HomeMy WebLinkAboutresolution.council.055-92A RESOLUTION OF THE ASPEN CITY COUNCILv CITY OF ASPENv COLOR~DO~
FOR THE APPROVAL OF A CONCEPTUAL PLANNED UNIT DEVELOPMENT (PUD)
PLaN FOR THE EAST COOPER AFFORDABLE HOUSING PROPOSAL LOCATED ON A
2.35 ACRE METES AND BOUNDS PARCEL ON EAST COOPER AVENUE~ IN THE
RIVERSIDE ADDITION.
Resolution No. ~'"~
(Series 1992)
WHEREAS, on an application was submitted to the Planning
office by C&G Mustard Seed, Ltd. for a mixed residential
development under the AH (Affordable Housing) zone district
requirements; and
WHEREAS, the property is currently zoned R-15 (Moderate
Density Residential) and must be rezoned to AH prior to or
concurrent with the Final PUD Plan approval; and
WHEREAS, in order to obtain a level of assurance that the
proposed rezoning was acceptable to the City, the Applicant
requested that rezoning to AH be discussed as a threshold issue
during Conceptual PUD review; and
WHEREAS, the Planning office received referral comments from
the Engineering Department, Housing Office, Aspen Consolidated
Sanitation District, Parks Department, Water Department and the
Fire Marshal; and
WHEREAS, because the Applicant desired input from the
surrounding neighbors potentially affected by the proposed
development, an informal public meeting was held on August 27~
1992; and
WHEREAS, in consideration of the application and the referral
comments the Planning office recommended approval of the East
Cooper Affordable Housing Conceptual PUD Development Plan with
conditions; and
WHEREAS, at two meetings held on September 8 and September 15,
1992, the Planning and Zoning Commission heard comments from the
public regarding the proposed development; and
WHEREAS, in consideration of the application and the concerns
of the public, the Planning and Zoning Commission expressed that
Riverside Drive should not be used as access into the any portion
of the proposed development, and that the density of the site was
too great and negative impacts to the area would potentially
result; and
WHEREAS, at the September 15, 1992 meeting, the Planning and
Zoning Commission voted 6-0 to recommend approval of the East
Cooper Conceptual PUD with 23 conditions; and
1
WHEREAS, the Planning and Zoning Commission agreed that as a
threshold issue, the proposed rezoning of this parcel to AH was
acceptable; and
WHEREAS, at a public hearing on October 13, 1992, the Aspen
City Council considered the recommendations forwarded by the
Planning and Zoning Commission and the comments expressed
neighbors of the proposed development; and
WHEREAS, the Council agreed with the rezoning as a threshOld
issue, and was also concerned that the impacts of the project on
the surrounding properties would be too great; and
WHEREAS, the Council voted 5-0 to approve the East Cooper
Conceptual PUD Development Plan with the conditions recommendediby
the Planning and Zoning Commission and added a condition to require
that the Final PUD Development Plan reduce the impacts of the
development on the surrounding neighborhood.
NOW, THEREFORE BE IT RESOLVED by the Aspen City Council that
the East Cooper Affordable Housing Conceptual PUD Development Plan
is approved with the following conditions to be satisfied within
the Final PUD Development Plan:
1. The CDOT must grant an access permit for the project's access
driveway and emergency drive.
2. The parking design for the townhomes shall be re-worked to
eliminate conflicts with the emergency access corridor.
Parking spaces shall be indicated on the Final PUD submission.
3. Any curbs, gutters, streets, and parking areas must ibe
designed and constructed to City specifications.
4. There shall be utility easements over all underground utility
installations.
5. The Riverside Ditch Company must enter into an agreement with
the developer including but not limited to reconstruction and
relocation, maintenance, and general liability. Maintain
contain with Parks staff regarding these items.
6. Holy Cross shall provide more information on what easements
it is interested in acquiring. Each utility must be specific
as to its easement requirements.
7. Calculations/methodology for slope density reductions must!be
provided. These shall be prepared and stamped by a registered
land surveyor or registered architect.
8. A complete drainage plan and calculations must be submitted
2
with the Final PUD Development application. Each free market
lot will have to provide the same with submission of building
permit applications.
9. The grading plan and report by CTL/Thompson must be finalized
regarding fill material removal/replacement° The project
shall then be designed around their specific recommendations.
10. In addition to standard Final submission requirements, the
following must be addressed or included:
- designated common areas
- parking spaces
- trash access areas
- snow storage areas
- exterior site lighting
11. All required easements must be recorded prior to the city
Engineer approving plats for recordation.
12. Any changes to deed restriction category mixes resulting from
P&Z or City Council review must be reconsidered by the Housing
office prior to Final PUD Plan approval.
13. If necessary for a water line extension, the developer must
receive a waiver of the Water Mainline Extension Moratorium
from City Council concurrent with Final PUD Plan approval.
14. The proposed 8" waterline from Riverside Dr. to Lot 4 shall
be extended to Hwy. 82 to complete a loop. All installations
shall be according to established City standards.
15. The Applicant is responsible for all tap fees, water right
dedications, and applicable provisions of the Municipal Code.
16. Trees must be at least 30' from the Hwy.82 intersection.
17. Connection fee surcharges will be required to address two
downstream constraints in this drainage area.
18. Connection to Sanitation District system must be approved
prior to review of final plans. If site collection system
will be deeded to the district for maintenance/repair, it must
meet District specifications.
19. Submission of a Final PUD Development Plan must be submitted
within one year of approval of a Conceptual Development Plano
Failure to do so will nullify the Conceptual approval unless
an extension is granted by the City Council.
20. Within the Final PUD submission, the Applicant shall include
appropriate assurances guaranteeing construction of affordable
units.
21. Engineering reserves the right to further review the Highway
82 right-of-way with the Applicant and the CDOT.
22. The Applicant shall include in the Final PUD submission a
parking and service plan which will address keeping vehicle
impacts off of neighboring roads and properties.
23. All material representations made by the applicant in the
application and during public meetings with the Planning and
Zoning Commission and City Council shall be adhered to and
considered conditions of approvalf unless otherwise amended
by other conditions.
24. The impacts of the East Cooper AH Development shall be reduced
by incorporating any or all of the following methods (but
shall not be limited to): reduction of density, FAR, setbacks,
or height.
RESOLVED, APPROVED AND ADOPTED this ~ day of~
1992, by the City Council for the City of Aspen, Colorado.
John ~. Bennett, Mayor
I, Kathryn S. Koch, duly appointed and acting City Clerk do
certify that the foregoing is a true and accurate copy of that
resolution adopted by the ~y Coun_cil. ok the City of Aspen,
Colorado, at a meeting held//~~4/ ~ , 1992.
Kathryn ~/'K~ch, City Cler~F