II. Civic Space Options
P1
Page 1 of 7
MEMORANDUM
TO: Mayor and City Council
FROM: Rob Taylor, NV5 & Jeff Pendarvis, Capital Asset Project Manager
THROUGH: Jack Wheeler, Capital Asset Manager
DATE OF MEMO: August 19, 2016
MEETING DATE: August 23, 2016
RE: Options for Aspen City Hall
REQUEST OF COUNCIL: Three Aspen City Hall options are being presented today for design direction and
discussion from Council:
1) Galena Option – One Roof Option
2) Armory Reuse without Powerhouse – Three roof option, Armory, Rio, Galena
3) Armory Reuse with Powerhouse – Four roof option, Armory, Rio, Galena, & Powerhouse
The goal of today’s session is to find out if Council would like to change the direction given to staff on November
16, 2015 that was to “take the Galena Plaza Option solution to detailed design” and/or if further information is
required for analysis and discussion.
PREVIOUS COUNCIL ACTION:
THE GALENA OPTION
July 19, 2016 – Galena Option previously approved was shown with additional requested options of the Galena
Alternate and an Armory Re-use Option with a Purchase of Space. Council directed staff to produce more
information on the use of the Armory as City Hall.
July 5, 2016 – Update on the Galena Option and Galena Reuse Option 2.0. Council requested additional phasing
and cost information on these options as well as the Galena Alternate.
March 7, 2016 – Worksession update on the Galena Option. Council requested to keep modest and humble.
Nov 16, 2015 - Worksession. Confirmed - Move the city office project “the Galena Option” at Galena Plaza
forward to detailed design.
November 3, 2015 - The community was asked in an advisory vote if the Armory building should be used as city
offices, or for community use. Community use was preferred.
August 3, 2015 – Worksession - Programing of 51,900 sf at Galena Plaza including reuse of the existing Armory for
community use was approved to move to detailed design by a vote of 4-1.
July 14, 2015 – Worksession – Options of Armory Option, the Galena Option, and the Galena Alternate conceptual
designs. Council discussed each design and was in favor of the staff recommendation for the Galena Option 3-2.
P2
II.
BACKGROUND:
• 2015 Final Facilities Master P
national space standards and
departmental space:
• 2014 Facilities Master Plan cond
feet (sf) for the Aspen Police Depa
• 2012 Aspen Area Community P
Historic assets, connections with parks)
• Civic Master Plan 2006 adopted;
• Purchased Zupancis property in
Aspen Police Department is approved by Council to proceed on
DISCUSSION:
The process that the City of Aspen has gone through to
Council is a process that started in 2003 and has been ongoing at some level
arrived at three options (included as Exhibit B
Galena Option and the Galena Alt Option met the needs of the
possible with one question lingering: whether or not the community liked the idea of the repurpos
some fashion, to its historic use as a community hall. To gather a sense
voters were asked in an advisory question:
use?” Community use was preferred.
The 2015 and 2016 open RFP process on the future use of the Old Powerhouse
meeting all of the criteria needed to execute a lease agreement.
an Armory Reuse option, with potential inclusion of reuse of the Powerhouse.
Powerhouse use process can be found in Staff memo of July 19, 2016 worksession.
GALENA OPTION DISCUSSION: (Current
GALENA OPTION DESIGN
Galena Option Schematic Design was issued at the end of May
Based on recent requests from Council for
Option design has been placed ON HOLD.
As of the end of August 2016, approximately
outreach for the Council approved Galena Option
Page 2 of 7
Facilities Master Plan program issued. Current space allocation per person is less than typical
space standards and recommended departmental space actually decreases from current
lan conducted a detailed departmental analysis and showed need for 14,900
Aspen Police Department and 51,900 sf for City services.
12 Aspen Area Community Plan is aligned with current Galena Option (services in core, preservation of
toric assets, connections with parks).
Civic Master Plan 2006 adopted; recommended utilization of Galena site for bulk of City Hall space needs
upancis property in 2000 with the purpose of providing a public facility on the site
Aspen Police Department is approved by Council to proceed on the Zupancis site).
has gone through to arrive at the decision and direction that
2003 and has been ongoing at some level through June 2015
(included as Exhibit B) to address a long term, much needed solution. Council felt that the
ption met the needs of the organization to provide the best public service
whether or not the community liked the idea of the repurpos
to its historic use as a community hall. To gather a sense community sentiment, on
question: “Should the Armory Building be used as city offices, or for community
RFP process on the future use of the Old Powerhouse recently resulted in no applicant
to execute a lease agreement. Given this, Staff were requested to look at utilizing
an Armory Reuse option, with potential inclusion of reuse of the Powerhouse. Additional discussion of the
erhouse use process can be found in Staff memo of July 19, 2016 worksession.
