HomeMy WebLinkAboutresolution.council.115-17 RESOLUTION 115
(Series of 2017)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO,
APPROVING AN ADDENDUM BETWEEN THE CITY OF ASPEN AND SHAW
CONSTRUCTION, A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND CHARLES
CUNNIFE ARCHITECTS, A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND
AMBIENT ENERGY, A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND NV5,
AUTHORIZING THE CITY MANAGER TO EXECUTE SAID ADDENDUM ON BEHALF .
OF THE CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council an Addendum #06 —
Guaranteed Maximum Price (GMP) of the 505 Housing at 540 E. Main Street - between the City
of Aspen and Shaw Construction, NV5, Charles Cunnife Architects and Ambient Energy a true
and accurate copy of which is attached hereto as "Exhibit II, IV, V, and VI".
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves the Addendum #06 GMP
between the City of Aspen and Shaw Construction,NV5, Charles Cunnife Architects and
Ambient Energy a copy of which is annexed hereto and incorporated herein, and does hereby
authorize the City Manager to execute said agreement on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by thc4Ska
cil of the Cit of Aspen on
the 28`h day of August, 2017.
Stev , Mayor
I, Linda Manning, duly appointed and acting Cityertify that the foregoing is a
true and accurate copy of that resolution adopted by the City Council of the City of Aspen,
Colorado, at a meeting held on the 28`h day of August, 2017..
Linda Manning, City Clerk
Page 1 of 1
RESOLUTION #116
(Series of 2017)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO,
APPROVING CITY MANAGER ADMINISTRATIVE EXECUTION OF SUBSEQUENT
CONTRACTS AND CHANGE ORDERS THAT ARE WITHIN THE APPROVED 505
HOUSING AT 540 E. MAIN ST. PROJECT BUDGET. AUTHORIZING THE CITY
MANAGER TO EXECUTE SAID CONTRACTS AND CHANGES ON BEHALF OF THE
CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council a Project Budget Update in the
Sum of$5,397,860: Attached hereto as "Exhibit I".
NOW,THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby allows City Manager administrative
oversight of any subsequent contracts and change orders that are within the current Approved net
project budget of$5,397,860; and does hereby authorize the City Manager to execute said
agreement on behalf of the City of Aspen. Council will be updated by staff and City Manager on
a regular basis.
INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on
the 28`h day of August, 2017.
Steven Skadron, Mayor
I, Linda Manning, duly appointed and acting City Clerk do certify that the foregoing is a
true and accurate copy of that resolution adopted by the City Council of the City of Aspen,
Colorado, at a meeting held on the 28`h day of August, 2017.
Linda Manning, City Clerk
Page 1 of 1
Exhibit A
August 17 2017 N V
Mr.Jeff Pendarvis
Capital Asset Project Manager
City of Aspen
130 South Galena Street
Aspen,CO 81611
ASPEN POLICE DEPARTMENT PROJECT—CONSTRUCTION GUARANTEED PRICE
ADDENDUM No. 06 and CONTINGENCY USE
Dear Jeff.
The purpose of this letter is to recommend that the City of Aspen executes a Guaranteed Maximum Price
(GMP)Addendum from Shaw Construction,LLC for the 505 Housing at 540 E. Main Street as well as
change orders to three key consultants,Charles Cunniffe Architects (CCA),Ambient Energy and NV5.
This letter also covers overall budget status and contingency release. CoA Staff will also be requesting the
ability to have City Manager authority/sign off of budgeted contingency funds associated with the project
budget.
BACKGROUND
CCA (and their sub-consultants)prepared construction documents for the Aspen Police Department under the
guidance of the Asset Department, Police Department and the Construction Manager (NV5). Shaw
Construction was brought onto the project team to provide pre-construction services. The construction
drawings are complete and have been submitted for a building permit.
The APD project is well underway and structure is progressing. This contract consent request is for the
Council acceptance is required for change orders/addendum above$25,000.
Guaranteed Maximum-Price.(GMP)for Employee Housingat 540 E.Main Street'Projeot. .
$2,591,329 ,
Shaw submitted a GMP price in the sum of$2,591,329 which includes all the work needed to complete the
project,except for that which is already included in the Aspen Police Department Project.
