Loading...
HomeMy WebLinkAboutresolution.council.065-05RESOLUTION NO. ~ (Series of 2005) A RESOLUTION GRANTING CONSTRUCTION CONTRACT TO LYON CONSTRUCTION, FOR CONSTRUCTION OF THE RIO GRANDE REGIONAL STORMWATER QUALITY FACILITY, PHASE-I PROJECT, AND AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN WHEREAS, there has been submitted to the City Council a contract between the City of As~en, Colorado and Lyon Construction, a copy of which contract is annexed hereto and made a part thereof. NOW, WHEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO: Section One That the City Council of the City of Aspen hereby approves the contract between the City of Aspen, Colorado, and Lyon Construction, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said contract on behalf of the City of Aspen. Dated: " fie len ~Kali~l~landemd, Mayor I, Kathryn S. Koc. o.~, duly appointed and acting City Clerk do certify that the foregoing is a tree and accurate copy ~T ttl/at resolution adoDied by the City Council (~~//c~c~c, 2005. of the City of Aspen, Colorado, ~at a meeting held 08/16/2005 18:89 9708ZG5943 LYON CONSTRUCTION PAGE 02/17 CONTRACT FOR CONSTRUCTION THIS AGREEMENT, made and entered into on OF ASPEN, Colorado, hereinafter called the hereinafter called the "Contractor". , by and 'between the CITY "City", and LAon Constructi.on , , WHEREAS, the City has caused to be prepared, in accordance with the law, specifications end other Contract Documents for the work herein desddbed, and has approved and adopted said documents, and has caused to be published, in the manner and for the time required by law, an advertisement, for the project: Rio Grande Reqional Stormwater Q.u. ality Facility Phase I (Project 2005-039), and, WHEREAS, the Contractor, in response to such advertisement, or in response to direct invitation, has submitted to the City, in the manner and at the time specified, a sealed Bid in accordance with the terms of said Invitation for Bids; and, WHEREAS; the City, in the manner prescribed by law, has publicly opened, examined, and canvassed the Bids submitted in response to the published Invitation for Bids therefore, and as a result of such canvass has determined and declared the Contractor to be the lowest responsible and responsive bidder for the said Work and ha~ duly awarded to the Contractor a · Contract For Construction. therefore, for the sum or sums set forth herein; NOW, THEREFORE, in consideration of the payments and Contract for Construction · herein mentioned: The Contractor shall commence and complete the construction of the Work as fully described in the Contract Documents. The Contractor shall furnish all of' the materials, Supplies, tools, equipment, labor and other services necessary for the construction and ~:ompletion of the Work described herein. The Contractor shall commence the work required by the Contract Documents within seven (7) consecutive calendar days after the date of "Notice To Proceed" and will complete the same by the date and time indicated in the Special Conditions unless the time is extended in accordance with appropriate provisions in the Contract Documents. The Contractor agrees to pedorm ail of the Work described in the Contract Documents and comply with the terms therein for a sum not to exceed 163.428.00 DOLLARS or as shown on the BID proposal. The term "Contract Documents" means and includes the documents listed in the City of Aspen General Conditions to Contracts for Construction (version GC97-2) and in the Special Conditions. The Contract Documents are included herein by this reference and made a part hereof as if fully set forth here. ~/~, P~ge I CC" CC.doc lO. 11. 13, 14. The City shall pay to the Contractor in the manner and at such time as set forth in the Genbral Conditions, unless modified by the Special Conditions, such amounts as required by the Documents. This Contract For Construction shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. Notwithstanding anything to the contrary contained herein or in the Contract Documents, this Contract For Construction shall be subject to the City of Aspen Procurement Code, Title 4 of the Municipal Code, including the approval requirements of Section 4-08~040. This agreement shall not be binding upon the City unless duly executed by the City Manager or the Mayor of the City of Aspen (or a duly authorized official in his/her absence) following a resolution of the Council of the City of Aspen authorizing the Mayor or City Manager (or a duly authorized official in his/her absence) to