(Currently on Hold at Council direction)
esign was issued at the end of May 2016 and is currently in Detailed Design
requests from Council for iterations, new program options, and a Master Plan review, the Galena
ON HOLD.
approximately $990,000 will have been spent on design, survey,
Galena Option. This is within the current budget.
space allocation per person is less than typical
departmental space actually decreases from current
ucted a detailed departmental analysis and showed need for 14,900 square
ption (services in core, preservation of
Galena site for bulk of City Hall space needs.
2000 with the purpose of providing a public facility on the site (note:
the decision and direction that staff received from
June 2015. At that time we
to address a long term, much needed solution. Council felt that the
organization to provide the best public service
whether or not the community liked the idea of the repurposing the Armory, in
on November 3, 2015
y offices, or for community
resulted in no applicant
Given this, Staff were requested to look at utilizing
Additional discussion of the
Detailed Design Phase.
lan review, the Galena
spent on design, survey, estimating and
P3
II.
Page 3 of 7
Preliminary Galena Option site planning (Schematic Design)
GALENA OPTION PROGRAM:
The baseline program is on track for all departments and common spaces such as Council Chambers, Sister Cities,
shared meeting rooms, locker rooms, flex spaces, mail etc. The program of 51,900 sf is met under one roof. There is
an additional 2,700 sf of potential space that staff is seeking future Council direction on for ACRA, whether this
should be co-located or be in an alternate lease or owned location.
GALENA OPTION CONSTRUCTION IMPACTS:
The Galena Plaza Option has the least impact on the community as it is one project, which will be completed in 24
months. When complete, public services will move out of their current locations into the new building. Basically
this option constructs space that does not affect City Services at all, and then the City moves into a new building.
GALENA OPTION FINANCIAL/BUDGET IMPACTS:
Galena Option current budget is at $31.3 million, on budget for the base program of 51,900 sf and still subject to
ongoing value engineering efforts by the design team. The schematic design has been priced by Shaw Construction
and is a more developed cost estimate than other City Hall option program estimates being presented today.
Per the City’s Finance Department, funding for one site at Galena at $31.3 million and would be financed through a
combination of cash ($20.7 million) and financing ($10.6 million). The annual debt service payment would be
mostly from the Asset Management Plan Fund, supported by departmental contributions.
LOCATION GALENA OPTION
Armory – Repurposed to community (19,800 sf) 0
Purchase space 0
455 Rio Grande and 425 Rio Grande 51,900
Powerhouse – Repurposed to community (8,000 sf) 0
TOTAL (GSF) 51,900
PROGRAM BUDGET Schematic Design $31.3Million*
GALENA OPTION - PROS AND CONS:
PROS CONS
• Seamless transition of Public Service
• All core services under one roof
• Doesn’t discard sunk cost and time to date
• Is consistent with the 2015 vote
• Requires 43,700 sf of new building
• Moves services to the other side of Main Street
• Adds traffic and heavy use to Rio Grande Street
P4
II.
Page 4 of 7
• Aligns with the Civic Master plan
• Aligns with the Aspen Area Community Plan
• Could push capital costs for the Armory to
another party outside the General Fund
• Relieves parking and traffic in the Core
• Could accommodate long term ACRA offices
in the Armory.
• Does not lease property at market rate
• Does not buy property tied with unknown
future risks
• Is offset by 10,900 sf of current ACRA and Rio
(i.e. gross add is not 54,600 sf)
• Fiscally responsible with no tax increase
ARMORY REUSE OPTION WITHOUT POWERHOUSE
ARMORY REUSE OPTION WITHOUT POWERHOUSE DESIGN
Given direction from July 19, 2016, this option enables a full refurbishment of the Armory AFTER a new
component of City services is constructed at the Galena location (current ACRA at 425 Rio Grande Place). This
option offers provides almost seamless service for current City Services in that after the new structure is built, the
Armory program can move to Galena, while the Armory gets its necessary Code, ADA, Structural, Safety,
Functional, and Performance upgrades, where the City can then be consolidated under the three roof scenario of
“Galena, Rio and the Armory”.
ARMORY REUSE OPTION WITHOUT POWERHOUSE CONSTRUCTION IMPACTS:
The Reuse Option without Powerhouse will be two major construction projects at Galena and the Armory, and a
minor upgrade of the current Rio Grande building to reconfigure for City Offices.
