HomeMy WebLinkAboutresolution.apz.019-99RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION
APPROVING AN 8040 GREENLINE REVIEW, WAIVING THE GARAGE
SETBACK REQUIREMENT OF THE RESIDENTIAL DESIGN STANDARDS
AND GRANTING FRONT YARD, REAR YARD, AND SIDE YARD VARIANCES
TO THE CONSERVATION ZONE D/STRICT FOR THE MITCHELL
RESIDENCE, 550 ASPEN ALPS ROAD, CITY OF ASPEN.
Parcel No. 2737-182-00-012
Resolution #99 - 19
WHERE.aS, the Community Development Department received un application
from Cynthia and George Mitchell, owner and applicant, for an 8040 G~enline Review,
Appeal of the Residential Design Standards for the garage ~etbaek requirement, and
variance from the Conservation Zone District dimensional requirements for front yard,
side yards, and rear yard setback for a single-family residence to be newly constructed
and replacing an existing single-family home at 550 Aspen Alps Road; and,
WHEREAS, the parcel is approximately 10,161 square feet and located in the
Conservation (C) Zone District and within the 8040 Greenline Review Environmentally
Sensitive Area; and,
WHEREAS, the legally created parcel is non-conforming with the minimum lot
size requirements of the Conservation (C) Zone District and pursuant to Section
26.312.040 a single-family home may be developed; and,
WHEREAS, pursuant to Section 26.435 of the Municipal Code, development
within the 8040 G-reenline Review Environmentally Sensitive Area may be approved by
the Planning and Zoning Commission; and,
WHEREAS, pursuant to Section 26.410 of the Municipal Code, variances to the
Residential Design Standards may be granted by the Planning and Zoning Commission
when consolidated with another required review process.
WHEREAS, pursuant to Section 26.314 of the Municipal Code, varianoes to the
dimensional requirements &the zone district in which a property resides may be granted
by the Planning and Zoning Commission in accordance with said Section as part ora
consolidated application process authorized by the Community Development D/rector;
and,
WHEREAS, pursuant to Section 26.314 of the Municipal Code, the Community
Development Director has authorized the consolidation of the application review process;
and,
WHEREAS, the Fire Marshall, Aspen Consolidated Sanitation District, the City
Water Department, City Engineering, the City Zoning Officer, City Parks Department,
the Aspen/Pitkin County Building Department, and the Community Development
Depa~a~ent reviewed the proposal and recommended approval with conditions; and,
WHEREAS, during a duly noticed public hearing at a regular meeting on August
3, 1999, and continued to October 19, 1999, the Plann/ug and Zoning Commission
approved by a five to one (5-1) vote the 8040 Greenline Review, the variances from the
front yard, rear yard, and side yard dimensional requirements of the Conservation Zone
District, and waived the garage setback requirement of the Residential Design Standards
for the Mitchell Residence, 550 Aspen Alps Road, with the conditions recommended by
the Community Development Department.
NOW, THEREFORE BE IT RESOLVED by the Commission:
That the 8040 Greenline Review, Variances to the front yard, rear yard, and side yard
dimensional requirements of the Conservation Zone District, and waiver of the garage
setback requirement of the Residential Design Standards for the Mitchell Residence, 550
Aspen Alps Road, are hereby approved, subject to the following conditions:
1. The building permit plans shall be in accordance with all requirements of the
Conservation Zone District and Residential Design Standards, both in effect on
June 14, 1999, with the following exceptions:
a. Setback requirements.for the parcel shall be: front = 14.5 feet; rear (west) = 10
feet; north side = 10 feet, south side = 11 feet.
b. The garage setback requirement of the Rasidential Design Standards shall not
apply.
2. The building permit application shall include:
a. A permit from the Environmental Health Department for any certified
woodstoves or gas log fireplaces (coal- & woodbuming fireplaces are not
allowed) and an approved fugitive dust control plan.
b. A tree removal permit from the City Parks Department for the removal or
relocation of trces as per Section 13.20.020 9fthe Code.
c. A water tap permit for a tap sized for the requ'uext fire suppression system and
for the domestic use. The structure shall include a fire suppression system
approved by the Fire Marshall. A pump system may be required by the Fire
Marshall to accommodate the required pressure for the fire suppression
system.
d. A tap permit from the Aspen Consolidated Sanitation District. Sources of
clear water may not be directed to the sanitary sewer.
e. Written approval from the Aspen Ski Company for the construction and
maintananee of the drainage facility proposed in the amended application shall
be provided. Any required easements shall be recorded and reflected on the
building permit set.
3. The building permit plans shall include:
a. Construction details related to the foundation design, foundation walls and
retaining walls, floor slabs, underdrain systems, site grading, soil stabolization
plan, and surface drainage plan signed and stamped by an Engineer registered
in Colorado. This plan must accommodate drainage on-site both during and
after construction and shall utilize an on-site containment basin and delayed
pump system to the catch basin on Aspen Mountain. A 2 year storm frequency
should be used in designing any drainage improvements.
b. An anvironmental protection plan detailing the limits of disturbance on the
parcel and construction access. The limits of disturbance shall be fenced prior
to issuance of a building permit and shall remain in place until a Certificate of
Occupancy is issued.
4. The applic, am shall contain all construction activity, including staging and contractor
parking, on. site unless pem~ission is granted by the Aspen Alps Association for use
of the parking area east of the Mitchell property. Adequate width for safe passage
along Aspen Alps Road shall be maintained at all times.
5. If evidence of mining activity is discovered during excavation of the property, all
construction activity shall cease until a mitigation plan is approved by the City
Engineer.
6. Highly tefle, ctiYe materials shall not be used for the roof material.
7. All utility meters and any new utility pedestals or transformers must be installed on
the applicant's property and not in any public right-of-way. Easements must be
provided for pedestals. All utility locations and easements must be delineated on the
site improvement survey. Meter locations must be accessible for reading and may not
be obstructed.
B. These conditions of approval shall be printed on the cover sheet of the building permit
set and al1 other drawing sets used for construction. The primal7 contractor shall be
provided with a copy of this Resolution and shall submit a letter as part of the building
permit application stating that the conditions of approval have been read and
understood.
9. All material representations made by the applicant in the application and during public
meetings with the Planning and Zoning Commission shall be adhered to and considered
¢onditiens of approval, unless otherwise amended by other conditions. The applicant
shall record this Planning and Zoning Resolution with the County Clerk and Recorder.
APPROVED by the Commission at its regular meeting on October 19, 1999.
APPROVFA) AS TO FORM:
PLANNING AND ZONING COMMISSION:
C~y Attorney ~t
ATTEST:
kie Lothian, Del~uty, DeputY CitY Clerk
I IIIIIIIillllllltlllllllllllllllllllllllllllllllfilllll
15.08 D e,ee N ~.8e P%TKZN COIINTY CO