Loading...
HomeMy WebLinkAboutresolution.apz.006-98 I IIIIII IIIII IIIIII IIIIII IIIII IIII IIIIII III IIIII IIII IIII 415473 04/10/lgg8 11:481:1 RE$OLUTX DAVX$ $XLVX I o~ 4 R 21.~0 D ~.0~ N 0.~0 PXTKXN COUNTY CO RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION GRANTING SPECIAL REVIEW APPROVAL FOR THE PROPOSED OFF-STREET PARKING ASSOCIATED WITH THE FOUR (4) DEED RESTRICTED UNITS OF THE TIPPLER TOWNHOMES DEVELOPMENT, AND RECOMMENDING APPROVAL OF THE SUBDIVISION REQUEST FOR THE TIPPLER TOWNHOMES DEVELOPMENT LOCATED AT 535 DEAN STREET, AND LEGALLY DESCRIBED AS LOTS L, M, AND N, BLOCK 97, ASPEN TOWNSITE, LOT 1 TIPPLE WOODS SUBDIVISION AND LOT 2, CANNON'S ENTRY IN THE NW 1/4 OF SECTION 18, T. 10 S., R.84 W., OF THE 6TH P.M., CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO Resolution 98- 0~0 WHEREAS, The Community Development Deparrmem received an applicatiun from Vann Associates on behalf of the Kettle Corporation, owner, for Special Review of.Off-Street Parking Requirements associated with the development of Affordable Dwelling Units and, Subdivision; and WHEREAS, pursuant to Section 26.64.040(B) of the Aspen Municipal Code, Special Review of Off-Street Parking Requirements may be approved by the Planning and Zoning Commission; and. pursuant to Section 26.88.040 of the Aspen Municipal Code. the Planning and Zoning Commission shall make a recommendation to the City Council regarding requests for Subdivision approval; and. WHEREAS. the Housing Office, City Engineering, Parks Department, Aspen Consolidated Sanitation District, Environmental Health Department and Community Development Department reviewed the proposals and recommended approval of each with conditions; and. WHEREAS, the above referenced application was legally noticed for a public hearing; and. WHEREAS, during the public meeting held on March t7. 1998, the Planning and Zoning Commission approved by a 6-0 vote the Special Review of the Off-Street Parking requirements; and, WHEREAS, during a public hearing on March 17, 1998, the Planning and Zoning Commission reconunended approval by a 6-0 vote of the Subdivision application with the conditions recommended by staff, as amended. NOW, THEREFORE BE IT RESOLVED by the Commisstun: A. Special Review of Off-Street Parking Requirements: That the proposed off-street parking plan associated with the affordable units in the Tippler Townhomes is ~' hereby approved pursuant to Section 26.64.040(B), Special Review of Off-Street Parking Requirements. of ~_. the Aspen Municipal Code. The approved plan includes the provision of two (2) off-street parking spaces for each of the two (2) two-bedroom affordable housing units, and one (1] off-street parking spac~ for each ;:- of the two (2~ one-bedroom units. This results in a total of six (6) off-stred parking spaces for ~th$.foilr (4) units. All of the parking for the project's affordable units will be located in the undergrouffd:parking garage, with direct, enclosed stairway access to the associated dwelling units. The plan 'also include the provision of two (2) guest parking spaces in the underground garage and the ability to util/ze the four (4) surface parking spaces intended for non-exclusive use by both guests of the Tippler Townhomes and residents of the Tipple Lodge. B. Subdivision: That a recommendation to approve the Subdivision request, is forwarded to the City Council. That is. the Commission recommends to Council that the Tippler Townhomes request Subdivision be approved by the City Council with the following conditions: 1. Prior to the issuance of any building permits, the applicant shall provide the Environmental Health Department with: documentation indicating that the Aspen Consolidated Sanitation District (ACSD) is capable of serving the development: ~i letter of agreement from the City of Aspen Water Departmem indicating that they will serve the development; a fnreplace/woodstove permit: a fugitive dust and erosion control plan which includes, but is not limited to fencing, watering of haul roads and disturbed areas, daily cleaning of adjacent paved roads to remove mud that has been carried out, speed limits, or other measures necessary to prevent windblown dust from crossing the property line or causing a nuisance; documentation indicating that a qualified Engineering finn has reviewed the parking structure's ventilation system and found that it is adequate to prevent carbon monoxide from reaching high levels inside the facility or in the nearby areas outside of it; and, documentation indicating that the Colorado Department of Health has reviewed and approved the proposed parking structure ventilatiori system. 