Loading...
HomeMy WebLinkAboutresolution.council.136-17 RESOLUTION # 136 (Series of 2017) A RESOLUTION APPROVING A CHANGE ORDER TO THE CONTRACT BETWEEN THE CITY OF ASPEN, COLORADO, AND EXCAVATION SERVICES, INC, AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a change order request to address an emergency pipe replacement on Lake Avenue; and WHEREAS, a contract setting forth the terms and conditions regarding the curb and gutter replacement project between the City of Aspen,Colorado, and Excavation Services, a true and accurate copy of which is attached to the contract as Exhibit `B", was adopted by Resolution #69, Series 2017, on April 24, 2017. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves a change order to the contract between the City of Aspen and Excavation Services, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 91h day of October, 2017. Steven Skadr n, Mayor I, Linda Manning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held October 9, 2017. 0 Lmda Manning, City Clerk EXCAVATION SERVICES INC. PO Box 1159 CARBONDALE, CO. 81623 PHONE 970-963-8355, FAX 970-963-4336 CONTRACT DATE 8/28/2017 REVISED 9/26/2017 CONTRACTING PARTY Cit); of Aspen Engineering 130 S. Galena Street Aspen, Colorado 81610 ADDRESS OF PROPERTY Lake Avenue drainage DESCRIPTION OF WORK TO BE DONE: We are pleased to submit the following bid for the work at the site listed above. Bid based on drawing by RIFE. Any testing or permits required to be supplied by COA. Any rerouting of existing utilities due to pipe conflicts will be done on a time and material basis. Mobilization. $ 1,200.00 Erosion control $ 1.000.00 Traffic Control. $ 2,500.00 RCP Pipe. $ 3,850.00 (Supply 28.85' of 21" RCP. Includes delivery to site.) Installation. $ 10,220.00 (Supply all machines, labor, trucking. 1/4" class 6 aggregate, dump fees for installation of RCP. Includes removal of existing pipe.) Inlet box. $ 8,000.00 (Supply and install one type 13 inlet with grate.) Asphalt patching. $ 3,500.00 Rip Rap ditch & inlet. $ 1,200.00 JOB TOTAL. $31,470.00 Exclusions: Storm Water Management Plans and record keeping Rock excavation Survey and layout Soils testing Snow removal Winter protection GPS As-builts Payment terms: Billing statements will be forwarded on or before the 25th of each month for work completed that month. Payment is due upon receipt.Amounts outstanding after the 15th of the next month shall beer interest at the rate of 1.5%per month or l g%annually. Rock Clause: Blasting or splitting of rocks encountered,and special rock handling,including rocks in excess of 2.5 cubic yards or ledges 4 inches or more,shall be charged on a cost plus basis. Dewaterine: In the event that underground water is encountered,dewatering the site shall be charged on a cost plus basis. Underground Utilities: Excavation Services is not responsible for the cost of any repairs to private utility lines not shown or located by owner or contracting party. I Permits and Tap Fees: Contracting patty is responsible for payment of all permits, taps and tap fees, public or private (subdivision regulations)prior to commencement of work. THIS CONTRACT IS ENTERED INTO BETWEEN THE UNDERSIGNED PARTIES AS OF THE DAY AND YEAR ABOVE WRITTEN. EXCAVATION SERVICES INC'. CONTRACTING P RTY Troy Buster E .w.'—:m— ��- CITY OF ASPEN CHANGE ORDER FORM CHANGE ORDER NUMBER: 2: Lake Ave Emergency Culvert Repair PROJECT NAME: 2017 Concrete Replacement and Pedestrian Improvements ACCOUNT NUMBERS 000.327.81200.52130.50465, 160.328.81200.57210.50272 TO: Excavation Services Company Name 226 12th St. Carbondale, CO 81623 Address Contract Date: April 24, 2017 Project: 2017-50465 Upon approval of this form by the City Manager or designee, you are directed to make the following changes in this contract: Enter a brief description of the project and why the change order is necessary. Barwick has to approve Change Order over$l OK. The original Contract Sum was ............................:........................$ 380,610.00 Net change by previous Change Orders.............................................S 20,231.00 The Contract Sum prior to this Change was .......................................$ 400,841.00 The Contract Sum will be increased By this Change Order .........................................................S 31,470.00 The new Contract Sum, including this Change Order; Willbe ........................................................................$ 432,311.00 SUBMITTED BY: ACCEPTED BY: REVIEWED BY: AP OV D BY: Jack Danneberg Troy Buster ,,p,�'' /J'�`'^+'4 ENGINEERING EXCVATION Don Taylor „ SteveBarwick CITY OF ASPEN SERVICES CITY OF ASPEN CITY OF ASPEN ADDRESS ADDRESS ADDRESS ADDRESS 130 S. Galena St. 22 12Ttt ST 130 S.Galena St. 130 S.Galena St. Aspen Carbondale Aspen Aspen CO 81611 CO 81611 CO 81611 CO 81611 Troy ,.,.....,....., �! // BY: _ _ BY: Buster BY: BY: DATE: DATE: 10/20/2017 DATE: �a"�� �1 DATE: �D J 7-/2