ARMORY REUSE OPTION WITHOUT POWERHOUSE FINANCIAL/BUDGET IMPACTS:
Per the City’s Finance Department, funding for the City’s reuse of the Armory, basic renovation of the Rio Grande
and a new 28,400 sf building at Galena at a TOTAL COST of $36 to $39 mil would require cash of $21 mil and
financing of $15 to $18 mil.
LOCATION ARMORY REUSE OPTION
Armory - full remodel (+ small addition) - REUSE 19,800
Rio – (455 Rio Grande – existing space) - REUSE 6,400
Galena – (425 Rio Grande Place current ACRA) – NEW SPACE 28,400
Powerhouse (full community use at 8,000 sf, REUSE) 0 sf for City 0
TOTAL (Gross Square Footage)** 54,600
PROGRAM BUDGET rough order of magnitude* $35.9 - $38.6 Million*
*ROM unit pricing and current market pricing
** Gross Square footage impact of 5%-10% could occur due to multiple locations
Phasing costs for this Armory Reuse Option without Powerhouse are reduced, given the current City configuration
can be held without loss of City service. ACRA will move to Powerhouse during construction of Phase1.
ARMORY REUSE WITHOUT POWERHOUSE - PROS AND CONS:
PROS CONS
• Uses current configuration for City offices
• Can Maintain the seat of government at the
Historic Armory
• Keeps government in the Downtown Core
• Can be phased
• Reduces GSF of new construction by 19,800
sf
• Aligns with the Aspen Area Community Plan
• Is $5 - $8 million more expensive, is difficult
to pay for over the next 10 years.
• Three roofs (Galena, Rio, Armory) =
confusing municipal planning, disparate
customer service, difficult parking, loss of
efficiency
• Six roofs during temporary use
• Against the vote for Armory Community use
P5
II.
Page 5 of 7
• Aligns with the Civic Master Plan
• No tax increase
• Loss of +/- $1,000,000 sunk costs to date on
Council approved Galena Option
• Large construction risk incurred with Armory
renovation
• Potential increase in Gross Square Footage
due to multiple buildings i.e. more stairs,
elevators, corridors, bathrooms, etc.
• Less efficient staff utilization if travel time is
factored
ARMORY REUSE OPTION WITH POWERHOUSE
ARMORY REUSE OPTION WITH POWERHOUSE DESIGN
Given direction from July 19, 2016, this option enables a full refurbishment of the Armory AFTER a new
component of City services is constructed at the Galena location (current ACRA at 425 Rio Grande Place). Similar
to use without the Powerhouse, this option can offer almost seamless service for current City Services in that after
the new structure at Galena is built, the Armory program can move to Galena, while the Armory gets its necessary
Code, ADA, Structural, Safety, Functional, and Performance upgrades, where the City can then be consolidated
under the three roof scenario of “Galena, Rio and the Armory”.
Given recent developments in Powerhouse usage, the Powerhouse refurbishment could happen sooner and allow
Asset, Transportation, Environmental (possibly other departments given a detailed program and space design) and
meeting to be closer to the Core prior to the overall completion in mid-2020.
ARMORY REUSE OPTION WITH POWERHOUSE CONSTRUCTION IMPACTS:
The Reuse Option with Powerhouse will be two major construction projects at Galena and the Armory, a moderate
remodel at the Powerhouse and a minor upgrade of the current Rio Grande building to reconfigure for City Offices.
ARMORY REUSE OPTION WITH POWERHOUSE FINANCIAL/BUDGET IMPACTS:
Per the City’s Finance Department, funding for the City’s reuse of the Armory, moderate upgrade of the
Powerhouse, basic renovation of the Rio Grande and a new 20,400 sf building at Galena at a TOTAL COST of $35
to $38 mil would require cash of $21 mil and financing of $14 to $17 mil.
LOCATION ARMORY REUSE OPTION
Armory - full remodel (+ small addition) - REUSE 19,800
Rio – (455 Rio Grande – existing space) - REUSE 6,400
Galena – (425 Rio Grande Place current ACRA) – NEW SPACE 20,400
Powerhouse (zero community use) all use for City 8,000
TOTAL (Gross Square Footage)** 54,600
PROGRAM BUDGET rough order of magnitude $35 to $38Million*
*ROM unit pricing and current market pricing
** Gross Square footage impact of 5%-10% could occur due to multiple locations
Phasing costs for this Armory Reuse Option with Powerhouse are reduced, given the current City configuration can
be held without loss of City service. ACRA will move to Powerhouse during construction of Phase 1.
