HomeMy WebLinkAboutminutes.hpc.19980805ASPEN HISTORIC PRESERVATION COMMISSION MINUTES OF
AUGUST S, 1998
Meeting was called to order at 5:00 p.m. by Chair-person Suzannah Reid,
with Roger Moyer, Mary Hirsch and Susan Dodington present. Excused
were Jeffrey Halferty, Melanie Roschko, Gilbert Sanchez and Heidi
Friedland.
COMMISSIONER COMMENTS
Amy informed the HPC that she received seven calls concerning the crane at
414 N. First, Louis Pasada's house. The crane was allowed by the building
dept. It is a temporary thing that they are using to pick up materials and
putting them on the site so that they do not have to keep driving back and
forth. It is 110 feet high.
Mary relayed that she had a conversation with Tom Cardomen and Louis said
the crane would be there for at least 18 months and maybe two to three years.
When the project was oked everything was to come down the side road
through the alley. It is hanging over ACES. She also informed Staff that the
picture wall explaining the project is still not up.
Amy relayed that the Isis is going under construction next week.
203 S. GALENA - GUCCI - WALL PARTIAL DEMOLITION
Chris Bendon, planner relayed that the HPC did a site visit to look at the wall
and apparently there was a fire years ago that effected the structural
capabilities and the structural engineer feels that the wall should come down.
1) The wall could completely be restored using the same brick or brick from
other parts of the building.
2) A steel bearing wall could be constructed with an exterior veneer of the
old bricks. In this scenario, less of the original wall would need to be
demolished.
3) The wall could be reconstructed with a stucco veneer over steel studs.
Ted Guy, architect was sworn in and presented.
ASPEN HISTORIC PRESERVATION COMMISSION MINUTES OF
AUGUST S, 1998
Ted relayed that the area is about 13 feet. The brick wall would be like it
was originally and the door would be taken out. There is some concern
presently with water leaks.
MOTION: Roger moved to approve the partial demolition of the upper
south west wall of the Brand Bldg. 203 S. Galena St. with two conditions:
1) The applicant preserve as much of the original construction as possible
on the western section of the wall by using the second alternative suggested:
Reconstruction of the wall by using steel bearing studs and a historic brick
veneer.
2) Priority of the bricks' used for this veneer shall be: 1) bricks' salvaged
from the subject section of the wall; 2) historic bricks' salvaged from other
portions of the building, 3) historic salvaged bricks from off-site.
Motion second by Suzannah. ,411 in favor, motion carried.
Suzannah said it is important to say that it is the eastern part of the wall.
Suzannah relayed that there were some individiuals on the board that had a
problem with the door pulls but the doors can be reversible. She does not
feel they should have to come back that the pulls can be handled by the
monitors.
Mary made the motion that the door handles be handled by the monitors;
second by Susan. All in favor, motion carried.
MOTION: Roger moved to adjourn; second by Suzannah. All in favor,
motion carried.
Meeting adjourned at 5:15
Kathleen J. Strickland, Chief Deputy Clerk
2