Loading...
HomeMy WebLinkAboutresolution.apz.012-97 RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION FOR THE APPROVAL OF A SPECIAL REVIEW FOR A SANITARY SEWER LINE WITHIN THE NO DEVELOPMENT AREA ESTABLISHED BY THE TOP- OF-SLOPE AND FOR APPROVAL AND DENIAL OF VARIANCES TO THE "RESIDENTIAL DESIGN STANDARDS" AT THE FRENZEL RESIDENCE LOCATED AT 329 PARK AVE~, CITY OF ASPEN PARCEL # 2737-181-58- 001, CITY OF ASPEN Resolution #97 - ] ~ WHEREAS, The Community Development Department received an application from Mr. Otto Frenzel, owner, for a Special Review to repair and replace a sanitary sewer line within the no-development area within fifteen (15) feet of or below the top-of-slOpe established through Stream Margin Review and a request to vary "Residential Design Standards" for a proposed single family home with an accessory dwelling unit at 329 Park Avenue; and, WHEREAS, Pursuant to Section 26.68.040 of the Aspen Municipal Code, any development deemed essential within fifteen (15) feet of or below the top-of-slope may be approved by Special Review; and, WHEREAS, the Community Development Departmem considers repairing and or replacing faulty sanitary sewer lines to be essential development; and,' WHEREAS, during a hearing at a regular meeting on June 3, 1997, the Planning and Zoning Commission approved by a 7-0 vote the Special Review for the Frenzel property with all conditions recommended by the Community Development Department except condition #6; and, WHEREAS, any Board for which an applicant must gain approval may vary the requirements in Municipal Code Section 26.58 "Residential Design Standards" at a public hearing; and, WHEREAS, during a public hearing at a regular meeting on June 3, 1997, the Planning and Zoning Commission approved by a 7-0 vote condition #6 of the Staff memo, finding unusual site specific constraints warranting a variance, for reasons of fairness; and, WHEREAS, during a hearing at a regular meeting on June 3, 1997, the Planning and Zoning Commission granted by a 5-2 vote a variance from '"Residential Design Standards" 26.58.040(A)(3) and 26.58.040(F)(4)(c), allowing the garage to be configured freely on the site, for reasons of fairness related to site specific constraints; and, I Illlll Ili[I Illlll Illll lilll IIlll IIIII Ill Illl Illl Illl 4;)8121 ;)9/;)5/1997 01:28P RESOLUT! DI:IVIS SILV! 1 ~* 3 R 16.00 D 0.00 N 0.00 P]:TK]:NCO COLORI:IDO WHEREAS, during a hearing at a regular meeting on June 3, 1997, the Planning and Zoning Commission denied by a 7-0 vote a variance from the "Residential Design Standard" 26.58.040(A)(2) concerning a street oriented principal window. NOW, THEREFORE BE IT RESOLVED by the Commission: That the Special Review for repairing and/or replacing the sanitary sewer line below or within fifteen (15) feet of the top-of-slope established through Stream.Margin Review and variances to the "Residential Design Standards 26.58.040(A)(3) and 26.58.040(F)(4)(c) are approved with the following conditions' , The applicant may repair and/or replace as necessary the sewer service line below or within fifteen (15) feet of the top-of-slope established as elevation 7,935. This approval shall not be considered approval of any other development in this designated area and shall not alter the approved setbacks and height requirements established by the elevation 7,935 top-of-slope. . Pursuant to Section 26.68.040(B)(5), the applicant shall provide a plan addressing pollution or interference with the natural changes of the river, stream or other tributary, including erosion and/or sedimentation during. construction before issuance of any permits. . Before digging for the sewer line, the applicant shall place construction fencing along the. areas of planned disturbance to the approval of the Zoning 'Officer, the Parks Department, or the City Engineering Department. This fencing should be placed to minimize the impact of construction on the native vegetation in this no development zone. All development and construction required for the repair and or replacement of the sewer line shall be limited to within the fenced area, regardless of construction technique. Failure to obtain approval of the construction fencing placement before digging shall at least be considered grounds for a stop work order. 4..The owner shall revegetate all areas disturbed by the sewer line construction. Only native species shall be used. 5. A tree removal permit shall be required for the removal or relocation of trees as per Section 13.20.020 of the Code. o Prior to issuance of a building permit, applicant shall comply with all standards of Section 26.58, Residential Design Standards, except Standard 26.58.040(A)(1). This will allow the buildings to be non-parallel to the street. ,, Prior to issuance of a building permit, the applicant shall place funds in escrow with the Aspen Sanitation District to cover the costs of the District I IIIIII IIIII IIIIII IIIII IIIII IIIIii IIIII III IIIII IIII IIII 4;)8121 09/05/1997 01:28P RESOLUT! DAVIS SILVI 2 ~( 3 R 16.00 D 0.00 N 0.00 P~TK~NCO COLORRDO Engineer, construction observation, and to televise the completed line extension. . Prior to issuance of a building permit, the applicant shall complete a tap permit and shall pay all connection charges due to the Aspen Sanitation District. , Prior to issuance of a building permit, the applicant shall delineate and note any access and sanitary sewer easements required by the Sanitation Department on the final plat. 10. All material representations made by the applicant in the application and during public meetings with the Planning and Zoning Commission shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. APPROVED by the Commission at its regular meeting on June 3, 1997. APPROVED AS TO FORM: City Attorney PLANNING AND ZONING COMMISSION: Sara Garton, Chair ATTEST: ~ckie Lothian,-D~puty City Cl~rk I IIIIII IIIII IIIIII IIIII IIIII IIIIII IIIII Ill IIIII IIII IIII 488121 89/;)5/1997 01:28P RESOLUTI DAVIS SILVI 3 ~}f 3 R 15.$$ D 0.00 N 0.00 PITKINC0 COLOR~D0