Loading...
HomeMy WebLinkAboutresolution.apz.015-89 RESOLUTION OF THEASPEN PLANNING AND ZONING COMMISSION RECOMMENDING THEAPPROVALOF 1001 uTE AVENUE 8040 GREENLINE, CONDITIONAL USE, & GMQS EXEMPTION Resolutio. No. 89- /6-- Whereas, the Aspen Planning and Zoning Commission held a public meeting November 7, 1989; and Whereas, the 1001 Ute Avenue 8040 Greenline and Conditional Use review and GMQS Exemption was included on the agenda; and Whereas, the planning staff recommended approval of the 1001 application with conditions; and Whereas, the applicant did not consent to Condition %15; and Whereas, the Commission approved the application (4 to 3) supporting staff's review and conditions; and Whereas, the Commission directed staff to work with the city Attorney and applicants to develop more agreeable language for Condition #15; and Whereas, Condition #15 has been amended from: no development application shall be accepted until 2083 - to: it is the intention of the Planning and Zoning Commission that no development shall occur on the tennis court site until 2083; and Whereas, the Commission also established that the height of the residence shall be measured from finished grade, the elevation of 8020, not natural grade; and NOW, THEREFORE, BE IT RESOLVED by the Planning and Zoning Commission: That it does hereby approve of the 8040 Greenline and Conditional Use review and the GMQS Exemption for development of a single family home with an accessory dwelling unit with the following conditions: 1. Before the issuance of an excavation permit the applicant shall submit to the Engineering Department confirmation from Chen that their Supplemental Geotechnical Study is applicable to this new proposal. 2. Prior to the issuance of an excavation permit, the applicant shall submit, to the Engineering Department, a detailed stormwater drainage plan. 3. The applicant shall agree to join a Special Improvement District, if one is ever formed. 4. At such time that he alignment is determined, the applicant shall grant an easement for the Spar Gulch Drainage Project. 5. The applicant shall service project with public sewer as provided by the Aspen Consolidated Sanitation District and water provided by the Aspen Water Department distribution system as represented in the application. 6. Prior to issuance of an excavation permit the applicant shall contact the Environmental Health office for a final determination regarding the criteria for the development a fugitive dust control plan addressing windblown dust since the site is larger than 5 acres. 7. The proposed residence shall not contain wood burning devices as is represented in their application. Gas fireplaces and/or certified gas appliances, however, may be installed. 8. The applicant shall contact the Environmental Health office regarding the potential mine waste, waste rock or mine dumps which may be encountered during the excavation phase of the project. The applicant shall adhere, to the satisfaction of the Environmental Health Department, to recommendations by the Chen- Northern Geologist regarding contaminated soils and mine waste on-site and providing an imported noncontaminated soil to cap the materials. 9. The applicant of the Chen-Northern shall follow the specific recommendations report regarding soil stability and the final grading plan shall be Department for consistency with retention of slope cuts and reviewed by the Engineering Chen's recommendations. 10. Before the issuance of an excavation permit tree permits shall be required for any tree 6" in caliper. Relocation of these tress should be a priority. 11. Prior to the issuance of a Certificate of Occupancy, the applicant shall install a hydrant at the terminus of the (8) inch water main extension. 12. Prior to the issuance of a Certificate of Occupancy, the applicant shall provide an easement across the project site to permit the future extension of the proposed eight (8) inch main. The applicant shall also to participate in the cost of that extension. 13. Prior to the issuance of a building permit, the applicant shall dedicate a twelve foot wide public easement, to the City, for the new trail. 14. Prior to the issuance of a building permit trail a deed for the until the year 2083. 16. The easements for the Spar Gulch drainage and the public trail shall be filed with the City Attorney's office and recorded by the clerk. 17. Prior to the issuance of a building permit, a landscaping plan shall be reviewed and approved by the Parks and Planning Departments. 18. The height of the building shall be measured from finished grade which shall be the elevation of 8020. APPROVED by the Commission at their regular meeting November 21, 1989. ~FrEST Jag Ca~ney, bep~y City Clerk ROVED ~FROM: ed Gannett, Ci~Attorney ASPEN PLANNING AND ZONING C.%-Welton And~rson, Chairman APPROVED AS TO CONTENT: Amy M~gerum, P~ing DirectOr the Housing Guidelines. 15. It is the intention of the Planning and Zoning Commission that if ever the tennis courts are construed to be another building site, no development shall occur on that site restriction shall be filed with the Housing Authority accessory dwelling unit which shall comply with the provisions of