HomeMy WebLinkAboutordinance.council.019-73RECORD OF PROCEEDINGS
100 Leaves
ORDINANCE NO. 19
(Series of 1973)
AN ORDINANCE ESTABLISHING M~NDATORY BUILDING PERMIT REVIEW
PROCEDURES PENDING ADOPTION OF A NEW ZONING ORDINANCE AND
NEW ZONING DISTRICT MAP; DESIGNATING USES EXCEPTED FROM REVIEW;
ESTABLISHING REVIEW CRITERIA; PROVIDING FOR DESIGNATION OF
ADDITIONAL EXCEPTED USES AND REVIEW CRITERIA; AND SETTING A
TERMINATION DATE OF ONE YEAR FROM THE EFFECTIVE DATE.
WHEREAS, the Aspen City Planning Commission pursuant to its
authority granted in Section 139-59-1, et seq., of the Colorado
Revised Statutes has presented to the Aspen City Council the
1973 Aspen General Land Use Plan, consisting of a land use map
and text~ and incorporating its recommendations for amendments
to Aspen's Zoning Code and its zoning district map; and
WHEREAS, the adoption by the City of Aspen of these recom-
mendations will contribute toward the control of growth, will
balance and correlate land uses and transportation facilities,
will provide residential areas for permanent residents, broaden
the economic base of the community, accomplish a harmonious
development of the city in accordance with present and future
needs and promote the health, safety, convenience, prosperity,
and general welfare of the community, and
WHEREAS, the objectives and purposes of the anticipated
land use changes will be defeated if building permits issue for
future structures and uses inconsistent with the commission
recommendations prior to adoption of a new zoning code and
zoning district map; and the issuance of permits only in
accordance with anticipated changes will aid in the orderly
and efficient adoption of a new code and map.
NOW~ THEREFORE~ BE IT ORDAINED BY THE CITY COUNCIL OF
ASPEN, COLORADO:
RECORD OF PROCEEDINGS
100 Leaves
Section 1.
Purposes.
health, safety,
The purpose of this ordinance is to promote the
order~ convenience~ prosperity and general wel-
fare of the residents of the City of Aspen by establishing a
building permit review procedure which will allow the issuance
of permits for structures and uses consistent with the land use
changes recommended to the City of Aspen by the Aspen City
Planning Commission, which building permit review procedure is
to remain in effect for a period of time sufficient to incor-
porate the recommendations into the Aspen Zoning Code and Zoning
District Map.
Section 2.
I. Building Permit Review Procedure. No building permit shall
issue from the effective date of this ordinance, for other than
excepted uses, until the following review procedure has been
complied with and approval granted all as provided herein:
A. Ail plans for development shall be submitted to the
Aspen Planning and Zoning Commission for its review and approval
as follows:
1. Conceptual presentation: Ail applicants for a
building must first make to the Aspen Planning and Zoning
Commission a conceptual or sketch plan presentation
describing the objectives of the proposed development.
Such presentation shall be in writing, with an accom-
panying oral presentation at the election of the
applicant. The applicant shall include a site plan,
state the number of units to be developed, and
describe how the intended development complies with
the use recommendations of the 1973 Aspen General
Land Use Plan and satisfies all review criteria
pertaining to the land use category in which the
development will take place.
RECORD OF PROCEEDINGS
100 Leaves
2. Preliminary design presentation: After approval
of the concept is given, applicants shall make a
preliminary design presentation consisting of a
final site plan, schematic design drawings, preliminary
elevations~ and, at the election of the applicant
or at the request of the Commission, a building model.
3. Final presentation: Upon approval of the pre-
liminary design, all development plans and drawings
must be submitted for final approval prior to sub-
mission to the building inspector's office of working
drawings for issuance of a building permit.
4. Any applicant may simultaneously make a Preliminary
design presentation and a Final presentation, provided~
however, that all applicants must make a conceptual
presentation prior to a Preliminary design presentation
and Final presentation, and independent thereof.
B. Prior to any presentation to the Planning and Zoning
Commission, all applicants must pay an estimated building
permit fee, which fee shall not be refundable, except as follows:
1. If the development is disapproved at or after
the conceptual presentation but prior to the prelimi-
nary design presentation, 75% of any estimated building
permit fee paid shall be refunded.