ARMORY REUSE WITH POWERHOUSE - PROS AND CONS:
PROS CONS
• Uses current configuration for City offices
• Can Maintain the seat of government at the
Historic Armory
• Keeps government in the Downtown Core
• Is $4 - $7 million more expensive, is difficult
to pay for over the next 10 years.
• Four roofs (Galena, Rio, Armory,
Powerhouse) = confusing municipal planning,
P6
II.
Page 6 of 7
• Can be phased
• Reduces GSF of new construction by 27,800
sf
• Aligns with the Aspen Area Community Plan
• Aligns with the Civic Master Plan
• No tax increase
disparate customer service, difficult parking,
loss of efficiency
• Six roofs during temporary use
• Against the vote for Armory Community use
• Loss of +/- $1,000,000 sunk costs to date on
Council approved Galena Option
• Large construction risk incurred with Armory
and Powerhouse renovation
• Potential increase in Gross Square Footage
due to multiple buildings i.e. more stairs,
elevators, corridors, bathrooms, etc.
• Less efficient staff utilization if travel time is
factored
The impacts of each the option as related to new square footage in town is shown below
RECOMMENDED ACTION: Staff request Council discuss design direction on the City Hall location options.
CITY MANAGER COMMENTS:
Attachment
Exhibit A – Pros and Cons
Exhibit B – Presentation
Exhibit C – ROM Budget
P7
II.
Page 7 of 7
EXHIBIT A – PROS AND CONS
Galena Option Armory Reuse
Parking
Reduces parking and traffic in core Doesn’t reduce parking and traffic in core
Construction
More new construction by COA– Less new
construction likely by others
Least new construction by COA- Most new
construction likely by others
Shorter Construction on one site Longest Construction on 3-4 sites
Construction activity affects fewer people Construction activity affects most people
Less square feet needed for building
appropriate facilities due to building/design
efficiency
Most square feet needed to building
appropriate facilities due to building/design
inefficiency
Fewer building systems and spaces to build
and maintain
Most building systems and spaces to build and
maintain
Allows for best future flexibility Allows for least future flexibility
Civic
Most effectively activates underutilized city
assets (parking garage/plaza)
Least effectively activates underutilized city
assets (parking garage/plaza)
Completes “civic blocks” and consolidates
public services
Less “Civic Block” orientation with 3-4 sites
and fractured service. Although does still
allow connection to Galena.
Potentially allows Powerhouse and Armory to
be used as public functions
One option potentially allows Powerhouse to
be used as public functions after construction
phase
Efficiency
Best building/space efficiency Least building/space efficiency
Best energy efficiency Least energy efficiency
Best staff efficiency Least staff efficiency
Cost
Less cost assumed for LEED/WELL design
and construction
More cost needed for LEED/WELL design
and construction as well as Historic
construction needs and multiple mobilizations
as well as escalation
P8
II.
CIVIC SPACE
RELOCATION PROJECT
OPTION STUDY
Aspen City Council Work Session
August 23, 2016
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 1 P
9
I
I
.
TODAYS GOALS
•Given July 19, 2016 discussion
Armory should be considered for
some of City Hall
•Present options for City Office long
term solution to Council to have
discussion on long term solution
–LOCATION
–COST
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 2
P
1
0
I
I
.
SPACE PROGRAM
•SPACE PROGRAM
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 3
P
1
1
I
I
.
1. GALENA OPTION
•Currently ON HOLD at start of Detailed
Design
•Currently designed to program at
51,900 sf city program plus ACRA
2,700 sf = 54,600 sf
•$1mil spent on design to date
•Total - $31.2 mil base program
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 4
P
1
2
I
I
.
SITE LOCATION MAP - GALENA OPTION
AUGUST 2016
MAIN STREET
HOPKINS STREET
RIO GRANDE PLACE
RIO GRANDE PARK
PROPOSED
CITY OFFICES
POWERHOUSE
BUILDING
PITKIN
COUNTY
LIBRARY
COMMUNITY BANKS
OF COLORADO
PITKIN
COUNTY
COURT-
HOUSE
ARMORY
517 HOPKINS
PITKIN
COUNTY
JAIL
PITKIN
COUNTY
SHERRIFF
BUILDING
PROPOSED
COUNTY
ANNEX
OBERMEYER
BUILDING
HOTEL
JEROME
PROPOSED
POLICE
STATION
GALENA
PLAZA
BLEEKER STREET
S
M
I
L
L
S
T
R
E
E
T
S
G
A
L
E
N
A
S
T
R
E
E
T
S
H
U
N
T
E
R
S
T
R
E
E
T
GALENA OPTION
54,600 SF GALENA
ARMORY RETURNS TO THE PUBLIC
P
1
3
I
I
.
