Loading...
HomeMy WebLinkAboutagenda.apz.20010102MEMORANDUM TO: Mayor and City Council Planning and Zoning Commission Aspen/Pitkin County Housing Board Historic Preservation Commission FROM: Chris Bendon, Long -Range Planner RE: Infill Program Update and Work Session January 29`h 5 p.m. to 7 p.m. Council Room DATE: December 21, 2000 SUMMARY: Staff has scheduled a joint work session for the Infill Program with the City Council, Planning and Zoning Commission, Historic Preservation Commission, and the Housing Board for January 29"'. The meeting will be in the Citv Council Room (basement of City Hall) from 5 p.m. to 7 p.m. The purpose of this long-range project is to analyze the possibilities for infill development and the various regulatory barriers that should be addressed. This follows the general recommendation provided in the Aspen Area Community Plan regarding infill development. The purpose of this update is to review the progress of the Infill Advisory Group and to solicit input regarding the direction of this project. This is an opportunity to redirect the Group, if necessary, or request the Group investigate additional issues. Following the work session, staff will be seeking a formal direction to proceed from the City Council. The Infill Advisory Group consists of members of Citv Council, the P&Z, the HPC, Housing Board, CCLC, as well as citizens in general and has been working on this project since July. The last check -in with elected officials was in October to review the general direction of the project. Since then, the Group has reviewed the City's development requirements for heights. FAR, density. use, view planes, open space, and parking as well as the review processes to which projects are subject. The Group has also reviewed some suggested uses for TDR's in the City. Graphic depictions of various zoning scenarios have been prepared for different areas of town and will be presented. MEMORANDUM TO: Planning and Zoning Commission THRU: Julie Ann Woods, Community Development p ent Director FROM: Joyce Ohlson, Deputy Director RE: Iselin Park Consolidated Conceptual/F' Conditional Use Public Hearing: anal PUD/SPA & 1st meeting -Overview Presentation and Discussion DATE: January 2, 2000 APPLICANT: City of Aspen Asset Management Dept. ZONING: Park LAND USE ACTIONS: PUD, Specially Planned Area 8s Conditional Use SUMMARY: REPRESENTATIVES: Steve Bossart, Project Manager Jeff Woods, Parks & Recreation Director PROPOSED FLOOR AREA: 76,051 square feet -Swimming Pool 8� Ice Rink Facility, including appurtenant facilities within the structure The Iselin Park combined Conceptual/Final PUD S review process has formallybey � PA and Conditional Use bun with the submittal of application materials and plans by the applicant. Three different la reviews are necessary for the application. The include incl nd use action development review (for the overall master plan f a planned unit specially planned area review (for the allowance of the subject property) a affordable housing on the site) and conditional use review (for the allowance o in the Park zone district) . Due to the limited extent f a recreational building Of issues involved with the PUD and because of a significant communityin application is being reviewed as a consolidated Cn terest being served, the application. conceptual and final The applicants provided an Overview of the project t Zoning Commission on May 30, 2000, when p o'ecto the Planning and conceptual phase. The May work session h to as plans were in a very conducted in order to gain an understanding a public hearing) was erstanding of any major concerns and/or threshold master planning issues that the P&Z could identify at that time. Generally, the P&Z felt comfortable with the scope of the project and the site planning and had limited issues of concern. Attached is a summary of the P&,Z comments from May that identifies some specific items. Now that the plans are more fully evolved, Staff has requested the applicant present an overview to the Commission at this meeting. This is being done for two reasons: 1. Reacquaint the Commission and the public with the project -its site planning, programmatic components and how the project fits into the bigger picture of the School Campus setting. Understanding that larger picture initially will make the: -topic reviews more ZD efficient and less confusing. 2. Major issues that need to be addressed during the more substantive review are identified up -front and either requested of the applicant to further address or staff to further research/ analyze. Staff intends this session as primarily an informative meeting with a more in-depth substantive review public hearing occurring on February 6, 2001 (unless an additional meeting is scheduled for 1 / 30 by the P&Z). Staff has requested the applicant's presentation be approximately 15-20 minutes with 10-15 minutes for Commission clarification questions. Issue identification could take approximately 10-15 minutes as well. This initial meeting, as well as the entire PUD / SPA/ CU process with the Commission, will be administered as a public hearing. The public should be given an opportunity to ask clarification questions and provide issue identification on the project. As part of this overview, the Commission should determine if there are any additional issues or if the list needs to be amended to add or delete issues. A .summary of the current development program for the project is included in the application as Appendix D. Referral comments from other City departments are attached in memorandum form from Ben Ludlow to Joyce Ohlson, dated July 17, 2000. It should be noted that the referral comments are quite general and sometimes lacking due to the conceptual nature of the plans brought to the Development Review Committee (DRC) back in June. The DRC will convene again prior to the next public hearing and review these this final set of plans. Therefore, the P&,Z can expect more detailed referral comments at the next hearing. Staff recommends the Commission ask the applicant team clarification questions about the application, identify any issues to be addressed during the next public hearing, and continue the public hearing to February 6, 2001. TIT�V7, T-r.v-... ❑ Size, Scale, & Mass/Volume of Buildings. ❑ Traffic & Circulation Site access and Public Transportation opportunities ❑ Service & Delivery Access ❑ Parking. Overall Site Plan. Integration of the project into the overall School Campus setting. Includes location and orientation of all buildings and parking. Architectural Style. Compatibility to the site. ❑ Landscaping. Number, location, and species of vegetation. Trail Connections. Summary of Comments: Planning and Zoning Commission Work Session, May 30, 2000 Iselin Pool & Ice Facility Trails and paths: -include numerous bike racks, anticipate high bike usage -multiple use of trails is good-nordic, bike, ped -access to trails should be easy, clear and obvious Parking: -Scheme seems to make sense -Drop off area is important -Is there enough parking for employees/occupants of the AH? Kitchen facilities: -make facilities adequate and include real cooking facilities, not only microwave -do not "skimp" on"kitchen -have a food service that really feeds people in light of anticipated family/visitor use, competitions, extended & day long stays, and Youth Center -food service should be targeted toward user of the facility Youth Center: -View of pool good -Computers will be available -Students wanted to be able to have youth center as an alternative place to do homework (the facility may be too distracting) -Youth center will be multiple use and appeal to multiple ages with mulitple use managed through operations Employee Housing: -maximize the number of units possible on the site -try to house Iselin facility employees on site in order to minimize vehicle trips and need for car -minimize operation/mechanical noise impacts to the residential component Competition: - Yes, both hockey (adult & youth), skating and swimming -(1) m. diving board is necessary for high school level competition -no high diving competition -pool includes deep area for swim meets -staging outside for events -look @ fold down seating & other seating options for pool -any expansion options? -special events -8 foot "walk around" for special events -is 450 seating capacity too small? -no "huge" events @ arena, Olympic will not fit -noise with mechanical and impact on housing component -is 6 pool lanes sufficient? -according to h.s. regulations — yes Multiple use issues: -Utilize parking off site @ school campus for events acknowl that Tiehack parking only seasonally available)edge -noise within building -glass wall separates -swim meets will require closure of leisure lobby from pool area pool, general pool area MEMORANDUM To: Joyce Ohlson, Planner From: Ben Ludlow, Project Engineer Reference DRC Caseload Coordinator Date: July 17, 2000 Re: Iselin Park The Development Review Committee has reviewed the Iselin Park application at their May 10, 2000 and the July 12, 2000 meetings, and has compiled the following comments: General 1. Sufficiency of Submittal: DRC comments are based on the fact that we believe that the submitted site plan is conceptually accurate, that it shows all site features, and that it is feasible. The wording must be carried forward exactly as written unless prior consent is received from the Engineering Department. This is to alleviate problems related to approvals tied to "issuance of building permit." The drainage report is incomplete from a review standpoint as is the soils report. Therefore the Engineering Department can make no real comments or acceptance of anything that is based upon those reports nor will they be made until a full report is received. 2. R.O.W. im_rae-fa: rr there are any encroachments into the public rights -of -way, the encroachment must either be removed or be subject to current encroachment license requirements. Site Review Site ,Drainage — Requirement —A drainage report was not submitted for review by the DRC. Before the final design is approved, the site development approvals must include the requirement meeting runoff design standards of the Land Use Code at Sec. 26.88.040.C.4.f and a requirement that, prior to the building permit application, a drainage mitigation plan (24 x36" size plan sheet or on the lot grading plan) and a report signed and stamped by an engineer registered in the State of Colorado, must meet the requirements of the Engineering Department Interim Design and Construction Standards and must be submitted for review and approval by the -Engineering Department. The mitigation plan must also address the temporary sediment control and containment plan for the construction phase. If drywells are an acceptable solution for site drainage, a soils report must be provided with a percolation test to verify the feasibility of this type of system. Drywells have depths well below depth of frost (10' minimum) to function in cold weather. The drainage plan must contain a statementspecifying the routine maintenance required by property owner(s) to ensure continued and proper performance. Drywells may not be placed within public right of way or Page 2 of 5 July 17, 2000 Iselin Park utility easements. The foundation drainage system should be separate from storm drainage, must be detained and routed on site, and must be shown on drainage plans and submitted for approval prior to application for building permit. The drainage may be conveyed to existing landscaped areas if the drainage report demonstrates that the percolation rate and the detention volume meet the design storm. Information — The City drainage criteria needs to be implemented completely. This includes but is not limited to erosion control, soil stabilization, and re - vegetation in disturbed areas. Also, there needs to be an analysis of where the drainage will flow and what adverse affects may arise from potential mud and debris flow. 2. Sidewalk, Curb, and Gutter — Requirement- All sidewalk, curb, and gutter must be designed using the City of Aspen design standards which are available in the City Engineering Department. 3. Fire Protection District — Information — As of the request of the Fire Protection District revisions need to be made as follows: a. A sprinkler system and a fire alarm system are required for the entire building. It is important to verify that water service lines are large enough to handle this capacity in emergency situations. 4. Transportation — Information — a. NONE 5. Building Department — Information — The following information has been provided by the Building Department: a. Check with a building code consultant before final design to make sure all of the building adheres to code. 6. Parking — Requirement — The following requirement has been provided by the Parking Department: a. NONE 7. Engineering Department — Requirement- The following requirements have been provided by the Engineering Department: a. A soils report needs to be performed to identify soil stability in areas that will be covered by pavement and by the buildings. b. A landscape plan needs to be submitted for review by the Engineering Department for approval including landscaping in and around the right of way. c. A complete drainage report needs to be submitted to the Engineering Department for approval. Page 3 of 5 July 17, 2000 Iselin Park d. A construction traffic maintenance plan needs to be submitted to the Engineering Department for approval. e. Geometric design, alignments, and calculations of all road improvements and parking improvements needs to be submitted to the Engineering Department for approval. Information — The following information has been provided by the Engineering Department: a. Consideration needs to be given for the addition of acceleration and deceleration lanes for the proposed parking lot. This will allow for better vehicular egress and ingress during high traffic volumes. 8. Streets Department — Requirement- As of the request of the Streets Department revisions need to be made as follows: a. The applicant shall not track mud onto City streets during construction. A washed rock or other style mud rack must be installed during construction. 9. Housing Office — Information — The following information has been provided by the Housing Office: a. NONE 10. Community Development — Information — The following information has been provided by the Community Development Office: a. The final PUD plat needs to be more defined of the subject property inclusive of the ball fields and current construction. 11. Emergency Management Disaster Coordinator — Requirement - The following requirement has been provided by the Pitkin County Disaster Coordinator: a. Law enforcement and Parking enforcement impacts need to be considered before stating that the City will perform these tasks. Both departments are nearly unavailable to perform these tasks with the current staff load. 12. Parks — Requirement- The following comments have been produced by the Parks Department: a. NONE 10. Utilities: A utility plan was not submitted with the application. For the utility departments to properly comment, a utility plan must be submitted - Water.- E Page 4 of 5 July 17, 2000 Iselin Park City Water Department - Requirement — As a request of the City of Aspen Water Department, revisions need to be made as follows: a. All uses and construction will comply with the City of Aspen Water System standards and with Title 25 and applicable portions of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code as they pertain to utilities. b. If raw water is used for the playing fields, an analysis of this procedure needs to be preformed because it is the very end of the raw water supply line. c. Drinking fountains outside of the building will require a new potable water line. d. Service to the employee housing needs to be separate from the service to the main building. Wastewater., Aspen Consolidated Waste District - Information —As a request of the Consolidated Waste District, revisions need to be made as follows: a. Pool drain size requirements will be determined by ACSD based on capacity allowances. b. Detailed plans needs to be submitted to ACSD so that a fee estimate can be established. c. The food area will need an oil and grease interceptor. d. The Zamboni garage will need an oil and grease interceptor. e. The elevator shaft will need and oil and grease interceptor. Construction: Work in the Public Right of Way Requirement — Given the continuous problems of unapproved work and development in public rights -of -way adjacent to private property, we advise the applicant as follows: Approvals 1. Engineering: The applicant receives approval from the City Engineering Department (920-5080) for design of improvements, including grading, drainage, transportation/streets, landscaping, and encroachments within public right of way. 2. Parks: The applicant receives approval from the Parks Department (920- 5120) for vegetation species and for public trail disturbance. 3. Streets: The applicant receives approval from the Streets department (920-5130) for mailboxes, finished pavement, surface materials on streets, and alleyways. J r Page 5 of 5 July 17, 2000 Iselin Park 4. Permits: DRC Attendees Obtain R.O.W. permits for any work or development, involving street cuts and landscaping from the Engineering Department Staff: Nick Adeh Ben Ludlow Tom Bracewell Dennis Murray Fred Jarman Joyce Ohlson Ed Van Walraven Applicant's Representative: Tim Anderson Steve Bossart County of Pitkin } AFFIDAVIT OF NOTICE PURSUANT } SS. TO ASPEN LAND USE REGULATIONS State of Colorado } SECTION 26.304.060(E) being or representing an Applicant to the City of Aspen, personally certify that I have complied with the public notice requirements pursuant to Section 26.304.060(E) of the Aspen Municipal Code in the following manner: 1. By mailing of notice, a copy of which is attached hereto, by first-class postage prepaid U.S. Mail to all owners of property within three hundred (300) feet of the subject property, as indicated on the attached list, on the ' day of , 200 c-> (which is I (. days prior to the public hearing date of zu) 2. By posting a sign in a conspicuous place on the subject property (as it could be seen from the nearest public way) and that the said sign was posted and visible continuously from the Z2ttday of , 200 c> , to the bZ'I'day of 3a-4u" , 200 ( . (Must be posted for at least ten (10) full days before the hearing date). A photograph of the posted sign is attached hereto. (Attach photograph here) Signature Signed before me this 2&lay of 200J. by h LA-) . �E WITNESS MY HAND AND OFFICIAL �••��''••••••••••'''o�o� E OF G My Commission expires: 4 I Ij o� Notary Publi EXHIBIT AM a County of Pitkin } AFFIDAVIT OF NOTICE PURSUANT } SS. TO ASPEN LAND USE REGULATIONS State of Colorado } SECTION 26.304.060(E) I � L� �C, , being or representing an Applicant to the City of Aspen, personally certify that I have complied with the public notice requirements pursuant to Section 26.304.060(E) of the Aspen Municipal Code in the following manner: 1. By mailing of notice, a copy of which is attached hereto, by first-class postage prepaid U.S. Mail to all owners of property within three hundred (300) feet of the subject property, as indicated on the attached list, on the day of 5200 (which is days prior to the public hearing date of ). 