2. If the development is disapproved at or subsequent
to the preliminary design presentation but prior to
the final presentation, 50% of any estimated building
permit fee paid shall be refunded.
3. If the development is disapproved at or subsequent
to the final presentation, 25% of any estimated building
permit fee shall be refunded.
RECORD OF PROCEEDINGS
100 Leaves
cant
C. Prior to the Preliminary design presentation the appli-
shall obtain written comment from the following agencies:
1. From the water, electric and gas utilities and
sewer districts concerning the availability of these
utilities and services;
2. From the Aspen fire department concerning the
feasibility of supplying adequate fire protection
services to the development;
5. From the city engineer concerning access, cir-
culation, the necessity of street improvements and
utility easements,
considerations;
4o From the local
drainage, and other engineering
school authorities describing the
probable impact on enrollment by the development.
Provided, however, that none of the above information is required
if the applicant is subject to subdivision regulation.
D. The planning and Zoning Commission shall approve or
disapprove (or approve subject to conditions) the intended
development after each presentation or plan submission and within
30 days of each such presentation or plan submission. Approval,
conditional approval or disapproval shall be in accordance
with the use recommendations of the 1973 Aspen General Land
Use Plan, consisting of a map and text which, for purposes of
the review procedures, are hereby made a part of this ordinance,
and with the review criteria hereby established or additions or
amendments thereto. Approval at any stage shall not preclude
disapproval at any later stage of the review procedure provided,
however, that approval of development plans and drawings will be
final.
(4)
RECORD OF PROCEEDINGS
100 Leaves
E. In the event of disapproval the reasons for disapproval
shall be given in writing to the applicant by the building
inspector who must then deny any building permit application
made for such development. An applicant may not reapply
without demonstrating a substantial change in the development
proposal or in the uses permitted in the land use category in
which the development will occur.
II. Pendin~..Applications. Any application for a building per-
mit pending at the effective date of this ordinance shall be
exempt from the provisions of this ordinance providing that
a permit is ultimately issued on said application. Provided,
further, that an application shall not be deemed to be pending
for the purposes of this ordinance if the applicant is subject
to subdivision regulation and such subdivision has not received
final approval and the subdivision plat has not been recorded
on the effective date of this ordinance.
III. ~pted Uses and Review Criteria. These are hereby
designated excepted uses to which the building permit review
procedures above described shall not apply nor shall a permit
be denied under this ordinance for said uses. There are hereby
further adopted review criteria and considerations which, with
the use recommendations of the 1973 Aspen General Land Use Plan,
shall be applied in the review procedures established by this
ordinance. The Planning and Zoning Commission is authorized
to recommend the adoption of additional excepted uses and
review criteria, or modifications to those herein contained,
for application in the review procedure, provided, however, that
such additional excepted uses and review criteria must, prior to
their application, be approved by the City Council by ordinance.
(s)
RECORD OF PROCEEDINGS
100 Leaves
A. Central Area: within that area designated on the
1973 Aspen general land use map as "Central Area":
1. The following uses shall be exempt from review
(except in those areas between Garmisch and Monarch
Streets and Hunter and Original Streets):antique shop,
appliance store, restaurants, art supply store,
art gallery, bakery, bookstore, camera shop, candy,
tobacco or cigarette store, catalogue store, clothing
store, decorator shop, florist shop, furniture store,
gift shop, hobby shop, jewelry shop, job printing
shop, key shop, pet shop, photography shop and
sporting goods store.
2. Provided, however, that all lot and yard require-
ments and building heights are subject to review
during which the following factors are to be considered:
the preservation of views of Aspen and Shadow mountains;
the reduction of building bulk and lot coverage, with
allowances for greater height in exchange for reduced
lot coverage; and providing for plazas.
3. Off street parking requirements are subject to
modification both as to placement and number of spaces
required, to better suit the terrain of the development
site, and to ensure adequate off street parking as
determined by the use of the property, the walking
distance to the downtown area and the availability of
public transportation, both existent and planned.
