Loading...
HomeMy WebLinkAboutapz.res.035-91RESOLUTION OF THE ASPEN PLaNNiNG ~ ~ON~NG COMI~ISSION ~I~NT~N~ STRF~H I~.R~IN APPROVAL FOR THE CONSTRUCTION OF A I~YAK COURSE PEDESTRI~%N PATH AD~CENT TO THE R~O ~I~NDE PROPERTY~ AND THE STRE~ I~RG~N APPROVAL TO PLACE F~LL BEHIND THE EAGLES CLUB~ ASPEN~ COLOI~DO eso ut on WHERF~B, the Aspen Planning and Zoning commission held a meeting October 22, 1991; and WHERE~S, the Commission reviewed an application for a stream margin review for the construction of a pedestrian trail and kayak course in the Roaring Fork River adjacent to the Rio Grande property; and WHEREAS, pursuant to Section 24-7-504 development within 100 feet from the high water line of the Roaring Fork River and its tributary streams, or within the one hundred year floodplain is required to undergo Stream Margin Review; and WHEREAS, the Planning staff reviewed the application and recommended approval with conditions; and WHEREAS, the Commission reviewed the application and amended the conditions of approval to include: 3. Boater put-in and take-out including parking shall be addressed for the course. This will occur prior to and during the Master Plan effort. 4. The City Attorney shall review the liability impacts of this whitewater course. 5. Additional stream margin review is anticipated to complete the course; and Resolution No. 9~- Page 2 WHEREAS; condition of office. WHERE~S, the applicant requested an amendment to the stream margin review to place fill from the kayak course behind the Eagles Club for a foot path connecting Spring Street to Newbury Park; and the Commission reviewed the amendment and added a approval requiring review by the city Attorney's NOW, THEREFORE, BE IT RESOLVED by the Commission that it does hereby grant stream margin approval and an amendment to the approval for the construction of a kayak course in the Roaring Fork River, a pedestrian river trail on the Rio Grande property and the placement of fill behind the Eagles Club for a foot path connecting Spring Street to Newbury Park with the following conditions: 1. Prior to construction: a. the applicant shall provide a set of drawings stamped by the engineer who performed the hydraulic analysis and shall be reviewed and approved by the Engineering Department; b. an erosion mitigation plan shall be approved by the Engineering Department and the plan shall include, but not limited to, revegetation of disturbed areas; c. tree removal permits are required from the Parks Department before any trees greater than 6" in caliper may be removed. Every effort should be made to relocate on site the trees that must be disturbed; d. necessary 404 Permits shall be obtained and provided to the Engineering Department; and e. the colorado Water Conservation Board shall be notified of changes to the river channel and shall be notified for additional work. 2. All representations that have been made in the application and during the presentation shall be adhered to. Resolution No. 9~- Page 3 for the course. Plan effort. This will occur prior Boater put-in and take-out including parking shall be addressed to and during the Master liability impacts of this 4. The city Attorney shall review the whitewater course. 5. Additional stream margin review is anticipated to complete the course. 6. Prior to the removal of any trees greater than 6" caliper tree removal permits must be obtained from the Parks Department. Any tree removed shall be replaced on site pursuant to the Parks Department standards. 7. All fill shall be stabilized and landscaped by the Spring of 1992. 8. Neighborhood concerns shall be resolved prior to the placement of fill in Newbury Park. 9. Placement of fill shall in no way encroach into the 100 year floodplain without further review. 10. Prior to placement of fill the city Attorney's office shall review the liability impacts. APPROYED by the Commission at its regular meeting on October 22, 1991 and amended November 19, 1991. ASPEN PLANNING AND ZONING COMMISSION Bruoe Kerr, Chairperson Clerk