2. By posting a sign in a conspicuous place on the subject property (as it could be seen from the nearest public way) and that the said sign was posted and visible continuously from the day of , 200 , to the day of , 200 . (Must be posted for at least ten (10) full days before the hearing date). A photograph of the posted sign is attached hereto. 1Ao+ice__ (Attach photograph here) Signature WITNESS MY HAND AND O My Commission expires: (�/�0 Notary Public 'D C 'n•. w' O ? y 7 G y j• O `C �• C C ,x0.. ° _� ° O Cc, 3 w 0- 0. ; ID C� C �• ^ O a O N 0 y D n 0 w '0 0. `G � 'N-. •p O y cD •p' a� O .•. N r• y CD N '•t O O y S a w p '+ C. �. w ryq O ^D O 1010 ^ N °,. 0. ('~D a W N C S -i .00. n c7D;. 0.0. pi O w ;C N n. �. OW 0 y. y p' c"p CA'p O w ODq 0• W ^ A 7 A N O •� O N Q A A [D S O 'C7 0a O n a~ w O C a �• 0 0 0 0~ O P, 0 K D w C 0 0 S'0 D y OQ 0• ° (~D (D a C a w 0 '� T S O W .On•. C[J N 0 N .0. .'O•. (D CD C 7 0' O. (D 0 7 7C a<< N- „h '0 O_ N '< r. 0. CD w °i :: O ° p N 0 . a,C a 1 lD ...j 0 -. O [D Ll p fD a 0, O m 7 a OQ N O' 0 0. O. O' _ ^ p M °, 2aO�O O O ° SD Cy c C .0.ao 0 ° O°; q;_ O (D O27 y �C y ,Ay ~ OC - 00 a n!~D O y O`^^;m ° nr O y`< 0 � Oi �•r.°'p n n w e cD N N; c "'p�° p a cD 8° 5w c _.aAoa z _ '�' c o c nw - 0�° ^vy +wO��� �Hu0i��0q��Oy.Oa`'���OaNCi�Oc`<vWOp'SO0.Oi=WM= 'y�O Q0°`'?7o°mo�y°^moo 0 lD -� 7L 0Q' ° O 0• cD C •0 ? N .0 N .0 0 S ,.� y '0 a O N (D M ,A,i a '-1 O C O c •� O D O• ,� O d [CD -� 0 0 0 A c in 7 0 N Q»�;°•=c7D oyc_c^'c_o�OfD°o=<o^B..TNc7<o�n°wo-<?c?Ao�7N�y� o c v .. , cD OOn rn aco a o_ N c c 7n � ' N o y f7D n� C w O E3 0 G w �• cnD O n O a c '! O .... 0 n O �, N n c(D N u -� ° b y 0.0 0 -� •� C1 a 0 f 0 •^ 0 0 .y. OW n fl, 'Y M a a 0 l9 O n a = O T C 7^ a �• O O^� C< a O O O >> o 0 `, O C G c<D 0 q A7 ° O N W (D G w o lD ? a° C C 0 w O N OQ 7 O d S cn y O rn n 7? > �• ry° ODQ ^ cD .0 5 m O .0+ p 7 O a W C. 0 7 C y -T _ y p 0 0 a w, O `< N cD I M a ]• a M �' W� = 0. 0' �• .0+ S O lD ^ C1 0 D• -nt O"~ C O 0 N w p O G. ,N* N �' N OQ G- fD ' j ° G. '� 7 G l30 .0•r 0 O rCi, C y C .n•. H OQ OQ m O= N p n m OQ O' 0 �0s°���o°n 7mo 'b as°50 �yo�m°0.0� �QM (D ?nc�n��•=0�>TdQ mwva,�y`DSp-OfDa°aaM•07 a� 'cfDo °�a��wco°m�cD=°coca• w�Wm,00M°o"=ro ;oc�3"ynna7"°m o° n_�noTC`�m • O- o !D tD O•`$ .0 a (D 0 a n Q ,y. cD MD a 0' _ N r•. O C1 A Li 0 0 y cD w .. O �p .wi - y " p °_ o 0 w 0 cD • - r, _ 'T� o O N S w �i C w o; a 0 v' 'i7 y 7 ai 'J < .'y A •'� (yD N 7 A� O a 7 N O u, a a -y P O c^ 0- -t .0 N -i y `G a -"• M A S S n ae 0 .7p•OCD •,w - •.� 59°m•o,-.,.wN-1�c•o O •-, c o cD .q�,..��sw 'A+• -, .+ `< ••r cD a? "' ° .n. C ,.., 'C a `n a< a 0 O N- a 0 w y C S F p cD O cD N m [D 'O O- w (D O N w O A �G O .wN. G. (9 7 .* •p N �.D O 'O ti '0 O ° O t9 c�D N m n a - n .Oy R y C= 7 s W n O O 0 c0D �?. -Ci lD ,� W PO+ �• 7• b '"' ^ b, '0 0 7 C7 -• .+ '0 (D 7 0 c (D �? '0 y -� c - y p (D a s fD ,� a N v N w n c N m cCDw N SD N 4(70 °: m (D° O (D ?? a� c7D cD`y 7 7 l<D�7 N w° 7 (~D O n 0 G G S> o a n O^ = K N S n •• ,» ••1 •y O (D CD a (D N `< M •� a o' -� m m OQ 0 M 7 v b c^o o Q Wzz w np>nOs- am n•a O' p y m 'a, "'d `e c 9 r N'vc n- w n= c _,w n a- w O o �' y CD M O O °i. 'v 7 7 �• a 7 O �e v; 'C �' a -vo W o 0 a O w y w �• ° n n' �' ° �' ° S n A= ° cc Nm ° in m o N (D N `0. m O O O z➢= Q OD ay m ,fin„ O N O n y r. < y a S G^ ti O O O 0 n� A S 'C•. ? A w a T C7 y 0. N A O < S N S T S C n 7 CT : t z O _• T a GQ v °_ y :.: 0 w `< y v C W C << O `< D' wa 00 o. c 0 _O mz O ti c 7 m L� n _• j !D O Z;jC wGQ 0. , o x o cD , o _ cD CC v_ N a < '0 `� (<D 7 lD `n 0 '� O Z 0 W0 an as _ <' n ° c oaN < O 0 0 w? Z °q (D 0. �n cD O w o 0 0• '< "It n 3 m cn C " S W m° m o Sn t^a m 0 A C Z Q n° •n r7y O G W y Z v c � c o£, o O O o c 0 co�° -� 3 a'0 O in 0' s' 7 n' ,5. c �oQ c y°° N° w i° -va°Q SCD o a a k S0oQ a a ."• ^Ci �. fD �, "� O O N a n N C (D O �''� .S. CA w f M, `t z ti n Q C co D. Fn �y _ m7 v0 -` O' a, n O Y 'b S Q o o C a n c .. j C '0 s cD cc O -, co �<<a.; N O ca A �_ C ti y '0 O O O O C O m o N S •r ,� C N 0 o oc nn n. . 7 M< CL A ° a5 = < '' '0 a= w m _S O ti O Z w j y 0. 0 0 "' a m OQ 0 0 N a 0 iD O a S n a o W 7 -lr 0 Z N� m���m py o p :m� cD ti Nan o m +o co c+oQ .fD, c a P • n n o< w cD S -0 B .. ,� _. a C n c <`:c<o C O� N? a O° a° 0 a m A T� a rn o 0c N o o 0 y w~ t7 3 t m n 0 P a O C Z O cn 0 o' G') L n a fD 0 n �' n S Z cD N a + y _ W S N 'v cD n -. (D 0 o cn `t O D O_ ^ a O O O N °7 5• _ n 0. S _ 0-1 7 a w 0 D y O n c 0 n C n <D `i �D m `< 0 `< 0 0 C �_ O- W �D 0 '7 O t''D C 0 MUl O 0 Ul-n ��7 v N O a O Q O C7 O r O l7D C ,�. O -� �? O .A. - v o W O a O S m' O OQ 0 a 0 � OWN ^ a 0 G.:$ `t ,0. 'fl n p o N 0. C G" C S a a'G . O N G :� 0 _O . �, ? '•7 n m toil O ^; p C •� m C 0. a a 0 7 am cD l7 e m .. S 0 tD c m 0 '� m O 7 O ' r, y ?_ c�ooya ow v m o O " -. 00 0` 0 S S n O O 0 7 O a a ,t a C 0 O . cD n cD :: OQ cD .w 0. <iD° ,oa oaNn o -, 7 c o M cmn 0 0Iz� vnM "w��O-Gn �m��O� O v°``>noo rn op°, � O' c�_.N0°ao°o�9'°70z00 v °tea.°,- y'fD.cn.M°OWy N LUo)su oo WONa�Cya°� D ToC nowocNNOooc��°°n i�cm°co o ; rD - m n c n n ? ncD m CSpC a - -, a$ a o co -� o C °•� o' w 'o o ° m co w� n _.� a 3T , o a = o °' = "0 n o ° w �o y a^ D O n- �D m o o non CL N `-+ 00 �0 9 o nn� w p7r a-, o ao a g .^ °p� fD o O', a y o =n.vo op, w N__ 5° a ° ar.o a A `�° . °_� �n � 5! 7 ° n�c d5 (Dm cDo.c� c„0.� O = N n N D`< 0 X. •-� (9 0 a C < Z O OT a? O C ^ c N 'ai .: n y� 'O 0 �. `< n y N.�j, 0 .� a. m fD O OQ '•i �• 0 a C _cD C 0 C 0. O e'j O 0 O C 7 n fD 0£ „0� :< O Oi � N � m p � y' w � 0 y N £' OA l'D S• �. O 0 p; •Ci -Ci T,C' -Oi ?o cD 7C N ao�w• z03 o a • ; E`' ;o» �< N » . 'O•, o, y.ao� � �>9 oa�°nD2. � (�D c n�,oa, ..=00n0n o S° ocaDmncxio�0 3 , , , a� N cD , , << V� (9 0 << OQ OQ -ti cD .. cD rn o a - a cD a �c o -, 5 n' a a o N 0 �o :; 7 m a rD $ a°, p7 n 0 °o c ^nc.°0a� 0A)r- c7Dnd� ti cD�Ca�a�o'o co° w oo a nw C O a y NOQ, O cr W 'v yn� a�v;d(Do��"° anG��nW n 0 o K n? 00 a�m�n nc = n•v (D C7 n m� n 9? p-z0�0 cwco ° aa�0°0v�, .0 0.- p .. w 0 '' .O 0, ? O P� o 0)m .- O O < 'D Az 7 N� m 7 a -i -ai m tV n Q° p» O m m W j y+ 7 N n J 0 7 a Ali �, .0ti a y O S O o maa n �cv / -9 p ow m (D n y 9 n o n w+ v= p w z •O-, M 0° y�cD o c ° m aco ° �a w y v w°° �(A a� o-o y2 o -VON R n 0. `� o na0 an n V m �' cow o co ° n (Dn -C C~71 cD W C W s D o £ O �' O?. ^ ,-: (D O O or M W p << y N m a w m w a [ _ N £ o' r c? 7r = 0. �. 0 ? ' ° o' -a "U 0 -0 M < o v co o (D r -0.Jn�OO�0 0nC°v�,rn}i�o'r)cl' �pn��•,°°�oE5oomID a�^na,�Ac °'7-, ��wwco :aO O 0.0' y 7 0 a 0 S Q o o C ry- o `< ° w y n r•..a+ o w 7 �m0 0. C'< 5 !yD m° O 9`< c~D 7 C:) � o0D ° a �3 gib y'0 w !D �� W o �- (D H Cu 10 O' 7 0 •t n O V OQ ... S 't . 0 O C a w pi I'D •p W '0 a) y 0 a -� 0 G ri -0 y� n-. p ~ < (D Wo o •• n� �D n obi Vi ''.n •y n �e"< �n cocD a`n o o co o w �'w� a n•7 -, C7�G7nC-1 n v, o `c _, _a n o a 0 a ne n ao >r-^v vz za -� 0 2 y p-i n Q fD•0 0 �° �<op y c 9' ii y ac,^o ° :° o 2< a (, o z° y� Ogca�O� N n a �.ni z� = = an� �� a n-0B,� Cr CL 0 q rn NSG�z-"z n 7 0 a 7 O ] o = `< (D A 0. rb7 'C x n tD ,» ,rycp. << w `G �, �D O. a a 7 ,» o • ? �. o, ID (D '0 '0 0 p �' O 7 0 O N G �-� N C< .T a 0. S PJ (D N Cn (D " P+ cD '" » -a, C C7 c <^rDEl a•$.p 5o m°�°3o° o cw m0 mn y,0 y.y N w y'Op A�• WZm o g 4, y n o� �.-''�s7E w L; co T- c`'o cD D° N?c 00 Ov AN`3aFnL7 v 0w oC5.0 O fit*°° aL2,00,0cvcaD��cN ° ~ A0n�$. 0? nb`� `�co -v N -- oCL cD 7 7 y o GJ m a n a _ M Naz �oacg' •� �9 °CL Ao°co" °"• �y yo-o�'°c,q 0-0 "n ?,° w `-tD m �o ° ti 7 4 fD a°^^ �.o °='•Sv'�° x'� c �' a cow iD a y c loon v ti a O ^y cD t i , D, Or w M H a N N a .� 0 0. p: ' n-1C�D v-o oa�� C� C)n�� nna bnQ�^-1^Z N vcoo *fN �vNv w o n•O N N a w .b O z O c 7 O o cD O pq O w w C o 0 7 '+ $ o c ^+ -^ �n o o .�?. S O '� m O 0 0 ,.• O C C w eb 00 0 7 cp M n M. W v•v v m n Qe a w o rno �' g`' Soo-oa °' §ii, CFR � 0 m rDt7 gO v �i, a4Q S❑ Q0 nc "' ° Vt0 N n c D zO co m cD 0 co Q O n , o N-• a n v cD _ ss cn co a s 0. 0 W '� O, '1 O r a y 0 �=• 8 (D ^ y N ,.; 0 O' '* n .t p^ O 7. O .D D in tD p O OQ O 7 0 0 n a OQ ►. 7 a •• go N O O y C n :cnv- _ co 7C aao o O ^, Q o co E a c o w O O D M. o a y cn E -3�'�L�z �CJ0 c <o a� S ..-noC S w`�� :cDc3•q=0 N�o°,° 0 0 go mid-,�-� ID w° o a D c a N» co co �-i a o o �� .- � �o a o c> > a y cD ,, Z_ -. o �, m -C w n o n CC7a a7 °' is ° o n m R o +y c cp v �a�co.. a0" '* a�w Noo ,y .�rov y o w a ao�o n$vc'O z �. B v- $E 9_ �z»,-+c_ a�,O ,�rzn n 0a n^3q � N ao cD M 0 y w a B "0Q co 0 o a ay x' o ;�,yZm $�cn0 , OcD c Qo o ° y� Z--.- -� crG�v' O ° o w N ,� cab` �co�c y , n �,� CC)0 v '�fo 2�n W .,O'v m a �� a c �N -+ c^ < �, v -p m ri.^ cn co T as co 0 0 «o , w a 5)I'Dn o n, v, N "O.a. woo w p cn� c� v°i0_a 0 �O U +A r ��O �. co 9 0 n A a-►Noa o 0 o g O ,b cn� '� N �jncD e%v-a N -7' D Cr, •� C7 Wr ^,0 ,-• '0 70 �a 0 (D w A' `< 7M -1 N OQ O C C "� O m �+ ° S v v`, fD Q'- 0, OC4 S C ^ A O w m O C C -� �. w _ o zw c N c eM Cxy Zn �� pNciQ.� p w ^ 0 5 ".°» ;' O 0 avr p 0 �.m x°:n n o ^"� �, OQ "rD uC, C� ° z�O o cD wD N mZ m D w5 < "tiP c n Y a� < �zNn o bw -y £ n w A N z a ryry ootn=O N n an o. �zvO Zz _� �..C� .O nO C O C S - DQQOZ, fn �O C C 1 CJO < O _.pr O .O O f� tvSO Q " �0 O z n w_.o d.-1 caa7� u, cD., o[^ C _y v^3a - o .,nooc9 o wC� no z No v �'om0 "3 ° cnp cmnoa -°r *•-coo n��; �m rZ�n..O R 3 c c� aocD ° 0 - 3 "m u, io ac o a z Ono .;� O =j ba v� rn N -re a� m o v maO o a 0Q N a° w-o O 0 y, _.� �v o .Arco yC)M"n inn y O >00 W� 0 m nvA Vic» =Q r 0a CC 17y� y Q< g n o TO a= C)10 »O �.,0 OC-Oap -n�Z�UU� O < Nn-3z wm W cnnow y N o co s_°� o n-I�C m o fD ° 0, L�i�c co o a Q m o -mOxn c�o 00 o ao T� vo ^..?_ov�°yvw°c� 0(D � p•p o• M o° o o_ cD C C,;*a0. (D 7 m _G•y 7 -'7nVZim^ 7nc"a'� O S' �+N= a NC 0 d0.S-� 't1 r0 m M MXN ''+S7 `No �."� fyD10 ,. y "'� np ti N 'v n r. 0 nCWNc7 a•-0. aN<g cHO�•-�� -1 bcDw c?`��To ono Opo`aow� d0 'z�czi3O m ti 'o � M S a oo y° :3.rL G �n w �M S�� o w �sw y, Sao y N y^ o :ra Hy 7;'ac<Da. o d o0QcO a, `"w :m°°cam `ov°' zooac zro 'a:o m °o0 OCn -, o,C�_0 My _�•N ° ~n 7 ^ o o � p: SD? c<o cD � �°+ w °:° rn R' ID o :"'? cn °c0�?5•°i n cDa°' n'cND:•'°'W O �. N �w l O O F..1 y Blaich Associates Design Management Consultants 319 North Fourth Street Aspen, 8161 1, Colorado, U.S.A. Tel. 970-920 9276 Fax 970-920 3433 blaich@sopris.net 01"`%us€„',Y'y.,3swaso-`.'e'k.. W ............ ...r 3 z .. sz Trying to quit Editor: I made a New. Year's :resolution to' not write any ' more. letters -to the editor. But. = I could not make it 1 through the first day. I know that Andrew Kole, Anthony Hershey, Tom McCabe and Rachel Richards are going to be very unhappy that I could not keep my resolve to "shut up but I feel that our community needs to know that today at 4:30 p.m. the City of Aspen is going to submit "their'-' final plans for the proposed pool X and ice to P and Z for recommendations with the public 3> being allowed to comment on the PUD application. In April of 2000, your paper's headlines said, accord - In to .certain `city staffers, "pool planning process far from over" -and "that the pool concept and designs were ;Y preliminary and that the `public would have lots of r opportunity to comment." would like to know how we went from April of, 2000 to January 2001 without one community or public meeting on the pool plans for comment, and now the city is submitting their final plans? I did plead for a comment session during one of the budget meetings but was told to "sit down and shut- up." (So much 'for the public process.). While it has become painfully clear that the city staffers responsible for the current pool plans have cho- sen to not give: any -"credibility" to my efforts, experi ence and credentials. and many of our teens requests, I -cannot understand . why they have not and will not hire any pool or aquatic consultant experts. What, really perplexes me is how certain city staffers can insist, that the pools are being built as a "state of the art" facility when the current plans do not even meet certain regulations. If the city staffers would consult with the experts or listen to what other Colorado sister cities' pools have said about the plans poor design in safety, that would shut me up. Toni Kronberg f Y Aspen C Dear Aspen City Council, We support the idea of a warm water pool with deep and shallow water. If the pool is designed as a place where teens can go and hang out, it would be great for our downtime, and, also, as a workout/rehabilitative pool. Athletes, adults, families, handicapped, seniors, scuba, water exercise, water aerobics, therapy, and tourists could also use the warm water pool with deep water. Silverthome and Avon recreation centers have a separate deep water tank. Aspen's pools should equal if not excel the designs that are already in the ground at other comparable communities with resort economies. Thank you for helping us with a pool that we have needed for a long time. Easten Treadwell loth Jessica Gosda IOth Alexa Meyer IOth Jamie Walbert IOth Nina Mohrman 1 Ith Lydia Hanrahan 1 Ith Liam Kiernan 1 Ith Heidi Hauenstein 12th Dave Stolley Ronald L. Rakestraw Hohn Rubel Janet Lowe Bryan Johnson Liza Klanderud Thunder Thorton Marcus Morton Sophie Morton David F. Breasted Julia Steindler Elizabeth Severy Gabe Gunther -Brown Tiffany Stone Kate Jensen Lauren Taddune Rossana Gamarra 1 Ith I Ith 12th 12th 12th 1 Oth 1 Oth Teran Christian Nate Walla Ale Crum Sascha Anastas Carter Hansen Bree Kimmel Chris Patterson Spencer Purvis Brandon Moon Zac Paris Anders Head Marina Kanipe Jeff Flack Chris Luu Kate Linehan Sam Beach Michelle Faurer John Stewart Nick Pearsons Michael Reveal Mark Welgos Laura Hadar Rob Feliciano Cody Obuhanick Stuart Barwick 1 Oth 1 Oth 12th 12th 12th 1 Oth 12th I Ith 12th 1 Oth 1 Oth 12th 12th 12th 12th 12th 11th 1 Oth 1 Oth 1 Oth 1 Oth 1 Oth 1 Oth 1 Ith 11th EXHIBIT w Danielle Hession 1 Oth Gabby Loeb 1 Oth Hillary Fornell 1 Oth Besha Dean IOth Martie Lurie Cherly Ann Lurie Gail Cusick John L. Lamoureax Morgan S. Vail RA Beattie IOth Josh Whitney 11 th Jenna Fuechsel 1 lth Wayne Chittey 1 lth Chase LaCroix 9th Gus Urkaine 11 th Devon McCloskey 1 lth Jessie Young 1 lth Becky Bruening 1 lth Andres Soonthornswad llth Jeff Brence 11 h Paul Conedera Deb George Shelly Mars Lyndee R. Dean C Mark Higgius Names collected at time of printing Daniel Adamson 011ie Urbach Matt Brager Paul Popish Bill Weeks Toni Kronberg David Camara Joey Hanson Sean Friedland Duncan Delano Cory Reno Kathy Johnson Hayley Cassatt Alison Eastley WO Jones Terry A. Decker David Catanzaro Jan Bandy Vanna Vail Rupert Vail Rowland Krupp Jennifer Belmont To add name to list to be given to Aspen City Council, please call The Kids Campaign Contact person: Toni Kronberg 544-6148 11 th 11 th 12th 12th 12th 11 th 12th To: From: CC: Date: Re: Joyce Ohlson, City of Aspen, Community Development Steve Bossart, City of Aspen, Asset Management 12/27/00 Iselin — Consolidated Final PUD/SPA - Correction The Iselin Park— Consolidated Final PUD/SPA, contains an error in Appendix D, Programming Summary, page 10, under "Training Pool". This paragraph states, "re -use the existing -25 yard x 6-lane pool. Recondition the pool shell and provide new coping and deck area. The existing mechanical will also be re -used and placed in the mechanical room...." The concept of re -using the existing pool shell was under consideration for a brief period but was abandoned. Our plan is to completely demo the 25-year-old facility and construct all new facilities. EXHIBIT W < �i i� m FLAII�IN'II�N'IGJAIN`ID)Z�0)N111W1G; �'OINIWIIIfS;S,IIQ�NI MEETINf. DATE: 01IO2/01 NAME OF PROJECT: ISELIN PARK CONCEPTUAL/FINAL PUD/SPA CITY CLERK: Jackie Lothian STAFF: Joyce Ohlson, Stephen Bossart, Ed Sadler, Jeff Woods WITNESSES: (1) (2) (3) (4) (5) (6) (7) EXHIBITS: 1. 2. 3. 4. 5. 6. 