro
ro ro ro ro ro ro ro ~ ~ ~ ~ ~ " ~ " " ~ ~ " " ~ ;J
"Q-,a ..o-,a
~ e'
~ ~
-:; ~ ::)
D '~ C
., -:; 00 ICIa
D '&"
U. ., 0 ..
~ ~ '0 ..
0 ~ NU ..
N ~ !
\ ~
'i:c; ..
00
-s.o 0
s, 0
,..,..... ? ~ '0 U
:, ..::...... ~ NU
..,:~'ci:.:':.:'. " ~ .
ro ' ............ ~ , :E ~
....,................,..... D , 0
""iiij~~~ ., , 0 .:;
0
u. ( u.
~
"' \ ~ .
0 "
\ ~ 0'":
0 ::: ~ \ ~~
~ 0 ~
" \ V> -~
. . ~- -1~
~ ii: ii: \
'"' '"' I
N \ I
(0..
~
c
,
0
u
~
, ~
, "
, 'x
, w
"""/
,
~ ,
,
c , -1~
. ,
'" ,
'"' ,
,
,
,
,
,
-~ ,
~. ro ,
C ,
~ . I
W '" I
'"' ,
/ ,
.// N ,
-, ,
",. :;1 "
"- c ,
'" D' 0 ii: I
."
", .1 <0 , -1~
u., ~ I
., 0 c
. "'I . . ~ ,
~ 0' U ,
'" -, .e c ,
-' 0 . , !
'" "I
" .' I . '"' ,
~ DI "', ~I ,
." "'I c ,
" . ,
~I il U
\ ,
~ ,
,
, r--
~I I "' i ,
~ ,
~
I ~ ,
c ~ ,
v
. ~ .. ,
i "' '"' ,
'"' / ,
I \ ,
,
i , -1~
,
,
I
I
I
"' I
C I
. \ I
OS6~ "' I
'"' ~
,
,
......... ,
I
,
\ ,
~ ,
,
"
'"
~
~
'0
'"
"
,e
.-
00.
~~
~::
,
"
''',
I
o 0
u
o
w
"
E E
0 ~ ,
0 " <;
w_ '0 u-,
o~ 0 ~
~~ .;; N~
",C; i~
-
~
o
u
"
...
"
0.
o~
-~
0-
0>
o
~.~
..'"
J:
ut
m
e>>
::)
II:a
..
..
..
!
..
o
u
~
u
~
..,
I)
!
ATTACHMENT 4
Specific Submission Contents
Exemption from ESA Review
By Community Development Director
The request for Community Development Director approval of an Insubstantial Amendment or
Exemption shall contain the following items:
1. A written description of the existing conditions on the property which are requested to
be altered via the amendment or exemption.
2. Such site plan drawings or elevations as may be necessary to adequately evaluate the
proposed amendment or exemption.
3. A listing of all previous development approvals granted to the property, with the
approximate dates of said approvals.
4. A copy of any recorded document which affects the proposed development, including
but not limited to recorded plats, agreements and deed restrictions. If changes are
proposed to said recorded documents, these should be "red-lined" onto a copy of the
original document.
5. A written response to the applicable reyiew criteria (attachment 5).
r')
ATTACHMENT 4
MAROON CREEK PEDESTRIAN BRIDGE PROPOSAL
1. Description of Proposal
The City of Aspen is proposing the placement a pedestrian bridge from Iselin Park
across the Maroon Creek canyon to the base of the Tiehack ski area. This bridge will
serve to complete a missing link in a multi-purpose trail system that accommodates
walkers, runners, bicyclists, rollerbladers, skiers and equestrians. Existing multi-use
trails provide access to the east and west ends of this future bridge. Anticipated
improvements to the trail systems on Tiehack/Buttermilk Mountain and the Maroon
Creek/Castle Creek corridors will increase demand for the connection this bridge will
provide.
There is currently no safe, convenient trail connection between the Iselin recreation
complex and the base of the Tiehack ski area. There is a primitive, severely degraded
single-track trail that drops down into the Maroon Creek canyon, crosses a bridge
constructed by the United State Forest Service (USFS) and then climbs back up the
canyon. In addition, there is currently no safe, convenient Nordic ski trail connection
between the Nordic trails on the east side of theM.aroon Creek c~lnyon and the Nordic
ski trails located at the base of Tiehack mountain on the Maroon Creek Golf Club. The
existing Nordic ski trail connection is very steep and narrow and does not allow for
passage of snowcats for trail grooming. The new bridge will provide a safe convenient
connection between the two Nordic trail systems for both skiers and grooming
equipment. Plans and renderings for the bridge are included within ATTACHMENT 3 of
this application.
2. Site Plan Drawings
Drawings and a rendering of the bridge are included within ATTACHMENT 3.
3. Develop Approvals for the Properties
o Iselin Park PUD, 2000. This PUD approval allowed the City to move
forward with recreational improvements to Iselin Park, including an indoor
ice rink, swimming pool and recreational facilities. The Maroon Creek
Pedestrian Bridge was also a part of the PUD plan.
o The Maroon Creek Club PUD, 1993. An easement, granted on the final
plat, allows Pitkin County to construct a pedestrian bridge on and over
Common Lot Q. The annexation in 1996 of the Maroon Creek Club
transferred the pedestrian bridge easement to the City of Aspen.
o An amendment to the Maroon Creek Club Subdivision Improvements
Agreement, dated February, 2000, sets out the provisions under which the
City may gain access to construct the bridge.