NV5 has reviewed the proposal inclusions,exclusions and clarifications and confirm that these appear
reasonable and consistent with the scope of work defined by the design.
There is$49,806 (2%)contractor contingency.This are understood and are a focus of ongoing Value
Engineering and cost control efforts of the Team.
2 Charles Cunniffe Architects$71;760
2550 18TH STREET, SUITE 202 1 DENVER, CO 8021 1 1 VA MV5.COM I OFFICE 303.351.5045 . F" 303.539.9840
C ONSTRUGTION OUALITT ASSURANCE - INFRASTRUCTURE -ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL
Exhibit A
Saul Abrahams,Sr.Project Manager
February 6,2017
Page 2
CCA provided design services for this project.This change is for CCA to provide construction administration.
13.Ambient Energy$32,675
Ambient was contracted to provide commissioning services for the police department. This change order
incorporates the scope of their work to the employee housing.
i4.NV5$t 19„988-- -----
NV5 was contracted to provide project management during the design phase, this change order incorporates
permit management and construction oversight into their contract.
CONTINGENCY
NV5 and Asset Staff have been active in scope control,VE management and cost interrogation. The APD
construction phase of the project is a real case of time it mong. NV5 supports the Staff request that the
$438,663 of Contingency is an"administrative sign off'by the City Manager. NV5 will vet EVERY dollar,
but sometimes the four-week delay of Council approving a$25,001 change that is necessitated by
procurement code is subsequently accompanied by a delay cost that is much greater than the initial$25k.
NV5 will provide detailed project monthly and cost expenditure reports. We will continue our 100%
transparent reports on contingency and overall Budget Status. We are happy to answer any cost questions to
council and the community at any time.
FINANCIAL IMPACTS
Carrying this magnitude of Owners Contingency into the main construction phase is appropriate.
The consent of the phase II APD contract and budget recognized that$1,000,000 of the construction
contract for the APD GMP is allocated (contracted) to the 505 Housing fund,for the design,land use
process, foundations,structure and waterproofing for the'land'that has been approved for the future 505
Fund (City Staff Employee Housing) at the rear of the APD site.This was approved during resolution 013-
2017.
RECOMMENDATION
The Shaw GMP proposal is reasonable and has been under value engineering and cost savings efforts for
months.
NV5 supports the execution by Cod of this amendment,for$2,591,329 as well as consultant change orders
so that the new housing units may be completed in a timely manner.
We trust this is of assistance. Please contact me for any queries relating to this letter.
NIVI5
OMCES NATIONWIDE
CONSTRUCTION OUAuTY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL
Exhibit A
Saul Abrahams,Sr.Project Manager
February 6,2017
Page 3
Sincerely,
Saul Abrahams
Sr. Project Manager
I*'V5
Exhibit I Budget Overview(NV5—2017-08-17 version)
Exhibit I1 Shaw-Addendum Five (06) and associated Exhibits
Exhibit III Shaw Proposal
Exhibit IV CCA Change Order 48
Exhibit V Ambient Change Order 4
Exhibit VI NV5 Change Order 10
NIVI5
OFFICES NRTIONWIDE
CONSTRUCTION OWL"ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT ENVIRONMENTAL
Exhibit A
Saul Abrahams,Sr. Project Manager
February 6,2017
Page 4
NIVIS
OFFICES NATIONWIDE
CONSTRUCTION QUAL ASSURINCE INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL
Exhibit A
Saul Abrahams,Sr.Project Manager
February G,2017
Page 5
NIV15
OFFICES NATIONWIDE
CONSTRUCTION QUALITY ASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT ENVIRONMENTAL
a �
|
) ! 1 . . . . . . . . i . | § . i ;
!
|` � . . . . . . § . . . -77
. ;
, |
uj
. ! | l . . . . . . . | ! . . . |
|i
` g . . . . . , . ■ &( |
,
! �
ADDENDUM#06
CONSTRUCTION CONTRACT—ADDENDUM
Initial Contract: AIA A132 Standard Form of Agreement Between Owner and Contractor
Project Address or Location: 540 E.Main Street,Aspen.CO 81611
A. Owner and Contractor are parties to the above-referenced contract("Contract')and wish to amend the
Contract as follows:
B. Contractor has been requested to perform and agrees to perform the following Addendum Scope of
Work: Employee Housing at 540E Main Street
based on Design Documents issued July 7 2017 Addendum 1 2 & 3 Shaw proposal dated
8/16/17 and Shaw BSL dated 9/6/17.
