Loading...
HomeMy WebLinkAboutapz.res.015-92~ RESOLUTION OF THE ~SPEN P~~N~ ~ ZON~N~ COI~SS~ON FOR THE ~PPROVAL OF ~ CONDITION~., USE FOR BUS~NESS ~ PROFESSIONAL OFFICES ~N ~ NEigHBORHOOD COI.~ERC~~ ~NC~ ZONE DISTRICT FOR THE ~SPEN S~V~N~S ~ LOAN BUILDING, LOCATED ~T ~5 N. HILL STREET {LOTS D-~, BLOCK 78, TO~RSITE OF ~SPEN~ Resolution No. 92- /~~ WHEREAS, in 1975 the Planning and Zoning Commission made the determination that a financial institution is a business office use; and WHEREAS, the Aspen Savings and Loan has occupied 225 N. Mill Street as a financial institution since the building's construction in 1977; and WHEREAS, International Specialty Group, Inc. as current owner of the property, submitted an application for 'Conditional Use for business and professional office use approval to clear up ambiguities regarding the building's legitimate use for general business and professional office uses; and WHEREAS, the Planning Office received referral comments from the Engineering Department; and WHEREAS, in consideration of the application and the referral comments from Engineering, the Planning Office recommended approval of the Conditional Use for business and professional offices with conditions; and WHEREAS, at a public hearing held on June 2, 1992, the Planning and Zoning Commission voted 5-1 to approve (with conditions) a Conditional Use for business and professional offices in the Neighborhood Commercial (NC) zones. NOW, THEREFORE BE IT RESOLVED by the Commission that a Conditional Use is approved for business and professional offices at the Aspen Savings and Loan Building in a Neighborhood Commercial (NC) zone with the following conditions: 1) Prior to the issuance of any building permits on the parcel, the existing metal rail fence in the alley needs to receive an encroachment license or be removed. 2) Prior to issuing a building permit for any expansion of this building or before doing any site reconstruction which changes historic drainage, a site drainage plan prepared by a registered engineer in the State of Colorado must be submitted to and approved by the City. Engineering Department. 3) Prior to or concurrent with the issuance of any building permits on the site, the driveway radii at the street need to be reconstructed to be a minimum of 10' to facilitate safer ingress/egress into the site. Any work in the public right- of-way requires an excavation permit. 4) All material representations made by the applicant in the application and during public meetings with the Planning and Zoning Commission shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. APPROVED by the Commission at its regular meeting on June 2, 1992. Jasmine Tygre Jan -~rn~y, y Clerk