7. John McBride Lynn Mace King Woodward Debra Bradford Jonathan Lewis LJ Erspamer Georgia Hanson (8) Larry Slater (9) Steve Wicks (10) Matt Vickers (11) Jackie Broughton (12) Toni Kronberg (13) Norma Roberts Staff Report (X) (Check If Applicable)1/2/01 Affidavit of Notice (X) (Check If Applicable) 1/2/01 Board Criteria Sheet (X) (Check If Applicable) none Various drawings, maps, bluelines Steve Bossart Memo 12/27/00 Toni Kronberg letter 01/02/01 Toni Kronberg to City Council with Fish 01/02/01 MOTION: Roger Haneman moved to continue the public hearing for the Iselin Park Conceptual/Final PUD/SPA Conditional Use to January 30, 2001. Ron Erickson second. APPROVED 6-0. VOTE: YES 6 NO 0 ROBERT BLAICH YES _x_ NO ROGER HANEMAN YES _x NO RON ERICKSON YES _x_ NO JASMINE TYGRE YES _x_ NO STEVEN BUETTOW YES x NO ERIC COHEN YES _x_ NO PZVOTE 1/02/01 MEMORANDUM TO: Aspen Planning and Zoning Commission THRU: Julie Ann Woods, Community Development Director Joyce Ohlson, Deputy Director FROM: Nick Lelack, Planner RE: New West Hopkins Affordable Housing -- Conceptual Planned Unit Development — Public Meeting DATE: January 2, 2001 APPLICANTS Aspen GK, LLC Peter Gluck Burton B. Kaplan REPRESENTATIVE: Joe Wells LOCATION: West Hopkins Ave. at 5th Street (west of the new Boomerang site) CITY & COUNTY ZONING: R-15, Moderate Density Residential (subject to annexation) PROPOSED ZONING: Affordable Housing/PUD LOT SIZE: 53,187 square feet FAR: ALLOWED IN R-15: 7,965 sq. ft. PROPOSED (TOTAL): 27,218 sq. ft. AH: 10, 724 sq. ft. FREE MARKET: 16,494 sq. ft. LAND USE: Existing: Vacant Proposed: 15 Residential Units 11 Affordable Housing Units 4 Free Market Units saw The site as viewed from W. Hopkins and 5th St. i ne lower portion of the site as viewed from Shadow Mountain .REVIEW PROCEDURE • Conceptual Planned Unit Development: The Planning and Zoning Commission shall by resolution recommend City Council approve, approve with conditions, or deny the Conceptual Planned Unit Development request. • Annexation: City Council has the authority to annex a property. The Applicants have submitted a separate application requesting that the entire parcel be annexed into the City. • Final PUD, Rezoning, Special Review for Affordable Mousing Parking, Subdivision 8040 Greenline Review, and GMQS Exemption: If the conceptual PUD plan is approved, the Applicant is required to make an application for these land use approvals within one year. STAFF COMMENTS: Aspen GK, LLC, Applicant, represented by Joe Wells, has applied for a Conceptual Planned Unit Development (PUD) on a parcel located on West Hopkins Avenue at the end of 5th Street. The parcel is located partly in the City and partly in the County. It is zoned R-15, Moderate Density Residential in both jurisdictions. If the Conceptual PUD is approved, the Applicant will apply for a rezoning of the parcel to Affordable Housing/Planned Unit Development. On December 5, the Applicant presented an overview of the project to the Planning and Zoning Commission. This continued public meeting will consist of reviews by Staff and the Commission, public input, and possibly a Resolution by the Commission recommending City Council approval or denial. The following tables summarize several project features: UNITS: Affordable HousingUnits Number of Units Category Total Number of Bedrooms Sq. Ft. Per unit Total Sq. Ft. 3-bedroom 4 4 12 1,384 5,536 2-bedroom 1 2 2 956 956 2-bedroom 2 3 4 956 1,912 1-bedroom 2 1 2 685 1,370 Studio 2 2 2 475 950 Sub -Total 11 (73%) 22 (610N) 109724 Free Market 3-bedroom 1 3 3,711 3,711 3-bedroom 1 3 3, 964 3,964 4-bedroom 1 4 4,380 4,380 4-bedroom 1 4 4,439 4,439 Sub -Total 4 (27%) 14 (39%) 169494 TOTAL 15 36 27,218 At the first meeting, Planning and Zoning Commissioners, the public and staff identified several threshold issues to be discussed during the review process for this proposed development. These issues are discussed below. Some of the issues will be reviewed during the final review application, such as geologic hazards. The threshold issues to focus on for the purposes of this Conceptual PUD are: (1) density; (2) traffic; (3) trail connections; (4) size, scale, and mass of buildings; (5) site access; (6) the Colorado Midland Right -of -Way; (7) parking; and (8) site plan. 1. DENSITY The R-15 Zone District in the City would allow a single family residence or duplex, and one accessory dwelling unit per residence, for a total of up to 4 dwelling units on this site. The Affordable Housing (AH)/Planned Unit Development (PUD) Zone District allows density based on lot size. This lot is approximately 53,187 square feet; steep slopes reduce the size of the lot for purposes of calculating density. According to the application, the steep slopes on this lot reduce the lot area to 26,916 square feet for purposes of calculating density. The proposed density for this site requires a lot area of approximately 15,000 square feet. The Code requires 300 square feet of lot area per studio unit; 400 square feet of lot area per 1-bedroom unit; 800 square feet of lot area per 2-bedroom unit; 1,200 square feet of lot area per 3-bedroom unit, and 400 square feet of lot area per bedroom for 3 and more bedroom units. Units # of Units Lot Area Required Per Unit Total Lot Area Required (Sq. Ft.) Affordable Housing 3-bedroom 4 1,200 4,800 2-bedroom 3 800 2,400 1-bedroom 2 400 800 Studio 2 300 600 Free Market 3-bedroom 2 1,200 2,400 4-bedroom 2 1,600 3, 200 TOTAL 15 149200 Staff believes the proposed density complies with the 2000 Aspen Area Community Plan. The Plan states: "To conserve resources, an Aspen Community Growth Boundary has been identified. The City agrees to accept greater density within the boundary in exchange for preservation of important open space in the outlying County and key parcels in the City, maintaining the separation between communities, and prevention of sprawl." This parcel is inside the Aspen Community Growth Boundary. Inaddition, the Interim Aspen Area Citizen Housing Plan calls for developing citizen housing within the metro area, near available public mass transit, in areas that will not promote additional development or sprawl, and in a location with available public facilities and urban services. This site meets all of these criteria. The Plan also calls for the development of citizen housing to be compatible with the existing neighborhood character and environment. The Applicant proposes to build 15 residential units — 11 affordable housing units and 4 free market units — on a 53,187 square foot parcel. Based on other residential and lodge developments in this neighborhood (listed below), staff believes the proposed density is appropriate for the site. The Boomerang Lodge expansion was approved for 5 lodge units, 2 lodge condominiums, and 2 AH units immediately east of this property. The existing Boomerang Lodge-34 lodge units- is adjacent to this property. The Madsen apartments across the street include 9-10 residential units. Several duplexes are located in the immediate vicinity of this parcel. r0 The Christiania Lodge-26 lodge units (27 more proposed) -is one block north. The L'Auberge Lodge-16 lodge units, 1 AH-is about 1.5 blocks northeast. X The Ullr Commons-25 affordable housing units -is located about 1.5 blocks north. The West Hopkins Affordable Housing-11 AH units -is located about 1.5 blocks west. 2. TRAFFIC. The Applicant has not provided a traffic study for this proposal; instead, the Applicant proposes to complete a study if the project receives conceptual approval The study would be submitted with the final PUD application. Staff believes it is important to consider potential traffic impacts caused by this proposal during the conceptual review because the extent of the impacts could affect the project's density, and density must be resolved during the conceptual review. Staff has attempted to gather the best possible data to evaluate potential traffic impacts caused by this project. Three methodologies are used to determine potential traffic impacts. The City's Environmental Health Department contends that the residences within one-half mile of a bus stop generate about 8 automobile trips per day. The 1995 Shadow Mountain Affordable Housing Development Conceptual Submission, submitted by T. Craig Glendenning, provides a traffic study prepared by Banner Consulting Engineers & Architects. This study states that the average weekday generation rate of a free market residence in this location is approximately 6.9 daily trips, and 3 trips per day for an affordable housing residence. Jay W. Hammond, P.E., of Schmuesser Gordon Meyer, Inc., evaluated traffic impacts of the proposed Boomerang Lodge expansion on the parcel to the immediate east. Mr. Hammond's findings indicate that condominium and/or 1.1 townhomes in this location would generate approximately 5.86 automobile trips per day based on the 1997 Trip Generation by the Institute of Traffic Engineers. The following table shows possible traffic generation scenarios. Banner Banner Aspen Aspen Schmuess- Number Average Total Env. Total Schmuess- er Gordon Units of Units Daily Average Health Average er Gordon Meyer, Inc. Trips per Daily Dept. Daily Meyer, Inc. unit Trips Trips Total Trips Affordable Housing 11 3 33 8 S8 5.86 64.5 Free Market 4 6.9 27.6 8 32 5.86 23.4 Total Traffic 60.6 120 87.9 Generated These figures indicate that the development could generate between 60 and 120 automobile trips per day. Mr. Hammond's report, dated March 17, 2000, stated that the best available traffic counts on West Hopkins Avenue in this neighborhood are between 500 and 1,000 vehicle trips per day; this data is contained in the existing conditions section of the 1987 Aspen Area Community Plan: Transportation Element. (Since this element was completed, the West Hopkins AH development has been completed.) VIr. Hammond's recent report also stated that West Hopkins Avenue "does not function as a through street and serves only the immediate neighborhood properties. Current traffic volumes remain low through most of the day based on my observations during various site visits." He further stated that the 53 trips per day that the Boomerang expansion might generate would be a "negligible impact to surrounding streets." Staff concludes that due to the site's close proximity to downtown, transit, trails, and community amenities, traffic generation from this project may not reach as high as 120 trips per day. 3. TRAIL CONNECTIONS AND EASEMENTS. The Applicant and City Parks Department are working out the details of two trails crossing the property. A trail currently enters the property from the east behind the Boomerang expansion site, and then continues through the site to its end at the 5th Street/West Hopkins Avenue intersection. The proposal is to keep this trail in a modified form, as well as to provide a second trail higher up on Shadow Mountain behind the free market units. The Parks Department is supportive of this conceptual trail alignment. 5 4. SIZE, SCALE, & MASS/VOLUME OF BUILDINGS. The size, scale and mass of buildings, measured by floor area (basically above ground square footage) and height are determined by the zone district and lot size. Floor Area This parcel is 53,187 square feet. Similar to the density discussion above, the Land Use Code requires the lot area to be reduced for the purposes of calculating floor area based on the steepness of slopes. However, this calculation is different from the density calculation in that the maximum reduction in lot area for the purposes of calculating floor area is 25%. This maximum reduction creates a net lot area of 39,906 square feet. The R-15 Zone District would allow approximately 7,965 square feet of floor area (5,615 square foot duplex, 750 square feet for two garages, and 1,600 square feet for 2 accessory dwelling units). This figure does not include sub -grade space. The Affordable Housin- (AH)/Planned Unit Development (PUD) Zone District allows the floor area ratio to equal 80% of the lot area. Therefore, 80% of 39,890 square feet results in 33,906 square feet of floor area. The Applicant is proposing 27,218 square feet of floor area in three buildings, including garages. The square footage is about double the amount approved for the Boomerang Lodge expansion (approximately 13,000 square feet above grade and 3,000 square feet below grade). However, the Boomerang site is 19,287 square feet. Height The R-15 Zone District allows the maximum height of buildings to be 25 feet, measured to a flat roof or to the mid -point of a pitched roof. The AH/PUD Zone District allows height to be determined during the PUD review. The Applicant is proposing the height of the building closest to West Hopkins Avenue to be 21 feet high to a flat roof. The proposed height of the middle structure is 25 feet high. The proposed height of the third building, set behind the affordable housing buildings, is proposed to be 30 feet high. The first two buildings comply with the R-15 Zone District's height limit, and the third would require a 5-foot height variance under the PUD. Staff believes that locating the shortest structures on the street, followed by taller structures in the middle and back of the lot, preserves views for existing neighborhood residents, visitors, and passers-by, and respects the scale of the neighborhood's buildings. Staff believes that, based on the model and representations in the application, that the square footage has been distributed on the site in a manner that is in keeping with the neighborhood character and in compliance with the AACP goals to provide quality affordable housing in town. The photographs below show some structures located near this site. I Madsen Apartments Structures located next to the Madsen Apartments s _ `"OF Boomerang Lodge The Cisneros house located immediately west of the site in Pitkin Countv. n k A duplex west of this site on West Hopkins. A duplex east of the site 5. SITE ACCESS. One driveway is proposed for vehicular and emergency access from West Hopkins Avenue at the east end of the parcel. The proposed access appears to be meet Municipal Code dimensional requirements, including a 16-foot width to allow emergency vehicle access to the property with turning radii of 25 feet and 31 1 feet at the appropriate locations. 7 However, the location of the access along the east property line is not adequate, according to City Engineer Nick Adeh. Mr. Adeh strongly recommends that the access be aligned with 5th Street for safety reasons. According to Mr. Adeh, driveways that serve five (5) or more residential units must be designed to function as a minor residential road because of traffic volumes serving the property. He contends that minor residential roads must either be aligned with an intersection or located 200 feet from an intersection. Because the property's frontage is less than 200 feet, Mr. Adeh recommends that the driveway be aligned with 51h Street. In addition, the Entrance to Aspen Plan includes placing stop lights at 7th Street, 5th Street, and 31d Street, and street closures at 7th Street, 6th Street, and 4th Street, as shown in Exhibit C. Therefore, limited vehicular access between Main Street and West Hopkins Avenue at 7t", 6th and 41h Streets, will cause an increase in traffic impacts on 5t11 Street, particularly at the 5th Street and West Hopkins Avenue intersection. M Community Development Staff does not share the concern to the same degree as the City Engineer because West Hopkins is expected to continue to only serve the local neighborhood and not serve as a thru street. Community Development Staff and the City Engineer agree that the driveway should not be relocated to run along the west property line because of the potential for increased conflicts with pedestrians. Staff seeks the Planning and Zoning Commission's direction on how to guide the Applicant to arrange the access for the final plan review. At least two alternatives exist. One alternative is to require the access to be aligned with 5th Street. Such an alignment would require the two (2) affordable housing buildings to be separated into four (4) buildings or to reduce the number of affordable housing units on the site because of the narrow space remaining between the aligned access and eastern property line. The City Engineer strongly believes this alignment. would provide the safest intersection. A second alternative is to approve the access as proposed. This may allow for the sharing of driveways with the new Boomerang Lodge, which received PUD approval from City Council for a driveway on the western edge of its site. The timing for the potential of sharing a driveway is fortuitous because the Boomerang Lodge is seeking an amendment to its approved PUD concerning the number of underground parking spaces provided. However, even if the property owners do not share a driveway, Community Development Staff believes locating the driveways side -by - side would provide a focal point for traffic accessing these sites, thus providing a safe intersection for vehicular, pedestrian, and bicycle traffic to the neighborhood. A stop sign currently exists on 5th Street at the intersection with West Hopkins Avenue. Staff believes this intersection may require stop signs on West Hopkins Avenue as well because of neighborhood traffic circulation resulting from the Entrance to Aspen Plan. In addition to vehicular access to the site, pedestrian and bicycle access would be provided on a trail parallel to the driveway. In addition, a sidewalk along W. Hopkins Avenue would provide pedestrian access across the front of the property. And, each affordable housing unit fronting West Hopkins Avenue would connect to the street via a path from the front door to the sidewalk. 6. COLORADO MIDLAND RIGHT-OF-WAY. The Colorado Midland Right -of -Way across this property is not on the City's inventory of historic sites and structures. During the 1995 update of the list of historic sites and structures, the Historic Preservation Commission voted to include this right-of-way on the list, but City Council did not act on this recommendation. According to Amy Guthrie, Historic Preservation Officer, City Council did not consider the right-of-way as a historic landmark on this site because the integrity of the right-of-way in the area had been compromised by other structures built on top of it. Maps of the right-of-way are included in Exhibit B. I Staff does not believe this issue should impact this proposal because the right-of- way is not currently on the inventory. 7. PARKING. The Applicant is proposing to provide 23 covered parking spaces on site, including eight 8 parking spaces for the four (4) free market units and 15 spaces for the 11 affordable housing units. The number of parking spaces provided may be determined during the PUD review. In addition, Special Review is required to determine the number of parking spaces designated for affordable housing units. The Land Use Code requires two (2) parking spaces for free market units with 2 or more bedrooms, and one (1) parking space for studios and 1-bedroom units. On -Site Parking Spaces: Unit Type Total Number of Covered Parking Spaces Proposed Affordable Housing 15 Free Market 8 TOTAL 23 In addition, the Planning and Zoning Commission and Applicant discussed the possibility of providing additional on -site parking in an area shield by landscaping at the east end of the property between the free market and affordable housing units. Staff believes the proposed parking is appropriate for the site and neighborhood. 8. OVERALL SITE PLAN. Staff believes the proposed site plan is appropriate for the parcel and location. The Applicant has proposed to locate the affordable housing units on and near the street in two buildings. These units, which will be lived in year around, will bring life to the street and provide convenient pedestrian and bicycle access for these residents. The site plan includes appropriate pedestrian circulation. Connecting the units fronting West Hopkins to a new side walk, as well as dedicating public trails parallel to the access and behind the free market units provides pedestrian access to all points on and off the property. Parking is proposed to be accommodated on -site and mostly out of public view in covered parking spaces. Adequate turning radii also appears to meet the City Code; this will be verified during the final review. Emergency access also appears to be acceptable to the Aspen Fire Marshall and City Engineer. The site plan meets several City goals discussed above, including the provision of affordable housing and increased density within the community growth boundary. 10 ` The' remaining issue to be resolved -is access to the site, which was discussed above. 