GALENA OPTION
JULY 2016
ASPEN CITY HALL AT GALENA
52,000 SF
P
1
4
I
I
.
VIEW FROM MAIN STREET - ALL CITY OFFICES AT GALENA
JULY 2016
GALENA PLAZA
ENTRY AND
CITY HALL LOBBY
SISTER CITIES EXISTING RIO GRANDE
GARAGE ELEVATOR
AND STAIR
(CITY OFFICES EAST
WING BEYOND)
LIBRARY COUNCIL
CHAMBERS
P
1
5
I
I
.
GALENA PLAZA VIEW
JULY 2016
ALL CITY OFFICES AT GALENA
EAST WINGWEST WING
GALENA PLAZA
P
1
6
I
I
.
RIO GRANDE PARK AERIAL VIEW
JULY 2016
ALL CITY OFFICES AT GALENA
WEST WING
EAST WING
RIO GRANDE PL.NEW
STAIRS
GARAGE
ACCESS
GALENA
PLAZA
LIBRARY
30’-35’ SETBACK FROM RIO GRANDE PL. CURB
P
1
7
I
I
.
• GALENA PLAZA 54,600 SF
• ARMORY RETURNS TO THE PUBLIC ASPEN CITY HALL
GALENA OPTION
23 AUGUST 20161
P
1
8
I
I
.
2. ARMORY REUSE without
POWERHOUSE
•New space at Galena (28,400 sf)
•Reuse Armory major renovation (19,800 sf)
•455 Rio Grande basic remodel (6,400 sf)
•Galena 28.4 - $19.3 – 20.7 mil
•Armory - $15.1 – 16.3 mil
•Rio - $0.5 mil
•Sunk costs - $1.0 mil
•Total - $35.9 – 38.6 mil (programmed only)
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 5
P
1
9
I
I
.
SITE LOCATION MAP - ARMORY REUSE OPTION WITHOUT POWERHOUSE
AUGUST 2016
MAIN STREET
HOPKINS STREET
RIO GRANDE PLACE
RIO GRANDE PARK
PROPOSED
CITY OFFICES
POWERHOUSE
BUILDING
PITKIN
COUNTY
LIBRARY
COMMUNITY BANKS
OF COLORADO
PITKIN
COUNTY
COURT-
HOUSE
ARMORY
517 HOPKINS
PITKIN
COUNTY
JAIL
PITKIN
COUNTY
SHERRIFF
BUILDING
PROPOSED
COUNTY
ANNEX
OBERMEYER
BUILDING
HOTEL
JEROME
PROPOSED
POLICE
STATION
RIO
GRANDE
BUILDING
GALENA
PLAZA
BLEEKER STREET
S
M
I
L
L
S
T
R
E
E
T
S
G
A
L
E
N
A
S
T
R
E
E
T
S
H
U
N
T
E
R
S
T
R
E
E
T
ARMORY REUSE OPTION
WITHOUT POWERHOUSE
28,400 SF GALENA
19,800 SF ARMORY
6,400 SF RIO GRANDE
54,600 SF
P
2
0
I
I
.
ARMORY REUSE WITHOUT POWERHOUSE
• 28,400 SF AT GALENA
• 19,800 SF ARMORY AS CITY OFFICES
• 6,400 SF RIO GRANDE BUILDING
• 54,600 SF TOTAL
ASPEN CITY HALL
23 AUGUST 20162
P
2
1
I
I
.
3. ARMORY REUSE with
POWERHOUSE
•New space at Galena (20,400 sf)
•Reuse Armory major renovation (19,800 sf)
•455 Rio Grande basic remodel (6,400 sf)
•Powerhouse renovation (8,000 sf)
•Galena 20.4 - $14.7 – 15.8 mil
•Armory - $15.1 – 16.3 mil
•Rio - $0.5 mil Powerhouse - $3.5 – 3.8 mil
•Sunk costs - $1.0 mil
•Total - $34.9 – 37.6 mil (programmed only)
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 6
P
2
2
I
I
.
