HomeMy WebLinkAboutresolution.council.059-94
~.e.'.
~
~-
~.
~~.
- -....-
RESOLUTION NO. ~
Series of 1994
A RESOLUTION APPROVING A CONTRACT FOR CONSTRUCTION AGREEMENT
BETWEEN ASPEN EARTHMOVING, LLC AND THE CITY OF ASPEN,
COLORADO FOR CONSTRUCTION SERVICES RELATING TO THE NEALE
AVENUE SIDEWALK PROJECT AND AUTHORIZING THE CITY MANAGER TO
EXECUTE SAID AGREEMENT ON BEHALF OF THE CITY OF ASPEN,
COLORADO.
WHEREAS, there has been submitted to the City Council a contract for
construction agreement between Aspen Earthmoving, LLC and the City of Aspen, a true
and accurate copy of which is attached hereto as Exhibit "A";
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
ASPEN, COLORADO:
That the City Council of the City of Aspen hereby approves that contract for
construction agreement between Aspen Earthmoving, LLC and the City of Aspen, a copy
of which is annexed hereto and incorporated herein, and does hereby authorize the City
Manager of the City of Aspen to execute said agreement on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by the
Aspen on the /1 day Of~ ' 1994.
City Council of the City of
JOiZ;B:n:t{~
I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City Council of
-"
% M942S0
~~ .
Exhibit "A"
----
3\)~
AGREEMENT
~ . . This AGREE),fE!'-'T r.J:lce and entered into as of the dale, hereinafter stated.
~. between the CITY OF ASPEN, Colorado, ("Owner") and ....o9SPGV ~/J?o 1//#.-:r .
("Contractor"). . L..c..c /
WHEREAS. the Owner has caused to be prepared. in accordance with the law.
specifications and other contract documents for the Work her~in described. and has approved
and adopted said documents, and has caused to be published, in the manner and for the time
required by law. an advertisement, for the project titled: Neale Avenue Sidewalk Project, and
WHEREAS. Contractor. in response to such advertisement, or in response to direct
invitation. has submitted to the Owner, in the manner and at the time specified, a sealed Bid
. in accordance with the terms of said Invitation to Bid; and,
WHEREAS, the Owner, in the manner prescribed by law, has publicly opened,
examined, and canvassed thc Bids submitted in response to the published Invitation to Bid
therefore, and as a result of such canvass has determined and declared lhe Contractor to be
the lowest responsible and responsive bidder for the said Work and has duly awarded to the
Contractor an Agreement thercfore, for the sum or sums named in thc Contractor's Bid;
NOW, THEREFORE, in considcratiun of the payments and Agreement hereinafter
mentioned:
_~ L
~~...
<.
2.
3.
4.
s.
lie,.
\,.
~
The Contractor shall commence and complete the construction of the Work as fully'
described in the Contract Documents.
The Contractor shall furnish all of the material, supplies. tools, equipment, labor and
, other services necessary for the construction and completion of the Work described
herein.
,
The Contractor shall commence the work required by the Contract Document~
within fifteen (15) calendar days after the date of the NOTICE TO PROCEED and
will complete the same by thc date and time indicated in the Supplementary
Conditions, and elsewhere within the cOntract documents, unless lhe time is extended
in accordance with appropriate provisions in the Contract Documents.
The Contractor agrees to perform all of the Work described in the Contract
Documents and comply with the terms therein for the sum
of ONe...vU"v.o,e C'V ~ 71/ou..r-4-7V.CJ :5/XTY-.r / X ~/ <'<7~J
~9':7LVevr-y <:EN7S'. (~r066.~!=>,
The term "Contract Documents" means and includes the documents ,listed in the
Supplemcntary Conditions and contained in the Bid Package. I The Contract
Page 23
B:l.Ncale.lmp
--....
~6.
~.
Documents are included herein by this norerellee anti made a part hercof as it" fully
set forth here.
The Owner shall pay to the Contractor in the manner and at such time as set forth
in the General Conditions such amounts as required by the Contract Documents.
7.
This agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns. Notwithstanding anything to the
contrary contained herein or in the Contract Documents, this agreement shall not
be, binding upon the Owner unlc::ss duly executed by the Mayor of the City of Aspen
(or a duly authorized official in his absence) following a Resolution of the Council
of the City of Aspen authorizing the Mayor (or a duly authorized official in his
absence) to execute the slime.
IN WITNESS WHEREOF, the parti"es hereto have executed, or caused 10 be exccuted by their
duly authorized officials, this Agreement in four copies each of which shall be deemed IIn
original on the date hereinafter written.
By: ~ >= I~
Johrt S. Bennett, Mayor
CITY OF ASPEN, COLORADO
Dated:
1~9~
...' ATI.ESTED BY:
\.~&
"'" Kathryn K . City Clcrk ~
/~ .
/ . - . !//.7&~
--Aptfr'ove to fonn
CONTRACfOR: ~d~/~ ~/9Y
~,;J.rz:.&J A .::7eve?l/J
~
.,
ATIESTED BY:
PcwJ~~"4! '-
? ,4VL. /!UTTPw I-I(Jw 6te
~-;o'~ %jq{_
. .6JI~
~I CO ~1&)3 I
CA"mrnlSStir.- ..u.,tiuJ ; 5" jO.jqfyP
pagc 24
D:\Ne.le.lmp
- ---
'.'-'
~.
Z\;;_
~&d
7J6 /9;/
BID SCHEDULE FOR THE PROPOSED ~C."e
NEALE AVENUE SIDEWALK IMPROVEMENT PROJECT
ASPEN, COLORADO
ITEM ESTIMATED UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE COST
626 Mobilization L.S. @ 1000. = 7000."';
201 Clearing and Grubbing L.S. @/~O. = /Si?JO...a
202 Sawcut Asphalt "" 1,414 L.F. @ /.~ = .2</7</.~
202 Remove Existing Asphalt * 2,970 S.F. @ ~$2) = 1</8$". ~
202 Sawcut Curb and Gutter 32Yz L.F. @ 2.4't> = hS. /7&
202 Remove Existing Concrete '" 575 S.F. @ :3.- = /725.6'0
lft3 Unclassified Excavation .400 C.Y. @ (p. 7~ = ;2~"OD.~
\\
<1'-'
""< (j.,p
203 Embankment 50 C.Y. @ ~' ~
= ~.
207 Topsoil 40 c.Y. @ Z Z. ,,0 = e&:;. (/0
210 Reset Gas Meter 1 L.S. @ $/>>..0 = 800. to
210 Reset Fence 6.,0 ~,;o. (0
70 L.F. @ =
~4 ;ZS; 6'tJ Ioc>. lID
210 Reset Existing Mailbox EA. @ =
210 Reset Sign *6 EA. @ ~.tP = ~OCJ.40
614 Set New Sign .).00. eO = 800. QD
4 EA. @
/2~ /tiJ,!tJ . g(J
710 Split Rail Fence (2 Rail Cedar) 140 L.F. @ =
506 Recontour & Riprap Outlet 1 L.S. @ ~tKJ. p = UtJtJ,d'I'
203 Relandscape L.S. @ 6ltJ~ = :52JlI. tIV
e Page 16
~" B:INeale.!mp
~ ;r;Nt)jM7B /Za:)WCCl) ~
fMN7/ rES paz. 112) il'~'
I11rt;- w / /2CJ $' f' ?" q'u cK. I
-.
i\"
--
BID SCHEDULE FOR THE PROPOSED
NEALE AVENUE SIDEWALK IMPROVEMENT PROJECT
ASPEN, COLORADO
Continued
ITEM
NO. DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
COST
2 I 2 Seeding
I
403 Hot Bituminous Pavement '* 63
407 Tack Coat Emulsified Asphalt "I" 2,800
304 Aggregate Base Coarse
~ 310
~8
\'.
603
603
84 L.F.
if. -IC 7S - qs L.F.
Timber Retaining Wall &
Hand Railing
18"CMP
L.S. @ 5?JlJ. - = SNJ. ...