9. ANNEXATION The annexation process is administered through the City Attorney's Office. City Attorney John Worcester has determined that the property is eligible to be annexed into the City based on its location and contiguity with the City of Aspen boundary. City Council makes all decisions concerning annexation. The annexation application is on hold until City Council considers this land use application. City Council will consider annexation at the same time it considers the final application for this proposal. 10. ZONING. This Application proposes to re -zone to Affordable Housing (AH)/Planned Unit Development (PUD); this issue will be considered in the final review. This up - zoning allows for much higher density than the existing R-15 Zone District permits, as well as the size, scale and mass of buildings. As discussed in the previous and following sections, this site is across the street from the Madsen apartments and Boomerang Lodge, next door to the Boomerang Lodge expansion site, and within a couple of blocks of the West Hopkins Affordable Housing site, Christiania Lodge, L'Auberge Lodge, Ullr Commons, as well as several duplexes and other large structures. Staff believes the proposed AH/PUD zoning of the property is compatible with the existing neighborhood and approved development plans. 11. ROCK FALL HAZARDS. The Applicant has not provided a geologic report with this application; instead, the Applicant proposes to complete a study if the project receives conceptual approval. The City Engineer recommends a condition of this approval is that the Applicant shall develop a long term hazard mitigation and containment plan to protect the proposed development. The City Engineer's referral comments state that this site is directly below the rockfall area as identified in the 1972 US Geological Survey map. This map also indicates potentially unstable slopes adjacent to the rockfall area. Staff recommends two conditions of approval. One is that the Applicant provide a complete geologic report to the satisfaction of the Citv Engineer and Parks Department. The second is that the Applicant prepare a long term hazard mitigation and containment plan to protect the proposed development It should be noted that Pitkin County would not permit development on slopes exceeding 30% at the rear of this parcel. The City does not have similar regulations. 11 812. EXCEPTIONAL PROJECT. The Land Use Code requires affordable housing projects to include a minimum of 70% of a project's total number of bedrooms to be deed restricted affordable housing. However, a project may be eligible for a reduction of the minimum affordable housing bedroom mix if the project is deemed exceptional by City Council. The Applicant may propose a project consisting of 60% of the total bedrooms deed restricted to affordable housing if City Council finds that the project meets the requirements for such a project as set forth in the Affordable Housing Guidelines. On December 6, the Housing Board recommended City Council approve the project as "exceptional" finding that the Affordable Housing Guidelines review criteria have been met. The Planning and Zoning Commission does not make decisions or recommendations on whether a project is deemed "exceptional." 13. ACCESSORY DWELLING UNITS. No accessory dwelling units have been planned or are proposed as part of this project. The Planning and Zoning Commission asked the Applicant to consider including an ADU with each free market town house. 14. NEIGHBORHOOD CHARACTER GUIDELINES. Conformance with the neighborhood guidelines was also raised as an issue to address in the second meeting. The Neighborhood Character Design Guidelines were the precursor to Residential Design Standards, which were adopted in 1995. The Neighborhood Character Design Guidelines were intended to "guide" the design of new development in Aspen's core area neighborhoods, including a specific set of design guidelines for the Shadow Mountain Neighborhood. However, these guidelines are no longer applied to developments. Now, the Residential Design Standards are applied city-wide; this project must conform to the current standards or receive variances from them. The project's compliance with the standards will be reviewed during the final review of this project. The applicant has been advised that any variance from the standards could be addressed as part of the PUD. 15. WILDLIFE MIGRATION. The Pitkin County wildlife maps for the Roaring Fork Valley and Aspen do not show any mapped wildlife habitat on or near this parcel. SUMMARY: Staff believes the conceptual project meets City goals to provide density within the community growth boundary, and 11 affordable housing units in the metro area. 12 Important trail connections would also be preserved. Staff further believes that the density and size of the project are compatible with the existing neighborhood and approved plans for new developments. The Planning and Zoning Commission should discuss and provide direction on the appropriate location for site access. RECOMMENDATION: Staff recommends the Planning and Zoning Commission recommend City Council approve the Conceptual Planned Unit Development for the subject property, with conditions. RECOMMENDED MOTION: "I move to approve Resolution No. , Series of 2001, recommending City Council approve the Conceptual Planned Unit Development, with conditions, finding that the review criteria in Exhibit A have been met." ATTACHMENTS: Exhibit A -- Review Criteria and Staff Findings Exhibit B -- Referral Agency Comments Exhibit C -- Maps 13 RESOLUTION NO. 01 (SERIES OF 2004) A RESOLUTION OF THE CITY OF ASPEN PLANNING AND ZONING COMMISSION RECOMMENDING APPROVAL TO CITY COUNCIL OF THE NEW WEST HOPKINS CONCEPTUAL PLANNED UNIT DEVELOPMENT, CITY OF ASPEN, PITKIN COUNTY, COLORADO. Parcel No. 2735-124-00-003 WHEREAS, the Community Development Department received an application from Aspen GK, LLC, owner, represented by Joe Wells, for Conditional Planned Unit Development approval for an affordable housing project at the 600 block of West Hopkins Avenue, City of Aspen; and, WHEREAS, the subject property is approximately 53,187 square feet, is located partially in the City of Aspen and partially in Pitkin County, and is located in the R-15 Zone District in both jurisdictions; and, WHEREAS, pursuant to Section 26.445, the City Council may approve a Conceptual Planned Unit Development, during a duly noticed public hearing after considering a recommendation from the Planning and Zoning Commission made at a duly noticed public hearing, comments from the general public, a recommendation from the Community Development Director, and recommendations from relevant referral agencies; and, WHEREAS, the Aspen Fire Marshall, Aspen Consolidated Sanitation District, the City Water Department, City Engineering, City Parks Department, the Aspen/Pitkin County Housing Authority, and the Community Development Department reviewed the Project and recommended approval with conditions; and, WHEREAS, during a duly noticed public hearing on January 2, 2001, the Planning and Zoning Commission approved this resolution, by a _ to _ ( --) vote, recommending City Council approve the New West Hopkins Affordable Housing Conceptual PUD; and, WHEREAS, the Aspen Planning and Zoning Commission has reviewed and considered the development proposal under the applicable provisions of the Municipal Code as identified herein, has reviewed and considered the recommendation of the Community Development Director, the applicable referral agencies, and has taken and considered public comment at a public hearing; and, WHEREAS, the Aspen Planning and Zoning Commission finds that the development proposal meets or exceeds all applicable development standards and that the approval of the development proposal, with conditions, is consistent with the goals and elements of the Aspen Area Community Plan; and, WHEREAS, the Aspen Planning and Zoning Commission finds that this Resolution furthers and is necessary for the promotion of public health, safety, and welfare. NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF ASPEN PLANNING AND ZONING COMMISSION as follows: Section 1 That the Planning and Zoning Commission recommends City Council approve the New West Hopkins Affordable Housing Conceptual Planned Unit Development, with the following conditions: The Final Application shall include detailed descriptions of two (2) trails across the property to be dedicated public trail easements. One trail shall be across the lower portion of the property connecting the existing trail to West Hopkins Avenue and the other across the upper portion of the property. The Parks Department shall approve the trail easements. 2. The Final Application shall demonstrate how the project will implement Green Development Strategies as required by the Aspen/Pitkin County Housing Authority. a. Use of gas log appliances. Pollution reduction and energy conservation. b. Occupant recycling. Areas for glass, metal, plastic and newspaper. c. Waste management. Identify ways to recycle materials where possible, and minimize trips to the landfill, including separate dump containers for wood and other potential recyclables. d. Destratification fan systems. Fans recycle hot air at roof and recirculate to living areas to decrease heating loads. e. Attic fan systems. Naturally ventilate building, reducing the need for air conditioning from solar gain. f. Comply or exceed energy code requirements. g. Landscaping. Utilize native vegetation to reduce water use. h. Bike storage areas. i. Trail. To be made permanent fixture of town system by way of easement. j. Erosion control. Measured specified by licensed geotechnical engineer to minimize damage to vegetation and ground stability. k. Site preservation and restoration. Topsoil to be preserved for re -use in areas of disturbance. Site disturbance limited. Intensive restoration plan to ensure proper re -growth and stabilization of disturbed areas. 3. The Final Application shall address the Housing Authority's requirement to investigate additional Green Development Strategies, including: a. Building Commissioning. b. Asbestos -free building. c. CFC-free building products, including refrigeration systems and carpeting. d. Recycled materials. e. Building materials. f. Water conservation. g. Certified wood products. h. Human comfort. i. Energy efficient lighting. j . Light pollution. k. Indoor air quality. 1. Construction air quality plan. 5. The Final Application shall include a long-term hazard mitigation and containment plan to protect the development from rock falls, snow slides, and other natural hazards. The plan shall be approved by the City Engineer. A complete geologic report shall be submitted to both the Parks Department and City Engineer for their review and approval. 6. The site contains an old abandoned septic system. The Applicant shall comply with Pitkin County Environmental Health Department requirements for abandonment of the system and properly disposing of waste material. The Applicant shall also provide an Environmental Assessment, especially focused on any natural and man- made hazards that might exist on the property. Such assessment shall meet with the approval of the Director of Environmental Health. 7. The Applicant shall develop traffic reduction measures for the project prior to final submission in order to comply with the City's Municipal Code requirements. The traffic reduction measures shall be approved by the City's Environmental Health Department. 8. The landscape plan shall indicate that the native areas will be treated with the Parks Department's recommended seed mix. 9. A 5-foot buffer to accommodate snow storage and removal on each side of sidewalks and trails shall be indicated on the final site plan. 10. The final site plan shall show the areas of the dedicated public trail easements, approved by the Parks Department. 11. The buildings shall include an adequate fire sprinkler system and alarm system, approved by the Aspen Fire Marshall. 12. No excavation or storage of dirt or material shall occur within tree driplines or outside of the approved building envelope and access envelope. 13. All construction vehicles, materials, and debris shall be maintained on -site and not within public rights -of -way unless specifically approved by the Director of the Streets Department. 14. The applicant shall abide by all noise ordinances. Construction activity is limited to the hours between 7 a.m. and 7 p.m. 15. The applicant shall not track mud onto City streets during construction. A washed rock or other style mud rack must be installed during construction. 16. All uses and construction shall comply with the City of Aspen Water System Standards and with Title 25 and applicable portions of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code as they pertain to utilities. 17. The Applicant or owner shall mitigate any public impacts that this project causes, including but not limited to utility expenses and sanitary sewer and water lines. Section 2- All material representations and commitments made by the applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Planning and Zoning Commission or City Council, are hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, lidless amended by an authorized entity. Section 'I -- This Resolution shall not effect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 4- If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED by the Commission at its regular meeting on January 2, 2001. APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION: City Attorney ATTEST: Jackie Lothian, Deputy City Clerk Robert Blaich, Chair EXHIBIT A NEW WEST HOPKINS AFFORDABLE HOUSING PROJECT 26.445.050 Review Standards: Conceptual PUD A development application for Conceptual, Final, Consolidated Conceptual and Final, or Minor PUD shall comply with the following standards and requirements. Due to the limited issues associated with Conceptual Reviews and properties eligible for Minor PUD Review, certain standards shall not be applied as noted. The burden shall rest upon an applicant to show the reasonableness of the development application, and its conformity to the standards and procedures of this Chapter and this title. A. General requirements. 1. The proposed development shall be consistent with the Aspen Area Community Plan. Staff Fi.ndinty Staff believes the proposed development is consistent with the 2000 Aspen Area Community Plan (AACP). The Applicant is proposing to build 11 affordable housing units and 4 free market town houses on a 53,187 square foot lot. The 2000 Aspen Area Community Plan calls for increased density within the community growth boundary. Specifically, it states: "To conserve resources, an Aspen Community Growth Boundary has been identified. The City agrees to accept greater density within the boundary in exchange for preservation of important open space in outlying County and key parcels in the City, maintaining the separation between communities, and prevention of sprawl." This parcel is clearly inside the Aspen Community Growth Boundary and has not been identified as a key preservation parcel in the City. In addition, the Interim Aspen Area Citizen Housing Plan calls for developing citizen housing within the metro area, near available public mass transit, in an area that will not promote additional development or sprawl, and in a location with available public facilities and urban services. This site meets all of these criteria. The housing proposed is in the metro area, within a block and half of public mass transit, in an area that will not promote additional development or sprawl (up against Shadow Mountain), and in an area served by all public facilities and urban services. The Plan also calls for the development of citizen housing to be compatible with the existing neighborhood character and environment. Staff believes the density and size of the buildings are compatible with the existing neighborhood and approved development plans based on other residential and lodge developments in this neighborhood (listed below). City Council approved the Boomerang Lodge expansion for five chalet -style lodges, 2-lodge condominiums, and 2 affordable housing units immediately east of this property. The existing Boomerang Lodge is located across the street from this site. The Madsen apartments across the street include 9-10 residential units. Several duplexes are located in the immediate vicinity of this parcel. The Christiania Lodge and its associated affordable housing are one block north, and the L'Auberge Lodge, including a manager's unit, is about 1.5 blocks northeast. The. Ullr Commons — 25 affordable housing units and one (1) free market unit — is located about 1.5 blocks north. The West Hopkins Affordable Housing units are located about 1.5 blocks west. Staff believes this criterion is met. 2. The proposed development shall be consistent with the character of existing land uses in the surrounding area. Staff Finding The proposed development for multi -family housing on this site would be consistent with the character of existing land use in the surrounding area. Land uses in the surrounding area include: lodge; residential — detached single family, duplex, and multi -family; park; and office. Staff believes this criterion is met. 3. The proposed development shall not adversely affect the future development of the surrounding area. Staff Finding Staff does not believe the proposed development would adversely affect future development of the surrounding area. The surrounding area is mostly built out, consists of trails, steep slopes, or is in the county and would be subject to county land use regulations which severely restrict development on steep slopes and in wildfire areas. 