HomeMy WebLinkAboutresolution.council.023-99 RESOLUTION NO. _~
(Series of 1999)
A RESOLUTION GRANTING THE CONSTRUCTION CONTRACT TO ELAM
CONSTRUCTION, 1NC., FOR THE CITY'S 1999 STREET IMPROVEMENT PROJECTS, AND
AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF
THE CITY OF ASPEN
WHEREAS, there has been submitted to the City Council a contract between the City of
Aspen, Colorado and Elam Construction Company, Inc., a copy of which contract is annexed hereto
and made a part thereof.
NOW, WHEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ASPEN, COLORADO:
Section One
That the City Council of the City of Aspen hereby approves the contract between the City of
Aspen, Colorado, and Elam Construction, Inc., regarding the 1999 Street Improvement Projects, a
copy of which is annexed hereto and incorporated herein, and does hereby authorize the City
Manager to execute said contract on behalf of the City of Aspen.
Dated: ~W_.4_~_~; ~, ,1999.
I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the foregoing is a tree and
accurate copy ~f that resolution adopted by the City Council of the City of Aspen, Colorado, at a
meeting held ,~]'~c.~ _.,z~. , 1999.
Kathryn S. Ko~, City Cl~rk ~
1999 STREETS IMPROVEMENTS PROJECT
Project / Bid Number 99-003
SCOPE OF WORK
The work is to include: re-basing and paving of selected streets; asphalt overlaying
of selected streets; Roto-milling and asphalt overlaying of selected streets; slurry
seal of selected streets; cape seal of selected streets; slurry seal of selected streets;
removing and replacing selected concrete cross-pans; a limited amount of concrete
curb, gutter and sidewalk replacement replacement; crusher fines walk trail to be
constructed along Doolittle Dr.; drainage ditch to be constructed on Doolittle Dr.
along with cleaning culverts, re-shaping their basins, and reshouldering the road.
Also included in the bid package is an alternative bid for the golf course
improvements.. The scope of work includes construction of a cart path, building
three (3) tees, and constructing a drainage trench and drainage pit.
These streets are not included as a portion of the Koch contract.