4. It is the purpose of the review procedure to
encourage the following:
(a) the preservation of those buildings and
sites recommended by the Aspen Historic Preser-
vation Committee for Historic Designation:
(6)
RECORD OF PROCEEDINGS
100 Leaves
(b) that tourist related uses be loc~'ted in
the existent pedestrian mall or extensions
thereof;
(c) the placement of professional office
buildings in the fringe of the Central Area;
(d) the mixing of land uses resulting in the
integration of compatible uses that result in
constant activity in the Central Area;
(e) the preservation of views of Aspen and
Shadow mountains and Independence Pass;
(f) the development of the Central Area as a
pedestrian dominant rather than auto oriented
area.
B. Recreations/Accommodations: within that area designated
on the 1973 Aspen general land use map as ,,Recreations/Accom-
modations'':
1. The following uses are exempt from review: single
family detached residences with 6,000 square feet or
greater lot area; and accessory buildings.
2. Ail buildings not subject to subdivision regu-
lation are subject to review of the following con-
siderations:
(a) access the width of the street, its
grade, intersection safety, visibility and lot
entrance must be such as to provide adequate
access.
(b) fire protection -
must be sufficient so
protection.
(c) water pressure -
access and water pressure
as to ensure adequate fire
the water pressure must
be sufficient to supply domestic use and to
ensure adequate fire protection.
(7)
RECORD OF PROCEEDINGS
100 Leaves
(d) building bulk and height the reduction of
building bulk and lot coverage with allowances
for greater height in exchange for reduced lot
coverage is encouraged.
3. Off street parking requirements are subject to
modification both as to placement and number of spaces
required, to better suit the terrain of the development
site and to ensure adequate off street parking as
determined by the use of the property, the walking
distance to the downtown area, and the availability
of public transportation, both existent and planned.
4. The allowable density of the development is sub-
ject to modification as determined by:
(a) the physical conditions of the development
site, i.e., slope, access, drainage, natural
vegetation and all other terrain features
(b) the impact resulting from the development,
i.e., potential for stream and air pollution,
the feasibility of snow removal, the availability
of public transportation, and other public and
private services.
C. Recreation/Accommodations Transition: within that area
designated on the 1973 Aspen general land use map as ,'Recreation/
Accommodations Transition":
1. The following uses are exempt from review: single
family detached residences with 15,000 square feet or
greater lot area; and accessory buildings.
(8)
RECORD OF PROCEEDINGS
100 Leaves
2. Ail buildings not subject
are subject to review of the
to subdivision regulation
following considerations:
(a) acceSs the width of the street, its grade,
intersection safety, visibility and lot entrance
must be such as to provide adequate access.
(b) fire protection - access and water pressure
must be sufficient so as to ensure adequate fire
protection.
(c) water pressure the water pressure must
be sufficient to supply domestic use and to
ensure adequate fire protection.
(d) building bulk and height - the reduction of
building bulk and lot coverage with allowances for
reduced lot coverage is encouraged.
(e) exterior color and building material must
be in harmony with and blend into the natural
mountain setting.
3. Off street parking requirements are subject to
modification both as to placement and number of spaces
required, to better suit the terrain of the develop-
ment site and to ensure adequate off street parking
as determined by the use of the property, the walking
distance to the downtown area, and the availability
of public transportation, both existent and planned.
4. The allowable density of the development is subject
to modification as determined by:
(a) the physical conditions of the development
site, i.e., slope, access, drainage, natural
vegetation and all other terrain features.
(9)
RECORD OF PROCEEDINGS
100 Leaves
1973 Aspen general land use map as "Multiple Family":
(b) the impact resulting from the development,
i.e., potential for stream and air pollution,
the feasibility of snow removal, the availability
of public transportation and other public and
private services.
5. Restaurants and professional offices are prohib-
ited in this area.
6. Buildings are not to exceed 2,500 square feet
in floor space nor 25 feet in height.
7. Because of the high visibility of this area,
access and utility construction must produce no
scars upon the landscape.
Multiple Family: within that area designated on the
1. The following uses shall be exempt from review:
single family residences with 6,000 square feet or
greater lot area; and accessory buildings.
