HomeMy WebLinkAboutresolution.council.068-97
RESOLUTION NO. ~
(Series of 1997)
A RESOLUTION APPROVING A CHANGE ORDER FOR CONSTRUCITON BETWEEN THE
CITY OF ASPEN, COLORADO, AND GOULD CONSTRUCTION COMPANY, INC., SETTING
FORTH THE TERMS AND CONDITIONS REGARDING THE FRANCIS STREET STORM
RUNOFF COLLECTION SYSTEM AND ELECTRIC DEPARTMENT'S UNDERGROUND
POWERLINE CONDUIT PROJECTS, AND AUTHORIZING THE CITY MANAGER TO
EXECUTE SAID CONTRACT CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN
WHEREAS, there has been submitted to the City Council a contract change order between
the City of Aspen, Colorado and Gould Construction Company, Inc., a copy of which change order
is annexed hereto and made a part thereof.
NOW, WHEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ASPEN, COLORADO:
--
Section One
That the City Council of the City of Aspen hereby approves that contract change order
between the City of Aspen, Colorado, and Gould Construction Company, Inc., regarding the Francis
Street Storm Runoff Collection System and Electric Department's Underground Powerline Conduit
Projects, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the
City Manager ofthe City of Aspen to execute said contract change order on behalf ofthe City of
Aspen.
Dated:
aA~ .IS-
,1997.
~/P~
John Sennett, Mayor
I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the foregoing is a true and
accurate copy of at resolution adopted by the City Council of the City of Aspen, Colorado, at a
meeting held -, 1997.
~1I~
Kathryn S. , City Clerk
RES-004
CHANGE ORDER
City of Aspen Engineering Department
No. Two
PROJECT: WTP & EMPLOYEE HOUSING SITE IMPROVEMENTS (phase-n
DATE OF ISSUANCE: 09/03/1997
OWNER: City of Aspen
CONTRACTOR: Gould Construction Company, Inc.
OWNER's Project No. 96-003
ENGINEER: City Engineering Dept.
ENGINEER'S Project No. 96-003
You are directed to make the following changes in the Contract Documents.
Description: Construction of Francis Street surface runoff collection system, concrete replacement, HMA paving
and installation of underground pwerline conduits and vaults.. This work shall be done as an extension of work
quantities under the Watre Treatment Plant & Employee Housing Site Improvements including all required field
performances and compliance tests.
Purpose of Change Order: To improve the substandard right of way and underground the powerline.
Attachments: Gould Constrcution Company's written proposal for this additional work under the original
contract terms and conditions. This proposal includes all costs associated with increasing the maintenance bond
amount to cover this added work.
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
Original Contract Price: $1270,041.50
ICCD = Consecutive Calendar Days: WD = Workina Davs)
Previous Change Order No.: ONE
Original Contract Time: Expi,red
Net Change from previous Change Orders: $373,595.74
Contract Time prior to
this Change Order
90WD
days or date
Contract Price prior to
this Change Order
$1.265.187.00
Net Increase (decrease)
of this Change Order
30WD
days
Net Increase
of this Change Order
$373.595.74
Contract Price with all
approved Change Orders
$1.265.187.00 - 218.548.60 (deductive CO.) + 373.595.74 = 1.420.234.14
Contract Time with all
approved Change Orders
N/A
days or date
RECOMMENDED:
APPROVED:
APPROVED:
bY:~~.
/ Engineer
by:
Owner
C02-96003 (ENG-309)
CO2
Quantitv Tabulation Sheet
CITY OF ASPEN ENGINEERING DEPARTMENT
Date: Auaust 30.1997
Project Name: Francis Street Storm Drainage System
Proj. Location: Francis Street, Garmisch to 7th Street
Description of Work Unit Quan- Unit Total
titv Price Price
Traffic control (barricading, signing, flagging, media releases) Day 30 810.00 24300.00
Lower or raise utility service lines to 5+/- feet depth Each 30 1000.00 30,000.00
Connect storm sewer to existing manhole Each One 500.00 500.00
Remove and dispose Manhole or Inlet Each One 1500.00 1500.00
Remove & Dispose 12" to IS" RCP LF 8 50.00 400.00
Reset Stones CY 3 100.00 300.00
Reset Mail Box Each 30 100.00 3000.00
Install temporary gravel drive, 4" thick Sy 300 4.00 1200.00
HMA paving, 2.5 Inches thick Grading "CX" with ACI0 bitumen SY 2700 17,00 45900.00
Sawcut asphalt or concrete up to 4 inch depth LF 6000 1.25 7500.00
Rotomill and re-use asphalt pavement at the job site Sy 2000 3.25 6500.00
Remove & dispose conc. (pans, drives, walks, misc. pavement) SY 60 20.00 1200.00
Construct concrete curb & gutter-CDOT type" AX" concrete LF 100 20.00 2000.00
8" pan or 6" drive rarnp-CDOT type "AX", steel reinforced conc. SY 50 32.50 1625.00
30" HDPE pipe (include excavation & backfill per section in notes LF 714 86.06 61446.84
18" HDPE pipe (include excavation & backfill per section in notes LF 1700 57.37 97529.00
IS" HDPE pipe(include excavation & backfill per section in notes LF 300 4'7.74. 14322.00
12" HDPE pipe (include excavation & backfill per section in notes LF 235 44.14 10372.90
5' I.D. flat top MH including excavation & CL6-ABC backfill Each 5 2500.00 12500.00
Type 13 Inlet including excavation and CL6-ABC backfill Each 18 2300.00 41400.00
Three runs of 6" I.D. PVC schedule 40 (installation only, materials LF 7600 1.00 7600.00
are supplied by the City's Electric Utility Department)
6' square vault (installation only, vaults are supplied by the City's Each 5 500.00 2500.00
Electric Utility Department) including excavation and CL6-ABC
backfill
TOTAL= 373,595.74
TOTALSUMINWORDS~ ~ ~~~2.e. A..J~
CONTRACTOR'S FULL NAME SIGNATURE_ _ ~ _ .~ _ _ 'Au.t~
60~ ~khV1 J~C-
NOTES:
1. The unclassified excavation work shall be included in the unit price bid items for this project and shall
consist of asphalt wheel cutting, excavated materials removal, haul, disposal to landfill, dump fees and
complete site cleanup performed immediately on daily basis. Payment for this work shall be included in the
bid prices for this project and no additional payments will be will be made to the contractor.
