Loading...
HomeMy WebLinkAboutresolution.apz.020-98P&Z Resolution 98-.~0 Page 1 RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION FOR THE APPROVAL OF A CONDITIONAL USE.FOR TWO (2) ACCESSORY DWELLING UNITS ON 123 EAST ItYMAN AVENUE (LOTS E AND F, BLOCK 69, CITY AND TOWNSITE OF ASPEN), CITY OF ASPEN Resolution 98- ~1~ W}IEREAS, The Community Development Department received an application from Davis-Horn, Inc., on behalf of RK Land and Cattle Co., owners, for a Conditional Use Review of two (2) below-grade Accessory Dwelling Units having approximately four hundred eighty (480) square feet each; and WltEREAS, Pursuant to Section 26.40.090 of the Aspen Municipal Code, Accessory Dwelling Units may be approved by the Planning and Zoning Commission as Conditional Uses in conformance with the requirements of said Section; and WI-IEREAS~ the Housing Office, City Engineering, City Zoning, Sanitation, and the Community Development Department reviewed the proposal and recommended approval with conditions; and WltEREAS, a public hearing, which was legally noticed, was held at a regular meeting of the Planning and Zoning Commission on July 21, 1998, and continued to August 4, 1998 at which time the Commission approved by a 7-0 vote the Conditional Use for the 123 East Hyman AvenUe Accessory Dwelling Units with the conditions recommended by the Community Development Department as amended. NOW, TI-IEREleORE BE IT RESOLVED by the Commission: The Conditional Use for two (2) below-grade Accessory Dwelling Units containing approximately 480 square feet each and attached to the corresponding residences on Lots E and F, Block 69, City and Townsite ofAspen is approved with the following conditions: 1. Prior to the issuance of any building permits the applicant shall: a. Verify with the Housing Office that the net livable floor area of each Accessory Dwelling Unit will be between 300 and 700 square feet, and the units shall be totally private, having private entrances and no rooms (i.e., mechanical rooms, etc.) that might need to be accessed by people in the principle residences; b. Verify with the Housing Office that each ADU will contain a kitchen having a minimum of a two-burner stove with oven, standard sink, and a 6-cubic foot refrigerator plus freezer; c. Provide the Housing Office with a signed and recorded Deed Restriction, a copy of which must be obtained from the Housing Office, for each of the two ADUs; d. Clearly identify tl~e Accessory Dwelling Units (ADUs) on building permit plans as separate one-bedroom units; e. Provide a minimum of one off-street parking space for each ADU, and indicate these designated parking spaces on the final plans; f. Install any new surface utilities requiring a pedestal or other above ground equipment on an easement provided by the property owner and not within the pUblic rights-of- way; I IIIIII IIIII IIIIII IIIIII III IIIIII IIIIll III IIIII IIII IIII 422125 09/18/1998 11:33GI RESOLUTI DI~VZS S*rLV! 1 or' 3 R 16.00 D 0.00 N 0.00 PITKTN COUNTY CO P&Z Resolution 98-~ Page 2 g. Locate any additional proposed construction, including trash facilities, in such a way that it does not encroach into an existing utility easement or public right-of-way; h. Agree to join any future improvement district(s) which may be formed for the purpose of constructing improvements in adjacent public rights-of-way; the agreement shall be executed and recorded concurrently upon approval of this application; i. Submit working drawings to verify all height, setback, and floor area calculations, as well as lot size and lot area calculations; j. Complete and record a Sidewalk, Curb & Gutter Agreement; k. A tap permit(s) must be completed at the office of the Aspen Consolidated Sanitation District; payment of the total connection charges shall be made prior to the issuance of a building permit; I. If the building is found to contain 5,000 square feet or more of living ar~a, approval and installation of an automatic fire suppression system will be required; m. Verify that the proposed plans for the ADUs will comply with all UBC requirements' including but not limited to those addressing natural light and ventilation standards, as well as sound attenuation walls between each ADU and the principal residences; and, n. Submit building permit drawings which indicate all utility meter locations; utility meter locations must be accessible for reading and may not be obstructed by trash storage. The plans must also indicate a five (5) foot wide pedestrian usable space with a fiye (5) foot wide buffer for snow storage. 2. Prior to the issuance ora Certificate of Occupancy (CO), the applicant shall: a. Submit as-built drawings of the project showing property lines, building footprint, easements, any encroachments, entry points for utilities entering the property boundaries and any other improvements to the Aspen/Pitkin County Information Systems Department in accordance with City GIS requirements, if and when, any exterior renovation or remodeling of the property occurs that requires a building permit; b. Install sidewalks, curbs, gutters, and a five (5) foot wide buffer space between the walk and curb, meeting the standards of the City Engineering Department; the existing driveway curb cut must be removed and replaced with full height curb and gutter; and, c. Permit Community Development Department, Engineering and Housing Office staff to inspect the property to determine compliance with the conditions of approval. 3. In the event required, the applicant must receive approval from: The City Engineer for design of improvements, including landscaping, within public rights-of-way; The Parks Department for vegetation species, tree removal, and/or public trail disturbances; · The Streets Department for mailboxes and street cuts; and, · The Community Development Department to obtain permits for any work or development, including landscaping, within the public rights-of-way. 4. Prior to the issuance of any building permits, a review of any proposed minor changes from the approvals, as set forth herein, shall be made by the Planning and Engineering Departments, or referred back to the Planning and Zoning Commission. 5. The applicant shall provide a roof overhang or other sufficient means of preventing snow from falling on both the stairway leading to the doors and the area in front of the doors to the ADUs; sufficient means of preventing icing of the stairway is also required. 6. Prior to the issuance of any building permits, any needed tree removal permit(s) must be obtained from the Parks Department for any tree(s) that is/are to be removed or relocated I IIIIII IIIII IIIIII IIIIII III IIIIII IIIIII III IIIII IIII IIII 4221.25 09/111/1.998 1.1:331:1 RESOLUT! DI:IVI'S SXLV! 2 oF 3 R 1.6.88 D 0.00 N 8.88 PXTKZN COUNTY CO P&Z Resolution 98-~_~ Page 3 (including scrub oaks of three (3) inches or greater); also, no excavation can occur within the dripline of the tree(s) to be preserved and no storage of fill material can occur within this/these dripline(s). 7. The site development must meet the runoff design standards of the Land Use Code at Section 26.88.040(C)(4)(f), and the building permit application must include a drainage mitigation plan (full size - 24" x 36") and report, both signed and stamped by an engineer registered in the State of Colorado. 8. The ADUs shall not be entitled to any on-street guest parking passes. Primary on-street parking passes for the ADUs will be permitted only if the units are rented. 9. There shall be no interior connections or doorways between either of the ADUs and either of the principal residences. Going from one ADU to the other, or from one ADU to either of the principal residences shall require going outside the building(s). 10. All material representations made by the applicant in this application and during public meetings' with the Planning and Zoning Commission shall be adhered to and shall be considered conditions of approval, unless otherwise amended by an entity having authority to do so. APPROVED by the Commission at its regglar meeting orr Auggst 4 1998. APPROVED AS TO FORM: ~(~ ~ D~avid Hoefer, Assistant Cityt/Attorney Attest: Planning and Zoning Commission: l~i[I~ot~a~n, l~pt]ty City Clerk Sa-~a Garton, Chairperson I IIIlU IllU IIIIII lUlII Ul IIIIII IIIIII Ul IIIII UU IIII 422125 09/18/lgg8 11:33GI RESOLUT! DI:IVTS $!bV! 3 et~ 3 R 16.00 D 0.00 N 0.00 PITKIN COUNTY CO