2. Ail buildings not subject to subdivision regu-
lation are subject to review of the following con-
siderations:
(a) access - wiSth of the street, its grade,
intersection safety~ visibility and lot entrance
must be such as to provide adequate access.
(b) fire protection - access and water pressure
must be sufficient so as to ensure adequate fire
protection.
(c) water pressure - the water pressure must
be sufficient to supply domestic use and to
ensure adequate fire protection.
(10)
RECORD OF PROCEEDINGS
100 Leaves
(d) building bulk and height - the reduction of
building bulk and lot coverage with allowances
for greater height in exchange for reduced lot
coverage is encouraged.
3. Off street parking requirements are subject to
modification both as to placement and number of spaces
required, to better suit the terrain of the develop-
ment site and to ensure adequate off street parking
as determined by the use of the property, the walking
distance to the downtown area, and the availability
of public transportation, both existent and planned.
4. The allowable density of the development is sub-
ject to modification as determined by:
(a) the physical conditions of the development
site, i.e., slope, access~ drainage, natural
vegetation and all other terrain features.
(b) the impact resulting from the development,
i.e., potential for stream and air pollution,
the feasibility of snow removal, the availability
of public transportation and other public and
private services.
B. Mixed Residential: within that area designated on
the 1973 Aspen general land use map as "Mixed Residential":
1. The following uses are exempt from review: single
family detached residences with 6,000 square feet or
greater lot area; and accessory buildings.
2. The remodelling of existing lodges is not subject
to review where such construction will not result in
an increase in guest capacity.
(1~)
RECORD OF PROCEEDINGS
100 Leaves
3. All buildings not subject to subdivision regulation
are subject to review of the following considerations:
(a) access the width of the street, its grade,
intersection safety, visibility and lot entrance
must be such as to provide adequate access.
(b) fire protection -
must be sufficient so
protection.
(c) water pressure
access and water pressure
as to ensure adequate fire
the water pressure must
be sufficient to supply domestic use and ensure
adequate fire protection.
(d) building bulk and height - the reduction of
building bulk and lot coverage with allowances
for greater height in exchange for reduced lot
coverage is encouraged.
4. Off street parking requirements are subject to
modification both as to placement and number of spaces
required, to better suit the terrain of the development
site and to ensure adequate off street parking as
determined by the use of the property, the walking
distance to the downtown area, and the availability of
public transportation, both existent and planned.
5. Restaurants and tea rooms are prohibited.
6. Office uses in those residences abutting the
south side of Main Street which have been recommended
by the Historic Preservation Committee for historic
designation is encouraged.
RECORD OF PROCEEDINGS
100 Leaves
F. Residential: within that area designated on the
1973 Aspen general land use map as "Residential":
1o The following uses are exempt from review: single
family detached residences when the lot area meets the
minimum lot requirements of the existing zone district;
accessory buildings~ fences and signs.
2. Ail buildings not subject to subdivision regulation
are subject to review of the following considerations:
(a) access - the width of the street, its grade,
intersection safety, visibility and lot entrance
must be such as to provide adequate access.
(b) fire protection - access and water pressure
must be sufficient so as to ensure adequate fire
protection.
(c) water pressure - the water pressure must
be sufficient to supply domestic use and to
ensure adequate fire protection.
(d) building bulk and height - the reduction
of building bulk and lot coverage with allowances
for greater height in exchange for reduced lot
coverage is encouraged.
3. Off street parking requirements are subject to
modification both as to placement and number of
spaces required, to better suit the terrain of the
development site and to ensure adequate off street
parking as determined by the use of the property, the
walking distance to the downtown area, and the avail-
ability of public transportation, both existent and
planned.
(13)
RECORD OF PROCEEDINGS
100 Leaves
4. Office uses in those residences abutting the north
side of Main Street which have been recommended by
the Historic Preservation Committee for historic
designation is encouraged.