4. The proposed development has either been granted GMQS allotments, is exempt from GMQS, or GMQS allotments are available to accommodate the proposed development and will be considered prior to, or in combination with, final PUD development plan review. Staff Finding The free market residential development in the Affordable Housing/PUD zone district is exempt from growth management competition and scoring procedures, pursuant to Section 26.470.070 Growth Management Quota System — Exemptions. D. .Establishment of Dimensional Requirements: The final PUD development plans shall establish the dimensional requirements for all properties within the PUD as described in General Provisions, Section 26.445.040, above. The dimensional requirements of the underlying zone district shall be used as a guide in determining the appropriate dimensions for the PUD. During review of the proposed dimensional requirements, compatibility with surrounding land uses and existing development patterns shall be emphasized. The proposed dimensional requirements shall comply with the following: 1. The proposed dimensional requirements for the subject property are appropriate and compatible with the following influences on the property: Staff Finding The final development plan shall show all of the dimensional requirements proposed. Staff will evaluate the dimensions during the final review. The Conceptual PUD application presents the following approximate dimensional requirements: Maximum allowable density: 15 Maximum height: 21 feet for the affordable housing building fronting West Hopkins Ave.; 25 feet for middle building on the lot, and approximately 30 feet for the free market building at the rear. Maximum allowable floor area: approximately 27,218 square feet. Minimum number of off-street parking places: 23 a) The character of, and compatibility with, existing and expected future land uses in the surrounding area. Staff Finding . Overall, Staff believes the proposed dimensional requirements are appropriate and compatible for the site and neighborhood. Staff believes the proposed density on the site is similar to the Madsen apartments, West Hopkins Affordable Housing, Boomerang Lodge, Christiania Lodge, L'Auberge Lodge, and Ullr Commons. The size, scale and mass of the project appear compatible with the neighborhood as well. The Applicant is proposing approximately 27,218 square feet of floor area. This is comparable, in terms of lot size, with the Boomerang Lodge, Boomerang expansion, Christiania, and Ullr Commons. The height of the buildings are compatible with the neighborhood. The building closest to West Hopkins Avenue is proposed to be 21 feet high, measured from the ground to a flat roof. Behind this structure is a proposed second building, which would be 25 feet high. The third building, set near the rear of the property into the side of Shadow Mountain, is proposed to be approximately 30 feet from the ground to the top of a flat roof. Existing and approved neighborhood buildings appear to be within this height range. The Applicant is proposing to provide 23 covered parking spaces on site, including 8 parking spaces for the four (4) free market units and 15 spaces for the 11 affordable housing units. Additional parking may also be provided on -site in a landscape shielded area near the center of the parcel. This proposal exceeds the ratio of units to parking spaces on most other lodge and multi -family residential sites in the neighborhood and throughout the City. b) Natural or man-made hazards. Staff Finding Site hazards, both natural and man made, (including mining) will be identified during final review in the geologic hazards report and/or through further environmental assessment. Staff will address this criterion at that time. c) Existing natural characteristics of the property and surrounding area such as steep slopes, waterways, shade, and significant vegetation and landforms. Staff Finding Staff believes the units have been appropriately clustered in the lower portions of the lot. However, the geologic report will be important to determining whether the proposed free market town homes on the slopes at the rear of the property are compatible with the site's existing natural characteristics. Staff will address the compatibility with existing natural characteristics of the property, and specifically address the steep slopes, underground water flow, and significant vegetation and landforms during the final review. d) Existing and proposed man-made characteristics of the property and the surrounding area such as noise, traffic, transit, pedestrian circulation, parking, and historical resources. Staff Finding Staff does not believe the properties dimensions will have an adverse affect on existing and proposed man-made characteristics of the property or on the surrounding area. The Colorado Midland Right -of -Way has been considered in the past as a historic resource, but not included on the City's inventory of historic sites and structures. The proposed site plan includes structures across the Right -of -Way. The dimensional requirements for pedestrian circulation are appropriate for the site. Pedestrian circulation is provided through the provision of two trails across the property, a new side walk along the property's frontage on West Hopkins Avenue, and paths between the affordable housing units and sidewalk. The proposed density on the site could generate between 60 and 120 automobile trips per day; many of those trips would likely be from the site to Main Street via 5th Street, thereby reducing the noise and traffic impact on the surrounding area. This issue will be further evaluated during the final review. Please see 1(a) above for the parking discussion. Staff believes adequate parking is being provided on -site. 2. The proposed dimensional requirements permit a scale, massing, and quantity of open space and site coverage appropriate and favorable to the character of the proposed PUD and of the surrounding area. Staff Findi.n The proposed scale and massing appear compatible with the surrounding area, as well as quantity of open space and site coverage. The specific dimensions will be identified and reviewed during the final review. As previously discussed, staff believes the proposed density, floor area, height, and open space are comparable to those of the neighborhood's multi -family buildings and lodges, particularly in relation to lot size. In addition, the proposed height of the structures preserves views from all neighboring properties and respects the scale of neighborhood buildings. Open space and site coverage on the lot also appear to be similar to the amounts provided on other neighborhood lots. According to the application, approximately 55% of the site will remain undeveloped. Staff will further study this issue during the final review, but believes that the conceptual dimensions permit scale, massing, and quantity of open space and site coverage appropriate for the site and neighborhood. 3. The appropriate number of off-street parking spaces shall be established based on the following considerations: a) The probable number of cars used by those using the proposed development including any non-residential land uses. b) The varying time periods of use, whenever joint use of common parking is proposed. c) The availability of public transit and other transportation facilities, including those for pedestrian access and/or the commitment to utilize automobile disincentive techniques in the proposed development. d) The proximity of the proposed development to the commercial core and general activity centers in the city. Staff Finding The Applicant is proposing 23 on -site covered parking spaces off of West Hopkins Avenue, and may provide additional on -site spaces if in a level area near the center of the property. The Applicant is proposing to provide two (2) spaces for each free market town home, and 15 parking spaces for the 11 affordable housing units. The Land Use Code requires Special Review to consider the provision of the affordable housing parking spaces; this review will occur during the final plan review. The Applicant's parking proposal exceeds the ratio of units to parking spaces on most other lodge and multi -family residential sites in the neighborhood, including the Boomerang Lodge, Christiania Lodge, Madsen Apartments, and Ullr Commons, and throughout the City. Staff believes the Applicant has proposed an adequate number of parking spaces for this site, which is located one-half block from public mass transit, adjacent to the pedestrian/bike way into town (West Hopkins Avenue), trails, and downtown. Off -site parking is also available along West Hopkins Avenue. 4. The maximum allowable density within a PUD may be reduced if there exists insufficient infrastructure capabilities. Specifically, the maximum density of a PUD may be reduced if: a) There is not sufficient water pressure, drainage capabilities, or other utilities to service the proposed development. b) There are not adequate roads to ensure fire protection, snow removal, and road maintenance to the proposed development. Staff Findinv The Applicants are not proposing to develop the site at the maximum allowable density under the AH/PUD Zone District. 5. The maximum allowable density within a PUD may be reduced if there exists natural hazards or critical natural site features. Specifically, the maximum density of a PUD may be reduced if: a) The land is not suitable for the proposed development because of ground instability or the possibility of mud flow, rock falls or avalanche dangers. b) The effects of the proposed development are detrimental to the natural watershed, due to runoff, drainage, soil erosion, and consequent water pollution. c) The proposed development will have a pernicious effect on air quality in the surrounding area and the City. d) The design and location of any proposed structure, road, driveway, or trail in the proposed development is not compatible with the terrain or causes harmful disturbance to critical natural features of the site. Staff Finding At this time, Staff does not recommend reducing the allowable density within the PUD. Geologic reports of the site must be submitted in the final application to determine the density impact on the site; the final review will specifically address the impact of natural hazards on the site such as snowslides, rock fall, and underground water flow, as well as the density impact on critical natural site features. 6. The maximum allowable density within a PUD may be increased if there exists a significant community goal to be achieved through such increase and the development pattern is compatible with its surrounding development patterns and with the site's physical constraints. Specifically, the maximum density of a PUD may be increased if: a) The increase in density serves one or more goals of the community as expressed in the Aspen Area Community Plan (AACP) or a specific area plan to which the property is subject. b) The site's physical capabilities can accommodate additional density and there exists no negative physical characteristics of the site, as identified in subparagraphs 4 and 5, above, those areas can be avoided, or those characteristics mitigated. c) The increase in maximum density results in a development pattern compatible with, and complimentary to, the surrounding existing and expected development pattern, land uses, and characteristics. Staff Finding The applicant is not requesting an increase in density beyond what is allowed within the PUD. C. Site Design. The purpose of this standard is to ensure the PUD enhances public spaces, is complimentary to the site's natural and man-made features and the adjacent public spaces, and ensures the public's health and safety. The proposed development shall comply with the following: 1. Existing natural or man-made features of the site which are unique, provide visual interest or a specific reference to the past, or contribute to the identity of the town are preserved or enhanced in an appropriate manner. Staff Finding The proposed development appears to comply with the natural features of the site to the greatest extent possible. The final review will include a geologic report that may confirm or contradict this finding. Notable site features include steep slopes and dense vegetation, but these features are avoided to the greatest extent possible. The Colorado Midland Right -of -Way provides a specific reference to the past and contributes to the identity of the town, but is not on the list of historic sites and structures. In addition, this Right -of -Way crosses through the middle of the property and would be difficult to avoid in any affordable housing project. Part of the base of Shadow Mountain is located on this property, which is unique, provides visual interest, and contributes to the identify of the town. Staff believes that the site plan respects the natural features of the mountain in an appropriate manner. 2. Structures have been clustered to appropriately preserve significant open spaces and vistas. Staff Fi.ndin Staff believes the structures have been clustered to appropriately preserve significant open spaces and vistas. Vistas would be preserved by limiting height to 21 feet for the building fronting West Hopkins, 25 feet for the middle structure, and 30 feet for the structure at the rear of the development. The free market units span across the rear of the property, but in a town house configuration that preserves additional open space that could have been consumed by detached residences. Staff believes this criterion has been met. 3. Structures are appropriately oriented to public streets, contribute to the urban or rural context where appropriate, and provide visual interest and engagement of vehicular and pedestrian movement. Staff Finding Staff believes the structures are appropriately oriented to West Hopkins Avenue and 5tn Street. The affordable housing buildings are parallel to the street and contribute to the urban context of the neighborhood. The free market units are designed to blend into the side of Shadow Mountain and contribute to the rural context of the mountain and trails. The modern architecture should provide visual interest and engagement of vehicular and pedestrian movement, especially as it represents a completely different style than that of the approved Boomerang Lodge expansion. Staff believes this criterion has been met. 4. Buildings and access ways are- appropriately arranged to allow emergency and service vehicle access. Staff Finding Access to the property is from West Hopkins Avenue. Staff believes the dimensions of the proposed access are appropriate for the site. The Aspen Fire Marshall has reserved comment on the access until the City has received a final application, but believes. that the proposed site plan provides adequate emergency access to the site. The Applicant conducted preliminary discussions with the Fire Marshall. During these discussions, it was determined that a minimum of a 16- foot wide access must be provided to accommodate fire trucks with at least a 25-foot turning radii at the entrance and 31-feet by the free market units. A condition of approval is that the Aspen Fire Marshall shall approve emergency access to the property prior to the issuance of a building permit. A second, related condition of approval is that the buildings be sprinkled and equipped with fire alarms, which the Applicant has agreed to include. Staff believes the dimensional requirements have been met. 5. Adequate pedestrian and handicapped access is provided. Staff Finding Pedestrian and handicapped access will be provided via a proposed new sidewalk along West Hopkins, paths connecting the affordable housing units to West Hopkins, as well as a trail beside the driveway. The revised application proposes one ground level affordable housing unit, which would be ADA accessible. Staff believes this criterion has been met. 6. Site drainage is accommodated for the proposed development in a practical and reasonable manner and shall not negatively impact surrounding properties. Staff Findi.na A condition of approval is that a drainage plan, including an erosion control plan, prepared by a Colorado licensed Civil Engineer which maintains sediment and debris on -site during and after construction, be approved by the City's Engineering Department prior to the issuance of building permits. If a ground recharge system is required, a soil percolation report will be required to correctly size the facility. A 2-year storm frequency should be used in designing any drainage improvements. The City drainage criteria needs to be implemented. 7. For non-residential land uses, spaces between buildings are appropriately designed to accommodate any programmatic functions associated with the use. Staff Finding This is a residential land use. D. Landscape Flan. The purpose of this standard is to ensure compatibility of the proposed landscape with the visual character of the city, with surrounding parcels, and with existing and proposed features of the subject property. The proposed development shall comply with the following: 1. The landscape plan exhibits a well designated treatment of exterior spaces, preserves existing significant vegetation, and provides an ample quantity and variety of ornamental plant species suitable for the Aspen area climate. 2. Significant existing natural and man-made site features, which provide uniqueness and interest in the landscape, are preserved or enhanced in an appropriate manner. 3. The proposed method of protecting existing vegetation and other landscape features is appropriate. Staff Finding According to the application, landscaping will preserve existing on -site vegetation in the rear, native shrubs (lilac, serviceberry, honeysuckle) in the middle of the lot, and traditional street trees (cottonwood and crabapple) along the street right-of-way. The plantings are designed to contribute to the urban fabric of the neighborhood at the front of the site and native vegetation at the rear. A landscape plan will be required for review as part of the final application. This plan must comply with the Housing Authority's recommendations concerning landscaping to deem this project "exceptional." E. Architectural Character. It is the purpose of this standard is to encourage architectural interest, variety, character, and visual identity in the proposed development and within the City while promoting efficient use of resources. Architectural character is based upon the suitability of a building for its purposes, legibility of the building's use, the building's proposed massing, proportion, scale, orientation to public spaces and other buildings, use of materials, and other attributes which may significantly represent the character of the proposed development. There shall be approved as part of the final development plan an architectural character plan, which adequately depicts the character of the proposed development. The proposed architecture of the development shall: 1. Be compatible with or enhance the visual character of the city, appropriately relate to existing and proposed architecture of the property, represent a character suitable for, and indicative of, the intended use, and respect the scale and massing of nearby historical and cultural resources. Staff Finding Staff believes the architectural character of the proposed buildings will enhance the visual character of the City, appropriately relate to the existing architecture of the neighborhood, and represent a character suitable for the location at the base of the mountain. The architectural style incorporates features similar to the Boomerang Lodge and Madsen apartments such as low horizontal rooflines and balconies. The low staggered roof heights — lower at the street level and increasing toward the rear of the property — will preserve views of Shadow Mountain while providing quality living space for the residents. Specific architectural character will be reviewed during the final review of this project. 