Loading...
HomeMy WebLinkAboutresolution.council.037-95 RESOLUTION NO. ~-- (SERIES OF 1995) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO APPROVING CONCEPTUAL PLANNED UNIT DEVELOPMENT REVIEW FOR THE PARKS AND GOLF DEPARTMENT MAINTENANCE FACILITY AND OFFICE, ASPEN, COLORADO WHEREAS, the Aspen Parks and Golf Department has submitted a Planned Unit Development review application to expand their office and maintenance facility at the Golf Course; and WHEREAS, the Department requested a four step review process to ensure that their design proposals would be found acceptable before full architectural drawings were developed; and WHEREAS, the Planning and Zoning Commission did review the conceptual proposal at their May 2, 1995 public meeting; and WHEREAS, the Commission found that the proposal was a necessary expansion and that the conceptual proposal was the least impactive to the surrounding neighborhood, users of the golf course and Highway 82; and WHEREAS, the Commission amended the conditions of approval, identified those items that must be included in the fina~ PUD application and recommend to Council conceptual PUD approval; and WHEREAS, the Aspen City Council has reviewed the conceptual application at a duly public noticed meeting; and WHEREAS, Council has considered the conditions of approval as amended by the Commission and the Commission's recommendation. NOW THEREFORE BE IT RESOLVED by the Aspen City Council that it does hereby approve the conceptual PUD development proposal for the expansion of the Parks and Golf office and maintenance facility with the following conditions: 1. A final architectural plan with elevations of all proposed buildings including identification of building materials shall be included in the submitted final PUD application. 2. A detailed lighting plan and landscape plan shall be included in the final PUD application. 3. A housing mitigation plan shall be provided to mitigate 1.8 employees in the submitted final PUD application. 4. A storm drainage plan shall be included in the submitted final PUD application. 5. A conceptual sidewalk/curb/gutter and paving plan shall be developed with the Engineering Department and submitted for review during final PUD review. 6. A revised site plan shall be included in the final PUD application and shall include: a. trash/recycle area and bike storage/racks; b. on-site parking spaces; and c. relocated 15th Tee and berm near the Tee. 7. Oil and sand separators shall be installed where vehicles are serviced and stored. All chemical/fertilizer storage must be designed to prevent leakage into the public sewer system. 8. The four inch sewer service line shall be replaced. 9. The project shall install an approved automatic sprinkler system. 10. The application for final PUD review shall include the following items: a. detail description of building material b. detailed landscape plan c. a percentage break-out of golf use and parks use of the facility d. analysis of equipment and depreciation costs e. elevations of the proposed building including heights f. employee mitigation plan 11. Ail material representations made by the applicant in the application and during public meetings with the Planning and Zoning Commission shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. APPROVED by the Council at a regularly scheduled meeting June 12, BY: John Bennett, Mayor I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado at a meeting held ~ /3 , 1995. / Kathryn S. Koch, city Clerk