Loading...
HomeMy WebLinkAboutresolution.council.045-17 CONTRACT RENEWAL OPTION EXERCISED Between the City of Aspen and GH Daniels The City of Aspen and GH Daniels hereby exercise the option to renew a contract, entered into on March 27, 2017 and approved by City Council by Resolution#t45, Series 2017, for as-needed landscape and irrigation services. The renewal option begins March 27, 2018 and ends March 31, 2019. The terms of the renewal are listed in the agreement. Invoices will be paid Net 30. The parties acknowledge and understand that this Contract Renewal Option is, except as specifically amended hereinabove, subject to all of the terns and conditions set forth in the original signed City of Aspen Service Agreement and General Conditions for Service Agreements and by this reference made a part hereof. Having agreed to the above and foregoing, the parties hereto do affix their signatures. City of Asp n: / GH Daniels: By: // �7 / By: V.IWC— Title: C Jty Title: Date: Z ' Date: Z 3J 14►► CITY OF ASPEN CONTRACT RENEWAL The document provides written notice of the City and Supplier's decision to exercise its right to renew the contract identified below for an additional term. Suppliers are required to break out the number of hours and the hourly rates on each quote. CITY OF ASPEN CONTRACT RENEWAL Contractor's Full Legal Name: GH Daniels Contract No.: 2016-167 Solicitation Title: As-Needed Landscape and Irrigation Services Resolution M #45,Series 2017 Contract Award Date: March 27,2017 Current Contract Term: One year Beginning Date of New Contract Term: March 31,2019 End Date of New Contract Term: March 31,2020 CITY OF ASPEN,COLORADO: PROFESSIONAL: [Signature] [Signature] By: By: Kristen Nelson [Name] [Name] Title: Title: Controller Date: Date: 3/6/19 Construction Landscape Architect $ 95.00 Project Manager $ 85.00 Superintendant $ 75.00 Foreman $ 68.00 Sprinkler Technician $ 70.00 Labor-skilled(2yrs+) $ 54.00 Labor-training(2yrs-) $ 48.00 231 Bobcat Trackhoe $ 100.00 Semi-Tractor w/equip trailer $ 135.00 Tandam Dump Truck 12cy $ 95.00 Freightliner Dump 35cy $ 120.00 1-ton Dump Trucks 5-10cy $ 75.00 Laser Level $ 20.00 Maintenance Lawn Care Program 52"ZTR Mower $ 66.00 42"-48"Mower $ 60.00 21" Mower $ 54.00 Trimming/Blowing/Edging $ 54.00 Aeration/Walk Behind $ 60.00 Aeration/Tractor $ 66.00 Lawn Fertilizer $ 54.00 Pre-emergent Weed Control $ 78.00 Broadleaf Weed Control $ 78.00 Native Mowing $ 54.00 Detail Program Pre-emergent Weed Control $ 78.00 Detail $ 54.00 Chemical Weed Control $ 78.00 Shrub Trimming $ 54.00 Tree/Shrub Fertilizing $ 54.00 Pruning- Dormant Season $ 54.00 Winter Services $ 54.00 Tree Spray $ 78.00 Equipment and Vehicles w/Operator 621 Case Loader 3 cy $ 144.00 9010B Excavator w/Thumb .5 cy $ 150.00 W-20 Case Loader 2.5 cy $ 120.00 560 xlt Loader/Grader 1.25 $ 120.00 95xt Case Skidsteer 1 cy $ 120.00 963 Bobcat Skidsteer 1 cy $ 108.00 963 w/44"Tree Spade 44" $ 300.00 621 w/55"Tree Spade 55" $ 420.00 1845 c Case Skidsteer 0.5 cy $ 96.00 873 Bobcat Skidsteer 0 5 cy $ 100.00 560 Trencher w/4'Bar Rock Teeth $ 144.00 337 Bobcat Trackhoe 2'bucket w/thu $ 130.00 331 Bobcat Trackhoe V&2' $ 114.00 .All materials will be billed in addition to the above rates • Mobilization fee to be added