HomeMy WebLinkAboutresolution.apz.015-89 RESOLUTION OF THEASPEN PLANNING AND ZONING COMMISSION
RECOMMENDING THEAPPROVALOF 1001 uTE AVENUE
8040 GREENLINE, CONDITIONAL USE, &
GMQS EXEMPTION
Resolutio. No. 89- /6--
Whereas, the Aspen Planning and Zoning Commission held a
public meeting November 7, 1989; and
Whereas, the 1001 Ute Avenue 8040 Greenline and Conditional
Use review and GMQS Exemption was included on the agenda; and
Whereas, the planning staff recommended approval of the 1001
application with conditions; and
Whereas, the applicant did not consent to Condition %15; and
Whereas, the Commission approved the application (4 to 3)
supporting staff's review and conditions; and
Whereas, the Commission directed staff to work with the
city Attorney and applicants to develop more agreeable language
for Condition #15; and
Whereas, Condition #15 has been amended from: no development
application shall be accepted until 2083 - to: it is the
intention of the Planning and Zoning Commission that no
development shall occur on the tennis court site until 2083; and
Whereas, the Commission also established that the height of
the residence shall be measured from finished grade, the
elevation of 8020, not natural grade; and
NOW, THEREFORE, BE IT RESOLVED by the Planning and Zoning
Commission:
That it does hereby approve of the 8040 Greenline and
Conditional Use review and the GMQS Exemption for development of
a single family home with an accessory dwelling unit with the
following conditions:
1. Before the issuance of an excavation permit the
applicant shall submit to the Engineering Department confirmation
from Chen that their Supplemental Geotechnical Study is
applicable to this new proposal.
2. Prior to the issuance of an excavation permit, the
applicant shall submit, to the Engineering Department, a detailed
stormwater drainage plan.
3. The applicant shall agree to join a Special Improvement
District, if one is ever formed.
4. At such time that he alignment is determined, the
applicant shall grant an easement for the Spar Gulch Drainage
Project.
5. The applicant shall service project with public sewer as
provided by the Aspen Consolidated Sanitation District and
water provided by the Aspen Water Department distribution system
as represented in the application.
6. Prior to issuance of an excavation permit the applicant
shall contact the Environmental Health office for a final
determination regarding the criteria for the development a
fugitive dust control plan addressing windblown dust since the
site is larger than 5 acres.
7. The proposed residence shall not contain wood burning
devices as is represented in their application. Gas fireplaces
and/or certified gas appliances, however, may be installed.
8. The applicant shall contact the Environmental Health
office regarding the potential mine waste, waste rock or mine
dumps which may be encountered during the excavation phase of the
project. The applicant shall adhere, to the satisfaction of the
Environmental Health Department, to recommendations by the Chen-
Northern Geologist regarding contaminated soils and mine waste
on-site and providing an imported noncontaminated soil to cap the
materials.
9. The applicant
of the Chen-Northern
shall follow the specific recommendations
report regarding soil stability and
the final grading plan shall be
Department for consistency with
retention of slope cuts and
reviewed by the Engineering
Chen's recommendations.
10. Before the issuance of an excavation permit tree permits
shall be required for any tree 6" in caliper. Relocation of
these tress should be a priority.
11. Prior to the issuance of a Certificate of Occupancy, the
applicant shall install a hydrant at the terminus of the (8) inch
water main extension.
12. Prior to the issuance of a Certificate of Occupancy, the
applicant shall provide an easement across the project site to
permit the future extension of the proposed eight (8) inch main.
The applicant shall also to participate in the cost of that
extension.
13. Prior to the issuance of a building permit, the
applicant shall dedicate a twelve foot wide public
easement, to the City, for the new trail.
14. Prior to the issuance of a building permit
trail
a deed
for the
until the year 2083.
16. The easements for the Spar Gulch drainage and the public
trail shall be filed with the City Attorney's office and recorded
by the clerk.
17. Prior to the issuance of a building permit, a
landscaping plan shall be reviewed and approved by the Parks and
Planning Departments.
18. The height of the building shall be measured from
finished grade which shall be the elevation of 8020.
APPROVED by the Commission at their regular meeting November
21, 1989.
~FrEST
Jag Ca~ney, bep~y City Clerk
ROVED ~FROM:
ed Gannett, Ci~Attorney
ASPEN PLANNING AND ZONING
C.%-Welton And~rson, Chairman
APPROVED AS TO CONTENT:
Amy M~gerum, P~ing DirectOr
the Housing Guidelines.
15. It is the intention of the Planning and Zoning
Commission that if ever the tennis courts are construed to be
another building site, no development shall occur on that site
restriction shall be filed with the Housing Authority
accessory dwelling unit which shall comply with the provisions of