SITE LOCATION MAP - ARMORY REUSE OPTION WITH POWERHOUSE
AUGUST 2016
MAIN STREET
HOPKINS STREET
RIO GRANDE PLACE
RIO GRANDE PARK
PROPOSED
CITY OFFICES
POWERHOUSE
BUILDING
PITKIN
COUNTY
LIBRARY
COMMUNITY BANKS
OF COLORADO
PITKIN
COUNTY
COURT-
HOUSE
ARMORY
517 HOPKINS
PITKIN
COUNTY
JAIL
PITKIN
COUNTY
SHERRIFF
BUILDING
PROPOSED
COUNTY
ANNEX
OBERMEYER
BUILDING
HOTEL
JEROME
PROPOSED
POLICE
STATION
RIO
GRANDE
BUILDING
GALENA
PLAZA
BLEEKER STREET
S
M
I
L
L
S
T
R
E
E
T
S
G
A
L
E
N
A
S
T
R
E
E
T
S
H
U
N
T
E
R
S
T
R
E
E
T
ARMORY REUSE OPTION
WITH POWERHOUSE
20,400 SF GALENA
19,800 SF ARMORY
6,400 SF RIO GRANDE
8,000 SF POWERHOUSE
54,600 SF
P
2
3
I
I
.
ARMORY REUSE WITH POWERHOUSE
• 20,400 SF AT GALENA
• 19,800 SF ARMORY AS CITY OFFICES
• 6,400 SF RIO GRANDE BUILDING
• 8,000 SF POWERHOUSE
• 54,600 SF TOTAL
ASPEN CITY HALL
23 AUGUST 20163
P
2
4
I
I
.
ARMORY REUSE WITH POWERHOUSE
ARMORY REUSE WITHOUT POWERHOUSE
ASPEN CITY HALL
23 AUGUST 20164
P
2
5
I
I
.
SUMMARY
Option Cost (MIL) Complete
GALENA $31.2 LATE 2018
ARMORY no P’H $35.9 - $38.6 MID 2020
ARMORY with P’H $34.9 - $37.6 MID 2020
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 7
P
2
6
I
I
.
NEW SQUARE FOOTAGE
* with multiple locations, risk of SF increase
Option Program Reuse SF Replaced
SF
Added
SF
GALENA 54,600 0 10,900 43,700
ARMORY
no P’H* 54,600 26,200 4,500 23,900
ARMORY
with P’H* 54,600 34,200 4,500 15,900
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 8
P
2
7
I
I
.
SAFETY FACTORS TO
CONSIDER
–ADA Compliance
–Security – can be responsibly
managed with a modern, up to date
facility
–Areas of refuge
–Travel time between and within
buildings for ADA staff and
customers
–Indoor environment – LEED and Well
Building
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 9
P
2
8
I
I
.
SERVICE/ORGANIZATIONAL
EFFICIENCY
–Common theme of exit interviews is
that the physical work environment
is a negative
–Further Fractured public service
–Security expert (MWL memo) state
that confusing and fractured service
increases risk of staff threat and
incidents
–Consolidation will improve service &
efficiency
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 10
P
2
9
I
I
.
FUNDING
•Galena Option
–Cash $21 mil and finance $10 mil
•Armory without Powerhouse Option
–Cash $21 mil, finance $15 - $18 mil
•Armory with Powerhouse Option
–Cash $21 mil, finance $14 - $17 mil
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 11
P
3
0
I
I
.
DECISION POINT
•Council confirm decision of Nov 16,
2016 for the Galena Option, or provide
staff direction on another option.
•Does Council need any additional
information for a September work
session?
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 12
P
3
1
I
I
.
Discussion and
Questions?
ASPEN CIVIC SPACE RELOCATION PROJECT August 23, 2016 13
P
3
2
I
I
.
GALENA OPTION - GALENA - PLAZA LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
3
I
I
.
GALENA OPTION - GALENA - MIDDLE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
4
I
I
.
GALENA OPTION- GALENA - RIO GRANDE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
5
I
I
.
GALENA OPTION - GALENA - BASEMENT LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
6
I
I
.
ARMORY REUSE A - GALENA - PLAZA LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
7
I
I
.
ARMORY REUSE A - GALENA - MIDDLE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
8
I
I
.
ARMORY REUSE A - GALENA - RIO GRANDE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
3
9
I
I
.
ARMORY REUSE A - GALENA - BASEMENT LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
0
I
I
.
ARMORY REUSE A - ARMORY BUILDING - THIRD FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
1
I
I
.
ARMORY REUSE A - ARMORY BUILDING - SECOND FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
P
4
2
I
I
.
ARMORY REUSE A - ARMORY BUILDING - FIRST FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
3
I
I
.
