Loading...
HomeMy WebLinkAboutresolution.hpc.034-2005RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) APPROVING AN APPLICATION FOR MAJOR DEVELOPMENT (FINAL) FOR THE PROPERTY LOCATED AT 310 PARK AVENUE, CITY OF ASPEN, COLORADO RESOLUTION NO~/--~SERIES OF 2005 PARCEL ID: 2737-181-30-047 WHEREAS, the applicant, Tim Mooney, represented by Alan Richman Planning Services and A1 Beyer Design, has requested Major Development (Final) for the property located at 310 Park Avenue, the North Lot of the 308 Park Avenue Historic Landmark Lot Split, Block 2 of the Riverside Addition, City and Townsite of Aspen; and WHEREAS, Section 26.415.070 of the Municipal Code states that "no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;" and WHEREAS, for Final Major Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project's conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.D.3.b.2 and 3 of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, Amy Guthrie, in her staff report dated August 24, 2005, performed an analysis of the application based on the standards, found that the review standards and the "City of Aspen Historic Preservation Design Guidelines have been met, and recommended approval with conditions; and WHEREAS, at their regular meeting on August 24, 2005, the Historic Preservation Commission considered the application, found the application was consistent with the review standards and "City of Aspen Historic Preservation Design Guidelines" and approved the application by a vote of~'to G) NOW, THEREFORE, BE IT RESOLVED: HPC grants approval for Major Development (Final) with the following conditions: 1. HPC granted a variance from the "Residential Design Standard" related to "Secondary Mass" at Conceptual review. 2. HPC staff and monitor must review and approve the type and location of exterior lighting fixtures prior to wiring, purchasing, or installing the fixtures. 3. HPC staff mad monitor must review and approve the landscape plan prior to any installation. Page: 2 o~r 2 09/29/2005 10:43~ SILVIA DAVIS PITKIN COUNTY CO R 11.00 D 0.00 4. Information on all venting locations and meter locations not described in the approved drawings shall be provided for review and approval by staff and monitor when the information is available. 5. There shall be no deviations from the exterior elevations' as approved without first being reviewed and approved by HPC staff and monitor, or the full board. 6. The conditions of approval will be required to be printed on the cover sheet of the building permit plan set and ail other prints made for the purpose of construction. APPROVED BY THE COMMISSION at its regular meeting on the 24th day of August, 2005. Approved as to Form: David Hoefer, Assist~ntVCity Attorney Approved as to content: HISTORIC PRESERVATION COMMISSION AT : Kathy Chief Deputy Clerk