--------.
Page 01 of 02
Where new PVC conduits are installed in parallel with the storm pipelines, a wider trench must be excavated
to allow a minimum three(3) feet horizontal separation between the centerlines of pipe and conduit runs. The
conduit shall not be shallower than 36 inches or deeper than 48 inches. Payment for this work is included in
the unit price for installation of conduits and vaults.
2. Contractor's traffic control supervisor (TCS) is responsible for notification of property owners and tenants
at least 24 hours in advance of driveway closures, utility service disruptions and any other inconveniences.
3. All material testing as required by the Engineering Department's latest practices including in-place soil
compaction densities, in-place asphalt pavement densities, other compliance tests (TV line inspection, and
preparation of reports shall be paid by the Contractor. This type of work must be performed by a certified
materials testing lab. or consulting firm.
4. All other terms and conditions of the Bid 96-003 documents and addendum not modified by these notes
shall apply.
5. The trench backfilling section must include the following work:
a) Placement and compaction of screened crushed rock from minimum 4 inches bellow the bottom of
pipe to top of pipe.
b) Placement & compaction of excavated pit run to 6.5 inches below the existing pavement.
c) Installation of 4 inches thick Aggregate Base Course (ABC) Class-6 on pit run.
d) Installation of rotomilled pavement on ABC Class-6.
e) Removal of 2.5 inches of rotomilled materials and preparation of trench surface for paving.
Payment for this work is included in the unit price for Linear Foot of pipe measured in place.
6. Removal and replacement of concrete work shall include stabilization and preparation of sub-base prior to
placement of new concrete work. No additional payment shall be made to the contractor.
7. Lowering or raising the utility service lines bid item includes all necessary work for complete removal and
replacement of service line from corporation valve (service tap) or stub to curb box or meter point in ROW.
TABUL-01
Page 02 of 02
LETTER OF TRANSMITTAL
CITY OF ASPEN ENGINEERING DEPARTMENT
) / ~ F~ #- 945- 6371
DATE: .....9;:.. ;?/'2.. .T...... JOB)l\O,:... .............. .......' .......... ........ .......,...,...,.,. .....,.,.,. ....,..,...,....,.'..."....,..".,.,..,.,...,...,...
RE: .fl'd:!.1.<=/S.....~......c;L).r.::a/I.t.at./~.....::2.,y.~.~....,..,.,.....,..."."...,.".,..'..""".,.......,.,..,..,.",..
TO: ..G.a.l.lId.......C.OJ.1,j.h:u.C-./l:O.J:1...,..../n..c...h...........,..,........,..,........ '.,...' ....,...., ,....,......,., ,., ,....,.,..,......,.
ADDRESS: ........... ................."...... ........ ...... ......... ...................,. ..... ........... ..........,...,.,.....,....,.,........,."..".,.".",.""...,."".,..."..,.,.,.,
CITY: .................................................... STATE: ......................................................... ZIP CODE: ......,......,..,....,.... ..,..........
A TIENTION: 1!!1.t;tr:.~...c.........G..a.e.l.ld..........,...,.,........................................' .,..,.....' ,.,.,...,....,...", ,.,.,......, '....
PLEASE BE ADVISED:
WE ARE SENDING YOU X-ATIACHED _UNDER SEPARATE COVER VIA ,................................. THE FOLLOWING
_PRINTS _PLANS _SHOP DRA WINGS _SAMPLES ~PEClFlCA TlONS
_ARTWORK _PROOFS _PHOTOGRAPHS _COPY OF LETTER x...CHANGE ORDER
X-OTHER: ...QLL.?JJ.6..".. ....:fg.!.':'.{<r,h.~(j2.j:fl!.!qt~L.fP.r..da!JO rd. r
NO DATE COPIES DESCRIPTION
I 9047 ...Q.IJ..~. a'j!ll~Lmc..b~7:!;..{)r.du.iiL..
......
.1.. 5)ir/i-7 .0tJ. f?.. .t:Y~"..1.....a.tt.......h~Iy..74#.v/41i()rl..,5.h..ad............
...... .................... ............... ...................................................................................................................................................
...... .................... ............... ....................................................................................................................................................
...... .................... ............... ....................................................................................................................................................
THESE ARE BEING TRANSMITTED AS INDICATED BELOW:
XAS REQUESTED _APPROVED AS IS
-XFOR APPROVAL _APPROVED WITH CORRECTIONS
_FOR YOUR USE _RETURNED WITH CORRECTIONS
_FOR YOUR COMMENTS _RESUBMIT.......COPIES FOR APPRO V AL
FOR BID(S) DUE ...................,..........,................. ,....,...,...............,..........., '.."........., '...'...
_SUBMIT......,...COPIES FOR DISTRIBUTION
_RETURN...,..,..... CORRECTED....,......,.........,..
_RETURNED AFTER LOAN TO US
............................................................................
.----.....
COMMENTS: ............ ......................................................................................................................................,...............,. ..............
..........................................................................................................................................................................................................
:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::'~';~'~'~~.',':"j]l:~,'I,'.'.jjd~h.'~:~~.'~....,..'~,'..~~...
ENG.JOI