C. The compensation for said Addendum Scope shall be $ 2.495.726 which is in
addition to the amounts stated below:
ThisAmount...................................................................$2,495,726
Previous Change Amount................................................................$
Total of Changes to date..................................................................$
Original Contract Amount.............................................$18.742.100
Contract Amount to date................................................$21,237,826
D. Section 4.4.7.1. The GMP for this Addendum is$2,495;726 with clarifications.
Section 4.4.7.2. No alternates are proposed by this Addendum.
Section 4.4.7.3. Allowances of$16,045 and Contractors Contingency of$49,806 are included in this
GMP.
Section 3.3. The date of Substantial Completion is April 25, 2018. Certificate of Occupancy for
housing is dependent upon APD landscaping schedule and Substantial Completion date is dependent upon
receiving a permit on or before 10/1/17.
Section 3.5. Per clause AIA Al 32 section 3.5, Liquidated damages of$2,000 per calendar day apply.
Liquidated damages shall only be applied should Substantial Completion not be achieved by May 15,2018.
Except as expressly amended or modified herein, the Contract shall remain unmodified and in full
force and effect.
This Amendment is executed on the_J±—day of September .2017.
OWNER: CONTRACTOR:
By By:
Name: r /3t W Name: Sam ever
Title: M ec.. _ Title: Vice President
Contractor's Contact Information:
Street Address:— 760 Horizon Drive,#201,Grand Junction,CO,81506
Contact Name: Sam Meyer,Vice President Contractor Lic#: C-006164
Exhibit IV
0�
0�
CHARLES CUNNIFFE
ARCHITECTS
CHANGE ORDER #48
PROJECT: City of Aspen Building Replacement Project-Aspen Police Department
Aspen, Colorado
DATE: August 10, 2017
TO: City of Aspen, Steve Barwick, City Manager
JOB NO.: 1506
Per the Owner/Architect Agreement AIA 8101-2007 dated March 16, 2015, the following services
requested by the Owner are beyond the scope of work defined by the aforementioned
Agreement and the following is a request for approval to supplement the Agreement:
DESCRIPTION OF ADDITIONAL ARCHITECTURAL CONSULTANT SERVICES:
A) Added scope services for Construction Administration (C.A.) of 540 Employee Housing, to
include site visits, coordination with consultants, building department, HPC, contractor,
and owner.The total services fee below includes an allowance for 245 total hours over a
20 week estimated period of construction.
CCA:200 total hours-$30,000
KL&A:45 hours-$4,500
CMW: $12,750
Total C.A. - Change Order#48-Services Fee: $47,250
It is agreed by both the Owner and the Architect that the initial hourly allowances as stated
above are reasonable. Should the hourly demand be anticipated to unreasonably exceed
those allowances, the Architect shall be compensated for an additional and reasonable
amount as agreed to between Owner and Architect.
610 East Hyman Avenue Aspen,Colorado 81611 970.925.5590 Fax 970.920.4557 www.cunniffe.com
Exhibit IV
B) Ootional LEED for Homes Additional Service
Coordinate and prepare documentation for LEED for Homes certification (see attached
proposals for more information).
Active Energies: $11,260
MKK: $5,000
CCA: $8.250
Total Optional LEED (Add to CO#48): $24,510
Gross Change Order(A&B)#48-Services Fee: $71,760
Reimbursable expenses associated with these services are in addition to the Change Order
services fee and will be charged according to "Exhibit A-Schedule of Hourly Billing Rates" per
the Owner/Architect Agreement AIA 8101-2007 dated March 16, 2015.
AUTHORIZED BY:
St vvee Barwick,City of Aspen Date
AUTHORIZED BY: (�� -r 8 ' i7
Charles L. Cunniffe, AIA, Pal Date
Charles Cunniffe Architects
610 East Hyman Avenue Aspen,Colorado 81611 970.925.5590 Fax 970.920.4557 w .cunnitfe.com
KL&A, Inc.
