HomeMy WebLinkAboutresolution.council.043-05 RESOLUTION NO. Series of 2005
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO,
APPROVING AN AMENDMENT TO THE PART ONE CONTRACT, BETWEEN
THE CITY OF ASPEN AND SHAW-POSS-DHM, AND AUTHORIZING THE
MAYOR OR CITY MANAGER TO APPROVE SAID CONTRACT AMENDMENTS
ON BEHALF OF THE CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council a change order to the
Part One Contract between the City of Aspen and Shaw-Poss DHM in the amount of
$1,911,084.00 for certain "soft costs" for the construction of Burlingame Ranch;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF ASPEN, COLORADO:
That the City Council of the City of Aspen hereby approves a Change Order to
increase the contract price by $1,911,084.00 of the Part One Contract, between the City
of Aspen and Shaw-Poss-DHM. A copy of said Change Order is annexed hereto and
incorporated herein, and does hereby authorize the Mayor or City Manager to approve
said Change Order of behalf of the City of Aspen.
ADOPTED by the City of the City of
INTRODUCED, READ AND ~o~jacil~
Aspen on the/~ay o~2005.
I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the
foregoing is a tree and accurate copy of that resolution adopted by the City Council of the
the day here above stated.
City of Aspen, Colorado, at a meeting held on
'Kathryn S. Ko~ ~ity Clerk
TLO- saved: 6/7/2005-271-G:\tara\ResosXBurlingame Ranch contract amendment doc
A~rACHMENT A
CC APPROVED CHANGES TO ORIGINAL PLAN
ORIGINAL CC
Approved
Additions
2.01 Extend "Bluff Trail" along North Edge 98,600
2.03 Conduit to future street lighting 62,484
2.04a Two street lights at each (2) intersections in PHI 99,702
2.06 Install additional transit stop/trash 38,400
2.20 Underground system, ditch, reclaimed, and domestic water option.· 325,000
6.02 Solid surtace tops @ Cat 2-4 in lieu of laminate (kitchens) 157,248
6.03 Solid surtace tops (~ Cat 5-7 in lieu of laminate (kitchens) 231,840
8.04 Clerestory windows at select units 36,000
9.01 Bamboo finishes in units living rooms cat 5-7 in tieu of carpet 177,840
9.02 Bamboo finishes in units living rooms cat 2-4 in lieu of carpet 275,796
9.03 Bamboo finishes in units kitchens cat 2-4 in lieu of linolieum 51,480
9.04 Ceramic tile in lieu of linoleum in bethrms cat 2-4 28,980
9.05 Babmoo finishes in kitches cat 5-7 in lieu of ceramic tile 112,320
9.10 Tile surrounds in bathrooms in lieu o fiberglass enclosures 2-4 114,048
9.11 Tile surrounds in bathrooms in lieu o fiberglass enclosures 5-7 164,160
15.01 Alternate tub using cast iron in lieu of fibarglass cat 2-4 units 95,040
15.02 Alternate tub using cast iron in lieu of fiberglass cat 5-7 units 164,160
17.01 Commons Euilding Shell built in PHI 564,768
17.02 Change live-work units to conventional units 181,120
SUBTOTAL 2,978,986
Contingency -- (10%) 297,899
Developer Fee of 2.5 % 74,475
Jun-05
REVISED CHANGE IN
ESTIMATES for COST (from
CC Approved original
Changes estimate)
98,600
62.484
25,096 (74,606)
79,716 41,316
394,971 69,971
157,248
231,840
53,022 17,022
221,530 43,690
332,213 56,417
66,856 15,376
36,120 7,140
165,599 53,279
114,048
164,160
95,040
136,800 (27,360)
564,768
181,120
3,181,231 202,245
318,123 20,225
79,531 5,056
$ 3,351,359 $ 3,578,885 $ 227,526
** This item was a request of the Cit~ Council to keep all ~radin~ within the Phase I boundary.
PUD APPLICATION REQUIREMENTS - ADDITIONAL COSTS
PUD Additional
Costs
2.24 In-line cont roi valve (for water line) 6533
2.27 Barrier fence/erosion control for protecting area outside of PHI 66177
2.28 Level spreaders to reduce erosion 100822
2.29 Root barders (49 trees in ROW 5If barrier/tree 24" deep panels) 11644
2.30 Landscape manual & weed management plan for HOA 10935
[~ 196,111
Contingency - (10%) 19,611
Developer Fee of 2.5 % 4,903
$ 220,625
Odginial CC Approved items $ 3,578,885
PUD Items $ 220,625
TOTAL IF ALL ITEMS APPROVED $ 3,799,610
FINAL SOFT COST ALLOCATION
Permits
Building Permits
Plan Review Fees
Energy Code
Impact Fees
Water Tap
Sewer Tap
School
Park for RO Lots
Transportation
Holy Cross
Gas
Increase from Original Budger to Current
Mark-Up
TOTAL
Shaw's Original
Budget
88,828.00
57,738.00
8,883.00
963,148.00
322,507.00
21,938.00
339,500.00
g0,000.00
75,000.00
1,967,542.00
2.50%
2,016,730.00
Shaw Proposes
become COA Responsibility
88,828.00
57,739.00
8,883.00
1,616,352.00
322,646.00
157,517.00
339,500.00
90,000.00
75,000.00
2,756,465.00
~;l~i~ $ir~t ~menbment, made and entered into on June 13, 2005, by and
between the CITY OF ASPEN, 130 S. Galena Street, Aspen, Colorado 81611,
hereinafter called the "City", is hereby amends the Part 1 Agreement as follows:
Developer:
Shaw Builders LLC
760 Horizon Drive
Grand Junction, Colorado 81506
For the following project:
Budingame Ranch Affordable Housing Development
Stage Road, Aspen, Colorado
A master planned affordable housing development consisting of three phases of
construction, totaling 236 residential units and lots.