2. During construction, noise shall not exceed maxnnum permissible sound level standards, and consmaction shall not occur between the hours of 6 p.m. and 7 a.m. 3. Prior to the issuance of building permits, the proposed above-ground and underground parking arrangemems shall be reviewed by the City Engineering Depamnem, and revised as necessary to provide sufficient space (turning radii) to maneuver into and out of the parking spaces. 4. Prior to the issuance of building permits, the applicant shall demonstrate to the City Water Department's satisfaction how the subject property presently receives water service in order to plan the service to the new development while maintaining service to the neighboring buildings. 5. A dedicated mechanical space large enough for backflow prevention valves, individual water metering and valving for each of the proposed eight (8) units, a landscaping/irrigation system, and the frre sprinkler system is required: this space shall have separate access available to City Water Departmem and Fire Deparument personnel and will not be obstructed by vehicle parking, other equipment, or the need to pass through another room or space which could impede access by service persormel. 6. Water service lines and sanitary sewer lines shall be improved to present day standards for the newly constructed buildings. 7. The subdivision plat shall include explanatory notes fully describing the present status of the easements encumbering the property including notes and recording citations for easements which have been extinguished, abandoned or modified; the abutting subdivisions and lots will also be shown on the subdivision plat as required by the Municipal Code. 8 As determined to be necessary by the City Engineer, the existing sidewalks, curbs and gutters will be repaired or replaced prior to the issuance of an Certificates of Occupancy; any improvements or areas disturbed during construction will be restored to preconstmction condition or better; and, the existing light and sign post at the south side of the driveway onto South Galena Street will be removed. 9. The applicant shall dedicate Tract 3, a non-contiguous and undevalopable parcel fronting on S. Galena Street, triangular in shape and containing approximately 82 square feet, to the City as part of the subdivision dedications. 10. The site development must meet the runoff design standards of the Land Use Code at Section 26.88.040(C)(4)(f), and the building permit application must include a drainage mitigation plan (full size - 24" x 36") and report, both signed and stamped by an engineer registered in the State of Colorado: the plan shall identify solutions acceptable to the City Engineer to mitigate the site- generated drainage flows; said drainage plan will also need to address the conveyance of the off-site drainage flows which may pass through the site from the base of the Aspen Mountain ski area on the eastern side and southeast comer of the property. 11. The propert~ owner is required to join any future improvement districts formed for the purpose of constructing public improvements which benefit the property under an assessment formula; the agreement shall be executed and recorded concurrently with the recording of the subdivision plat. 12. Prior to the issuance of any Certificates of Occupancy, the building permit applicant will be required to submit to the Aspen/Pitkin County Information Systems Department as-built drawings for the project, showing the property lines, building footprint, easements, encroachments, enu'y points for utilities entering the property boundaries and any other improvements; these drawings shall be provided in accordance with City GIS requirements. I IIIIII IIIII, IIIIII IIIIII IIIII IIII IIIIII III IIIII IIII IIII 415473 04/~.0/lgg8 11:48g RE$OLUTX DRVXS SXLVX 2 of 4 R 21.80 D 0.00 N 0.00 PXTKXN COUNTY CO 13. If the proposed use, density or timing of the construction of the project change, or the site, parking or utility plans for this project change subsequent to this approval, a complete set of the revised plans shall be provided to th? Engineering and Community Development Departments for review and re- evaluation. 