Loading...
HomeMy WebLinkAboutapz.res.034-91RESOLUTION OF THE /%SPEN PL]%NNING STRF~%M M~RGIN APPROVAL FOR THE CROSSING THE ROARING FORK RIVER, ~ND ZONING COMMISSION GRANTING INSTALLATION OF ~ NEW BRIDGE REPLACEMENT OF THE EAST HOPKINS PEDESTRI/%NBRIDGE/%NDCONSTRUCTION OF A NEWTEAILALONGTHE ROARING FORK RIVER, ASPEN, COLORADO Resolution No. 91-~ WHEREAS, the Aspen Planning and Zoning Commission held a meeting September 3, 1991; and WHEREAS, the Commission reviewed an application for a stream margin review for the construction of a new pedestrian/bike bridge crossing the Roaring Fork River near the Mill Street river crossing, a pedestrain/bike trail connecting the Art Museum trail with the Rio Grande trail near the Aspen Consolidated Sanitation District (ACSD) and replacing the damaged East Hopkins Street pedestrian/bike bridge; and WHEREAS~ pursuant to Section 24-7-504 development within 100 feet from the high water line of the Roaring Fork River and its tributary streams, or within the one hundred year floodplain is required to undergo Stream Margin Review; and WHEREAS, the Planning staff reviewed the application and recommended approval with conditions; and WHEREAS, the Commission reviewed the application and amended the conditions of approval to include: 3. The west end of the Hopkins Street bridge shall be investigated for potential parking and landscaping. NON, THEREFORE, BE IT RESOLVED by the Commission that it does hereby grant stream margin approval for replacement of the East Resolution No. 91- Page 2 Hopkins bridge, a new bridge crossing the Roaring Fork River near the Mill Street river crossing and a new trail segment connecting the Art Museum with the Rio Grande trail near the ACSD with the following conditions: 1. Prior to the issuance of any building permits: a. the applicant shall provide a set of drawings stamped by the engineer who performed the hydraulic analysis and shall be reviewed and approved by the Engineering Department. b. an erosion mitigation plan shall be Engineering Department and the plan shall limited to revegetation of disturbed areas. approved by the include, but not c. tree removal permits are required from the Parks Department before any trees greater than 6" in caliper may be removed. Every effort should be made to relocate on site the trees that must be disturbed. 2. Ail representations that have been made in the application and during the presentation shall be adhered to. 3. The west end of the Hopkins Street bridge shall be investigated for potential parking and landscaping. APPROVED by the Commission at its regular meeting on September 3, 1991. ASPEN PLANNING AND ZONING COMMISSION ATTEST: Bruce Kerr, Chai~person D,t..ig..d /3. Carn&y; Deputy citF Clerk