Loading...
HomeMy WebLinkAboutapz.res.019-90 RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION RECOMMENDING APPROVAL OF T~ CONCEPTUAL SPA DEVELOPMENT PLAN FOR THE ASPEN MEADOWS Resolution No. 90- i~ ~, on October 16, 1990 a Master Plan was adopted by the Aspen Planning and Zoning Commission outlining future land use, facilities expansions, and review pro6esses for approximately 85 acres zoned with an SPA (Specially Planned Area) Overlay known as the Aspen Meadows, owned by Savanah Limited Partnership and the Aspen Institute, and occupied by the Aspen Institute, the Music Associates of Aspen, the Aspen Center for Physics, and the International Design Conference (hereinafter "The Consortium,,); and WHEREAS, in order to implement the improvements and expansions outlined in the Master Plan, The Consortium submitted to the Planning Office a Conceptual SPA Plan; and WHEREAS, Conceptual Plan approval by the Planning and Zoning Commission (the Commission) is the first of four approvals required for any project on a parcel with an SPA Overlay; and WHEREAS, the Conceptual Plan was reviewed and commented upon by the City Engineering Department, the Aspen/Pitkin County Housing Authority, the Water Department, the Fire Marshal, the City Attorney, the Historic Preservation Committee, the Environmental Health Department, the Roaring Fork Transit Agency, and the Sanitation District; and WHEREAS, the Planning Office, in consideration of the comments made from the various departments and agencies, recommended to the Commission approval of the Conceptual SPA Plan with a list of twenty-seven conditions; and WHEREAS, at a regularly scheduled meeting on November 20, 1990, the Commission heard presentations by the Planning Office, the Consortium's representative, architect and traffic consultant; and ' WHEREAS, upon consideration of all information presented including that of the proposed underground parking facility, traffic study, access to the site, sketches of the proposed Rehearsal Hall, and expansion of the Health Club Facilities, the Commission found the Conceptual Plan acceptable and forwards its recommendation for approval to the City Council with conditions as amended by the Commission. NOW, THEREFORE BE IT RESOLVED by the Commission: that it hereby recommends to the City Council approval of the Aspen Meadows Conceptual SPA Plan with the following conditions: Prior to submission for Final Development Review: 1. The applicant shall submit a construction schedule. 2. The visual impact (height and linear appearance) of the underground parking lot at the tennis courts shall be reduced as much as possible. A detailed parking plan shall be provided indicating any existing parking to be removed and any proposed parking at the Meadows. 3. Those elements listed in the Master Plan must receive Conceptual and Final approval by the Historic Preservation Committee (HPC) unless the HPC determines that final approval is not necessary prior to Final SPA submission. 4. A Subdivision Plat in full compliance with Section 7-1004 D.1 and D.2 shall be submitted which describes the specific parcels to be held in separate ownership, including the Conservation Area to be purchased by the City. 5. Trail easements on the Meadows property must be dedicated on the Subdivision Plat. 6. Ail utilities shall be underground. Easement needs of each utility shall be addressed at Final submission. Major Utilities must sign off on final submission. 7. The applicant shall investigate with the Engineering Department how to comply with the "Urban Runoff Management Plan." Ditch and pond easements may be required. 8. Seventh Street shall be the primary access for two way traffic into and out of the Meadows. 9. Costs associated with the Seventh Street expansions or alterations shall be borne by the applicant. 10. Trails and bikeways shall be implemented in compliance with the adopted Pedestrian and Bikeway Plan. The pedestrian trail along the old Meadows road alignment shall be reconfigured to conform to design standards set forth in this plan. 11. A fugitive dust control plan must be approved by state and County agencies prior to issuance of any excavation or building permits. 12. Food service facilities shall comply with all State and local environmental health codes. 13. Energy efficient measures shall be used throughout the Meadows. 14. Housing mitigation for the 23.69 low income employees shall be provided through cash-in-lieu for 16.69 employees as well as ~n-site housing for seven employees, deed restricted to low income. 15. The affordable housing units must be deed restricted meeting the Housing Authority,s requirements for size, type, asset, income, and occupancy standards. 16. Condominiumization fees shall be paid for the eight existing 3 bedroom townhomes totaling $64,240, payable before plats are filed. These fees can only be waived by City Council. 17. New residential units must receive GMQS allotments. 18. The following areas shall be rezoned to a new zone district called OS-Open Space: the 25 acre parcel currently zoned C- Conservation, the Racetrack, Sage Meadow, Anderson Park, and the Tent Meadow, as designated in the Master Plan. Upon further review, some historic use of the parcel may indicate a slightly different approach to zoning (SPA). 19. The Rehearsal Hall will be located to the east of the Music Tent and shall be screened along the eastern MAA property boundary with a vegetative buffer. 20. A detailed description of the use program for the Rehearsal Hall shall be provided. This must address seasonal use, daily use, use by outside entities, public performances, etc. 21. The backstage expansion at the Music Tent shall be limited to 1,500 new square feet unless the Master Plan is amended to allow additional area. 22. A fire suppression/protection plan must be developed in concert with the Fire Marshall's Office and included in the Final submission. 23. The applicant shall commit to making necessary corrections to the Sanitation District trunk line as mentioned in the referral letter. 24. A detailed transportation plan shall be submitted with the Final Plan application. The bus loading area and its interface with pedestrian access ways must be addressed. The transportation plan shall also provide specific details on items mentioned in the Master Plan: vehicle size regulations, small non-diesel buses, Rio Grande shuttle, paid parking, residential parking permits, lodge limousine, and paved MAA parking. In addition the transportation plan shall eValuate the effectiveness of less underground parking and a better transit system throughout the property. 25. A digitized copy of the Subdivision plat is requested by the Engineering Department prior to recordation. APPROVED by the Commission Novembe~ 0, 1990. Jan Car~, DepUty C~ ~lerk at its regular me~ting on Welton Ande~soi~, Chairman jtkvj/meadows.reso