AMENDMENT
ARTICLE 8
PAYMENTS AND BASIS OF COMPENSATION
8.5
The total amount for Part 1 Agreement shall total lump sum amount of
$4,483,070. This amendment is based on:
· The original Part 1 lump sum amount of $2,241,872 plus
Change Order #1, $206,714.
· Part 2 Soft Costs reallocated to Part 1 for an increase of
$2,034,484 ($1,911,084 + 6.5% contingency)
This increase reflects a change in scope of work as well as a movement of soft
costs from the Part 2 contract to the Part 1 contract. The Scope of Work now
includes the following list of City Council approved additions and City Council
approved Planned Unit Development (PUD) application requirements.
Similarly, Part 2 of this Agreement requires the Developer to hold a Performance
Bond for construction. The cost of this bond is a cost to the City. By reallocating
the Soft Costs from Part 2 of this Agreement to the Part 1, the Performance Bond
amount is reduced and therefore reduces expense to the City. Therefore, Soft
Costs in the amount of $1,911,084 (plus 6.5% contingency) previously
associated with Part 2 are hereby reallocated to Part 1. (See Attachment "A':)
WITNESS WHEREOF, the parties agree hereto have executed this Part 1
Agreement on the date first above written.
ATTESTED BY:
Title:
RECOMMENDED F~OR AI~PROVAL:
City Asset Management Department
CITY OF ASPEN, COLORADO
APPROVED AS TO FORM:
City Attorney
ATTESTED BY:
Title:
DEVELOPER:
Note: Certification of Incorporation shall be executed if Developer is a
Corporation. If a partnership, the Agreement shall be signed by a Principal and
indicate title.
BURLINGAME PHASE I
TOTAL COST- DEVELOPMENT MODEL
6/10/2005
TOTAL DEVELOPMENT COSTS
ACQUISITION
Total Acquisition Costs
Provided by City
No Cost
HARD COSTS
Total Site Development Costs
Total Site Amenities
Total Building Costs
SoladPhotovoitaics
Total CORE subsidies assumed in program
$ 4,009,394
$ 157,500
$ 21,656,790
$ 77,750
$ (381,000)
TOTAL HARD COSTS $
TOTAL SOFT COSTS Part 2 Contract $
TOTAL CONTINGENCY $
DEVELOPERFEEincludingCouncil/PUDApprovedchangesat2.5%fee $
TOTAL DEVELOPMENT COST PART2
25,520,434
1 911 ~6~' Adjusted
2,612,668 Adi.s~ed
726,138 Agj.sted
$ 30,770,7O9
TOTAL CONTRACT PART 2
TOTAL DEVELOPMENT COST PART 2
City Council Approved Changes
PUD Approved Changes
Warranty Reserve adjusted for changes
CORE Subsidy
TOTAL AMOUNT CONTRACT PART 2
$ 30,770,709
$ 3,181,231
$ 196,111
$ 288,454
$ 381,000
$ 34,817,506
PART 1
TOTAL PART 1 CONTRACT
Finalized Authorized Changes to Part 1 Contract
TOTAL COSTS PART 1 Contract
=ART 2
HARD COSTS
Total Site Development Costs
Total Site Amenities
Total Building Costs
Solar/Photovoltaics
Warranty Reserve adjusted for changes
City Council Approved Changes
PUD Approved Changes
Developer Fee
Contingency
$ 2,241,872
$ 206,714
$ 4,009,394
$ 157,500
$ 21,656,790
$ 77,750
$ 288,454
$ 3,181,231
$ 196,111
$ 726,138
$ 2,612,668
$ 2,448,586
Original RFP
Original RFP
Original RFP
Original RFP
Adjusted for added scope
accounts for 2.5% credit on OOA soi~ costs
Adjusted for added scope
IHARD COSTS PART 2 CONTRACT
ITOTAL SOFT COSTS Part 2 Contract
SOFT COSTS PART 2 CONTRACT
TOTAL PART 1 & PART2
$ 32,906,036
$ 1,911,469
$ 34,817,506
$ 37,266,092
Pending Authorized Changes for Part 1 Soft Costs Contract $ 123,400