Loading...
HomeMy WebLinkAbout03_SURVEY_&_PLAT3.1Survey & Plat survey & plat section 3 3.2 Bar Slash X Ranch LLC - Annexation and Stage Road PUD/Subdivision: Final Submission Introduction In 1998, Bar/X Ranch engaged Bruce Hunsaker of Rocky Mountain Land Surveying to prepare a new survey of the ranch property. This survey was not completed until May 15, 2001 and turned out to be very considerbaly more work than originally anticipated. The ranch lies within Sections 2 and 11, Township 10 South, Range 85 West, of the 6th. Principal Meridian. Prior to the section breakout of Township 10 South, two patents were issued within Section 11. Section 11 was therefore, according to the surveyors’ rule book, tracted around these existing patent boundaries, rather than divided into sec - tions. These tract corners were originally marked with rocks or stakes, and did not generally survive well. When later patents were issued, the occupa- tion boundaries, which were often re-established from recorded documents, did not always corre - spond properly with the original tract corners set in the field, and over time, discrepancies in ownership boundaries appear. This situation is, of course, not unique to Aspen, but common throughout the intermountain west. Bruce Hunsaker did very extensive research, including several trips to Denver to consult origi- nal field notes and other documents, in order to produce a definitive survey. When Bruce moved to California in 2001, Bar/X Ranch engaged Mark Beckler of Sopris Engineering to complete the survey work for the subdivision. Mark had previ- ously surveyed many of the surrounding proper- ties for adjoining landowners, including extensive research of his own, and was therefore familiar with the area and the historic boundary problems. Mark Beckler validated Bruce Hunsaker’s work, and was able to move forward seamlessly with the additional surveying required. In fact, the quality of work from these surveyors was such that the Aspen Valley Land Trust, Burlingame Ranch and Soldner boundaries on the west and north of the ranch, and the Harvey boundary on the east, have all now been conformed to the ranch survey boundary. 3.3Survey & Plat Index of Plat Sheets Stage Road Planned Unit Development/Subdivision Sheet 1 of 6 Certifications and Vicinity Map Sheet 2 of 6 Exterior Boundary, Description, and Existing Easements Sheet 3 of 6 Exterior Boundary and Conservation Easements Sheet 4 of 6 Interior Lots and Easements Sheet 5 of 6 Interior Lots and Easements Sheet 6 of 6 View Lines Lots 7 through 11 (Maroon Creek Viewplane) Annexation Map of Bar/X Ranch and Parcel 2 of Park Trust Exemption Map Sheet 1 of 2 Certifications and Vicinity Map Sheet 2 of 2 Boundary Survey 3.4 Bar Slash X Ranch LLC - Annexation and Stage Road PUD/Subdivision: Final Submission This page intentionally left blank