execute the same. This agreement and all of the covenants hereof shall inure to the benefit of and be binding upon the City and the Contractor respectively and their agents, representatives, employees. Successors, assigns, and legal representatives. Neither the City nor the Contractor shall have the dght to assign, transfer or sublet his or her interest or obligations hereunder without the wdtten consent of the other party. This agreement does not and shall not be deemed or construed to confer upon or grant to any third party or parties, except to parties to whom the Contractor or the City may assign this Contract For Construction in accordance with the specific written consent, any .rights to claim damages or to bring suit, action or other proceeding against either the City or the Contractor because of any breach hereof or because of any of the terms, covenants, agreements or conditions herein contained. No waiver of default by either party of any terms, covenants or conditions hereof to be performed, kept and observed by the other party shall be construed, or operate as, a waiver of any subsequent default of any of the terms, covenants or conditions herein contained, to be performed, kept and observed by the other party. The parties agree that this Contract For Construction was made in accordance with the laws of the State of Colorado and shall be so construed. Venue is agreed to be kept exclusively in the courts of Pitkin County, Colorado. In the event that legal action is necessary to enforce any of the provisions of this Contract for Construction, the prevailing party shall be entitled to its costs and reasonable attomey's fees. This Contract For Construction was reviewed and accepted through the mutual efforts of the parties hereto, and the parties agree that no construction shall be made or presumption shall arise for or against either party based on any alleged unequal status of the parties in the negotiation, review or drafting of this Contract For Construction. The undersigned representative of the Contractor, as an inducement to the City to execute this Contract For Construction, represents that he/she is an authorized · representative of the Contractor for the purposes of executing this Contract For Construction and that he/she has full and complete authority to enter into this Contract For Construction for the terms and conditions specified herein. P~e 2 CC" CC,doc 08/16/2005 10:09 97087G594B LYON CONSTRUCTION PAGE 04/17 IN WITNESS WHEREOF, the parties agree hereto have executed this Contract For Construction on the date first above wdtten. ATTESTED BY: CiTY OF ASPEN, COLORADO By:. Title: RECOMMENDED FOR APPROVAL: City Engineering Department APPROVED AS TO FORM: By: City Attorney ATTESTED BY: Title: Vice President Note: Certification of Incorporation shall be executed if Contractor i~ a Corporation. If a partnership, the Contract shall be signed by a Principal and indicat~J title. CC.doc Page 3 CC*' 88/16/2885 10:09 9788765943 LYON CONSTRUCTION PAGE 05/17 CERTIFICATE OF INCORPORATION (To be completed if Contractor is a Corporation) STATE OF ~_¢ {¢ c~. A,/~3 ) . )ss. COUNTY OF ~ r~[~ {~ ) On this / ~,./-L~ day ofO_zt~ ,20~:::)3~', before me appeared ¢' · Ke]_lv ~,_von , to me personally known, who, being by me first duly swom, did say that s/he is Vice ~=esiaent of Lyon Construction_, and that the seal affixed to said instrument is the corporate seal of said corporation, and that said instrument was signed and sealed in behalf of said corporation by authority of its board of directors, and said deponent acknowledged said instrument to be the free act and deed of said corporation. WITNESS MY HAND AND NOTARIAL SEAL the day and year in this certificate first above written. Address My commission expires': ~ Project No.: 2005-039 BID DATE: August 15, 2005 PROJECT: Rio Grande Regional Stormwater Quality Facility - Phase I (CONTRACTOR) CONTRACTOR'S PROPOSAL TO: The Governing Body of the City of Aspen, Colorado The undersigned responsible bidder declares and stipulates that this proposal is made in good faith, without collusion or connection with any other person or persons bidding for the same work, and that it is made in pursuance of and subject to all the terms and conditions of the advertisement for bid, the invitation to bid and request for bid, all the requirements of the bid documents including the plans and specifications for this bid, all of which have been read and examined prior to signature. The bidder agrees to keep this bid open for SixtF (60) consecutive