HomeMy WebLinkAboutapz.res.016-90 RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION
FOR THE APPROVAL OF T~IE I~L~T,TAM LAKE PIPELINE STREAM MARGIN REVIEW
Resolution No. 90- /~
WHEREAS, in order to restore groundwater flow to Hallam Lake
lost as a result of construction of the Rio Grande Parking
Garage, the Aspen City Council directed the Engineering
Department to design a gravity fed pipeline system; and
WHEREAS, the most workable route was determined to run
through the river corridor in the Art Museum area; and
WHEREAS, the Engineering Department submitted for approval
to the Commission an application for Stream Margin Review; and
WHEREAS, the Planning staff recommended approval of the
Stream Margin Review with conditions; and
WHEREAS, the Commission reviewed and approved the Stream
Margin Review with conditions by a 7-0 vote on October 2, 1990.
NOW, THEREFORE, BE IT RESOLVED by the Commission:
That it does hereby approve by the Hallam Lake Pipeline Stream
Margin Review with conditions as follows:
1. Any trees which are removed along the route must receive a
tree removal from the Parks Department. They must be replaced
immediately upon project completion. Replacement shall be one
for one with 2.5" caliper trees of the same species.
2. Prior to excavation permit issuance, a barricade fence shall
be erected across the Art Museum parcel defining vehicular
movement and materials storage during construction.
3. Where the pipeline crosses the Rio Grande right-of-way, the
pipe must be deep enough and strong enough to allow for future
train traffic.
APPROVED by the
1990.
Commission
at its regular
meeting on October 2,
Jan~.~Am~ey ,v Deputy~ity Clerk
jtkvj/Hallam.smreso