Loading...
HomeMy WebLinkAboutresolution.apz.012-98 RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION APPROVING AN 8040 GREENLINE REVIEW FOR THE MATHYS RESIDENCE, 210 EASTWOOD DRIVE, CITY OF ASPEN. PARCEL NO. 2737-181-20-014 Resolution #98- /~Q,. WHEREAS, the Community Development Department received an application from Marc Mathys, owner and applicant, for an 8040 Greenline Review for an enlargement of an existing single-family home at 210 Eastwood Drive; and, WHEREAS, the proposed development will add more than 10% of the existing Floor Area, thus requiring review and approval by the Planning and Zoning Commission; and, WHEREAS, the Planning and Zoning Commission may approve development within the 8040 Greenline Environmentally Sensitive Area in conformance with the review criteria set forth in Section 26.68.030; and, WHEREAS, the City Engineer, Parks Department, and Community Development Department reviewed the proposal and recommended approval with conditions; and, WHEREAS, during a regular meeting on June 16, 1998, the Planning and Zoning Conmfission approved, by a 6-0 vote, the 8040 Greenline Review for the Mathys Residence, 210 Eastwood Drive, with the conditions recommended by the Community Development Deparunem, as amended by the Commission during the meeting. NOW, THEREFORE BE IT RESOLVED by the Commission: That the 8040 Greenline Review for the Mathys Residence, 210 Eastwood Drive. is approved with the following conditions: 1. Prior to issuance of a building permit, the permit plans shall demonstrate conformance with the applicable dimensional requirements of the R-15b Zone District. The applicant is encouraged, but not required, to conform to the 75 foot setback from Highway 82 established through private covenants, 2. Utility agencies are not liable for damage to, or the replacement of, improvements located in utility easements. This includes landscaping. 3. Prior to issuance of a building permit, the applicant shall gain approval from the Aspen Consolidated Sanitation District for foundations along the east property boundary and utility easement. Construction plans may need to be amended to prevent a conflict with the sanitary sewer. 4. Prior to issuance of a building permit, the proposed evergreen trees along the southern property boundary shall be located so that the driplines are not within the utility or utility maintenance easement. The planting pattern of these trees shall be visually offset so as not tc create a linear tree wall. Placement of these trees shall be approved by the Aspen City Forester. 5. Prior to issuance of a building permit, the permit plans shall propose a driveway no wider than 18 feet and a five foot pedestrian useable space fronting rite property, in the Eastwood Drive right-of-way. 6. Prior to issuance of a building permit, rite applicant shall submit a drainage report and a drainage plan, including a erosion control plan, prepared by a Colorado licensed Civil Engineer which maintains sediment and debris on-site during and after construction. Ifa ground recharge system is required, a soil percolation report will be required to correctly size the facility. A 2 year storm frequency should be used in designing any drainage improvements. 7. Prior to issuance ora building permit, the applicant shall complete and record a sidewalk, curb, and gutter agreement with the City Engineer. 8. Prior to issuance of a building permit, the applicant shall complete and record an agreement to join any future improvement districts for the purpose of constructing improvements which benefit the property under an assessment formula. 9. All utility meters and any new utility pedestals or transformers must be installed on the applicant's property and not in any public right-of-way. Easements must be provided for pedestals. All utility locations and easements must be delineated on the site improvement survey. Revisions to utility locations and easements must be delineated on a revised site improvement survey prior to issuance of a certificate of .i~ occupancy. Meter locations must be accessible for reading and may not be ..I~ ~ obstructed. .: ea ~ 10. A tree removal permit from the City Parks Department shall be required for the . ,., ~ removal or relocation of trees. =..iii ~, ~ 11. The applicant shall abide by all noise ordinances. Construction activity is limited to ~______~m ~. the hours bet~veen 7 a.m. and 10 p.m. III ~.--_~ _~ 12. The applicant must receive approval for any work within public rights-of-way from _iii~, the appropriate City Department. This includes, but is not limited to, approval for a ~ ~ ~ mailbox and landscaping from the City Streets Department. r~/~ ~ 13. Before issuance of a building permit, the applicant shall record this Planning and Zoning Resolution with the Pitkin County Clerk and Recorder located in the ~ ~' Courthouse Plaza Building. There is a per page recordation fee. In the alternative, the ~ ~' ~ applicant may pay this fee to the City Clerk who will record the resolution. ~i~~, 14. All material representations made by the applicant in the application and during public ~ meetings with the Planning and Zoning Commission shall be adhered to and ~--,* o~ considered conditions of approval, unless otherwise amended by other conditions. APPROVED by the Commission at its regular meeting on June 16, 1998. APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION: Sara ~arton, Chair