2. Incorporate, to the extent practical, natural heating and cooling by taking advantage of the property's solar access, shade, and vegetation and by use of non- or less -intensive mechanical systems. Staff Finding It is difficult for the property to incorporate any natural heating because of its location at the base of Shadow Mountain; similarly, natural cooling is accomplished by the shade provided by the mountain. According to the application, all units will use highly efficient radiant heat with highly rated efficient boilers. Walls and roofs will be well insulated and sealed. And, ample windows will increase the use of natural over artificial light. The project must also comply with the Housing Authority's recommendations to implement Green Development Practices to be deemed an "exceptional" project. This is included as a condition of approval. 3. Accommodate the storage and shedding of snow, ice, and water in a safe and appropriate manner that does not require significant maintenance. Staff Finding According to the Applicant, adequate room has been provided for snow plowing and snow storage on site. The flat roofs will not shed snow or water. This criterion will be reviewed during the final review when detailed plans are submitted and reviewed by the City Engineer. P. Lighting. The purpose of this standard is to ensure the exterior of the development will be lighted in an appropriate manner considering both public safety and general aesthetic concerns. The following standards shall be accomplished: 1. All lighting is proposed so as to prevent direct glare or hazardous interference of any kind to adjoining streets or lands. Lighting of site features, structures, and access ways is proposed in an appropriate manner. 2. All exterior lighting shall be in compliance with the Outdoor Lighting Standards unless otherwise approved and noted in the final PUD documents. Up -lighting of site features, buildings, landscape elements, and lighting to call inordinate attention to the property is prohibited for residential development. Staff Finding All new lighting for the proposed residence must be in compliance with the City's lighting code adopted in November 1999 and Uniform Building Code for safety. A lighting plan must be submitted with the final PUD application. According to the application, glare from lighting will be minimized through the use of shades and other screening devices. In exterior lighting will utilize shielded, down -directional fixtures to minimize impact on the trails and sidewalks in the area and Shadow Mountain. G. Common Park, Open ,Space, or Recreation Area. If the proposed development includes a common park, open space, or recreation area for the mutual benefit of all development in the proposed PUD, the following criteria shall be met: 1. The proposed amount, location, and design of the common park, open space, or recreation area enhances the character of the proposed development, considering existing and proposed structures and natural landscape features of the property, provides visual relief to the property's built form, and is available to the mutual benefit of the various land uses and property users of the PUD. Staff Finding No common park or dedicated open space is included in this application for this lot. However, the Applicant proposes to retain 55 % of the site as undeveloped open space. In addition, Applicant plans to maintain the native vegetation on the steep slopes at the rear of the property, replant native vegetation in the middle of the site and traditional street trees in the right of way. Common areas are located around and between the structures as well as on the hillside behind the free market units. Preserving the hillside in its natural state to the greatest extent possible will continue to provide visual relief to residents of this site and the surrounding area, as well as lodge visitors staying in the immediate area. 2. A proportionate, undivided interest in all common park and recreation areas is deeded in perpetuity (not for a number of years) to each lot or dwelling unit owner within the PUD or ownership is proposed in a similar manner. Staff Finding According to the Application, a proportionate interest in the common areas will be deeded in perpetuity to the dwelling unit owners on each lot within the site. 3. There is proposed an adequate assurance through a legal instrument for the permanent care and maintenance of open spaces, recreation areas, and shared facilities together with a deed restriction against future residential, commercial, or industrial development. Staff Finding The Applicant has committed to provide adequate assurances for the permanent care and maintenance of open spaces and other shared facilities on the property through protective covenants or other legal means acceptable to the City of Aspen. H. Utilities and Public facilities. The purpose of this standard is to ensure the development does not impose an undue burden on the City's infrastructure capabilities and that the public does not incur an unjustified financial burden. The proposed utilities and public facilities associated with the development shall comply with the following: 1. Adequate public infrastructure facilities exist to accommodate the development. Staff Finding All appropriate utility agencies and the City Engineer were referenced on this application and reported the ability to serve this project. 2. Adverse impacts on public infrastructure by the development will be mitigated by the necessary improvements at the sole cost of the developer. Staff Finding Staff recommends a condition of approval be that the owner(s) mitigate any public impacts that this project causes, including but not limited to utility expenses and sanitary sewer and water lines. 3. Oversized utilities, public facilities, or site improvements are provided appropriately and where the developer is reimbursed proportionately for the additional improvement. Staff Findinfy It has not yet been determine whether oversized utility stubs will be required for this project; this decision will be made during the final review. I. Access and Circulation. The purpose of this standard is to ensure the development is easily accessible, does not unduly burden the surrounding road network, provides adequate pedestrian and recreational trail facilities and minimizes the use of security gates. The proposed access and circulation of the development shall meet the following criteria: 1. Each lot, -structure, or other land use within the PUD has adequate access to a public street either directly or through an approved private road, a pedestrian way, or other area dedicated to public or private use. Staff Finding One driveway is proposed for vehicular and emergency access from West Hopkins Avenue at the east end of the parcel. The proposed access appears to be meet Municipal Code dimensional requirements, including a 16-foot width to allow emergency vehicle access to the property with turning radii of 25 feet and 31 feet at the appropriate locations. However, the location of the access along the east property line is not adequate, according to City Engineer Nick Adeh. Mr. Adeh strongly recommends that the access be aligned with 5th Street for safety reasons. According to Mr. Adeh, driveways that serve five (5) or more residential units must be designed to function as a minor residential road because of traffic volumes serving the property. He contends that minor residential r6ads must either be aligned with an intersection or located 200 feet from an intersection. Because the property's frontage is less than 200 feet, Mr. Adeh recommends that the driveway be aligned with 5th Street. In addition, the Entrance to Aspen Plan includes placing stop lights at 7th Street, 5th Street, and 3rd Street, and street closures at 7th Street, 61h Street, and 41h Street, as shown in Exhibit C. Therefore, limited vehicular access between Main Street and West Hopkins Avenue at 7th, 6th, and 4th Streets, will cause an increase in traffic impacts on 5th Street, particularly at the 5th Street and West Hopkins Avenue intersection. Community Development Staff does not share the concern to the same degree as the City Engineer because West Hopkins is expected to continue to only serve the local neighborhood and not serve as a thru street. Community Development Staff and the City Engineer agree that the driveway should not be relocated to run along the west property line because of the potential for increased conflicts with pedestrians. Staff seeks the Planning and Zoning Commission's direction on how to guide the Applicant to arranye the access for the final plan review. In addition to vehicular access to the site, pedestrian and bicycle access would be provided on a trail parallel to the driveway. In addition, a sidewalk along W. Hopkins Avenue would provide pedestrian access across the front of the property. And, each affordable housing unit fronting West Hopkins Avenue would connect to the street via a path from the front door to the sidewalk. 2. The proposed development, vehicular access points, and parking arrangement do not create traffic congestion on the roads surrounding the proposed development, or such surrounding roads ,are proposed to be improved to accommodate the development. Staff Finding Staff does not believe that the proposed development, access roads, and parking arrangement will create traffic congestion on the roads surrounding the site. As previously stated in B(3) above, staff believes that adequate parking is being provided on site and out of public view to avoid congestion. Only one access will further limit traffic congestion and conflicts in the neighborhood. Staff believes, many residential trips to and from the property will be by alternative transportation — bus, bike, or on foot — because of the site's close proximity to downtown, further reducing traffic congestion in and around the area. The Applicant has not provided a traffic study for this proposal; instead, the Applicant proposes to complete a study if the project receives conceptual approval and then submit a traffic study with the final PUD application. Staff concludes that due to the site's proximity to downtown, transit, trails, and community amenities, traffic generation from this project may not reach as high as 120 trips per day. 3. Areas of historic pedestrian or recreational trail use, improvements of, or connections to, the bicycle and pedestrian trail system, and adequate access to significant public lands and the rivers are provided through dedicated public trail easements and are proposed for appropriate improvements and maintenance. Staff Finding A historic pedestrian and recreation trail exists through the property, providing access to a trail system along Shadow Mountain and to Aspen Mountain. The trail currently enters the property from the east behind the Boomerang expansion site, and then continues through the site to its end at the 5tn Street/West Hopkins Avenue intersection. The proposal is to keep this trail in a modified form, as well as to provide a second trail higher up on Shadow Mountain behind the free market units. The Parks Department is supportive of this conceptual trail alignment. The Applicant and the City Parks Department are working out the details of two trails crossing the property. A condition of approval is that this trail become a dedicated public trail. 4. The recommendations of the Aspen Area Community Plan and adopted specific plans regarding recreational trails, pedestrian and bicycle paths, and transportation are proposed to be implemented in an appropriate manner. Staff Finding Based on the Parks Department's recommendations at the conceptual review, Staff believes the AACP's recommendations would be implemented in an appropriate manner with this project. 5. Streets in the PUD which are proposed or recommended to be retained under private ownership provide appropriate dedication to public use to ensure appropriate public and emergency access. Staff Finding The PUD only proposes a driveway for private and public emergency service access, not public use. 6. Security gates, guard posts, or other entryway expressions for the PUD, or for lots within the PUD, are minimized to the extent practical. Staff Finding No security gates or guard posts are proposed. J. Phasing of Development Plan. (does not apply to Conceptual PUD applications) The purpose of this criteria is to ensure partially completed projects do not create an unnecessary burden on the public or surrounding property owners and impacts of an individual phase are mitigated adequately. If phasing of the development plan is proposed, each phase shall be defined in the adopted final PUD development plan. The phasing plan shall comply with the following: 1. All phases, including the initial phase, shall be designed to function as a complete development and shall not be reliant on subsequent phases. 2. The phasing plan describes physical areas insulating, to the extent practical, occupants of initial phases from the construction of later phases. 3. The proposed phasing plan ensures the necessary or proportionate improvements to public facilities, payment of impact fees and fees - in -lieu, construction of any facilities to be used jointly by residents of the PUD, construction of any required affordable housing, and any mitigation measures are realized concurrent or prior to the respective impacts associated with the phase. Staff Finding Phasing will be reviewed as part of the final application. MEMORANDUM TO: Nick Lelack FROM: Cindy Christensen DATE: December 7, 2000 RE: NEW WE5T HOPKIN5 AVENUE HOUSING PROJECT ISSUE: The applicants are Aspen GK, LLC and Burton B. Kaplan. The applicants revised their application and have proposed a to construct a multi -family project of eleven (11) affordable housing units and four (4) free-market dwelling units. BACKGROUND: The site is presently undeveloped, although in the late 1800's, a number of miner's cottages were located on the property. The site is located across Hopkins Avenue from the Boomerang Lodge and the Madsen Apartments. The expansion proposal for the Boomerang Lodge, which was recently granted City approval, is on a site adjacent to and to the east of this proposal. A third contiguous parcel of 1,616 square feet, located in the County and owned by Peter L. Gluck, is being omitted from this application because of a Code technicality. This is not subject to the Housing Board's review. The Board will need to make a recommendation to the City Council on this project. The recommendation will be based on mitigation requirements, unit mix, unit size, categories of the units, and overall layout of the project. The initial application required approval to waive the 70/30 mix as it was only a 60/40 project and in order to waive the 70/30 AH/PUD requirement, the project had to be specified as an exemplary project. The applicant revised the project to contain studios, one bedroom units and two - bedroom units. The applicant is proposing the following categories and mix of units. The table includes the number of units, the category associated with the number of bedrooms, the square footage of the proposed units, and the minimum square footage for the bedroom and category of that unit. No. Category No. of Bedrooms Sq. Footage Min. Sq. Ft. 4 4 three -bedrooms 1,200 11200 1 2 two -bedrooms 956 850 2 3 two -bedrooms 956 950 2 1 one -bedroom 685 600 2 2 studios 475 400 2 Free -Market three -bedrooms 31711 & 3,964 2 Free -Market f our -bedrooms 4,380 41439 The revised total number of units is 15 - 11 deed restricted and 4 free market. This calculates to 73% affordable housing units and 27% free-market units. The bedroom mix, however, is still under the 70%/30% requirement as stated in Section 26.710.110, Affordable Housing/Planned Unit Development (AH/PUD) The revised bedroom mix f or the project contains a total of 36 bedrooms - 22 deed restricted and 14 free-market. This calculates to 61% affordable and 39% free-market. Section 26.710.110 states that a minimum of 70% of the pro ject's total bedrooms shall be deed restricted affordable housing consistent with the Affordable Housing -- Guidelines.. A project may be eligible for a reduction of the minimum affordable housing bedroom mix requirement to a level of 60% of the pro ject's total bedrooms if the applicant can demonstrate to the satisfaction of the City Council that the project meets the requirements for an exceptional project as set forth in the Affordable Housing Guidelines. Is this an exemplary project? There are eight standards stated in the 2000 Guidelines that should be considered by City Council in making a determination regarding the appropriateness of exemplary status for a project. All eight standards must be "satisfactorily met." They are as follows, with the applicant's response: 1. "The quality of the proposed development substantially exceeds that established in the minimum threshold for the scoring established in the GMQ5 Scoring section of the Aspen Municipal Code. " 0 Revitalizing the permanent community. Adding eleven affordable housing units for qualified employees by providing high -quality, on -site affordable housing. Providing site -appropriate mixing of free market and affordable housing for efficient provisions of services such as transit, and for discouraging site planning that segregates affordable and free market units. The free- market units are sited in close proximity to the affordable housing units. The owners of the free market units and affordable housing units will be governed by separate homeowners' associations and will retain ownership of the land within their lot in common with the other owners separate and apart from the owners of the free-market units. Providing transportation alternatives. The site's proximity to the commercial core and essential shopping and services should allow for walking. Also, a new store is being built in the 7th and Main project that could also accommodate this project. There is also a provision of a public trail easement through the property to encourage year-round pedestrian transportation. The applicant also states that they are willing to provide seasonal bus passes, upon request, to any full-time employee of the Homeowners' Association for the free market lot by the Association at no cost to that employee. Promoting environmentally sustainable development. The natural environment is one of the community's greatest assets. The site is shaded by Shadow Mountain, which makes solar heating impractical. However, all units will use highly efficient radiant heat with highly rated efficient boilers. Promoting community -recycling efforts. The applicant is proposing to provide recycling containers on the property. Maintaining design quality, historic compatibility and community character. Entry porches have been incorporated into the design of the north elevation of the affordable housing units that are closest to West Hopkins. The organization of the units also promotes neighborly outdoor use. - The affordable housing units are organized to form a paved communal courtyard where communal cohesion can occur. 