Structural Engineers and Builders
Request for Additional Services
KL&A, Inc., ("Structural Engineer")
215 N. 12"Street, Unit E
Carbondale,CO 81623
Telephone: (970)927-5174
Date:
August 8, 2017
Submitted to:
Charles Cunniffe Architects
610 East Hyman Avenue
Aspen,CO 81611
Attention:Scott Smith
Project:
540 Housing—Construction Administration
Aspen, CO
Description of Additional Services:
Construction Administration including reviewing submittals, answering questions from
the field, and approximately two site visits.
Total time associated with above:45 hours @ $100/hour=$4,500
Description
Total,this Add Service: $4,500
Agreement:
Structural Engineer:
KMA, Inc.
by
4 D1 .'-D.
Dan Doherty, P.E.
Principal Engineer
Page 1 of 1
Exhibit IV
Mr.David Rosenfeld
Mw
Charles Cunniffe Architects
540 Employee Housing
August 8,2014
3
Agreed and Approved
Construction Observation Services
540 Employee Housing
540 Main Street,
Aspen Colorado
CMW No. 2017.0001.0
LEED Green Rater Proposal
Charles Cunniffe Architects
Reed Langhofer, AIA
Project Details—One Multifamily building, 8 total units, 3 stories
540 East Main Street, Aspen, CO
August 8, 2017
fh"
r
ACTIVE
PO Box 7627
Avon, CO 81620
Phone: (970) 3064233
Fax: (866) 403-3485
info@activeenergies.com
www.activeenergies.com
Cost Proposal
MEGAN M. GILMAN
President
Ms. Gilman has extensive experience in energy efficiency, green building Active Energies,Inc.
techniques,water conservation,indoor air quality,site design,and renewable megan@acttveenergles.com
energy related to multi-family and single-family projects. In her position at 970-306-4233
Active Energies, she regularly consults project teams on cost-effective Education
energy improvements, including calculations of cost-benefit analysis and • B.S.Mechanical Engineering,
retum-on-investment of green improvements, in addition to providing The Pennsylvania State
University,2004
guidance and verification services for the LEED for Homes program, as a a Photovoltaic Design and
Green Rater. Ms. Gilman has been involved with the LEED programs, and Installation,Solar Energy
has worked on certified projects of many different types. Her experience in International,2006
the LEED for Homes program allows her to provide project teams and other • RESNET Energy Rater
professionals with wonderful perspective on feasibility and achievability of Certification Training, Kansas
different prerequisites and credits, while also providing clear guidance on Building Science Institute,
2006
required documentation throughout the design and construction process. • Building Performance
Institute, Energy Analyst
In addition to work throughout the US, Ms. Gilman was selected as an Training,2011
International Green Rater, and has since worked on some of the first LEED
for Homes international projects outside of the US. Work includes a LEED Certifications
• LEED'AP
Gold certified project in Istanbul,Turkey which was only the second LEED LEED'Green Associate
for Homes certified project outside of North America. Ms. Gilman and her LEED'AP+Homes
team are also working LEED registered projects in Montenegro, Italy, LEED'Green Rater
Mexico,Colombia,Turkey,Peru,Tanzania, Israel, Spain, China, Israel and RESNET Accredited Energy
Russia. Rater
•
RESNET Accredited Green
Notable achievements include, certification of all three of Colorado's first Rater
•
RESNET Accredited Rater
multi-family LEED-H projects, all located in Aspen and Snowmass, Trainer
including a LEED Platinum multi-family project. Additionally,Ms.Gilman . ENERGY STAR'Partner
was instrumental in the certification of Colorado's first gut-remodel project
certified under the LEED-H program. Professional and
Community Affiliations
Ms. Gilman also provides training and coursework in energy efficiency, ' Chair,Board Directors,
en design, Holy Cross Energy
Bregn,and the LEED programs through an adjunct faculty position at . Board of Directors,Colorado
Colorado Mountain College and Active Energies' training accreditation. Rural Electric Association
Ms. Gilman also regularly hosts workshops on green building programs, • Board of Directors,Walking
including LEED for Homes, residential energy efficiency, and renewable Mountains Science School
energy, and has been invited to speak at several conferences, including • Member,Town of Vail
presentations on LEED for Homes projects for USGBC Colorado. Sustainable Building
Initiative
• Member, Eagle County
Documents and certificates showing certification through RESNET and Model Code Committee
USGBC are available upon request. • Adjunct Faculty,Colorado
Mountain College
Cost Proposal
LEED Multifamily Midrise Option
Green Rater, Preliminary Rating Completed
Energy Rater, Leadership and participation in one preliminary rating for one multifamily
and Provider building. Conducted as an in-person meeting with project team. Kickoff project by
Services leading project team through the checklist, identifying potential point items,
responsible parties and considerations for drawings, specs or equipment selection
based on checklist. Follow-up email and correspondence with project's intended
checklist.
