Loading...
HomeMy WebLinkAboutresolution.apz.014-98 RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION APPROVING THE ASPEN SKIING COMPANY 8040 GREENLINE REVIEW FOR IMPROVEMENTS ON ASPEN MOUNTAIN RELATED TO THE F.I.S. RACE COURSE, AJAX (ASPEN) MOUNTAIN, PITKIN COUNTY, COLORADO. Resolution #98 - WHEREAS, the Aspen Skiing Company, applicant, submitted an application (development proposal) to the Community Development Department for improvements on Ajax Mountain, a.k.a. Aspen Mountain, related to the F.I.S. race course finish, snowmaking improvements on "Little Nell" ski run, and landscaping improvements near the base of the gondola; and, WHEREAS, the subject property is partially located in Pitldn County and the City of Aspen and within the 8040 Greenline Review area established by the elevation 8,040; and, VOtEREAS, the Planning and Zoning Commission, pursuant to Municipal Code Section 26.68, may approve development applications within the Environmentally Sensitive Area delineated by elevation 8040 at a meeting; and, WHEREAS, the applicant requested approval of said reviews and the Planning Department, the City Parks Department, the City Engineer, the Fire Marshal, the City Water Department, and the Environmental Health Department, reviewed the development proposal in accordance with all applicable procedure and review criteria set forth in the afore mentioned Section and recommended approval, with conditions; and, WltEREAS, during a meeting on July 7, 1998, the Planning and Zoning Commission reviewed and considered this application and, by a 6 to 0 vote, approved the 8040 Greenline Review, with the conditions recommended by the Community Development Department, as amended during the meeting. NOW, THEREFORE BE IT RESOLVED by the Commission: That the Aspen Skiing Company F.I.S. 8040 Greenline Review, Ajax Mountain, is approved with the following conditions: APPROVED by the Commission at its regular meeting on July 7, 1998. 1. The applicant shall comply with the Fugitive Dust Control Plan as submitted. The ~ applicant shall water all disturbed soils as necessary during construction and as ..... additionally requested by the City during the construction process. A construction I Illlll IIIII IIIlll Illlll !llll Illll Illll Ill IIlll Illl Ill 4~,g844 07/2~,/1998 12.48P RE$OLUTI D~I¥IS $ILVI ~. ol~ 3 R ~.6.e0 D 0.00 N 8.08 PZTKIN COUNTY CO manager shall be available during all hours of construction to address specific needs as necessary. 2. To minimize soil erosion after construction, the applicant shall tamp the disturbed soil, provide water bars to direct runoff away from the disturbed areas, seed and mulch the affected areas, place hay hales or silt fencing where runoff may accumulate, and any other mitigatiOn measures provided in the land use application or as requested by the City Engineer or the Forest Service. 3. All disturbed areas shall be re-seeded and mulched within ten (10) days of final grading and irrigated on an ongoing basis until proper germination. All areas which do not germinate in the 1998 growing season shall be re-seeded in the Spring of 1999. Seed mixes used shall be approved by the City Forester. The applicant shall not use White Dutch Clover or Alsike Clover in the seed mix. 4. The applicant shall replace the four Aspen trees removed in kind with double the total caliper. Placement of these new Aspens shall be proximate to the area of impact, or as otherwise approved by the City Forester, and shall be accomplished in the 1998 building season. The applicant shall guarantee the success of these replacement trees for one year by posting a bond with the City parks Department for the replacement value of the removed trees. This requirement is specific to this land use approval, as requested by the City Parks Department, and should not be used as a precedent for overall management of Aspen Mountain. 5. The applicant shall provide a section of gravel at the end of Mill Street to minimize sediment loaded drainage from entering Mill Street and shall develop a temporary sedimentation pond on the Savannah property with written approval from Savannah Limited Partnership. The applicant shall continue to work with the City Engineer in adopting the Aspen Mountain Drainage Area Master Plan. 6. Prior to construction of the improvements, the applicant shall gain final approval from the City Engineer for the improvement's drainage system, the stability of materials being relocated, and mitigation of underground water conveyance in pipe trenches. If soil conditions require importation of large amounts of fill material, the applicant shall provide the City Engineer with a traffic control plan and the dust control plan shall be expanded to address Mill Street. Approval to include these provisions may be approved by the Community Development Director as an insubstantial amendment. 7. The City Planning and Zoning Commission hereby recommends Pitkin County approve the portions of this development proposal within Pitkin County with the same set of conditions as provided herein, except condition #4 related to the City's tree replacement Ordinance. 8. This City Planning and Zoning Resolution may be enforced by the Environmental Health Department or by either the City or County ZOning Enforcement Officer. 9. Prior to construction, the applicant shall pay the Community Development Department $1,505 land use application fees. This represents 6 hours of planning time at $180/hr. and flat fees for the City Engineer ($270) and the Environmental Health Department ($155). 10. The applicant shall gain approval from the City Water Department for potable water systems and any necessary improvements to the water meter and any additives to the snowmaking system. 41.9644 07/21/~998 1.2:48P RESOLUT! DAVZ$ $ICV! 2 =,~' 3 R 1.6.00 D 0.00 N 0.0~ PITKZN COUNTY CO 11. All conslruction staging and contractor parking shall be accomplished on-site and not within public rights-of-way. The applicant shall keep the public rights-of-way clear of tracked mud and debris by washing the street when necessary. 12. The applicant shall abide by all noise ordinances. Construction activity is limited to the hours between 7 a.m. and 10 p.m. 13. Any alterations to existing utilities shall be coordinated with the appropriate utility agency. 14. Before construction, the applicant shall record this Planning and Zoning Resolution with the Pitkin County Clerk and Recorder located in the Courthouse Plaza Building. There is a per page recordation fee. In the alternative, the applicant may pay this fee to the City Clerk who will record the resolution. 15. All material representations made by the applicant in the application and during public meetings with the Planning and Zoning Commission shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION: Cif~ Attorney Sara Garton, chair ATTEST: /ckie Lothian, I~eptl{y City Clerk' I IIIIII IIIII IIIIII IIIIII IIIII IIIII IIIII III IIIII IIII IIII 4~,g844 07/21/~g98:1.2:48P RESOLUT! DI:IVZ$ SILV! 3 of' 3 R 16.00 D 0.00 N 0.00 PZTKi'N COUNTY CO