Loading...
HomeMy WebLinkAboutresolution.council.001-86 RECORD OF PROCEEDINGS RESOLUTION NO. (Series of 1986) A RESOLUTION ESTABLISHING THE 1985 L-3 CITY OF ASPEN GROWTH MANAGEMENT ALLOTMENT WHEREAS, in accordance with Section 24-11.6(a) of the Municipal Code of the City of Aspen, Colorado, as amended, October 1 of each year is established as the deadline for submission of applications for lodge development allotments within the City of Aspen; and WHEREAS, in response to this provision, one application was submitted in the L-3 lodge category of competition, by Crestahaus Lodge Inc. (hereinafter "Applicant"), consisting of a request for a total of fourteen !14) new lodge units, a change in use of one (1) residential to one (1) lodge unit, and reconstruction of nine (9) existing lodge units; and WHEREAS, a duly noticed public hearing was held on November 26, 1985, by the Aspen Planning and Zoning Commission (hereinafter "Commission"), at which time the Commission did evaluate and score the project, and it did successfully meet the minimum required threshold of 63 points by having received 74.3 points (not including bonus points); and WHEREAS, the Commission considered the representations made by the Applicant in scoring this project and in granting approvals for special reviews related to this application, including, but not limited to the f oll owing: 1. Three (3) drywells will be installed to retain the "hilltop" surface runoff originating on the Crestahaus property. When soil studies are done for foundation designs they shall include a determination of historical water runoff onto adjoining properties. The drainage system shall be designed and constructed to not increase groundwater problems on adjacent RECORD OF PROCEED'rNG$ properties. 2. An engineering report addressing ways to improve the sight distance and other traffic problems associated with the intersection with State Highway 82 shall be prepared by the Applicant prior to the issuance of a building permit. The Applicant shall discuss the findings of this study with the Planning and Engineering Offices and agrees to comply with the practical findings of the study, as determined by the Engineering Office. 3. The Applicant will contribute $4,000 for the construction of a bicycle path along the south side of State Highway 82 for bicycle and pedestrian access into town. This sum will be given to the City prior to the issuance of a Certificate of Occupancy and will be held in an interest bearing account until the City formally commences the project to add this link to the bicycle path, not to exceed a period of ten (10) years after the submission of the application. If no bicycle path project including this link is begun after the ten (10) year period, then the original contribution and interest payments will be returned to the A ppl i ca nt. 4. Included in the landscape plan are buffer areas and fencing between the Crestahaus' eastern parking area and adjacent residential lots in the Riverside Subdivision, planting of trees and shrubs, berms, a path system and seating areas, all shown on the site plan and revised landscape plan. All landscape improvements represented in the landscape plan shall be installed no later than one (1) year after the issuance of a Certificate of Occupancy. 5. Exterior lighting shall be designed in such a manner that the light source will be sufficiently obscured to prevent glare as viewed from State Highway 82 and the surrounding neighborhood. A lighting plan shall be submitted as acceptable to the Planning and Engineering Offices prior to issuance of a building permit. 6. The dormitory employee unit shall be deed-restricted to the low- income price employee housing guidelines. Employees of the Crestahaus Lodge shall be allowed to live in the employee units even if income exceeds the low-income housing guidelines. 7. The new two-story construction will minimize visual impacts by keeping the median height of pitched roofs at 22 feet, or 3 feet lower than allowable under zoning requirements. RECORD OF PROCEEDINGS 8. The rebuilt and renovated lodge units and common areas will be suitable for occupancy prior to, or at the same time as the new units for which an allotment has been requested. The construction project is projected to commence in the spring of 1986 and be completed by fall, 1986. ; and WHEREAS, the Commission voted at the November 26, 1985 meeting to recommend to City Council to allocate the ten (10) units in the L-3 quota for 1985 and four (4) units from the 1986 quota for the Crestahaus project; and WHEREAS, the City Council of the City of Aspen, Colorado, did review the recommendation and scoring by the Commission at their regular meeting on December 16, 1985 and did concur with the Commission's recommendations. NOW, THEREFORE, BE 1T RESOLVED BY THE CITY COUNCIL OF ASPEN, COLORADO: That ten (10) units from the 1985 quota and four (4) units from the 1986 quota in the L-3 lodge zone category are hereby allocated to the Crestahaus upon the condition that the above stated representation and conditions of approval met. That the above allocation shall expire, pursuant to Section 24-11.7(a) of the Municipal Code of the City of Aspen, Colorado, in the event plans, specifications, and fees sufficient for the issuance of a building permit 3