Energy Modeling-HERS Rating of Units,as required by USGBC, including minor $700
updates to building envelope details,R-values and specifications
Mid-Construction Verification Site Visit $860
Leadership and participation in one on-site mid-construction site inspection to meet
project LEED certification verification requirements for one building. Includes
communication and customized list of verification items prior to site visit to help
prepare project team. Verification of current documentation and all on-site verification
requirements available for verification,including a site meeting with the project team.
Additional Mid-Construction Verification Visits,if Necessary $650
Each unit must be verified at the mid-construction point If all units are not
prepared at the same time,an additional visit will likely be necessary to complete the
required. In the case of larger projects, more than one additional visit may be
necessary.
$2,800
Final Verification&Testing Site Visit
Leadership and participation in one on-site final site inspection to visit each unit
within the building to meet project LEED certification requirements. Includes
communication and customized list of verification items prior to site visit to help
prepare project team. This site visit will consist of one day on the project site. Includes
review of the project site,verification of LEED for Homes prerequisites and credits,
completing blower door testing,duct leakage testing and verification of measures on
the ENERGY STAR v3 Rater Verification Checklists.
$5,400
Project Team Meetings and Correspondence
Participation in four team meetings by phone,correspondence on technical questions
and program guidance,preparation of documentation tracking list for the project team,
review of project specific documentation submitted by the project team as evidence of
compliance with credits. To be billed hourly at$120/hr. Estimated at 45 hours.
$850
LEED for Homes Provider Submission Fee
Review of submittal package by Quality Assurance Designee for compliance with
LEED for Homes requirements and credit verification. AE review with GBCI staff
regarding LEED checklist,supporting documentation and verification.
This proposal does not include registration and certification fees paid directly to USGBC.
Payment Schedule for Provider Scope
All payments are due upon completion of the particular scope of work Active Energies provides billing
once per month by email identifying completed scope of work during the prior month. Invoices are due
upon receipt.
Exhibit IV
MKK
AGREEMENT FOR ADDITIONAL SERVICES CONSULTING ENGINEERS,INC.
June 12,2017
Scott Smith
Charles Cuniffe Architects
610 East Hyman Ave
Aspen,CO 81611
Re: Aspen Housing—LEED for Homes
MKK Project Number:2015.01.0084
MKK Consulting Engineers, Inc. agrees to provide additional services on this project as described below.
Description of Additional Services:
Provide MEP design and LEED documentation for MEP related credits associated with the LEED
Housing Certification of the Aspen Housing project. LEED administration and energy modeling
will be provided by Active Energies.
Additional Services Schedule Agreement:
The completion date for the services and related scope items will be extended by 10 working
days from the date that the signed agreement is received.
Additional Services Fee Agreement:
Charges for this change will be billed as additional services as a lump sum of$5,000.
Services will proceed upon receipt of a signed copy of this form. All Terms and Conditions of the original
contract dated 11/21/16 shall remain in effect.
ENGINEER
MKK Consulting Engineers, Inc.
I'ali, 141*�
Ken Urbanek, PE
Director of Engineering&Principal
CC—David Rosenfeld w/CCA
DENVER-7600 E Orchard Road,Suite 250-S•Greenwood Village,CO 80111-2518•Main:303.796.6000 Fax:303.796.6099•www.mkkeng.com
Exhibit V
•
2 ri bient energy
••• impact. collaborate. Innovate
CHANGE ORDER
submitted via electronic mail to Rob Taylor and Saul Abrahams
To: Saul Abrahams
Company: NV5
Phone Number: 720.217.6822
Cc: Steven Anticknap, Greg Evans, Ambient Energy
Rob Taylor, Senior Project Manager, Rob.Taylor@nv5.com
Date: 7/12/2017
Proposal Name: Aspen Civic Space Relocation
Proposal No: 15157
Change Order No: 4
From: Renee Azerbegi, Renee(cclambient-e.com 303.278.1532 x208
Dear Saul,
Upon your request, Ambient Energy is submitting this Change Order for Commissioning services on
one additional buildings for the Aspen Civic Space Relocation project - the Multi-Family Housing
building on the Police Station site. Thank you for the opportunity to provide an additional scope of
services for this project.