ARMORY REUSE A - ARMORY BUILDING - BASEMENT
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
4
I
I
.
ARMORY REUSE B - GALENA - PLAZA LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
5
I
I
.
ARMORY REUSE B - GALENA - MIDDLE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
6
I
I
.
ARMORY REUSE B - GALENA - RIO GRANDE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
7
I
I
.
ARMORY REUSE B- GALENA - BASEMENT LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
8
I
I
.
ARMORY REUSE B - ARMORY BUILDING - THIRD FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
4
9
I
I
.
ARMORY REUSE B - ARMORY BUILDING - SECOND FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
P
5
0
I
I
.
ARMORY REUSE B - ARMORY BUILDING - FIRST FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
1
I
I
.
ARMORY REUSE B - ARMORY BUILDING - BASEMENT
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
2
I
I
.
ARMORY REUSE WITH POWERHOUSE A - GALENA - PLAZA LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
3
I
I
.
ARMORY REUSE WITH POWERHOUSE A - GALENA - MIDDLE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
4
I
I
.
ARMORY REUSE WITH POWERHOUSE A - GALENA - RIO GRANDE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
5
I
I
.
ARMORY REUSE WITH POWERHOUSE A - GALENA - BASEMENT LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
6
I
I
.
ARMORY REUSE WITH POWERHOUSE A - ARMORY BUILDING - THIRD FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
7
I
I
.
ARMORY REUSE WITH POWERHOUSE A - ARMORY BUILDING - SECOND FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
8
I
I
.
ARMORY REUSE WITH POWERHOUSE A - ARMORY BUILDING - FIRST FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
5
9
I
I
.
ARMORY REUSE WITH POWERHOUSE A - ARMORY BUILDING - BASEMENT
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
0
I
I
.
ARMORY REUSE WITH POWERHOUSE B - GALENA - PLAZA LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
1
I
I
.
ARMORY REUSE WITH POWERHOUSE B - GALENA - MIDDLE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
2
I
I
.
ARMORY REUSE WITH POWERHOUSE B - GALENA - RIO GRANDE LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
3
I
I
.
ARMORY REUSE WITH POWERHOUSE B - GALENA - BASEMENT LEVEL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
4
I
I
.
ARMORY REUSE WITH POWERHOUSE B - ARMORY BUILDING - THIRD FLOORASPEN CITY HALL
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
23 August 2016
P
6
5
I
I
.
ARMORY REUSE WITH POWERHOUSE B - ARMORY BUILDING - SECOND FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
6
I
I
.
ARMORY REUSE WITH POWERHOUSE B - ARMORY BUILDING - FIRST FLOOR
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
7
I
I
.
ARMORY REUSE WITH POWERHOUSE B - ARMORY BUILDING - BASEMENT
NOTE: PLANS INCLUDE BUT DON’T INDICATE COMMON SPACE
ASPEN CITY HALL
23 August 2016
P
6
8
I
I
.
Op
t
i
o
n
P
r
o
g
r
a
m
R
e
u
s
e
S
F
R
e
p
l
a
c
e
d
S
F
A
d
d
e
d
S
F
N
o
t
e
s
C
o
s
t
P
r
o
g
r
a
m
m
e
d
f
l
o
o
r
p
l
a
n
P
e
r
S
F
S
t
a
r
t
F
i
n
i
s
h
Ga
l
e
n
a
O
p
t
i
o
n
Ga
l
e
n
a
54
6
0
0
31
,
2
0
0
,
0
0
0
$
Do
n
e
57
1
$
1-Jul-17 30-Dec-18
AC
R
A
45
0
0
in
c
l
de
m
o
a
n
d
r
e
p
l
a
c
e
in
c
l
u
d
e
d
n/
a
Ri
o
G
r
a
n
d
e
64
0
0
de
m
o
a
n
d
r
e
p
l
a
c
e
in
c
l
u
d
e
d
n/
a
Ar
m
o
r
y
R
e
u
s
e
f
o
r
C
o
m
m
u
n
i
t
y
av
a
i
l
a
b
l
e
by
o
t
h
e
r
s
Su
n
k
c
o
s
t
s
-
$
ex
c
l
To
t
a
l
54
6
0
0
0
10
9
0
0
43
7
0
0
ba
s
e
o
p
t
i
o
n
c
o
s
t
31
,
2
0
0
,
0
0
0
$
57
1
$
50% DD drawings
Ar
m
o
r
y
R
e
u
s
e
w
i
t
h
o
u
t
P
o
w
e
r
h
o
u
s
e
Ga
l
e
n
a
28
4
0
0
Ga
l
e
n
a
w
e
s
t
.