4. Recorded Documentation
Included within ATTACHMENT 3 of this application are copies of the recorded plats of
record regarding the Iselin Park property and the Maroon Creek Club property.
t"i
('''\
\-,........",
A TT ACHMENT 5
Review Standards: ESA Exemptions by Planning Director
The expansion, remodeling or reconstruction of an existing development shall be exempt from
ESA Review if the applicable standards below are met. Please respond to the appropriate
criteria:
8040 Greenline Review Exemption.
I. The development does not add more than ten (10) percent to .the floor area ofthe existing
structure or increase the total amount of square footage of areas of the structure which are
exempt from floor area calculations by more than twenty-five (25) percent; and
2. The development does not require the removal of any tree for which a permit would be required
pursuant to Section 15.04.450 or the applicant receives a permit pursuant to said section; and
3. The development is located such that it is not affected by any geologic hazard and will not result
in increased erosion and sedimentation.
Stream Margin Review Exemption.
1. The development does not add more than ten (10) percent to the floor area ofthe existing
structure or increase the amount of building area exempt from floor area calculations by more
than twenty-five (25) percent; and
2. The development does not require the removal of any tree for which a permit would be required
pursuant to Chapter 13.20 of this Code.
3. The development is located such that no portion of the expansion, remodeling or reconstruction
will be any closer to the high water line than is the existing development;
4. The development does not fall outside of an approved building envelope ifone has been
designated through a prior review; and
5. The development is located outside of the ofthe special flood area and more than one hundred
(100) feet measured horizontally from the mean high water line of the Roaring Fork River and its
tributary streams, or the expansion, remodeling or reconstruction will cause no increase to the
amount of ground coverage of structures within the special flood hazard area.
Mountain View Plane Review Exemption. Exempt development includes the addition of any
mechanical equipment to an existing development which protrudes into the view plane, except
for the following types of equipment:
1. Satellite dish;
2. Elevator shaft; or
3. Any other piece of equipment whose height and mass are found to be of such significance in their
effect upon the designated view plane that their review pursuant to the standards of Section
26.435.050(C) is required.
Hallam Lake Bluff Review Exemption. Exempt development includes the exterior expansion,
remodeling or reconstruction of an existing structure or development, or the removal of trees or
shrubbery, jfthe following standards are met.
I. The development takes place more than thirty (30) feet from the top of slope, or the development is
obscured from the rear slope by other structures as determined by a site section provided pursuant to
review standard (C)(7) below.
C.7. Site sections drawn by a registered architect, landscape architect, or engineer shall be
submitted showing all existing and proposed site elements, the top of slope, and pertinent
elevations above sea level.
I)
()
ATTACHMENT 5
MAROON CREEK PEDESTRIAN BRIDGE PROPOSAL
5. Explanation of Review Standard Compliance
The design proposed for the bridge will span Maroon Creek from the top of the canyon
walls. The design to be used is known as an "arch-deck" design and is depicted on the
site plan submitted as a part of this application. This arch-deck design requires no
piers or supports into or near the course of Maroon Creek. Because of this, no impact
will result to the f100dpiain and riparian areas associated with Maroon Creek. The
following is a response to the review standards required for ESA Exemptions by the
Planning Director:
1. The development does not add more than ten (10) percent to the floor area
of the existing structure or increase the amount of building area exempt
from floor area calculations by more than twenty-five (25) percent.
The development proposed is a public pedestrian bridge and floor area
calculations are therefore not applicable.
2. The development does not require the removal of any tree for which a
permit would be required pursuant to Chapter 13.20 of this Code.
The bridge has been positioned on the site so that none of the existing
trees (spruce, scrub oaks) will be removed.
3. The development is located such that no portion of the expansion,
remodeling or reconstruction will be any closer to the high water line than
the existing development.
No existing development is present on the project site.
4. The development does not fall outside of an approved building envelope if
one has been designated through prior review.
The proposed development is contained within the defined limits of the
easement granted for placement of the pedestrian bridge.
5. The development is located outside of the special flood area and more than
one hundred (100) feet measured horizontally from the mean high water
line of the Roaring Fork River and it's tributary streams, or the expansion,
remodeling or reconstruction will cause no Increase to the amount of
ground coverage of structures within the special flood hazard area.
The entire structure of the bridge is located outside of the 1 DO-year floodpiain of
Maroon Creek as defined by applicable studies (see attached floodplain mapping for
the site). The mean high water line of Maroon Creek at the project site is
approximately located at the 7870" elevation. The lowest point of the bridge structure
will be the bottom of the arch support beams, which are located at the 7975' elevation,
approximately 105' above the high water mark (please see the attached site plan).
~/~
~~~96
0'. '
@
7809
ZONE AE
o
,
LIMIT OF
DET Al LED
STU DY
ZONE X
-ZONE A
~S\\E:
~,,~..\
"~
~
~
"~ \~
'~'~~-::
" "
~
~
'r."
"I,-
CITY Or- ASPEN--
OR0143
~~
ZONE X
Floodplain Mapping for the
Maroon Creek Pedestrian Bridge
1" = 500'
/
.
/'