HomeMy WebLinkAboutresolution.council.137-17 RESOLUTION # 137
(Series of 2017)
A RESOLUTION APPROVING A CHANGE ORDER TO THE CONTRACT
BETWEEN THE CITY OF ASPEN, COLORADO, AND HASELDEN
CONSTRUCTION, AUTHORIZING THE CITY MANAGER TO EXECUTE
SAID CHANGE ORDER ON BEHALF OF THE CITY OF ASPEN,
COLORADO.
WHEREAS, there has been submitted to the City Council a change order
request to address emergency pipe replacements on Mill and Bleeker Streets; and
WHEREAS, a contract setting forth the terms and conditions regarding the
Mill Street Complete Streets Project between the City of Aspen, Colorado, and
Haselden Construction, a true and accurate copy of which is attached to the
contract as Exhibit `B", was adopted by Resolution#110, Series 2017, on
September 25, 2017.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves a change order
to the contract between the City of Aspen and Haselden Construction, a copy of
which is annexed hereto and incorporated herein, and does hereby authorize the
City Manager to execute said agreement on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by the City Council of the City of
Aspen on the 9'b day of October, 2017.
Steven Ska on, Mayor
1, Linda Manning, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City Council
of the City of Aspen, Colorado, at a meeting held October 9, 2017.
(a 14�—'
Linda Manning, City C rk
Haselden Construction
6950 South Potomac Street FF
Centennial, Colorado 80112
303-751:1478 TEL
303-751-1627 FAX
www.haselden.corn
HASELDEN
CONSTRUCTION
August 21,2017
Pete Rice
City Of Aspen
201 N. Mill St
Suite 203
Aspen,CO 81611
Reference: Mill Street Traffic Improvements
Dear Mr.Rice:
We are pleased to submit this Lump Sum proposal for your review pricing to provide all necessary labor,
materials and equipment for the Mill Street improvements per JR Engineering plans dated 9/21/16(Mill Street
Complete Street)
BaseBid:........................................................$ 143,884
CLARIFICATIONS:
• We have excluded any asphalt patching as none is shown
• CDOT permit will be provided by City of Aspen
• Conduit will need to be laid during the sidewalk work taking place in September&October 2017
• Bore of 21 feet must take place during Mill St sidewalk work September&October 2017
• Pricing does not include temporary striping at Mill St.
• Re-Mobilization of painting operation only all other work to be completed in one mobilization
DOCUMENTS,
Our proposal is based off documents provided to the team by City of Aspen from JR Engineering Dated
9/21/2016.
Sincerely,
HASELDEN CONSTRUCTION
Brad Nobbe
Project Manger
CC.Brian Hunt
I
�� � �1�- � �
��1-1�1- 1-1�
1 �� �Ilt�1-�� C�C��
�1�*[Tl 1�1�1�1�1�
1 . IIF-�il�l�l�
��I i�1�I-1�I�1�
��������'�1-1-1-1-1-
��_?!•I�I�1 1�1
J
��:�1�1-1�1�1�
��:-�1-I�1 1�1-
��_�1-I-1 1�1-
��'I-I-1 1�1�
��-�1-1-1=1 1�
r_z-._��r.-���.-�I�I�I�Ir1�
t'_F3.���-�1�1�1-I�1
�r_�1-1-1-1�1�
,� � 1�
c ... . ��C;�1 1-1-1-1-
-�1-1- -1-1-
SI����'-�1-1- -1-1-
�al�l� �1�1�
1 �1- I 1�
_ -�1 -
___ I^f-���"�t_I�I 1�1�1�
1-- ��-�I�I�I�t�1�
i1-1�1lF '+�
C���ICI®IC..
C_ .�I-I�IY .-
�f�'3:�I-1�1�1�1�
��:1>_t�1-1�1�1�
__ ®I�IrI`= �I�
�-1-1-I�I�i�
����I�I��1��
.. ,. __ '
■T:.1111-1-1-1�1-
����������C
� 1 1-1�1-1-
Ln„"an'�R=Z�-].�f���ll�1-1-1-1-1-
� 1 1 1 1 1
�-1-1-1�1�1�
��T��1.1-1-1-I-1�
�t'C�'_�1-1-1�1�1-
�-1-1-1-I�1�
-1--I-I�I�I�
-I 1-1�1�1�
Kral-li�l�l�l�
��1�1-I�I�I�
��1-I-I�1�1�
fSS�ft�l�l-1�1�1-
m[:�LII�I�I�I�I�
�-1-1-1�I�1�
�-1�1-1�I�1�
m[t�?�AJI�I�I�I�I�
��1-1�1-1�1-
CITY OF ASPEN
CHANGE ORDER FORM
CHANGE ORDER NUMBER:CA : 5WV-1 I .# 1\G- 20k1
PROJECT NAME: MM ?)\p_eKer Frneraencu S'IZ n-n sewcXc 'ReP\aCe—MP—r\ '
ACCOUNT NUMBERS l(p().32_� . �12�• 6-12.10. S02-13
TO: BQS66en Constroc:lrion
Company Name
252G S : Grand Ave -*Wq C levtwocd Springs . CO 3I1o01
Address
Contract Date: q -n 1—1 Project: MOM SiTeC,{ VMPro�lew—rl�S
Upon approval of this form by the City Manager or designee, you are directed to make the
following changes in this contract: Enter a brief description of the project and why the change
order is necessary. Barwick has to approve Change Order over$10K.
The original Contract Sum was .....................................................$ 143,3 'A
Net change by previous Change Orders............................................$
The Contract Sum prior to this Change was .......................................$ 1y��y
The Contract Sum will be increased
By this Change Order .........................................................$ 112 1928
The new Contract Sum, including this Change Order,
Willbe ........................................................................$ 25(D-,5 1Z (�
SUBMITTED BY: ACCEPTED BY: REVIEWED BY: APPROVED BY: C�
nee Don Taylor Steve Barwick
CITY ASPEN CITY OF ASPEN CITY OF ASPEN
ADDRESS ADDRESS ADDRESS ADDRESS
130 S. Galena St. 130 S.Galena St. 130 S.Galena St.
Aspen Aspen Aspen
CO 81611 CO 81611 CO 81611
BY: U BY: BY: �o a �✓� BY:
DATE: 0 DATE: DATE:--Ib DATE: