HomeMy WebLinkAboutresolution.hpc.032-2000I IIIIII IIIII IIIIII IIIIII III IIIII IIIIIII III IIIII IIII IIII
449670 12/14/2000 11:211~ RESOLUT! Dt~VIS $ILVI
I oF 2 R 10,08 D 0.00 N 0.08 PITKIN COUNTY CO
RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION
ADDRESSING REMAINING ISSUES WITH THE FINAL REVIEW APPROVAL
AT 330 LAKE AVENUE, CITY AND TOWNSITE OF ASPEN, COLORADO
Parcel No. 2735-121-28-001
RESOLUTION NO. 32, SERIES OF 2000
WHEREAS, the applicants, Bill and Ellen Hunt, represented by Lipkin Warner Design
Partnership, have received final design approval for the property at 330 Lake Avenue,
City and Townsite of Aspen. The project involves demolishing additions to the historic
buildings and replacing them; and
WHEREAS, the final approval, granted through Resolution 10, Series of 2000, March
22, 2000, identified several issues that would need further clarification before building
permit; and
WHEREAS, the architect presented information addressing these issues at the June 21,
2000 HPC meeting, at which time the HPC approved the proposal and/or added further
conditions of approval by a vote of 7-0.
NOW, THEREFORE, BE IT RESOLVED:
That HPC approves the following actions for 330 Lake Avenue, City and Townsite of
Aspen, as presented at the June 21, 2000, with conditions:
1. A design was presented for the lightwell along the porch on the south side of the
historic house. The HPC requires further study of this design to include a defined
walkway across the grate and onto the porch, to be approved by staff and
monitors.
2. The front porch trim, posts, roof form, and eaveline are to match that found on the
south porch.
3. A final design for the front door is to be reviewed by staff and monitor. The
design of the door shall be based on evidence found in the original framing,
including the installation of a transom window if it is clear that one previously
existed. Trim on the door is to match that found on the rest of the historic house.
4. The bathroom window that is being relocated from the front porch to the south
porch area shall be installed using the trim that currently exists.
5. Further discussion will be needed in regard to the entry door and porch on the
north side of the historic house to determine if they may be removed and replaced
with a window. Framing evidence shall be reviewed by staff and monitor once
exposed.
6. When the brick is salvaged and re-used for the foundation of the old house, it
shall be detailed so as to be flush with the building wall.
I IIIIII IIIII IIIIII IIIIII III IIIII IIIIIII III IIIII IIII IIII
449678 12/1.4/2000 11:211:1 RESOLUT! DAVXS SXLVX
2 et' 2 R 10.00 D 0.00 N 0.00 PITKIN COUNTY CO
The HPC will support raising the barn height approximately 6" and creating a
new foundation detail to better preserve the structure. This action is supported in
the record of the Planning and Zoning Commission, who reviewed the project for
impacts on Hallam Lake. A specific detail must be reviewed by staff and
monitor.
APPROVED BY THE COMMISSION at its regular meeting on the 21st day
of June, 2000.
Approved as to Form:
Davilt/Hoefer, Assistant City Attorney
Approved as to Content:
HISTORIC PRESERVATION COMMISSION
Sd~/an~ ileid, Chair~
ATTEST:
K~c~l~-~nd~uW~lerk