Multi-Family Housing Building, Police Station Site
KEY ASSUMPTIONS
The original proposal was based on a 15,000 sf police station.
The final police station is 18,515 sf plus 8,290 of multi-family housing for a total of 26,805 sf.
This additional service request is for the multi-family housing building.
The main police station will pursue a LEED v4 BD+C rating.
• The multi-family buildings will not pursue a separate LEED rating.
There will be separate reports for both buildings.
The Owner is the City of Aspen.
Any significant changes to these Key Assumptions may affect the Proposed Tasks and associated Fee
for the project. Client shall inform Consultant of any discrepancies to the above listed Key
Assumptions.
DENVER • SAN FRANCISCO
Ambient Energy• 130 W 5th Ave Denver CO 80204• 303.278.1532 • www.ambient-e.com
Exhibit V
.; ambient energy
PROPOSED TASKS
Task 001 Commissioning of Multi-Family Building at Police Station Campus
Construction Documents
Develop the commissioning plan.
HVAC Commissioning review of 90% Construction Design documents (or final construction
documents) as a back-check review, and issue comments to the Owner and Design Team.
Plumbing Commissioning review of 90% Construction Design documents (or final construction
documents) as a back-check review, and issue comments to the Owner and Design Team.
Electrical Commissioning review of 90% Construction Design documents (or final construction
documents) as a back-check review, and issue comments to the Owner and Design Team.
Update Cx plan with a preliminary list of equipment and systems to be commissioned for the
project.
Review of design from a Building Envelope perspective (by Pie).
Attend design overview meeting with architect and consultants.
Construction Administration
Conduct the commissioning kick-off meeting with the owner, design team attend.
Coordinate and schedule commissioning activities with construction schedule (publish to
commissioning team after the Cx kick-off meeting).
Provide list of specifications needing to be submitted for review.
Verify systems manual updates and delivery.
• Review contractor submittals applicable to systems being commissioned, submittals are
reviewed for compliance to the OPR and BOD, and must be concurrent with the architect's and
engineers' review of the submittals. Provide comments to the Owner and Design Team.
Facilitate and document that an owner personnel training is conducted.
Review equipment Warrantees and O&M Manuals.
Develop systems manual for commissioned systems Including Current Facility Requirements,
operations & maintenance plan.
• Update Cx plan for construction and distribute to the Cx Team members.
Receive equipment submittals accepted by the engineer of record (EOR) and develop the
construction checklists for the systems to be commissioned on the project.
Review and comment on construction checklists completed by the contractor(s)
Develop and Maintain Master Issues Log to document findings. Issue Master Issues Log with
Site Visit Reports.
• Provide site visits with associated commissioning reports. Site visits include review of HVAC and
plumbing.
Provide site visits with associated commissioning reports. Site visits include review of electrical
service and distribution, and lighting.
Develop Test Scripts (Functional Performance Tests Procedures) for the systems to be
commissioned. Deliver to the contractor for review and comment.
Review and comment on TAB report, send comments to Owner. Note that TAB must be
complete prior to start of Functional Testing.
Exhibit V
ambient energy
• Direct, verify and witness functional performance testing, (coordinate FPT with controls
contractor).
Commissioning Process
Site visits will be coordinated with the design and construction schedule. If the project only accepts
the fundamental commissioning option, then the warrantee review site visit can be eliminated from
the list below.
Up to eight additional (8) Site Visits will be Conducted Which Include:
• One (1) during construction to review the installation of the equipment and systems to be
commissioned and kickoff meetings.
• Four (4) building envelope site visits (via Pie Consulting).
Three (3) functional testing.
Systems that will be Commissioned Include:
HVAC (heating, ventilation and air conditioning systems)
• Lighting and daylighting control systems
• Building envelope.
• Domestic hot water systems
Building Automation System (BAS)
Exhibit V
.; ambient energy
'0
Total Change Order Fee:
Client shall select below which task has been approved or not approved by selecting Yes or No by
each task.