3 2 . "The proposal maximizes affordability, consistent with housing needs established as priority through these Guidelines. " A I I of the eleven units are to be category units. 3. "The proposal integrates a mixture of economic levels and housing for a variety of lifestyles (e.g., singles, seniors and families). " The affordable housing units will be restricted to a range of income restrictions and will be equally available to singles, seniors and families who qualify under the Guidelines. The revised project contains studios, one, two and three -bedroom units. The revised project also covers all the category mix - 1 through 4. 4. "The proposal minimizes impacts on infrastructure by incorporating innovative, energy -saving site design, structural design characteristics or other techniques that minimize the use of water, heating and sewage disposal. " The proposal will comply with the City's building code in effect at the time of construction, and does include energy efficient heating systems and on -site recycling. 5. "the proposal incorporates or integrates with an existing local based economy (i. e. , sustainable local businesses). " The eleven units are to house a portion of the workforce, which supports the existing local -based economy. 6. "7-he proposal accomplishes a level of design and site plan ingenuity that advances the community goals expressed in the Aspen Area Community Plan. " The proposal's design and site plan characteristics intended to advance the community goals as expressed in the Aspen Area Community Plan and discussed on page 27 of the application. 7. "The proposed project represents an exceptional commitment to advancing the visions, goals, and specific action items of the Aspen Area Community Plan, particularly those addressed in the scoring criteria under the Growth Management Quota System as stated in the City of Aspen Municipal Code. " The applicants believe that the proposed project represents an exceptional commitment to advancing the visions, goals and specific action 0 items of the Aspen Area Community Plan and discussed on page 39 of the application. 8. 'No RO units are included in the project; only category units are included in the project. " The applicant is proposing Category 1, 2, 3 and 4 units. Staff concurs that 5tandards 1, 21 31 51 6, 7 and 8 have been satisf ied. The applicant has also provided a memo regarding the sustainability issue in 5taindard #4. As long as the attached "green Development Strategies to be Implemented' is implemented, and the applicant has explored the other ideas stated in the "49reen Development Ideas to be Investigated, Standard #4 has been satisfied Another positive aspect of the project is that 'it is presently anticipated that separate homeowners' associations will be created for the owners on each of the two proposed lots and that the owners will retain an undivided interest in the land on each of the lots. This is a plus on the affordable housing side as they can deal with costs associated with their deed restricted units, and not with additional items that can be added by the free-market owners. RECOMMENDATION: The Housing Board met on this project December 6, 2000. At that meeting, the Board recommended approval of the project as an exemplary project, as long as the attached "Green Development Strategies to ,be Implemented' is implemented. The revised proposal meets the needs of a mixed project and a greater number of households in the community would qualify for this project. The Board also approved the type of units and the category of the units as specified in the chart above. cic:h\word\referral\nwhopkinsproj.doc 5 DEC. 7.2000 12:48PM ASPEN HOUSING OFC NO.304 P.7 Green Development Strategies to be Implemented: 1. Use of Gas Log ,Appliances. Pollution reduction and energy conservation. Z. Occupant Recyclin Areas for Glass, meta plastic and newspaper. 3, waste Management Plan. Identify ways to recycle materials where possible, and minimize trips to the landfill, including separate dump containers for wood and other re potential clables. p cY 4. Oestrat fication Fan systems. Fans recycle hot air at roof and recirculate to living areas to decrease heating loads. I Attic Fan systems. Naturally ventilate building, reducing need for air conditioning from solar gain. b. Comply or exceed energy code requirements. 7. Landscaping. Utilize native vegetation to reduce water use. S. Bike storage areas. 9. Trail. To be made permanent fixture of town system by wary of easement. 10, Erosion control. Measures specified by licensed geotechnical engineer to minimize damage to vegetation and ground stability. 11. Site Preservation and Resoratipn. Topsoil to be preserved for re -use in areas of disturbance. Site disturbance limited, Intensive restoration plan to insure proper re -growth and stabilization of disturbed areas. DEC. 7.2000 12:49PM ASPEN HOUSING OFC NO.304 P.e Green Development Ideas to be Investigated; 1. Building Commission in . Balance and performance -deck all building mechanical systems for proper functioning. Proper balancing can significantly reduce energy consumption. .Applieab' 'ty to our pro)ect has to do with whether we use anyforced-airsY sterns. 2. Asbestos -free building. Use products free of asbestos products or that comply with OSHA standards, part 1926. 3. CC -free building products, including refrigeration systems and carpeting. 4. Recycled Materials. Use of recycled materials where possible, a. Trex decking material. b. Carpets that are CFC-free. c. Use renewable products —cork, bamboo, etc, 5. Building Materials. Adhesives, sealants and paints used art the building are all low or no " VOC" products (volatile organic compounds). ®. Water Conservation. Use water -conserving fixtures in all buildings. Lead free plumbing fixtures. 7. Certified wood products, Implementation would require efficient ordering (i.e. full truckloads), and capability to store material on site. There might be a way to team up with the city of Aspen affordable housing projects and make a certified wood `store' somewhere in town, If this could be clone, price for products might only be 10 percent upeharge over traditional material. 8. Human Comfort. Comply with ASHRAE standards for human comfort. 9. Energy Efficient lighting. Complete EPA's Green Lights Program or California's Title 2.4 lighting requirements. 10. Light Pollution. Reduce light pollution with certain fixture types only. 11. Indoor Air Quality. Comply with Ashrae Standard 62-1989 with the provison that the ambient air quality standard requirements shall be site -specific and not region -specific (air quality at the proposed point of fresh air intake), Building fresh air intake shall be located away from loading areas, building exhaust fans, cooling towers and other point sources of contamination. DEC. 7.2000 12:49PM ASPEN HOUSING OFC NO.304 P.9-"� 12. Construction Air Quality Plan. Guidelines for the use of the bUuilftg's mechanical system during construction would be followed to avoid contamination and to provide for clean ventilation pathway for occupancy, Palters used during construction to be replaced prior to occupancy. MEMORANDUM To: Nick Lelack, Community Development Department From: Lee Cassin, City Environmental Health Department Date: November 30, 2000 Re: NEW West Hopkins Ave. Housing Project Parcel ID #2735-1... The City of Aspen Environmental Health Department has reviewed the land use submittal under authority of the Municipal Code of the City of Aspen, and has the following comments. SEWAGE TREATMENT AND COLLECTION: Section 11-1.7 "It shall be unlawful for the owner or occupant of any building used for residence or business purposes within the city to construct or reconstruct an on - site sewage disposal device." The plans to provide wastewater disposal for this project through the central collection lines of the Aspen Consolidated Sanitation District (ACSD) meet the requirements of this department. The site has an old abandoned septic system that recently served a restaurant. The contents of a septic tank, vault, or seepage pit, the use of which has been terminated, must be properly disposed of. Then the emptied tank, vault, or pit must be filled with soil or rock, or the County Environmental Health Department may require the tank or vault to be removed and disposed of properly. A condition of approval should be that the applicants comply with County Environmental Health Department requirements for abandonment of the system and properly disposing of waste material. ADEQUATE PROVISIONS FOR WATER NEEDS: Section 23-55 "All buildings, structures, facilities, parks, or the like within the city limits which use water shall be connected to the municipal water utility system." The provision of potable water from the City of Aspen system is consistent with Environmental Health policies ensuring the supply of safe water. The City of Aspen water supply meets all standards of the Colorado Department of Health for drinking water quality. A letter of agreement to serve the project must be provided. WATER QUALITY IMPACTS: Section 11-1.3 "For the purpose of maintaining and protecting its municipal water supply from injury and pollution, the city shall exercise regulatory and supervisory jurisdiction within the incorporated limits of the City of Aspen and over all streams and sources contributing to municipal water supplies for a distance of five (5) miles above the points from which municipal water supplies are diverted." A drainage plan to mitigate the water quality impacts from drive and parking areas will be evaluated by the City Engineer. AIR QUALITY: Sections 11-2.1 "It is the purpose of [the air quality section of the Municipal Code] to achieve the maximum practical degree of air purity possible by requiring the use of all available practical methods and techniques to control, prevent and reduce air pollution throughout the city..." The Land Use Regulations seek to "lessen congestion" and "avoid transportation demands that cannot be met" as well as to "provide clean air by protecting the natural air sheds and reducing pollutants". The major air quality impact is the emissions resulting from the traffic generated by this project. PM-10 (83 % of which comes from traffic driving on paved roads) is a significant health concern in Aspen. The traffic generated will also produce carbon monoxide and other emissions that are health concerns. The municipal code requires developments to achieve the maximum practical degree of air purity by using all available practical methods to reduce pollution. The applicant needs to implement measures that will minimize traffic increases of the development, or offset the emissions from the project with PM10 reduction measures elsewhere. Standards used for trips generated by new development are the trip generation rates and reductions from the 'Pitkin County Road Standards' which are based on the Institute of Transportation Engineers Trip Generation Report, Fifth Edition. Housing units use the trip generation rate for ITE Land Use code 210, which is 9.55 trips per day per unit. Residential units located within one half mile of a transit stop are allowed a reduction of 1.5 trips per day. The project would generate 105 trips/ day without any reductions, and would generate 88 trips/ day with the reduction for its location within 1/2 mile of transit. This site is ideally located close to mass transit so vehicles would not be needed for shopping or skiing. This is a significant number of trips given the air pollution problems the community has been dealing with for the last thirty years, the vast majority of which comes from cars. Additional measures are required to mitigate these trips to comply with the requirements of the Municipal Code. Since this project is partly affordable housing, we recognize the need to limit costs, so we recommend the applicant consider additional measures from the list below, many of which have low or no cost to the applicants. As an example, some of the market incentives cost the applicant nothing and could provide a significant financial benefit to single parents and families trying to purchase an affordable unit. Mitigation measures proposed by the applicant are provision of seasonal bus passes to employees, and provision of secure bicycle parking and lockers at the affordable housing lots. These facilities should be provided prior to issuance of a CO. The applicant also proposes to provide a legal easement for the pedestrian/bike trail across the property that has been used historically. The applicant�proposes two parking spaces/unit. It would be desirable if the applicants believe there will be very few trips, to provide long-term car storage instead of this number of spaces onsite, but it is beneficial that additional spaces are not provided. Examples of mitigation measures that have been employed in the past by developers include providing carpool/vanpool financial incentives to employees, providing free bus passes, providing vanpools, providing dial -a -ride service, paying for additional RFTA buses and service, providing private bus service for employees, limiting parking, allowing residents to pay for parking spaces if they choose and giving discounts to those who don't, having homeowners association fees on a sliding scale depending on the number of cars, providing connecting bike path links in populated areas, plowing bike paths in populated areas, paving dirt shoulders or high -use parking lots, providing covered and secure bike storage, providing free bike fleets for residents, building sidewalks to adjacent commercial areas, donating connecting bike path links, and other measures. Whatever combination of measures the applicant chooses to mitigate PM-10 emissions and trips generated, is acceptable as long as it prevents additional traffic that would significantly impact air quality. The City Environmental Health Department has no preference for which trip reduction measures are used, and typically an applicant chooses measures that provide an ancillary benefit to the project. It is very important for the City's efforts to provide easy bicycle/pedestrian access throughout town, to maintain the West Hopkins Pedestrian/ Bikeway. With additional development along this corridor, there could be pressure to open this street to vehicle through -traffic. It is hoped that the applicants will work to ensure this street continues to serve as a connecting bicycle/ pedestrian link. The separate trail easement and trail are an added amenity, as is the easement for continued pedestrian/bike use of the old railroad right of way trail. A condition of approval should be that the applicant develop additional traffic reduction measures for the project prior to detailed submission, in order to comply with code requirements. The applicant should work with the Environmental Health Department to determine whether the measures are sufficient. FIREPLACE/WOODSTOVE PERMITS The applicant commits to installation of gas fireplace appliances and to no woodstoves or gas log fireplaces. This will prevent the emissions that would occur if woodstoves were used, or if gas log fireplaces were installed and used with wood by owners unaware of city and county regulations. FUGITIVE DUST A fugitive dust control plan is required which includes, but is not limited to fencing, watering of dirt roads and disturbed areas, daily or more frequent cleaning of adjacent paved roads to remove mud that has been carried out, speed limits, or other measures necessary to prevent windblown dust from crossing the property line or causing a nuisance. Dust control will be crucial due to the closeness of existing homes to the site. CARPORTS The applicant must consult with an engineering firm about design of the carport parking ventilation system to ensure that ventilation is adequate to prevent carbon monoxide from reaching high levels inside the carports or in the units above them. This is a concern because the carports are under overhanging units with bedrooms immediately above the parking spots, so that fumes might collect beneath sleeping areas in areas where air circulation is poor. An engineer who specializes in design of heating and ventilation systems must certify that the proposed design will prevent excessive levels of carbon monoxide from concentrating inside the carports or in buildings above. ECOLOGICAL BILL OF RIGHTS The only energy efficiency feature appears to be use of efficient boilers. The applicant should use other inexpensive options and we recommend they contact the CORE office for assistance. We recommend the applicant amend the provision related to recycling to state that the containers will be maintained as long as public or private pickup services are available. We recommend the applicant specify that facilities will be provided for recycling of at least cardboard, glass, plastic, cans, office paper, newspaper and magazines. We encourage the applicants to also provide a backyard composting facility for use by the complex. The applicant could make this a project that is a model of goals contained in the Ecological Bill of Rights at minimal cost to the project. Recycled -material decking could be used, compact fluorescent or other high -efficiency lights could be used outside (and inside), setback thermostats could be provided, low -flow faucet fixtures could be provided... the list is endless, but we encourage the applicant to incorporate some of these or other features. NOISE ABATEMENT: Section 16-1 'The city council finds and declares that noise is a significant source of environmental pollution that represents a present and increasing threat to the public peace and to the health, safety and welfare of the residents of the City of Aspen and it its visitors ...... Accordingly, it is the policy of council to provide