Loading...
HomeMy WebLinkAboutapz.res.004-92 RESOLUTION OF THE ~SPEN PLanNING ~ ZONING COI~SS~ON FOR THE ~PPROV~L FOR THE MENDE~L STR~ ~G~N REVIEW LOCATED ~T ~320 RED BUTTE DRIVE (LOTS 2 AND 3 OF BLOCK 2, RED BUTTE SUBDIVISION) Resolution No. 92- ~ WHEREAS, the Planning Office received an application for Stream Margin Review for a building envelope for an existing residence on Lot 2 and new single family residence and building envelope on Lot 3 by Keifer and Mary Elizabeth Mendenhall, represented by Sunny Vann; and WHEREAS, the new residence will be deed restricted for resident occupancy in accordance with the housing mitigation requirements set forth in Ordinance 1, Series 1990; and WHEREAS, the Planning Office, Parks Department and the Engineering Department reviewed the proposal and recommended approval of the Mendenhall Stream Margin Review with conditions; and WHEREAS, at a regular meeting on April 7, 1992 the Planning and Zoning Commission approVed by a 6-0 Vote the Stream Margin Review amending the conditions recommended by the Planning Office. NOW, THEREFORE BE IT RESOLVED by the Commission- That the Mendenhall Stream Margin review is approved with the following conditions- 1) The applicant shall make a statement on the permit set of drawings indicating that there will be no destruction of vegetation between the building envelope and the river. Revegetation is required for any disturbed soil on the site(s) . Additional plantings shall be permitted after construction. 2) Construction procedures shall be employed that permit no runoff from disturbed soil into the river. Prior to issuance of any excavation or building permits, the applicant shall submit information to the Engineering Office describing construction procedures and drainage controls. 3) Prior to development on Lot 3, driveway access for both lots shall comply with Sec. 19-101 of the Municipal Code. 4 ) The applicant shall consult the Parks and Engineering Departments prior to development in the public right-of-way and shall obtain permits through the Streets Department. 5) If dedicating a fisherman or trail easement along the river, the applicant should contact the Parks Department to determine an appropriate location for the easement. 6) The property owner shall contact the Parks Department for tree removal/relocation permits prior to the issuance of any building permits in the event that permits are required. 7) New ditch culverts must be 8" minimum. Keep all culverts clean and in good condition. 8) Foundation excavation along the river side of the structure(s) shall be done from the inside out. The Applicant shall satisfy the Engineering Department regarding methods and procedures to prevent debris from falling down the slope. Methods and procedures shall be in place prior to commencement of excavation and shall remain throughout construction. 9) Ail material representations made by the applicant in the application and during public meetings with the Planning and Zoning Commission shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. 10) Prior to the issuance of any building permits for Lot 3, the Applicant shall record a deed restriction on the proposed structure for resident occupancy with language approved by the Housing Authority, and a copy of the recorded deed restriction shall be forwarded to the Planning Office. APPROVED by the Commission at its regular meeting on April 7, 1992. s : Planning an.4 Zoning ~~mission: /"J~ ca-rney, Deputy City Cl%rk ! Jasmine Tygre, Chai% O