TON @ l!3o < <JD = 6<? YO. or>
L.F. @ j.utJ = Z8(X). (Jf)
TON @ ZO.tJf1 = ~ZOO.dO
If//k
@ .LP~ - . c,': !3 </oCl~ dlJ
@ &to, dV = ;z. 700. db
@ 62JlP = 57;.,,0
18" Watertight Connection
1 L.S.
603 4" PVC Foundation Drain 40
202 Remove Existing Inlet & Pipe 1
604 Storm Drain Inlet ~.... -4- -:3
604 Storm Drain Manhole 1
608 5' Concrete Walk
"* 5,120
609
412
-3.90 =
@ Ih.90 =
SF. @
S.F. @
/t!Cj6fJ."""
,
/~$gd,. '#"7
/
.;2/c!J.$'b
)
Type 2 Curb & Gutter
.~ ~.,1,11'}9vo L.F.
6". Z-<> =
tJ1
fFq"
J "L I '7(,'
r~ ~_ 10~
fJ~.q~
B:INealdmpJj' ~3)
40
5,0"
1,or
6" Thick Concrete Flatwork
..,I( 412
i~_
"
\)
~<
-;H<=-- .7llJ7J/~ ~67C..- kvr.f/A* .J7./l)/~ ~S/t11U
~ C(A/ /r.5 - Y6 ~Y-I-'e7L-- f//L/d/L 7?J 7-r;, -9y'..
/U17.r- lJ/17/ Ct/CtC/C.I2t:J7Jj /VI.
Page 17
e1:
v,
"'<.
BID SCHEDULE FOR THE PROPOSED
NEALE AVENUE SIDEWALK IMPROVEMENT PROJECT
ASPEN, COLORADO
Continued
ITEM ESTIMATED UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE COST
601 8" Reinforced Concrete ~, fo = 6lJ f3s; ~o
Crosspan 737 S.F. @
J
627 Crosswalk Striping oj(' 60 S.F. @ 7ItflJ = ,;2yb. '"
Traffic Control & Signage I L.S. @ ;2aoo." = .,,2000 . aO
630
I
210 Replace Fire Hydrant 1 L.S. @ 'leo."" = 9071. 00
. Boulder Retaining Wall 315 SF @ o:.e.tJ = /6""75, e>C
)
\ll,~ Adjust Manhole 7'5 EA @ 61;. ~ = ,,25?;J. tTf> '>P
, t'/'r 57;. 10 tOt'). '1')
619 Adjust Valve 7/"2 EA @ .;2.5- = d 10, cpfj' 1J)
Alternate as requested in pre-bid meeting and referred to in addendum number J. q'?~ob" I
fa I
203 Muck Excavation · 1,400 C.Y. @ h.~ = 91 tJlJ. IfJ > i'''''' IN .,0
.
$.1>T' /1 ~cfJ. pO jZlTA-L .
203 Borrow (Pit Run) · 1,400 C.Y. @ =
,
.
As requested by Engineer in field to improve subgrade if required.
..
~-
Page 18
B:INeale.Irnp
~.
%.
.~
\~
.:. '
\,,,.
- ---
Total Bid: /tJ YtJ&f,. Zo
/
Total Bid written: dollars and cents.
dNGJlt(AI'()1UFlJ IR:;U/Z. 77/tJ&i~/) $/JCT'/-5/X d)OU~1' /TWCP./?Y CGNt:S
A percentage to be multiplied by total bid quantity
if construction occurs in the summer of 1995.
~%
101, J'2G" [.0
In submitting this bid it is understood that the right to reject any and all bids has been reserved by the
Owner.
Dated this 6 70/ dayof:Ita, Y , 1994
,
Name of Bidder /lS/?-&V ~
/l1tJ{//A/k L-cC &,.t::" 3Z5'
SrmW/l1.4Jr Co?-tJ J'/.6sV
Address
92-7 ~7Y/Y/
Telephone Number
;ft~d~
Authorized Officer
~S1.
Tit! V
Page 19
B:INeale.lmp