standards for permissible noise levels in various areas and manners and at various times and to prohibit noise in excess of those levels." During construction, noise can not exceed maximum permissible sound level standards, and construction cannot be done except between the hours of 7 a.m. and 7 p.m., Monday through Saturday. No construction is allowed on Sundays. It is very likely that noise generated during the construction phase of this project will have some negative impact on the neighborhood. The applicant should be aware of this and take measures to minimize the predicted high noise levels. Lance Clarke, 03:02 PM 10/31/00 -0700, referral - West Hopkins Housing Page 1 of 1 X-Sender: lancec@comdev X-Mailer: QUALCOMM Windows Eudora Pro Version 4.2.2 Date: Tue, 31 Oct 2000 15:02:26 -0700 To: Nickl@ci.aspen.co.us From: Lance Clarke <lancec@ci.aspen.co.us> Subject: referral - West Hopkins Housing Nick- A few comments on the proposed annexation /rezoning/PUD: -It appears the development will infringe on 30% slopes. This would not be permitted were the property to be developed in Pitkin County. -This general area can be subject to rockfall hazard, avalanche hazard and slope instability. A geologic hazards analysis and proposed mitigation should be part of any review of this property for development. Printed for Nick Lelack <nickl@ci.aspen.co.us> 11/30/00 To: rncx LELAcx FROM: BEN DODGE a RE: TRAIL COIVIlVIENTS, KAPLAN PARCEL DATE: DECEMBER- 11, 2000 CC: REBECCA SCIUCKLING The City of Aspen Parks Department is strongly in favor of the lower trail alignment as indicated by the applicant. This trail will allow improved access to Hopkins Avenue from Koch Lumber Park and the Barbee Trail. We request that this trail match specifications of the existing trail from Koch Park to Fourth Street. The City of Aspen Parks Department would like to continue discussions .with the applicant in regards to another, upper trail alignment. This proposed alignment would be located on the southern end of the lot at an elevation ranging from approximately 7,964 feet to 7,996 feet, as indicated in Exhibit "A". The trail as indicated on this exhibit ranges in elevation from 7,974 to 7,986 feet: This indicated trail alignment is only a proposed alignment, intended to show the general area of trail alignment, and should not -be construed as necessarily being the precise, preferred, final alignment. The Parks Department would like to negotiate with the applicant towards obtaining an "as -built" easement for the final, preferred trail alignment. This proposed trail alignment is one of the missing segments of a trail along the side of Aspen and Shadow mountains that will eventually connect the eastern part of Aspen (Ute Trail) to the Castle Creek corridor (Marolt Pedestrian Bridge.) It is believed that this trail can be located such that it will not be perceived as an intrusion of the uppermost free-market homes. The trail would have a natural surface, be approximately four feet in width, and would be open to but not limited to pedestrians and bicyclists. There would be no motorized use of this trail, except for maintenance purposes by the City of Aspen Trails Department. We thank the' applicant for the continued cooperation in discussing these easement issues. MEMORANDUM To: Nick Lelack, Planner From: Ben Ludlow, Project Engineer Reference DRC Caseload Coordinator Date: November 9, 2000 Re: West Hopkins Avenue Housing The Development Review Committee has reviewed the Aspen GK, LLC West Hopkins Avenue Housing application at their October 25, 2000 meeting and has compiled the following comments: General Sufficiency of Submittal: DRC comments are based on the fact that we believe that the submitted site plan is conceptually accurate, that it shows all site features, and that it is feasible. The wording must be carried forward exactly as written unless prior consent is received from the Engineering Department. 2. R.O.W. Impacts: If there are any encroachments into the public rights -of -way, the encroachments must either be removed or are subject to current encroachment license requirements. Site Rpwiew 1. Site Drainage — Requirement — A drainage report was not submitted with the application. The site development approvals must include the requirement meeting runoff design standards of the Land Use Code at Sec. 26.580.020.A.6.a and a requirement that, prior to the building permit application, a drainage mitigation plan (24"x36" size plan sheet or on the lot grading plan) must meet the requirements of the Engineering Department Interim Design Standards and must be submitted for review and approval by the Engineering Department. The mitigation plan must also address the temporary sediment control and containment plan for the construction phase. If drywells are an acceptable solution for site drainage, a soils report must be provided with a percolation test to verify the feasibility of this type of system. Drywells have depths well below depth of frost (10' minimum) to function in cold weather. The drainage plan must contain a statement specifying the routine maintenance required by property owner(s) to ensure continued and proper performance. Drywells may not be placed within public right of way or utility easements. The foundation drainage system should be separate from storm drainage, must be detained and routed on site, and must be shown on drainage plans prior to application for building permit. The drainage may be conveyed to existing landscaped areas if the drainage report demonstrates that the percolation rate and the detention volume meet the design storm. Page 2 of 5 November 2, 2000 West Hopkins Avenue Housing Information — The City drainage criteria needs to be implemented. This includes but is not limited to erosion control, soil stabilization, and vegetation disturbance. Also, there needs to be an analysis of where the drainage will flow and what adverse affects may arise from potential mud and debris flow. 2. Fire Protection District — Requirement — As of the request of the Fire Protection District revisions need to be made as follows: a. There needs to be an access area large enough for a proper turnaround for emergency vehicles as required by AFPD. b. The building needs to be sprinkled pursuant to the Fire Code. c. A fire alarm system needs to be installed pursuant to the Fire Code. 3. Building Department — Requirement — The following requirement has been provided by the Building Department: a. The building is subject to the following: 97 UBC • 97 UMC 971PC • 97 NEC 97 APECC 4. Parking — Requirement — The following requirement has been provided by the Parking Department: _95 W1[QLlI� 5. Engineering Department — Requirement- The following requirements have been provided by the Engineering Department: a. The site is directly below the rockfall area as identified in the 1972 USGS map. This map also indicates potentially unstable slopes adjacent to the rockfall area. The applicant must develop a long-term hazard mitigation and containment plan to protect the proposed development. b. The entrance to the development must line up with 5th Street to avoid accident vehicular movement. 6. Streets Department — Requirement- As of the request of the Streets Department revisions need to be made as follows: a. The applicant shall not track mud onto City streets during demolition. A washed rock or other style mud rack must be installed during construction. 7. Housing Office — Information — The following information has been provided by the Housing Office: a. NONE Page 3 of 5 November 2, 2000 West Hopkins Avenue Housing 8. Community Development — Requirement — The following requirements have been provided by the Community Development Office: a. A neighborhood compatibility study needs to be verified. The project appears to have a massive density that is not a characteristic of the neighborhood. b. A housing office review on the bedroom mix needs to be completed. 9. Emergency Management Disaster Coordinator — Requirement - The following requirement has been provided by the Pitkin County Disaster Coordinator: E�I, [or, 10. Parks — Requirement- The following comments have been produced by the Parks Department: a. The applicant must implement a site visit regarding the trail reconfiguration and layouts. b. A trail easement that is currently in existence is not shown on the proposed site plan. c. The Parks Department needs a 5 foot buffer to accommodate snow storage and removal on each side of sidewalks and trails. d. The native areas must be treated with the Parks Department's recommended seed mix. 12. Utilities: A utility plan was not submitted with the application. For the utility departments to properly comment, a utility plan must be submitted. Water.• City Water Department - Requirement — As a request of the City of Aspen Water Department, revisions need to be made as follows: a. All uses and construction will comply with the City of Aspen Water System Standards and with Title 25 and applicable portions of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal code as they pertain to utilities. b. A water service agreement is required. c. Additional fees may be assessed based upon development and dedication of water rights. d. There needs to be a utility access easement of 10' on either side of the centerline of the driveway. e. The site layout needs to show individual unit metering and service. Wastewater: Aspen Consolidated Waste District - Requirement — As a request of the Consolidated Waste District, revisions need to be made as follows: Page 4 of 5 November 2, 2000 West Hopkins Avenue Housing a. Detailed plans including TV line inspections and wastewater line components need to be submitted to ACSD to assess fees before issuance of a building permit. b. The needs to be an easement for a sewer line that is a minimum of 20 feet wide. A total easement for water and wastewater shall be 30 feet wide. c. Landscaping plans must have enough details in order to avoid conflict with sewer lines including services. d. There needs to be detailed plans for the storm drainage system to verify potential conflicts with the sanitary system. - Electric: City Electric Department - Requirement — As a requirement of the City of Aspen Electric Department, revisions need to be made as follows: a. Street light upgrades may be needed pursuant to the City of Aspen Municipal Lighting Code. b. The location of transformers needs to be identified. c. Electrical loads need to be determined. Construction. Work in the Public Right of Way Requirement — Given the continuous problems of unapproved work and development in public rights -of -way adjacent to private property, we advise the applicant as follows: Approvals 1. Engineering: The applicant receives approval from the City Engineering Department (920-5080) for design of improvements, including grading, drainage, transportation/streets, landscaping, and encroachments within public right of way. 2. Parks: The applicant receives approval from the Parks Department (920- 5120) for vegetation species and for public trail disturbance. 3. Streets: The applicant receives approval from the Streets department (920-5130) for mailboxes, finished pavement, surface materials on streets, and alleyways. 4. Permits: Obtain R.O.W. permits for any work or development, involving street cuts and landscaping from the Engineering Department Page 5 of 5 November 2, 2000 West Hopkins Avenue Housing DRC Attendees: Applicant's Representative Nick Adeh Phil Overynder Tom Bracewell Denis Murray John Krueger Nick Lelack Ed VanWalraven Becca Schickling Joe Wells Aspen Consolidated sanitation District Sy Kelly ' Chairman Paul ;Smith * Treas y'Ticl-iael Ke y ecy November 9, 2000 Nick Lelack Community Development 13 0 S . Galena Aspen, CO 81611 Re: New West Hopkins Housing Dear Nick: John Keleher Frank Louslull Bniee Matherly, Mgr The proposed development lies within the service area of our District and service would be provided by extending the West Hopkins main line. Service is contingent upon compliance with the District's rules, regulations and specifications which are on file at the District office. A line extension request and collection system agreement will need to be approved by our Board of Directors. Easements will be required for the main line extension and they must be granted according to standard district form. All of the required forms and agreements are available at the District office. The developer will be required to deposit funds with the District to cover the costs of reviewing the collection system plans, line extension construction observation, and closed circuit inspection of the line extension. Shared service line acknowledgments will be required for multiple units sharing a common service line. The covered parking areas will be required to have oil and sand separators. We will need to review the landscape and drainage plans once they become available. The total connection charges for the project can be estimated once detailed plans are available for the project. There are downstream constraints that will be eliminated through a system of proportionate additional fees. We request that all District fees be paid prior to the issuance of a building permit. Separate agreements to cover billing and common utilities may be needed for each of the two associations that would be created. Please call if you have any questions. Sincerely, Bruce Matherly District Manager 565 N. Mill �t.,Aspen, CO 81611 (91i�)(-)??5-3601 F X (�?i'0) ()?�-?� DI' m PaLA1N1NlICN,G� �l A1NID� Z�QiNfIIWIG CAOM "� iTHE CITY OF AsPEN M(I�S,SaIlOiN MEerIrvc DATE: ovozioi NAME OF PROJECT: NEW WEST HOPKINS AFFORDABLE HOUSING PROJECT CONCEPTUAL PUD CITY CLERK: Jackie Lothian STAFF: Nick Lelack WITNESSES (1) Joe Wells (2) Charlie Kaplan EXHIBITS: 1. Staff Report (X) (Check If Applicable) 2. Affidavit of Notice (X) (Check If Applicable) 3. Board Criteria Sheet (X) (Check If Applicable) #1 . MOTION: Jasmine Tygre moved to recommends City Council approve the New West Hopkins Affordable Housing Conceptual Planned Unit Development, with the followinL conditions: 1. The Final Application shall include detailed descriptions of two (2) trails across the property to be dedicated public trail easements. One trail shall be across the lower portion of the property connecting the existing trail to West Hopkins Avenue and the other across the upper portion of the property. The Parks Department shall approve the trail easements. 2. The Final Application shall demonstrate how the project will implement Green Development Strategies as required by the Aspen/Pitkin County Housing Authority. a.) Use of gas log appliances. Pollution reduction and energy conservation. b.) Occupant recycling. Areas for glass, metal, plastic and newspaper. c.) Waste management. Identify ways to recycle materials where possible, and minimize trips to the landfill, including separate dump containers for wood and other potential recyclables. d.) Destratification fan systems. Fans recycle hot air at roof and recirculate to living areas to decrease heating loads e ) Attic fan systems. Naturally ventilate building, reducing the need for air conditioning from solar gain. f.) Comply or exceed energy code requirements. g.) Landscaping. Utilize native vegetation to reduce water use. h.) Bike storage areas. i.) Trail. To be made permanent fixture of town system by way of easement. j.) Erosion control. Measured specified by licensed geotechnical engineer to minimize damage to vegetation and ground stability. k.) Site preservation and restoration. Topsoil to be preserved for re -use in areas of disturbance. Site disturbance limited. Intensive restoration plan to ensure proper re -growth and stabilization of disturbed areas. 3. The Final Application shall address the Housing Authority's requirement to investigate additional Green Development Strategies, including: a.) Building Commissioning. b.) Asbestos -free building. c.) CFC-free building products, including refrigeration systems and carpeting. d.) Recycled materials. e.) Building materials. f.) Water conservation. g.) Certified wood products. h.) Human comfort. i.) Energy efficient lighting. j.) Light pollution. k.) Indoor air quality. 1.) Construction air quality plan. 4. The Final Application shall include a long-term hazard mitigation and containment plan to protect the development from rock falls, snow slides, and other natural hazards. The plan shall be approved by the City Engineer. 5. The site contains an old abandoned septic system. The Applicant shall comply with Pitkin County Environmental Health Department requirements for abandonment of the system and properly disposing of waste material. 6. The Applicant shall develop traffic reduction measures for the project prior to final submission in order to comply with the City's Municipal Code requirements. The traffic reduction measures shall be approved by the City's PZVOTE Environmental Health Department. 7. The landscape plan shall indicate that the native areas will be treated with the Parks Department's recommended seed mix. 8. A 5-foot buffer to accommodate snow storage and removal on each side of sidewalks and trails shall be indicated on the final site plan 9. The final site plan shall show the areas of the dedicated public trail easements, approved by the Parks Department. 10. The buildings shall include an adequate fire sprinkler system and alarm system, approved by the Aspen Fire Marshall. 11. No excavation or storage of dirt or material shall occur within tree driplines or outside of the approved building envelope and access envelope. 12. All construction vehicles, materials, and debris shall be maintained on -site and not within public rights - of -way unless specifically approved by the Director of the Streets Department. 13. The applicant shall abide by all noise ordinances. Construction activity is limited to the hours between 7 a.m. and 7 p.m. 14. The applicant shall not track mud onto City streets during construction. A washed rock or other style mud rack must be installed during construction. 15. All uses and construction shall comply with the City of Aspen Water System Standards and with Title 25 and applicable portions of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code as they pertain to utilities. 16. The Applicant or owner shall mitigate anv public impacts that this proiect causes, including but not limited to utility expenses and sanitary sewer and water lines. Ron Erickson second. APPROVED 6-0. VOTE: YES 6 NO 0 ROBERT BLAICH YES _X NO ROGER HANEMAN YES _X NO RON ERICKSON YES X_ NO #2. MOTION: JASMINE TYGRE YES X_ NO STEVEN BUETTOW YES _X NO ERIC COHEN YES _X_ NO iVw•161�M