Loading...
HomeMy WebLinkAboutordinance.council.040-90 ORDINANCE NO. 40 (SERIES OF 1990) AN ORDINANCE OF THE ASPEN CITY COUNCIL GRANTING A PUD AMENDMENT FOR TH]~ SMUGGLER MOBILE HOME PARK PLANNED UNIT DEVELOPMENT WHEREAS, pursuant to Section 7-908 B. of the Municipal Code, the Smuggler Homeowners Association as represented by Brooke Peterson, submitted an application for an amendment to the PUD; and WHEREAS, there are several documents that address the development of the Park, those are: Chapter 14 of the Municipal Code, the Mobile Home Park Zone District in the Land Use Code, the Declaration of Protective Covenants of the Mobile Home Park, Rule and Regulations of the Architectural Control Committee, and the Precise Plan (used as the PUD Plan); and WHEI~EAS, the applicants requested to amend the Final PUD (Precise) Plan to formalize the dimensional requirements and eliminate the necessity to file an insubstantial amendment every time a change is made on a parcel in the Park; and WHEREAS, a duly notice Public Hearing was held by the Aspen Planning and Zoning Commission (hereinafter "Commission") on Hay 22, 1990 to consider the amendment to the PUD; and WHEREAS, after review and consideration of the representations made by the applicant and Planning staff, the Commission recommends approval to Council, with conditions, of the PUD amendment; and WHEREAS, the Board of Directors of Smuggler Mobile Home Park have reviewed amendments and approve of the proposed amendments to the PUD. NOW, THEREFORE, BE IT ORDAINED BY TI{E CITY COUNCIL OF THE CITY OF ASPEN, COLORADO: Sectlon 1: That is does hereby grant the following amendments to the PUD: Permitted uses: Mobile Home, Modular Home, or Site Built Home is permitted within the Smuggler Mobile Home Park pursuant to the dimensional requirements set forth in this PUD Amendment. New additions and redevelopment: All additions to any Mobile Home or structure in the Smuggler Mobile Home Park shall meet the City of Aspen Building Regulations Chapter 7 of the Municipal Code. Basements: Any basement and floor system upon which one relocates a mobile home must be capable of supporting the relocated mobile home. All newly constructed basements shall incorporate the radon mitigation technique that is being proposed for the 1991 UBC. (Appendix Chapter 12 Section 1235,1237.) Height: a) reduction of minimum service building height from 25 feet to 15 feet; b) the height of the residential units shall remain at 15 feet as measured from the midpoint of the lots average slope. Minimum Lot Size: The minimum lot size shall be 2400 Square feet. Front Yard Setback: The minimum front yard setback shall be 0. For every parcel in the Park there is an average 8 foot limited common element from the edge of the roadside curb to the front property line. This common element is intended to be used for off-street parking for the homeowner. Rear Yard Setback: The rear yard setback shall be a minimum of 5 feet. Side Yard Setback: Minimum of 10 feet on one side and minimum of 0 on the other side w~th the condition that, prior to the issuance of a building permit, aL1 placement of Mobile Homes on the lot is subject to review and approval by the Architectural Control Committee. Maximum Floor Area: The maximum allowable floor area shall be 2000 square feet and 500 square feet shall be exempt for either a garage or a shed. For the purpose of this PUD we will use the following calculation to determine floor area: each 1 square foot of above grade space will equal 1 square foot of floor area; each 1 square foot of below grade space will equal .5 square feet of floor area. Parking: The parking requirements shall remain the same as is defined in Rules and Regulations of the Architectural Committee. They are: there shall be a minimum of 2 off-street parking spaces for each lot on the combination of lot and the adjacent part of the roadway easement which may be used for parking in accordance w~th the covenants. For any mobile home over 1,500 square feet in living area, three parking spaces are required. For any mobile home in excess of 2,000 square feet, 4 parking spaces are required, and for any mobile home in excess of 2,500 square feet, 5 parking spaces are required. When garage space is used for parking it shall not be ~ncluded in the calculation of living area for computing required parking spaces. Accessory Buildings: No accessory buildings or necessary egresses shall be built within the required setbacks. Section 2: That is does hereby grant approval with the following conditions: 1. Prior to the issuance of any building permits for renovations or changes to structures within the Park, the Homeowners Association shall amend their Rules, Regulations and Procedures for the Smuggler Mobile Home Park Architectural Control CommIttee of the Smuggler Home Owners Association to be consistent with these amendments. 2. Prior to the issuance of any building permits for renovations or changes to structures within the Park, the Final PUD Agreement shall be amended to reflect these changes. Section 3: That the City Clerk be and hereby is directed, upon the adoption of this ordinance, to record a copy of this ordinance in the office of the Pitkin County Clerk and Recorder. Section 4: Nothing in this ordinance shall construed to affect any right, duty or liability under any ordinance effect prior to the effective date of th~s ordinance, and the same shall be continued and concluded under such prior ordinances. Section 5: A public hearing on the Ordinance shall be held on the 9 day of July, 1990 at 5:00 P.M. in the city Council Chambers, Aspen City Hall, Aspen Colorado, fifteen (15) days prior to which hearing a public notice of the same shall be published one in a newspaper of general circulation within the city of Aspen. INTRODUCED, ~ AND ORDERED PUBLISHED as provided by law, by the City Council of the city of Aspen on the //~ay of , 1990. Will~am L. St~rllng, Mayor FINALLY, adopted, passed and approved this ~ day of William L. Starling, Mayor ATTEST: Kathryn S. Koch, city Clerk