HomeMy WebLinkAboutresolution.apz.051-00 RESOLUTION NO, 51
(SERIES OF 2000)
A RESOLUTION OF THE CITY OF ASPEN PLANNING AND ZONING
COMMISSION APPROVING THE STREAM MARGIN REVIEW FOR ADDITIONS
TO THE KELLER RESIDENCE AT 1430 RED BUTTE DRIVE, CITY OF ASPEN,
PITKIN COUNTY, COLORADO.
Parcel No. 2735-013-02-006
WItEREAS, the Community Development Department received an application from
Annette Keller ("Applicant"), represented by Klm Raymond of Kim Raymond Architects, for
a Stream Margin Environmentally Sensitive Area Review for an addition to an existing
residence and a storage shed 1430 Red Butte Drive; and,
WltEREAS, the subject property is approximately 52,415 square feet, and is located
in the R-30, Low Density Zone District; and,
WHEREAS, the Planning and Zoning Commission may approve development within
one hundred (100) feet, measured horizontally, from the high water line of the Roaring Fork
River and its tributary streams, and all development within the Flood Hazard Area, also
known as the 100-year flood plain if the Commission makes a determination that the
proposed development complies with all review criteria set forth in Section 26.435.040(C)
Stream Margin Review; and,
WHEREAS, the subject property and proposed development are located at an within
100 feet of the Roaring Fork River's highwater line and floodplain; and,
WHEREAS, the Community Development Department recommended approval of
the Stream Margin Review with conditions; and,
WltEREAS, the Planning and Zoning Commission approved, by a siX to zero (6-0)
vote, the Stream Margin Review for additions to Keller Residence at 1430 Red Butte Drive,
with conditions recommended by the Community Development Department; and,
WHEREAS, the Aspen Planning and Zoning Commission fmds that the development
proposal meets or exceeds all applicable development standards and that the approval of the
development proposal, with conditions, is consistent with the goals and elements of the Aspen
Area Community Plan; and,
WHEREAS, the Aspen Planning and Zoning Commission fmds that this Resolution
furthers and is necessary for the promotion of public health, safety, and welfare.
NOW, THEREFORE, BE IT RESOLVED BY TIlE CITY OF ASPEN
PLANNING AND ZONING coMMIssIoN as follows:
Section 1
That the Stream Margin Review for 1430 Red Butte Drive is approved with the following
conditions: ·
1. The building permit application shall include:
I IIIIIIBllllllllllllllllllllllllllllllllllllllllllllll
449992 12/27/2999 04:02p RESOLUT! DI:IVZS SZL¥!
J. Of 4 R 20.0~ D_0.00 N 0.90 PXTKXN COUNTY CO
a. A copy of the final recorded P&Z Resolution.
b. The conditions of approval Printed on the cover page of the building permit
set.
c. The building plans shall demonstrate an adequate fire suppression system for
fire protection approved by the Aspen Fire Marshal. The addition will
require fire sprinklers as stated in the Fire Code because the total square
footage of the house will be over 5,000 square feet. The existing house will
be required to be sprinkled when the remodel is proposed.
2. Prior to issuance of.a building permit:
a. The Applicant shall grant to the City a fisherman's easement granting public
fishing access within the high water boundaries of the Roaring Fork River
course via a recorded "Fisherman's Easement," pursuant to the City of
Aspen's Land Use Code Section 26.435.040 Stream Margin Review.
b. Before issuance ora building permit, the applicant shall record this Planning
and Zoning Resolution with the Pitkin County Clerk and Recorder. There is
a per page recordation fee. In the alternative, the applicant may pay this fee
to the City Clerk who will record the resolution.
c. The primary contractor shall submit a letter to the Community Development
Director stating that the Conditions of approval have been read and understood.
d. All tap fees, impacts fees, and building permit fees shall be paid. If an
alternative agreement to delay payment of the Water Tap and/or Parks Impact
fee is finalized, those fees shall be payable according to the agreement. The
Applicant shall connect to the City's Water System and pay tap fees to be in
compliance with the Municipal Code, if reqUired.
e. The City Engineer shall approve the grading and drainage plan for the parcel,
including the proposed addition and garage.
f. The Applicant shall submit and the Environmental Health Department shall
approve a fugitive dust control plan to ensure that dust does not blow onto
neighboring properties or get tracked onto adjacent roads, if required.
g' Run'°ff from the site during construction must be prevented by detention
ponds, hay bales, or similar methods to be approved by the City Engineer, if
required.