14. Prior to the issuance of building permits, the developer shall submit a traffic and parking plan acceptable to the City Engineer, Parking and Transportation Departments, Streets Department, and Utilities Department. The plan shall describe traffic detouring, parking, and staging areas for the several stages of construction of the project; The developer shall be required to rent on-street parking spaces if, due to the construction activities, any such spaces will be temporarily impacted or unusable for public parking. These plans and permits will also need to be coordinated with the Rights-of-Way permit for the utility and street frontage work. 15. In the event required, the applicant must receive approval from: The City Engineer for design of improvements, including landscaping, within public fights- of-way; · The Parks Department for vegetation species, tree removal, and/or public trail disturbances; · The Streets Department for mailboxes and street cuts; and, · The Community Development Deparanent to obtain permits for any work or development, including landscaping, within the public rights-of-way. 16. Prior to obtaining a building or demolition permit, the applicant must have the existing building tested for asbestos, and if any is present, it must be removed by a licensed asbestos abatement f'mn. It is recommended that testing be done well ahead of time so that, if removal is required, delays will not be experienced: 17. In the event required, a tree removal permit must be obtained from the Parks Department for any tree(s) that is/are to be removed or relocated; also, no excavation can occur within the dripline of the tree(s) to be preserved and no storage of fill material can occur within this/these dripline(s). 18. Down-directional, sharp cut-off fixtures shall be used for screening of all outdoor lighting sources. 19. Prior to and on a proportional basis to the issuance of any building permits for the residential units, the applicant shall pay a cash fee in lieu of School Land Dedication to the City of Aspen. 20. The proposed plans for the common sanitary sewer service line to the development will need to be reviewed by the Aspen Consolidated Sanitation District line superintendent prior to building permit issuance; the subgrade parking area will be required to have a District-approved oil and sand separator installed; a shared service line agreement will need to be completed and approved by the ACSD Board; no clear water connections will be allowed to the public system; the flows collected by the trench drain to be installed in the driveway must be directed into the drywell or stormwater drainage system rather than the sanitary sewer system. 21. Staff of the Aspen/Pitkin County Housing Authority shall be permitted to visit and inspect the affordable housing units prior to the issuance of the Certificates of Occupancy. 22. Deed restrictions on the affordable units shall be recorded prior to building permit issuance. 23. The applicant Will make the required Park Dedication Impact Fee payment, as determined by the City Zoning Officer, prior to the issuance of a building permit for the project. 24. The applicant shall submit to the Community Development Department, all materials required to carry out a review of the proposed architecture against the'Residential Design Standards in place at such time as the submittal is received. 25. All material representations made by the applicant in this application and during public meetings shall be adhered to and shall be considered conditions of approval, unless otherwise amended by a Board/Commission having authority to do so; APPROVED by the Commission at its regular meeting on March 17, 1998. APPROVED AS TO FORM: I IIIlll Illll IIIIII mill Illll IIII Illlll III Illll Illl IIII ~'~=¥ -~ (~J~ 4~5473 84/:8/1998 '1t.,:48A RE$OI.UTX ORYX$ SX/YX 3 oF 4 R 21.0~ D e.00 N 0.00 PXTKXN COUNTY CO D~vid Hoefer, Assistant C~y Attorney Attest: Planning and Zoning Commission: faCk~-e'L°t~ian, Deputy City Clerk Sara Garton, Chairperson c:khomehnitchh\p&zmemos\tipplrcs.doc I IIIIII IIIII IIIIII IIIIII IIIII IIII IIIIII III IIIII IIII IIII 41.5473 04/t0/~998 X]:48;I RESOLUTI DAVX$ SXLVX 4 o; 4 R 2t.00 O 8.09 N ~.00 PXTKXN COUNTY CO