Task Service Description Yes/No Fee
Task 001 Fundamental and Enhanced Yes No $15,700
Commissioning of Multi-Family
building
Subcontr Yes No $14,200
actor
Expenses Yes LINo $2,775
Total Total Fee with Subcontractor and Yes No $32,675
Expenses
Total Accepted Fee
Fee
Fees shall be billed at a ® lump sum rate OR ❑ time and materials rate based on Selection of
Payment Option by Client, unless Change Orders are requested by Client that are not included in
Proposed Tasks. Client agrees to pay Consultant amount for accepted Proposed Tasks performed by
Consultant.
Reimbursable Expenses
Reimbursable expenses including parking, meals, charrette folders, printing, reproductions, mileage,
parking, and deliveries ® are OR ❑ are not included in this Statement of Work.
Exhibit V
e �e
ambient energy
Upon notice to proceed and signed Change Order letter, Ambient Energy will begin this consulting
service. Thank you for the opportunity to continue to support NV5 on this project! The Parties
acknowledge that each has fully read and understood this Change Order, and is, intending to be
legally bound, thereby executed.
AMBIENT ENERGY, INC.
By:
Name: Renee Azerbegi
Title: Principal
Date: 7/12/2017
By: Cit of Aspen u
Name: Steve Barwick
Title: City Manager
Date: 9-/I-/7
Exhibit IV
Should the level of effort be considerably more than that estimated in the attached schedule NV5 request that the fee
may be adjusted to reflect the actual work performed.
Except as expressly amended or modified herein,the Contract shall remain unmodified and in full force and effect.
OWNER: PROJECT MANAGER:
Name: //°ti L' "�"'^'' Name: Com' 08/17/2017
Title: Title: Proiect Director
Exhibit IV
N V !� 5
ASA#10
CONSULTING SERVICES AGREEMENT—ADDITIONAL SERVICES AUTHORIZATION(ASA)
Project Name: City of Aspen—Civic Space Relocation Project
Owner: City of Aspen
Project Manager: Jack Wheeler,Capital Asset Manager
Project Address: 130 S Galena St,Aspen,CO 81611
Contract: Council Resolution 120-2015,26 October 2015
Date: 17 August 2017
Owner and Project Manager are parties to the above-referenced contract("Contract")and wish to amend the Contract as
follows:
Project Manager has been requested to perform and agrees to perform the following additional services for the project.
The services outlined below are in addition to the services under the original agreement:
Further to our discussions, we are excited to submit our revised fee proposal for Owner Services to assist you with the
Affordable Housing at 540 Main St(Aspen Civic Space Relocation Project Aspen Police site),including improvements of
the historic structures to refurbish the large structure to be habitable.
These structures are closely integrated into the overall site plan for APD and are included the HPC Land Use application
package. Access, ADA routes, elevators and the site plan all are heavily integrated between our base ACSRP scope and
this add service. Current plans indicate 8 multifamily units.
The revised schedule is as follows:
• to end lune 2017 Design
• July to October 2017 Building permits&establish GMP
• November 2017-June 2018 Construction,closeout&turnover
Per the attached fixed fee schedule and based on the hourly effort estimated,NV5 will:
• Oversee program finalization and approval
• Manage cost and schedule
• Oversee design and confirm it aligns with program
• Facilitate the design approval process with the asset,the housing department and APCHA
• Oversee the permitting process
• Finalize GMP package pricing with the APD contractor(Shaw construction).
Rob Taylor will lead the project,assisted by Saul Abrahams.
TOTAL additional Lump Sum fee for additional services described above:$59,995. This includes an allowance for
reimbursable expenses such as travel and accommodation.
n
0
P
0 o N N Q
0 0 o voi
a
tl
0
0 o c N Q
a m m < e N
f
N o 0 0 o Q
O m m O e N
C N
�• < � Z m m d O N
C N
� N p
W O e O N
O n p4
O Q 8N
m O O N G
U Op W O .n
Qm m O O 10811
N N O Jt �O/f O
] m C m eo O •�
L
O H 9 f
f ¢ a
`u
E u C
Y � E
i u m u
a u
6 N
i• � A 6 � � � N 16Q ` n �