G. Ne~9..r~o.d.F.ommercial/Limited Industr~ial: within that
area designated on the 1973 Aspen general land use map as
"Neighborhood Commercial/Limited Industrial":
1. The following uses shall be exempt from review:
C-PND Commercial Planned Neighborhood Development
Districts in the existing commercial zoneS and which
are subject to and satisfy the requirements of Chapter
24, Section 24-10.1 PUD Planned Unit Development of
the Aspen Municipal Code; appliance sales and repair
shops, office machine sales and repair shops, furniture
stores, carpet and rug stores, paint and wall paper
stores, furniture upholstery and repair shops, hard-
ware stores, garden supply centers, printing shops,
rental stores, lumber yards, shop craft industries,
plumbing shops, electrical and heating supply shops,
cabinet shops, wholesale establishments, warehousing,
offices accessory to any of the above listed uses,
and residences for employees of the Neighborhood
Commercial/Limited Industrial District.
2. Ail buildings not subject to subdivision regu-
lation are subject to review of the following con-
siderations:
(a) access - width of the street, its grade,
intersection safety, visibility, lot entrance,
and integration with the public streets and public
transportation facilities must be such as to pro-
vide adequate access.
(14)
RECORD OF PROCEEDINGS
100 Leaves
(b) fire protection - access and water pressure
must be sufficient so as to ensure adequate fire
protection.
(c) water pressure - the water pressure must
be sufficient to supply the commercial and
domestic use and ensure adequate fire protection.
(d) building bulk and height - the reduction
of building bulk and lot coverage with allowances
for greater height in exchange for reduced lot
coverage is encouraged.
3. Off street parking requirements are subject to
modification both as to placement and number of spaces
required, to better suit the terrain of the development
site and to ensure adequate off street parking as
determined by the use of the property, the walking
distance to the downtown area, and the availability
of public transportation, both existent and planned.
H. Institutional: within those areas designated on the
1973 Aspen general land use map as ,,Institutional", all uses
shown on an Aspen Planning and Zoning Commission approved
plan for institutional lands are exempt from review.
I. Public: within those areas designated on the 1973 Aspen
general land use map as "Public", all uses shown on a Planning
and Zoning Commission approved plan for public lands are exempt
from review.
IV. Termination Date.
terminate one year from its effective
that termination will occur prior to
of a new zoning
Aspen.
The provisions of this ordinance shall
code and zoning district map
date, provided, however,
that time upon the adoption
by the City of
(15)
RECORD OF PROCEEDINGS
100 Leaves
V. Inconsistent Provi~.ipn. All provisions of the Aspen
Zoning Code and District Zoning Map, not inconsistent here-
with, shall continue in full force
supplement the provisions of this
Section 3.
If any provision of this ordinance or the
and effect and shall
ordinance.
application
thereof to any person or circumstance is held invalid, such
invalidity shall not affect other provisions or applications
of the ordinance which can be given effect without the invalid
provisions or applications and to this end the provisions or
applications of this ordinance are declared to be severable.
Section 4.
A public hearing on the ordinance shall be held on June
11, 1973, at 4:00 p. m. in the City Council Chambers, City
Hall Building, Aspen, Colorado.
INTRODUCED, READ AND ORDERED PUBLISHED as provided by
law by the City Council of the City of Aspen, Colorado,
regular meeting held at
14th day of May, 1973.
ATTEST:
~__~- ~lerk --
the City of Aspen, Colorado, on
Eve Homeye r,~ayuz
at its
the
AMENDED ORDINANCE PROCEEDINGS
A public hearing on the amended ordinance shall be held
on July 9, 1973, at 4:00 p. m. in the City Council Chambers,
City Hall Building, Aspen, Colorado.
(16)
RECORD OF PROCEEDINGS
100 Leaves
INTRODUCED, READ AND ORDERED PUBLISHED as amended as
provided by law by the City Council of the City of Aspen,
Colorado, at its regular meeting held at the City of Aspen,
on Y ~- ,//"'
Stacy ~tan 1~ Ili, Mayo~ ~
by the City
regular meeting held at
16th day of July, 1973.
INTRODUCED, READ AND ORDERED PUBLISHED as provided by law
Council of the City of Aspen at its continued
the City of Aspen, Colorado, on the
ATTEST:
S~acy Standl~z)~lll, Mayor