It. A tree removal permit as required by the City Parks Department and any
approval from the Parks Department Director for off-site replacement or
mitigation of removed trees, if required.
3. No excavation or storage of dirt or material shall occur within tree driplines.
4. All construction vehicles, materials, and debris shall be maintained on-site and
not within public rights-of-way nnless specifically approved by the Director of
the Streets Department. All vehicle parking, including contractors' and their
mployees, shall abide by the parking hm~tations of the area. The applicant
shall inform the contractor of this condition.
I IIIIII IIIII IIIIII IIIIII IIII IIII IIIIIII III IIIII IIII IIII
449992 1.2/27/2000 04:02P RE$OLUT! DI~VX$ $XLVX
2 o~ 4 R 20.00 O 0.00 N 0.00 P!TKZN COUNTY CO
5. The applicant shall abide by all noise ordinances. Construction activity is limited
to the hours between 7 a.m. and 7 p.m.
6. Bef°re issuance of a building permit, the applicant shall record the Planning and
Zoning Resolution with the Pitkin County Clerk and Recorder located in the
Courthouse Plaza Building. There is a per page recordation fee. In the alternative,
the applicant may pay this fee to the City Clerk who will record the resolution.
7. The applicant shall not track mud onto City streets during construction. A
washed rock or other style mud rack must be installed during construction.
8. The Applicant or owner shall mitigate any public impacts that this project causes,
including but not limited to utility expenses and sanitary sewer and water lines.
9. All uses and construction will comply with the City of Aspen Water System
Standards and with Title 25 and applicable portions of Title 8 (Water Conservation
and Plumbing Advisory Code) of the Aspen Municipal code as they pertain to
utilities.
10. For the purpose of maintaining the integrity of the Roaring Fork River's riparian area,
the applicant shall erect silt fencing to protect the riparian area until the completion of
ail construction and sign-off by the Building InSpector.
11. Outdoor lighting shall meet the standards set forth in Section 26.575.150 of the Land
Use Code.
12. Any changes to the design or representation made to staff or the Commission in this
application for development within the ESA area must be formally accepted as an
amendment to this ESA approval.
13. Historic drainage patterns and flow rates must be maintained.
_S. ection 2:
All material representations and commitments made by the applicant pursuant to the
development proposal approvals as herein awarded, whether in public hearing or documentation
.presented before the Planning and Zoning Comanission or City Council, are hereby incorporated
m such plan development approvals and the same shall be complied with as if fully set forth
herein, unless amended by an authorized entity.
.Section 3:
This Resolution shall not effect any existing litigation and shall not operate as an abatement of
any action or proceeding now pending under or by virtue of the ordinances repealed or amended
as herein provided, and the same shall be conducted and concluded under such prior ordinances.
.Section 4:
If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any
reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be
I Illlll IIlll Illlll Illlll IIII Illl IIlllll Ill Illll IIII Illl
449992 12/27/2000 04:02P RESOLUTI O;tVI$ SILVI
3 of 4 R 20.80 O 0.88 N 0.00 PITKIN COUNTY CO
deemed a separate, distinct and independent provision and shall not affect the validity of the
remaining portions thereof..
APPROVED BY the Planning and Zoning Commission of the City of Aspen on the 24th day of
October, 2000.
APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION:
C~ty Attorney ' bert Blaich, Chair
ATTEST:
f~,~ckie Lomian, DePuty City Clerk
F:\1430 Red Butte reso.doc