R
i
o
e
a
s
t
d
o
e
s
n
’
t
f
i
t
19
,
2
6
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
67
8
$
20
,
7
0
4
,
5
0
0
1-Jul-17 30-Dec-18
Ar
m
o
r
y
19
8
0
0
19
8
0
0
fu
l
l
r
e
f
u
r
b
,
l
o
n
g
t
e
r
m
15
,
1
3
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
76
4
$
16
,
2
6
4
,
7
5
0
1-Jul-19 29-Dec-20
Po
w
e
r
h
o
u
s
e
Ri
o
G
r
a
n
d
e
64
0
0
64
0
0
no
m
i
n
a
l
w
o
r
k
,
r
e
d
o
T
a
s
t
e
r
s
50
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
78
$
53
7
,
5
0
0
1-Jul-17 28-Dec-17
AC
R
A
45
0
0
in
c
l
de
m
o
a
n
d
r
e
p
l
a
c
e
in
c
l
u
d
e
d
n/
a
Su
n
k
c
o
s
t
s
1,
0
0
0
,
0
0
0
$
De
s
i
g
n
c
o
s
t
s
t
o
d
a
t
e
18
$
1,
0
7
5
,
0
0
0
done
To
t
a
l
54
6
0
0
26
2
0
0
45
0
0
23
9
0
0
35
,
9
0
0
,
0
0
0
$
38
,
6
0
0
,
0
0
0
$
65
8
$
38
,
5
9
2
,
5
0
0
No design complete concept only
11
5
%
`
1
Ar
m
o
r
y
R
e
u
s
e
w
i
t
h
P
o
w
e
r
h
o
u
s
e
-
Ga
l
e
n
a
20
4
0
0
Ga
l
e
n
a
w
e
s
t
.
S
h
o
w
R
i
o
/
e
a
s
t
m
a
s
s
i
n
g
14
,
6
8
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
72
0
$
15
,
7
8
1
,
0
0
0
1-Jul-17 30-Dec-18
Ar
m
o
r
y
19
8
0
0
19
8
0
0
fu
l
l
r
e
f
u
r
b
,
l
o
n
g
t
e
r
m
15
,
1
3
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
76
4
$
16
,
2
6
4
,
7
5
0
1-Jul-19 29-Dec-20
Po
w
e
r
h
o
u
s
e
80
0
0
80
0
0
re
f
u
r
b
p
'
h
o
u
s
e
,
C
o
A
c
o
s
t
s
3,
5
0
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
43
8
$
3,
7
6
2
,
5
0
0
1-Jul-17 1-Jul-18
Ri
o
G
r
a
n
d
e
64
0
0
64
0
0
no
m
i
n
a
l
w
o
r
k
,
r
e
d
o
T
a
s
t
e
r
s
50
0
,
0
0
0
$
Mo
s
t
l
y
d
o
n
e
,
r
e
v
i
e
w
78
$
53
7
,
5
0
0
1-Jul-17 28-Dec-17
AC
R
A
45
0
0
in
c
l
de
m
o
a
n
d
r
e
p
l
a
c
e
in
c
l
u
d
e
d
n/
a
Su
n
k
c
o
s
t
s
1,
0
0
0
,
0
0
0
$
De
s
i
g
n
c
o
s
t
s
t
o
d
a
t
e
18
$
1,
0
7
5
,
0
0
0
done
To
t
a
l
54
6
0
0
34
2
0
0
45
0
0
15
9
0
0
34
,
9
0
0
,
0
0
0
$
37
,
6
0
0
,
0
0
0
$
63
9
$
37
,
5
1
7
,
5
0
0
No design complete concept only
11
2
%
12
1
%
Ga
l
e
n
a
O
p
t
i
o
n
54
,
6
0
0
-
10
,
9
0
0
43
,
7
0
0
Ar
m
o
r
y
R
e
u
s
e
w
i
t
h
o
u
t
P
o
w
e
r
h
o
u
s
e
54
,
6
0
0
26
,
2
0
0
4,
5
0
0
23
,
9
0
0
Ar
m
o
r
y
R
e
u
s
e
w
i
t
h
P
o
w
e
r
h
o
u
s
e
54
,
6
0
0
34
,
2
0
0
4,
5
0
0
15
,
9
0
0
Ro
u
g
h
O
r
d
e
r
o
f
M
a
g
n
i
t
u
d
e
B
u
d
g
e
t
P69II.