calendar daFs fi"om the date of bid opening. The Contractor agrees that construction shall start immediately following a mandatory pre~constmcti0n conference held by the Engineering Department, which also constitutes the Notice to Proceed. Submission of this proposal will be taken by the City of Aspen as a binding covenant that the Contractor will finish construction within the time specified in the Special Conditions of this contract document. The City of Aspen reserves the right to make the award on the basis of the bid deemed most favorable to the City, to waive any informalities or to reject any or all bids. The City shall not pay the Contractor for defective work and/or for repairs or additional work required for successful completion of the project. All work not specifi'~ally set forth as a pay item in the bid form shall be considered a subsidiary obligation of the Contractor and all costs in connection therewith shall be included in the prices bid for the various items of work. Prices shall include all costs in connection with furnishing the proper and success completion of the work, including furnishing ali materials, equipment and toolsd and performing all labor and supervision to fully complete the work to the City's satisfaction. Poor quality and workmanship shall not be paid for by the City. Such work product must be removed immediately and replaced properly at no cost to the City. All quantities stipulated in the bid form at unit prices are approximate and are to be used only as a basis for estimating the probable cost of work and for the purpose of comparing the bids submitted to the City. The basis of payment shall be the actual amount of materials furnished and work done. The Contractor agrees to make no claims for damages, anticipated profit, or otherwise on account of any differences between the amount of work actually performed and materials actually furnished and the estimated amount of work. The City reserves the right to increase or decrease the amount of work to be done on the basis bf the bid unit price and up to plus or minus Twenty Five (25) Percent of the total bid. I hereby acknowledge receipt of ADDENDUM(s) numbered BP-2003-O38.doc BP* / t -ough _Z. la,~lwl108/15/2005 iii 17:05 9708765943 LYON CONSTRUCTION ESTIMATED BID QUANTITIES BID ITEM_DESCRIPTION UNIT UNIT ~ PR[CE PAGE TOTAL COST , 01/02 Mobilization & Demobilization LS 0001 Traffic Management LS 0001 Erosion & Dust Control LS 0001 Cleadng and Grubbing. LS 0001 Unclassified Ex. and Haul CY 0306 Sfructural Backfill/Embankment CY 0143 Sawcut Pavement (full depth) LF 0110 4' Diameter Manhole EA 0002 Diversion Manhole - (MH 2) EA 0001 Diversion Manhole - (MH 4) EA 0001 Pretreatment Sedimentation Basin EA 0001 Stormwater Sampler w/Flow Meter EA 0002 Install one inch Diameter Elec. Conduit LF 022,5 (Buded 24" deep) Meter Socket LS 0001 Control and Breaker Panel LS 0001' 15 Amp Wiring for Sampler LF 0235 Remove/Replace 5' Concrete Sidewalk LF 0060 Remove/' Curb and Gutter' LF 0060 Landscaping ' SF 0100 12I' Riprap @ RCP Outlet CY 0037 24" RCP Storm Sewer LF 0141 24" RCP FES w/3' Toewall EA 0001 18" RCP Stubout LF 0008 Asphalt Paving TON .0048 Remove/Replace Rock Wall SF(f, ce) 120 Remove/Replace Concrete Trail (6') SY 0023 $ 3t500.00 $ ~ -~. 500.00 3,000.00 24.00 $ 5~.00 $ 8.00 $_3_,_0._0._0_, 00 $15 t500.(~0 $.~4;$oo.oo · $ 14,300.00 $ 3,500.00 $_ -?" · $, 500.00 3.000.00~ 7,344,0'0 72 .oo 880.00 $ 6~000,00 $15,5op.oq $~4;soo.oo $28,600.00 15.00 $. 3,375.00 600.00 2,500.00 2.00 600;OO 2,500.00 47.0.00 $ 75.00 $ 4~500.00 $ 30.OQ $_1.~1~800.00' $ TBDBC'3 $ TBDBC $ 70.00 $_~z~ 590.00 $ 147.00. $_Z.,3,,5_0..,~ .$ .,.,3 oo.o¢ $ 150.00 $ 7,200.0~ $~__.8.34 $ 1,0d0.00 $ 90.00 $ 2,070.00 88/15/2085 i7:05 9708765943 LYON CONSTRUCTION PAGE 02/82 Mulching Fencing addendum #2 SF 2000 $ .5o $ ..1..,ooo .oo 3,000.Ob ITOTAL BID IN NUMBERS: $_363,_4~8.oo ... 1 Total Bid in 'Words: I acknowledge that in submitting this bid it is understood that the dght to reject any and all bids has been reserved by the owner. :~vl,'ws. f~ ~ 7000.00 . 700.00 ,..,',_,Ci_t anti o¢4zJ.~x:l ~ an ~,1"1¢t.~,_.~ cn each 'cr~. Authorized offlcer~' Iz~ ~-----~,_,.---//-,,,~7 , Title: .. ]gsid,,,~f ,:,,. Fu, ---___ Company address:' K)~c~ 110, ~ ~ 816'5"f Telephone number: F'/o-876-5'9~ Fax number:. 970-~6-59,t3 . Subcon.trac. tor & Material Supplier List' Namei' ~'~' Address: 3215 O3.r~ ~ ~15, S~b, oo 81652 Service or Product: ~ Phone #: 970-.876~ Name: Address: ,Phone #: Service or Product: . Name:. Address: , Phone#: Service or Product: