HomeMy WebLinkAboutresolution.apz.007-86RESOLUTION OF TIE ASPEN PLANNING AND ZONING CONNISSION
FORNARDING THE ASPEN AREA COMPREHENSIVE PLAN:
HISTORIC PRES~RViqTION ELENI~T FOR I~OR~ENEI~F OF THE
HISTORIC PRESERVATION CONNITTEE AND CITY COUNCIL
Resolution No.
Planning and Zoning Commission
periodically review,
elements of the
WHEREAS, the Aspen
after "Commission") is authorized to
amend and extend in greater detail
Comprehensive Plan; and
(herein-
revise,
Aspen Area
Council for their endorsements.
BE 1~ FUl~fH~R RESOLVRD that
Preservation Committee and City
Area Plan:
Comprehensive
subsequent to formal Hi~oric
Council endorsement, the Aspen
Historic Preservation Element will
WHEREAS, the Commission is presently in the process of
updating the 1973 Aspen Area Comprehensive Plan; and
WHEREAS, the Commission held public meetings on February 12,
December 2, April 1, 1986 and April 22, 1986 to work on develop-
ing the Historic Preservation Eleaent; and
WHEREAS, the Commission has revised in detail the Historic
Preservation Element and has made revisions to it which are
incorporated in the current draft.
NOW, THEREFORE, BE 1T RESOLVED by the Commission that the
Aspen Area Comprehensive Plan: Historic Preservation Element be
forwarded to the Historic Preservation Committee and to City
Resolution No. 86- ~
Page 2
return to the Commission for public hearing and adoption.
APPROVED by the Commission at its regular meeting on April
22, 1986.
Kim Wilhoit
Deputy City Clerk
ASPEN PLANNING AND ZONING
C0~ISSION
Chairper son~
SB.21
MEMORANDUM
TO: Aspen City Council
THRU : Ron Mitchell, Acting City Manager
FROM: Steve Burstein, Planning Office
RE : Aspen Area Comprehensive Plan: Historic Preservation
El eme nt
DATE : May 6 , 1986
BACKGROUND: Attached for your review and comment is the Asper.
Area Comprehensive Plan : Historic Preservation Element . This is
the second draft which we have prepared and it is the result of a
series of meetings with the Planning and Zoning Commission during
which time revisions were made. Also attached is Planning and
Zoning Commission Resolution No . 86-7 forwarding the Plan Element
to Council and to the Historic Preservation Committee . The
Historic Preservation Committee, which hs been involved in the
process throughout , is scheduled to review the Plan Element on
May 27 , 1986 .
PROPOSED MOTION: "Move to endorse the Plan Element and direct
the Planning Office to prepare a Resolution formalizing this
action. "
SB.14
ASPEN AREA COMPREHENSIVE PLAN
HISTORIC PRESERVATION ELEMENT
Second Draft
May, 1986
Prepared by
The Aspen/Pitkin Planning Office
Alan Richman
Planning and Development Director
Glenn Horn
Assistant Planning Director
Project Planner
Steve Burstein
Project Planner
Janet Raczak
Nancy Crelli
Word Processing/Layout
TABLE OF CONTENTS
Page
LIST OF FIGURES AND TABLE iv
Resolution of Aspen Planning and Zoning Commission v
Adopting Aspen Area Comprehensive Plan:
Historic Preservation Element
INTRODUCTION 1
CHA PT ER
I . PLANNING PROCESS 3
II . GOALS AND OBJECTIVES
Introduction 6
Historic Preservation Goals and 6
Objectives
III. BACKGROUND
Introduction 12
History of Aspen' s Built Environment 12
Existing Conditions 21
Provisions of the Aspen 22
Municipal Code
1980 Inventory of Historic Sites 28
and Structures
Role of National Register of 31
Historic Places
Aspen Historical Society 33
IV. ISSUES AND CONCERNS
Introduction 35
Architectural Quality and 35
Compatibility
Evaluation and Inventory of Historic 36
Sites and Structures
Floor Area Ratio 36
Restoration and Renovation Know-How 38
i
i
TABLE OF CONTENTS continued . . .
Pa cue
Local Historic Preservation Review (HPC) 39
Review Authority of Historic 39
Preservation Committee
Review and Application Procedures 41
Expiration of HPC Revies 41
Historic District Development 42
Guidelines
Demolition and Moving Review 43
Individual Historic Designation 43
Expansion of Historic Districts 44
Growth Management Quota Exemption for 45
Historic Preservation
Historic Structures on Main Street 46
Capital Budgeting for Historic 48
Preservation
Maintenance and Improvements to 49
Public Building
Street Narrowing 50
Tree Planting Program 5 1
Commemorative Placque Program 51
Facade Easement Dedication 52
Revolving Loan Fund 52
State and Federal Incentives for 53
Historic Preservation
Open Space and Land Use 53
V. IMPLEMENTATION PLAN
Introduction 54
Code Amendments 54
Color and Illumination 54
Demolition and Removal Review 55
Floor Area Ratios 55
Individual Historic Designation 55
Historic District Expansion 55
Conditional Uses in Office Zone 56
ii
TABLE OF CONTENTS continued . . .
Page
Historic Preservation Committee Opera- 56
tions and Procedures
Development Guidelines 56
Review and Application Procedures 56
Capital Budgetting 57
Public Building 57
Street Narrowing 57
Tree Planting 57
Commemorative Placques 58
Informational Program 58
Update City Inventory of Historic 58
Sites and Structures
Restoration and Renovation Know-How 58
Assistance to the Aspen Historical 58
Society
Historic Preservation Studies 59
Main Street 59
Expansion of the Historic District 59
to Encompass the Aspen Townsites
and Early Additions
Facade Easements, Transfer of 59
Development Rights and Resolving
Loan Fund
iii
LIST OF FIGURES AND TABLE
Pa ige
Figure 1 Aspen Area Comprehensive Plan: Historic :Z
Preservation Element Study Area
Figure 2 Aspen Original Townsite and Subsequent 1.5
Subdivisions
Table 1 Aspen Register of Individually-Designated 25
Historic Structures and Sites
Figure 3 Map of Historic Inventory 3
iv
r
D
Z
z
z
G)0
n
m
INTRODOCT ION
In the Aspen Area, historic preservation has long been considered
a particularly important factor contributing to the quality of
the environment . The subject has received high priority in the
City Council and Planning Commission ' s statement of community
goals and objectives. Few comprehensive plans include a separate
element on historic preservation. Given the importance of our
heritage to understanding the community today, and the absence of
recent studies of our history and how we can best protect what
remains of our past , the Aspen Area Comprehensive Plan: Historic
Preservation Element has been prepared.
The Aspen Area Comprehensive Plan: Historic Preservation ]Element
represents a subsection of the Aspen Area Comprehensive Plan.
The study area is defined as the original townsite of Aspen and
the subsequent additions created prior to 1900 . As shown in
Figure 1, the study area is generally bordered by Castle Creek,
the Roaring Fork River and Aspen Mountain. This Element is part
of an on-going effort to update the 1973 Aspen Area Comprehensive
Plan.
The Historic Preservation Element represents one of nine elements
which make up the Aspen Area Comprehensive Plan. Other elements
are:
o Land Use
o Transportation
o Growth Policy
1
INSERT FIGURE 1 - ASPEN AREA COMPREHENSIVE PLAN: HISTORIC
PRESERVATION ELEMENT STUDY AREA
2
•
o Housing
o Parks/Recreation/Open Space/Trails
o Utilities
o Annexation
o Public and Institutional Facilities
To date, Aspen Area Comprehensive Plan Task 1: Existing Condi-
tions in the Aspen Area, the Growth Policy Element and Parks/Re-
creation/Open Space/Trails Element have been completed, while the
Transportation Element and Annexation Element are also presently
underway.
The Historic Preservation Element consists of the following
Chapters:
I . Planning Process
I I. Goals and Objectives
III. Background
IV. Issues and Concerns
V. Implementation Plan
The Historic Preservation Element has been prepared on a coor-
dinated basis by the Aspen Historic Preservation Committee, Aspen
Planning and Zoning Commission and the Aspen City Council .
PLANNING PROCESS
The work program for the Historic Preservation Element included
stages which are briefly summarized below:
3
A. Goals and Objectives - In September of 1984 , the Aspen
Planning and Zoning Commission gave preliminary approval to
the Goals and Objectives of the Aspen Area Comprehensive
Plan which formed the basis for the development of the
Historic Preservation Element .
B. Collecting Background Information - During the second half
of 1985, the Planning Office researched local history and
the existing conditions of historic preservation in Aspen.
The Aspen Planning and Zoning Commission and the Historic
Preservation Committee assisted in the development of the
resultant chapters during several meetings through that
period of time.
C. Issues and Concerns - In December of 1985 , the Aspen
Planning and Zoning Commission presented for public discus-
sion the staff ' s annotated list of issues and concerns for
historic preservation. The purpose of the Issues and
Concerns section is to identify the strengths and weaknesses
of the historic preservation system in place and to explore
further efforts to improve historic preservation . The
Historic Preservation Committee held similar meetings from
November 1985 through January 1986 to identify problems from
their perspective.
4
a
D. Implementation Plan - As the Aspen Planning and Zoning
Commission and Historic Preservation Committee analyzed the
staff ' s work and heard public comments, the Plan began to
take shape. The Commission, Committee and staff developed a
list of actions to implement the Plan. These actions were
established to give decision-makers guidance in both short-
term and long-term implementation of the Historic PrE-serva-
tion Plan.
5
• •
0
D
r
D
z
0
0
m
n
m
r
Introduction
The Goals and Obj ectives for the Aspen Area Comprehensive
Plan: Historic Element are intended to provide the basic direc-
tion to the staff and Planning and Zoning Commission in develop-
ing the Historic Preservation Element of the Plan. Goals are
defined as ends toward which the City ' s planning is directed ;
they are usually general in form and express ideals. Objectives
are intermediate milestones on the way towards a goal ; they are
in a form that is measurable and achievable.
Historic Preservation Goals and Objectives
The following Goals and Objectives are intended to serve as
general guides for land use planning with respect to Historic
Preservation.
1 . Education
Goal : To improve upon the historical knowledge of Aspen
and Pitkin County for the enjoyment and education
of residents and visitors.
Objectives :
a . Provide information that allows members of the -public
to use the built environment of Aspen as an historical
teaching device .
6
•
b. Give recognition to the structures, sites, districts,
and urban design qualities of Aspen that have contri-
buted to the historic evolution of the community .
C. Identify and preserve records of the people and events
that have or are making special contributions to the
community .
d. Study Aspen ' s historical environmental forms to
identify old qualities that are superior to standard
contemporary forms, and encourage new development to be
equal to or better than the historical development .
e. Assist the Aspen Historical Society in its efforts to
preserve and display historical artifacts and provide
cultural and educational programs for residents and
visitors.
f. Create a ski museum to give recognition to the contri-
butions Aspen has made in the evolution of the sport
and the role skiing has played in Aspen' s history .
g. Make mine tours available in the summer and winter for
the enjoyment and education of residents and guests.
7
2 . Quality of the Environment and Architecture
Goal : To maintain the high quality natural and man-made
environment which attracts both residents and
visitors to Aspen.
Objectives:
a. Encourage renovation and maintenance of historic
structures through development review incentives and
economic benef its.
b. Encourage productive and economically attractive uses
of historic structures.
C. Encourage faithful restorations of historic structures
evaluated to be excellent and exceptional in the 1980
Inventory of Historic Sites and Structures. The review
of proposed renovations should be based upon the
criteria of Aspen' s historic preservation guidelines,
design acceptability and economic considerations.
d. Discourage demolition of significant historic :struc-
tures identified and evaluated in the 1980 Inventory of
Historic Sites and Structures.
8
e. Allow historic designated structures to be moved if
demolition appears to be the only alternative.
f. Encourage new contemporary commercial and residential
buildings to be complementary to neighboring historic
buildings, in scale, form, materials and other ele-
ments.
g. Study Floor Area Ratios in all zoning districts to
protect the historic scale appropriate to each dis-
trict .
h. Maintain a balance between the preservation of Aspen ' s
old buildings and traditional settings and community
change in response to new lifestyles and economic
activities.
i. Preserve and encourage timely replanting of cottonwood
trees and other species of the urban f orest that
contribute to the streetscape beauty and historic scale
of buildings in relation to vegetation.
j . Utilize streetscape guidelines to guide the development
of new landscaping, sidewalks, and malls in order to
allow pedestrians to better appreciate Aspen' s visual
environment .
9
•
k. Continue the review function of the Historic PrE-serva-
tion Committee regarding exterior changes to existing
structures and building of new structures in the
Historic Overlay Districts.
1. Provide greater incentives for rehabilitation of
structures on Main Street .
M. Study the formation of an architectural review commit-
tee which reviews all projects in the City.
n. within the City ' s capital improvements program, budget
for tree planting, road narrowing, sidewalk and mall
improvements, upkeep of public buildings such as City
Hall and Wheeler Opera House, rehabilitation loans, and
other City financed programs that promote historic
preservation.
3 . Resort Amenities
Goal : To maintain Aspen' s unique small town character
and scale as one of its major attractions to
residents and visitors.
a. Develop recreational and cultural opportunities
10
associated with Aspen' s past which attract visitors to
the community.
b. Enhance the pedestrian and mass transit experience and
discourage use of automobile.
C. Encourage the preservation of Aspen ' s community scale
and small town building massing through open space,
growth management and land use regulations.
11
D
C7
000.7
6)
DOO
C
0
R
Introduction
Presented in this chapter are two sections : a history of Aspen' s
development and a discussion of Existing Conditions with regard
to how historic preservation is presently treated in Aspen
through municipal and private efforts.
History of Aspen's Built Environment
In this section a brief history of Aspen is presented in order to
identify the major historic periods evidenced in our architec-
ture. Buildings and other artifacts from each era of our history
have survived throughout the dramatic transformations undergone .
The understanding of Aspen ' s past is the foundation for our
efforts in historic preservation. This is not intended to be a
definitive study of Aspen's past, but rather an overview of the
main eras that have left their marks on the community . A
bibliography is provided for more complete historical informa-
tion.
The earliest known inhabitants of Aspen and Pitkin County were
the Ute Indians. They made hunting and fishing trips through the
Roaring Fork Malley, and it is doubtful that they resided here
year-round. Arrowheads and pottery shards are indications of
their presence .
In the summer of 1879, prospectors first came into the area from
Leadville. "A dozen log cabins at the foot of Aspen Mountain "
12
were built; and Henry Tourtellotte built his cabin in the aspen
grove of Tourtellote Park. Following the Meeker Massacre in that
year, nearly all prospectors and hunters returned to Leadville,
as "Ute City" was part of Indian territory. Following a truce
called by Chief Ouray later in 1879, the prospectors returned
with the promise held of peace with the Indians, mountains laced
with veins of silver, an agreeable mountain climate and splendid
scenery.
The community quickly grew as the center of one of the foremost
silver mining districts in the state. Other mining settlements
in the Roaring Fork and Crystal Valleys included Independence,
Ashcroft, Highlands, Lenado, Crystal , Schofield and Aspen
Junction (Basalt ) . The community of Redstone, containing many
outstanding historic buildings, was built between 1901 to 1903 in
conjunction with the development of nearby coal mines and the
coke oven operation. Redstone and Marble were both built at the
turn of the century, twenty ( 20) years and another era after the
silver mining camps were first settled.
By 1887 , even before the railroads (Denver and Rio Grande and the
Midland ) served Aspen, the population of Aspen reportedly reached
6, 000 people. In the years 1890 to 1892, the town had a building
boom, bringing the population to over 11 ,000 . This short period
produced most of the fine brick and red sandstone buildings
located in the Commercial Core. Elegant residences of mining
13
entrepreneurs and merchants, and the well proportioned miner ' s
cottages were also built during this boom. Some outstanding
buildings that have survived the period include the Lincoln
Block/Chitwood (1891) , Webber Block/Isis Theatre (1892) , City
Hall ( 1892) , County Courthouse (1891) , St . Mary ' s Catholic Church
(1891) , Brand Building (1891) , Cowenhoven Building/Ute Banque
( 1890 ) , and the Atkinson/Sardy House (circa 1890 ) . In 1891
alone, at least 75 buildings were under construction. De-
velopment of the mining, milling, roads and railroad facilities
of the era added to what must have been a phenomenal level of
activity in this confined, remote valley .
Aspen was a prosperous and opulent town built with all the
symbolic features of the best mining communities : a large and
varied business district, fancy hotels, attractive schools and
churches, and stone and brick construction throughout the
community. Aspen was a proud outpost on the mining frontier .
Investors primarily from the east were educated and affluent
people. Harper 's Weekly described Aspen in the 1880s as a town
of "unyielding respectability and force of character. " However,
at the same time a sizeable red light district of saloons and
brothels on Durant Street caused upright Aspen matrons to avoid
riding the Colorado Midland train, as they would have had to pass
down Durant Street to reach the station.
14
s •
FIGURE 2 - ASPEN ORIGINAL TOWNSITE AND SUBSEQUENT SUBDIVISIONS
15
In 1893 , the Sherman Silver Purchase Act was repealed, demonetiz-
ing silver . The young community suddenly saw the virtual
collapse of its economic base after reaching a peak population of
12 , 000 people. While Aspen never completely folded up in the
tradition of other boom and bust mining camps, population began
its decline and very little new construction occurred. The
community survived on scaled-down mining operations and a shift
to an agricultural economy during the years of 1894 to 1947 often
referred to as "the quiet years. " The population was reported to
be approximately 700 in 1920 .
Victorian buildings were largely preserved because there was
minimal environmental change during this inactive period. As a
result, Aspen has a substantial inventory of buildings from the
mining era. It is perhaps remarkable that of the fifty-eight
( 58) non-mining structures denoted in the 1893 Bird's Eye View of
Aspen, at least twenty-six (26) remain today .
The mining era also left its imprint on Aspen ' s settlement
pattern (see Figure 2) . The original townsite of Aspen was
platted in 1880, establishing the northwest-southeast orienta-
tion, block and street pattern, dimension of lots, right-of-way
widths, and sections of town within the relatively flat valley
floor . By 1890 , the East Aspen Townsite, North Aspen, Connors
Addition, Eames Addition, Capitol Hill Addition and Ute Addition
were established (if not properly platted in all cases) . The
16
settlement was contained within the boundaries of the Roaring
Fork River, Castle Creek gorge, and the mountain edge. This area
remains the primary urban area , today and contributE!s the
sense of our community scale.
Other environmental form features have evolved from historic
econcmic and environmental circumstances. The Commercial Core is
clustered at the base of Aspen Mountain, almost equal distance
from the once-thriving Aspen Mountain and Smuggler Mountain
mines. The Midland and Rio Grande Railroads enveloped the main
body of the settlement and their depots also reinforced the
Commercial Core. Linear commercial development along Main Street
made little sense. Fortunately, it never occurred, leaving Aspen
a pedestrian community . Main Street has always been the major
thoroughfare through town for all non-rail transportation as it
is the easiest and shortest route to the east and west . Irriga-
tion ditches that served farmers in both the immediate area and
Down Valley, as well as watered the rows of street trees in town,
played a very important role in Aspen' s sustenance and urban
environment . Furthermore, the presence of south slope spruce and
pine forests for building materials and nearby meadows for
grazing animals allowed for the community to take form and grow.
Although many buildings built prior to 1900 survived the "quiet
years, " from photographs of Aspen taken in the 1940 ' s, it can be
seen that the building stock was greatly reduced from the
17
1890 ' s. Aspen lost much of its original construction through the
" ghost town effect " of natural decay, fires, pillaging for
building materials, and moving structures to locations Down
Valley. In all districts of the settlement , there remain
structures from the mining days ; however, the majority of
historic structures are located in the commercial core, along
Main Street and in the West End and Hallam Addition neighborhoods
(see Figure 2) . Less original construction in the East Aspen and
Shadow Mountain neighborhoods has survived because of the
dismantling of the mining and railroad facilities in those areas
and the demolition that preceded lodge construction at the base
of Aspen Mountain. It appears from the 1893 Bird' s Eye View of
Aspen and photographs from the early era that there were primar-
ily small houses, and industrial and commercial structures in
these worker/industrial sections of the settlement .
The "quiet years" of Aspen ended when two events occurred that
brought on a new era. Walter Paepcke, Chairman of the Container
Corporation of America, and his wife Elizabeth came to Aspen and
took an interest in creating a cultural/spiritual/recreation
center here. At about the same time, Ted Ryan, Andre Roch, and
other individuals interested in creating a ski resort discovered
the Aspen Area. The beginning of the early cultural and ski era
corresponds with the end of World War II .
18
During the years 1945 to 1948 Walter Paepcke acquired signif icant
properties in Aspen. The Aspen Company was formed by Paepcke in
order to lease , modernize and refurbish the Hotel Jerome and
purchase auxiliary real estate holdings. Herbert Bayer was
retained by Paepcke to work on many of Paepcke ' s ideas for a
physical transformation of the community. Paepcke and Bayer
envisioned bringing the quiet community back to life through
modernizing it from within. The best architecture of the
inherited past was to be saved and new construction would be
built to be compatible in scale with the old. Paepcke also
bought 120 acres known as the Aspen Meadows . Most of the
buildings of the Aspen Institute and Meadows were built between
1953 and 1959 . It should be noted that Bayer was one of the
forces behind the creation of the Aspen Historical Societe when
he decried the loss of Victorian architecture in the 1960s.
In 1949 the international bicentennial of Goethe ' s birthday,
organized by Paepcke, was held in Aspen. This establishE!d the
town as a cultural and intellectual center. Shortly thereafter
the Aspen Institute began a regular series of programs for
businessmen, intellectuals and leaders in a variety of fields.
By 1938, the first ski runs had been opened, along with the "boat
tow" and a ski jumping hill. With construction of the Lift 1
Chairlift in 1946 , and development of various Aspen Mountain Ski
Trails, Aspen saw a number of new ski dormitories and remodeling
19
of houses. Lodge development was mostly concentrated at the base
of Aspen Mountain, although numerous facilities were also located
along Main Street and scattered south of Main Street . A popular
architectural motif of the 50s was the Swiss mountain village
style. The Skier ' s Chalet, built in 1952, is an example of that
style which has received local historic designation.
Beginning in the early 1960s Aspen began to grow dramatically . A
series of annexations and subdivisions surrounding the original
townsite and first additions have been approved since 1963 . Of
equal importance to expansion is the substantial amount of in-
fill which has occurred throughout all areas of the City . Most
modern construction has used contemporary design elements, adding
to the eclectic quality of the built environment while remaining
generally within a small-town scale . The present day mix of
architectural styles from the different eras is a fundamental
characteristic of the City.
With the new growth pressure on the community, it was recognized
that we needed a plan to guide a future development. The first
Aspen Area Comprehensive Plan, prepared in 1966 , and its subsequ-
ent update, prepared in 1973, both recognized the importance of
our historic resources . The 1966 Aspen Area General Plan
recognized the emerging trend whereby early Aspen residential
structures were being replaced with contemporary housing and
tourist accommodations. The Plan did not, however, recommend any
20
actions intended to preserve open spaces and historic structures
or discourage development on hillsides. Despite the lack of
guidance from the Plan, by 1972 the City had implemented an
historic overlay district and designated the Historic Preserva-
tion Committee as the board to review development activities in
the District.
The 1973 Aspen Land Use Plan, prepared during a time of high
growth, was significantly more concerned with protective measures
against the threat of losing community resources. Policy No . 1
of the 1973 Plan was to preserve the buildings and sites recom-
mended by the Historic Preservation Committee for historic
designation. Preservation of historic sites and structures as
well as tree planting in the commercial center and single-family
residential areas was encouraged . This plan provided a much
clearer foundation upon which to build a historic preservation
program in the community, as discussed in the following section.
Existing Conditions
In the twelve years since the last plan was completed, much
progress has been made to implement the Historic Preservation
goal. At the same time, various issues have arisen which require
increasing attention and new planning strategies if we are to
maintain a unique victorian character which sets Aspen apart: from
other resort communities. The purpose of the following sections
is to describe the conditions which make up our current strategy
21
for our historic environment, and then to identify various issues
and concerns affecting that environment.
In the existing conditions section a number of current programs
dealing with historic preservation are discussed. These programs
include Aspen' s Municipal Code provisions that regulate and give
incentives for historic preservation, the 1980 Inventory of
Historic Structures and Sites, the role of the National Registry
of Historic Trust in Aspen and the Aspen Historical Society .
Together , these programs are the framework through which the
community promotes preservation of historic architecture and
gives guidance to new design effecting the traditional qualities
of the built environment .
Provisions of the Aspen Municipal Code
Of central importance to the promotion of historic preservation
in Aspen are the following Sections of the Municipal Code :
o Historic Designation (Section 24-9)
o Exemptions from the Growth Management Quota System for
Structures with City Historic Designation (Sections 24-
11 .2 (b)
4-
11 .2 (b) and 24-11 .3 (d ) )
o Conditional Uses Allowed for Historically Designated
Structures in the Office Zone (Section 24-3 .2)
o Limited Enlargement of Non-conforming Structures with
Historic Designation (Section 24-13 .3)
o Flexibility in the requirements of the Uniform Building
Code for Historic Designated Structures (Section 7-141)
The basic purpose of the various Code provisions is to provide
incentives to preserve our inventory of historic structures .
22
•
Each provision is discussed in detail below.
Historic Designation. Historic Desianation (Article IX,
Section 24-9 of the Municipal Zoning Code ) was written and
adopted in 1973 . The purpose of this Article was to establish a
municipal role in "the preservation and continued existence of
historic structures, combination of structures, sites and areas
within the City (Section 24-9 .1) . The main components of
Article IX are:
o The creation of the Historic Preservation Committee;
o Standards and procedures for designation of H-
Historic Overlay Districts; and
o The procedure for HPC review of remodeling, reconstruc-
tion, removal, construction and demolition of struc-
tures in the designated Historic Overlay Districts.
Designation of historic structures and districts has been an on-
going function of the City since 1973 . Designation is accomp-
lished through ordinance amending the zoning district map and
requires participation of the HPC, Planning Commission and City
Council . The first three historic designations were the Wheeler
OF-era House, Ute Cemetery, and the Stallard House, accomplished
in 1973 . The Commercial Core Historic Overlay District was
designated in 1974; and the Main Street District received
designation in 1976 .
Every designated site and structure is placed in a category of
notable, excellent or exceptional . The criteria for desig:zation
are based primarily on the evaluations made in the 1980 inventory
23
and are discussed below in this report . During the period of
1973 to 1977, the main effort by the City was to obtain designa-
tions for those structures and sites in the Excellent and
Exceptional categories. Following a six month moratorium in 1981
on the issuance of permits to demolish or remove structures
identified in the 1980 inventory, there were cycles of desig-
nations encompassing larger numbers of structures in all categor-
ies .
Table 1 lists all structures designated at the time of writing
(November, 1985) .
Exemptions from the Growth Management Quota System. There
are two subsections of the Growth Management Quota System of the
Zoning Code pertaining to historically designated sites and
structures. Section 24-11 .3 (d ) states that any project needing
HPC approval ( i . e . , individual designated or in a Historic
Overlay District ) must receive conceptual approval from the
committee prior to submitting an application for GMP development
allotment. This means that the Historic Preservation Committee
has early input into the design of a new project , before it goes
before the Planning Commission and City Council for their review
of the GMP application.
24
TABLE 1
ASPEN REGISTER OF INDIVIDUALLY-DESIGNATED
HISTORIC STRUCTURES AND SITES
KEY: a- Exceptional Structures/Sites
•- Excellent Structures/Sites
•� Notable Structures/Sites
I. MAIN STREET
A 128 E. Main (Sardy House)
• 202 E. Main
• 208 E. Main
• 216 E. Main
• 221 E. Main
■ 330 E. Main (Jerome Hotel)
■ 506 E. Main (Pitkin County Courthouse)
A 533 E. Main (St. Mary's Church)
A Paepcke Park Gazebo
• 125 W. Main
• 135 W. Main
• 211 W. Main
A 328 W. Main (Copper Horse)
e 332 W. Main
• 400 W. Main
■500 W. Main (Mesa Store)
•612 W. Main
o 627 W. Main
• 633 W. Main
Jr. COMMERCIAL OJRE
■ 420 E. Cooper (Red Onion)
■501 E. Cooper (Independence Building)
■ 303-309 S. Galena (Aspen Block)
4L Owl Cigar Sign at 300 E. Hyman
■328 E. Hyman (Wheeler Opera House)
•413 E. Hyman
■ 501 E. Hyman (Ute City Banque/Cownhoven Block)
■590 N. Mill (Visual Arts Center)
■Lift it (Boat Tow, Tower, Bullwheel, Skier's Chalet)
■Ute Cemetery
A104 S. Galena
A 201-207 S. Galena (Brand Building)
130 S. Galena (Armory/City Hall)
•312 S. Galena
204 S. Mill (Aspen Hardware)
•208 S. Mill (Sabbatinis Sports)
♦201 E. Hyman
■300 E. Hyman
•426 E. Hyman
III. WEST ASPEN MDUM'AIN
•118 E. Cooper
•135 E. Cooper
• 113 E. Hopkins
•208 E. Hopkins
A 302 E. Hopkins
41222 W. Hopkins
•205 S. Third Avenue
IV. WEST END
•212 N. Monarch • 500 W. Francis
0 218 N. Monarch • 305 W. Smuggler
0126 E. Bleeker s 400 W. Smuggler
■200 E. Bleeker (Community • 513 W. Smuggler
Church) • 610 W. Smuggler Unit C
•214 E. Bleeker • 715 W. Smuggler
•131 W. Bleeker • 500 North Street
0 333 W. Bleeker • 101 Lake Avenue
■ 442 W. Bleeker (Pioneer • 206 Lake Avenue
Park) (Shaw House)
• 513 W. Bleeker o 210 Lake Avenue
■620 W. Bleeker (Stallard • 320 Lake Avenue
House) • 311 Gillespie (Chatfield Ski
0 123 E. Hallam Barn Residence)
•131 E. Hallam s 330 Gillespie
m 23 E. Hallam (Glidden • 414 N. First (Paepcke
House) Residence)
A 100 W. Hallam ■ 525 N. Second Avenue
e 320 W. Hallam • 610 N. Third Avenue
&530 W. Hallam ♦ 714 N. Third Avenue (Gay
0 135 W. Francis 906)
♦201 W. Francis O 319 N. Fourth Avenue
234 W. Francis • 121 N. Fifth Avenue
•432 W. Francis 0 505 N. Eighth Avenue
See Figure 3 - Map of Structures
Source: Aspen/Pitkin Planning
Office; March, 1986
25
Section 24-11 .2 (b) states that "the enlargement of, or change of
use in a structure which has received individual historic
designation" shall be exempted from complying with the GMPallot-
ment procedures. An example of this exemption is the Sardy House
proj ect . The Sardy House received approval in 1985 for a change
in use from residential to a bed and breakfast and also to build
an addition and annex. Twenty ( 20) guest units have been created
without competing for GMP allocation ; and these units have been
deducted from the L-1/L-2/CC/CL and Other zone district quota .
This special ability to re-develop a property without having to
compete in GMP competition is an incentive to find an appropriate
and usually more economically productive use of an historic
property if its integrity can be left intact . The GMP exemption
appears to be one of the strongest incentives in the Municipal
Code for preservation of existing structures and should be
maintained as a- tool for the foreseeable future.
Conditional Uses in the Office Zone District . In the Use
Tables for the Office Zone District a series of conditional uses
are allowed only for structures which have received individual
historic designation. Most of the uses are relatively low-
intensity service commercial uses that have traditionally existed
within the Office Zone District and particularly along Main
Street . Examples are bookstores, restaurants, art galleries and
boarding houses.
26
Main Street is of special significance in issues of historic
preservation because it contains some of Aspen' s finest old
residences and there remains an image of a tree-lined, largely
residential avenue. The street is the main entrance into our
community and does much to enhance the feeling that Aspen is a
distinguished, victorian, small town. The City has attempted to
preserve the historic character of Main Street through its
planning and zoning regulations. A Main Street Plan was p;-epared
by John Stanford in 1975, from which the current conditional uses
were established. The conditional uses for designated structures
are an incentive to preserve our historic properties by allowing
a variety of commercial uses to be placed in them, which would
otherwise be restricted.
Limited Enlargements of Non-Conforming Structures. Accord-
ing to Section 24-13 .3 (a�j ,- an individually historically desig-
nated single-family house or duplex that is non-conforming with
respect to allowable floor area may be enlarged by 500 square
feet . This exception applies only to historically designated
structures and represents another advantage of designation .
Other structures non-conforming in floor area are not allowed to
expand without approval from the Board of Adjustment .
Flexibility in Requirements of the Uniform Building Code.
Section 7-141 of the Municipal Code amends the Uniform Building
Code, 1979 Edition, to allow the building official to authorize
27
0 •
"repairs, alteration and additions necessary for the preserva-
tion, restoration or continued use of a building or structure
(designated historic) without conformance to all the requirements
of this Code, provided that :
o Unsafe conditions are corrected; and
o The restored building or structure will be no more
hazardous than the existing building.
This provision allows greater flexibility from the requirements
of the UBC for work performed on historic structures. For
example, stairways and size of rooms not meeting UBC requirements
may be allowed. It is another incentive to make improvements to
historic buildings while not compromising the architectural
integrity of those buildings.
1980 Inventory of Historic Sites and Structures
A comprehensive inventory of historic sites and structures within
the City limits was conducted in 1980 . The study was sponsored
by the Colorado Historical Society and the City of Aspen in order
to establish base data on historic resources in Aspen.
Research included photographing individual historic properties,
establishing the dates of construction, physical alternations,
and changes in ownership through public records, and documenting
the historic significance of structures.
Existing sites and structures were also evaluated for historical
significance . Numerical scores were given for each structure
28
within the following six categories :
o Historically associated with events of significance to
the locale, region, state or nation.
o Historically associated with individuals or groups
which are significant to the locale, region, state or
nation.
o Embodies distinctive characteristics of a type o;, style
of architecture or construction, period of architecture
or method of construction.
o Represents the work of a significant craftsman, builder
or architect at the local, state or national level.
o Is a noteworthy surviving example of a style bE'coming
rare in the locale or is identified with a street scene
or other landscape .
o Possesses high artistic value .
Combined scores were established to determine the overall
historical significance of Aspen' s sites and structures. Each
29
INSERT FIGURE 3 - MAP OF HISTORIC INVENTORY
30
historic resource was evaluated and placed in one of the three
categories of significance :
o Notable;
o Excellent ; and
o Exceptional .
The historic inventory has been catalogued and mapped. Figure 3
identifies each of the significant structures and the five
potential historic districts . Files are available in the
Aspen/Pitkin Planning Office and the Aspen Historical Society
Archives.
As already stated, the inventory has been the basis for the
City' s designation system. The inventory has also been useful
for giving out information to the public upon inquiry and
valuable reference in HPC reviews.
Role of National Register of Historic Places
Within the City of Aspen at the present time are seven stru-tures
on the National Register :
o Pitkin County Courthouse
o City Hall
o Wheeler Opera House
o Community Church
o Brand Building
o Stallard House
o Sheely Bridge (connects Rio Grande to Art Museum)
31
The Hotel Jerome has been nominated and may soon be listed as
well . In Pitkin County, the townsites of Independence and
Ashcroft, the Maroon Creek Bridge, Redstone Inn and Osgood
Mansion (the Redstone "Castle" ) are' also on the Register.
National Register properties are distinguished by having been
documented and evaluated according to the Department of Interi-
or ' s uniform and strict standards . Properties and districts
having this designation are given national recognition and
status . Listing serves as a principal educational tool .
Registered properties are eligible for preservation assistance
through tax incentives, easement donations, and federal grants
when available. In addition, consideration is given to regis-
tered sites in the planning for federally assisted projects and
issuance of surface coal mining permits.
The investment tax credit, available for historic commercial
structures has spurred a great deal of rehabilitation activity in
Aspen during 1985 . Private investment in such renovation
projects as the Hotel Jerome, Brand Building and Sardy House has-
been
asbeen facilitated by the tax credit .
The City of Aspen has received a Colorado Historical Society
grant to prepare a multi-resource nomination of the City to the
National Register. The objective of the project is to nominate
32
• i
to the National Register approximately twenty individual proper-
ties within a city-wide multi-resource district. The project is
scheduled to begin in April of 1986 .
Aspen Historical Society
The Aspen Historical Society was founded in 1963 as a non-profit
corporation for the purpose of promoting historic preservation in
Aspen and Pitkin County . The Society serves a very important
role in displaying and interpreting local history for the benefit
of all interested parties. Functions of the Historical Societv
include a publications program, operating the Stallard House
Museum and archives, operating the ghost towns of Independence
and Ashcroft, house tours and a variety of local cultural
activities . The Society ' s Board of Directors is developing a
plan for the growth of the museum into a comprehensive facility.
Areas of history to be covered are the Utes,,,mini ng; agriculture,
the resort and the post-1970 era.
The City and Historical Society have cooperated on various pro-
jects. For example, the City has contributed to the Society' s
acquisition of the Stallard House and operating budgets. The
Historical Society has provided museum tours for students and
made available archive information to City staff and appl f cant s
for HPC review. The group has also played a major role from
time-to-time in historic preservation issues brought before the
City through land use reviews . In order for the Historical
33
Society to grow into a comprehensive museum and take on other
activities suggested for the Historical Society in this plan,
further City-society cooperation and support is needed.
34
.cl)
CD
c
n
Cl)D
z
G
Ci
O
z
C)
m
DD
z
Introduction
This chapter provides a detailed discussion of issues and
concerns in historic preservation in the City of Aspen. The
issues and concerns section of this element is important because
it provides the basis for the recommended actions.
The chapter focuses on the following seven main issues and
concerns:
o Architectural Quality and Compatibility
o Local Historic Preservation Review
o City Incentives for Historic Preservation
o Historic Structures on Main Street
o Capital Budgeting (for Historic Preservation)
o State and Federal Incentives for Historic Preservation
o Open Space and Land Use
Architectural Quality and Compatibility
The broadest issues of historic preservation in Aspen can be
stated in the following two questions:
(1) How do we evaluate, appreciate and preserve those
elements of the built environment that are extraordi-
nary in their contributions to Aspen?
35
( 2) How do we encourage the construction of new buildings
which are compatible with the old and enhance the
quality of the community?
These questions raise three particular issues and concerns,
identified as the 1980 Inventory, Floor Area Ratio and Restora-
tion Know-How, each of which is discussed below.
Evaluation and Inventory of Historic Sites and Structures
Evaluation of our town's buildings has been largely accomplished
through the 1980 Inventory of Historic Sites and Structures.
However, there are a number of sites and structures which are not
adequately documented and evaluated. This valuable resource tool
should be updated and completed. Additional research finalizing
unfinished evaluations and inventory forms, and periodically
checking on the state of inventoried structures so to record
chances are tasks that should each be accomplished.
Floor Area Ratio
Another mechanism besides FAR should be considered to regulate
bulk using such standards as ceiling heights, volumes and the
amount of transparency . One of the elements of architectural
compatibility that has not always been honored is the bulk of a
new residential structure in relation to surrounding houses. The
zoning code restricts bulk through Floor Area Ratio ( FAR )
standards . In 1982 , the FARs within Residential zone districts
36
were revised, but comments are still made by many people that new
buildings are still out of character with community values. The
FAR limitations should be studied again in residential zones so
that new single family or duplex structures are not allowed to
dwarf surrounding Victorians.
As an alternative or complimentary approach to changing FARs, if
new historic districts are formed (discussed below) , then
building size, massing and other design elements closely related
to FAR could be subject to HPC review. This architectural
review , conducted with the aid of appropriate development
guidelines, may be able to accomplish much of the same objectives
as reducing FAR.
Open Space Requirements in the Commercial Core Zone District
A typical element of the historic commercial core streetscape is
a street-level storefront abutting the front lot line . It has
been argued that the 25 percent required open space in the
commercial core zone district discourages retaining this store-
front characteristic. The sunken pit, garden level storefronts,
and concrete patios are design solutions that have been used on
most of Aspen' s recent commercial structures, in some cases to
the detriment of streetscape aesthetics and activity level . A
code amendment should be considered to either delete the open
space requirement or make reduction of the required open space
subject to special review.
37
Two Separate Structures on Parcels Zoned for Duplexes
Within Aspen ' s historic neighborhoods there are many small old
houses on parcels with sufficient land area to allow duplexes.
There are also many carriage houses that were converted to
residential use prior to zoning code regulations and possess a
status of an existing non-conforming use, not allowing any
enlargement . Additionally, there are carriage houses that are
not residential and may have historic significance but can only
be used for accessory purposes. In the interest of providing an
alternative that may result in better site design and more
appropriate massing of structures, as well as to encourage
preservation of historic outbuildings, it may be appropriate to
allow two separate structures on parcels with historic designa-
tion and zoned for duplex use. A study should be done to analyze
the effects of allowing such development for individual historic
designated properties, based on HPC approval and Planning Commis-
sion special review approval .
Restoration and Renovation Know-How
There are a variety of specialists within the restoration and
renovation community including : restoration craftsman and
builders, building material suppliers, restoration architects,
interior decorators, landscape architects, historian; and
preservation consultants.
38
The Aspen Historical Society , HPC and Planning Office should
assist the public with pertinent information and referring those
with inquiries to the appropriate sources. By having a cohesive
local network of individuals knowledgeable in historic preserva-
tion, we should achieve a higher quality of restoration and
renovation in Aspen. The Aspen Historical Society archives is
the most complete and best indexed collection of information on
how old buildings originally appeared in Aspen. The Society is
perhaps in the best position to take on the responsibility of
creating a reference library of information on restoration
techniques and materials, and keeping a photographic record of
restoration and renovation projects in Aspen. The Planning
Office is assembling an historic preservation library pertaining
mainly to planning, the 1980 Inventory, architectural guidelines,
and current referral services.
Local Historic Preservation Review (HPC)
The City of Aspen' s most fundamental system for promoting and
regulating historic preservation is encompassed in the Historic
Preservation Committee and the Committee' s review responsibili-
ties. Areas for improvement discussed below include :
o Review authority of the Historic Preservation Commit-
tee;
o Review and Application Procedures;
o Historic District Development Guidelines;
o Demolition review;
39
• i
o Individual historic designation; and
o Expansion of Historic District .
Review Authority of the Historic Preservation Committee
Through Section IX of the Municipal Code, HPC review power
extends over aspects of exterior remodeling and new construction,
including, but not limited to, architectural style, design,
materials, texture, type and style of windows, lights, signs and
fixtures. Not included in this grouping of architectural
features is color or building illumination, although the present
development guidelines generally address color . There is some
interest in giving the HPC full power to review both colors and
illumination, as they significantly effect the appearance of a
building. At the present time, applicants typically discuss
colors with the HPC and voluntarily commit to use the colors that
have been represented. However, if an applicant chooses not to
discuss colors with HPC, then there is no obligation in this
regard.
The issue of color and illumination should be raised tefore
Council through an HPC-initiated Code amendment . The problem in
taking on review authority in these areas is that there may be no
objective criteria to demonstrate how the general public good is
protected and promoted by review of such building features. If
choices are subjective, then the current advisory function may be
appropriate while regulation is not appropriate . If it can be
40
shown that the general welfare is served, and standardized
criteria can be developed for color and illumination, then the
review powers for the HPC should be increased through a Code
amendment and thoroughly described in the development guidelines.
Review and Application Procedures
The Committee' s review function would be improved if both the
applicants and Committee members were better prepared to address
the criteria of HPC' s evaluation. A statement of procedures and
an application form clarifying what information is requested
should be developed. Each application form would be included in
the bi-weekly packet for HFC members, giving the members a chance
to review the issues in more detail. Applications with signifi-
cant imlzact s should be publicized in the newspaper in advance of
the HPC meeting, to inform the public of pending decisions. This
procedure should be in addition to the standard public notice as
a means of getting advance information to interested citizens so
to improve their input opportunities.
Expiration on HPC Approvals
In the process of reviewing a proposal the HPC considers compa-
tibility of design with the existing conditions of surrounding
properties . If the surrounding area changes in the interim
between HPC final review approval and construction of the
project , then the approved design may no longer be as suitable as
it had been. A sunset clause ( i. e. , three year time limit ) on
41
HPC approvals within which time plans must be submitted to the
Building Department sufficient for issuance of a building permit
should be implemented.
1
Historic District Development Guidelines
The HPC' s guidelines for rehabilitation and new construction need
to be updated to give better guidance to both the HPC and
property owners applying for review. The HPC and Planning Office
are presently revising the guidelines with the help of the
University of Colorado ' s Graduate Architecture Program.
The revised guidelines will address in greater detail the various
architectural elements within the groupings of :
a. new buildings in the historic commercial areas;
b. existing buildings in the historic commercial areas;
C. new buildings in historic residential areas; and
d. existing buildings in the historic residential arE!as.
Due to the diversity of architecture in Aspen and the continuing
philosophy to discourage replication of Victorian architecture,
such guidelines should given better direction for the type of
restoration, renovation and new construction considered most
appropriate. The new guidelines format will also be better
suited for HPC review if historic districts are expanded. A
number of specific restoration and renovation issues will need to
42
0 •
be discussed in the context of the guideline statements prior to
their adoption by the Historic Preservation Committee. For
example, the issue of authentic restoration versus renovation for
certain classes of structures should be addressed.
Demolition and Moving Review
There are a number of structures inventoried in 1980 but not
designated that have been demolished. Five structures listed in
the 1980 Inventory were identified to have been demolished as of
March, 1986 . This loss has not been monitored or reviewed and
represents a large threat to Aspen' s old buildings in the future
due to the large number of structures not designated. A permit
for demolition or moving a structure to another site should not
be issued for any structure evaluated to have notable, excellent
or exceptional significance on the 1980 Inventory, as updated,
without HPC review. This change could be accommodated through a
code amendment to Section 24-9 .
Individual Historic Designation
The 1980 Inventory of Historic Sites and Structures has been very
useful in developing the Historic Designation system which
includes 85 individually designated structures and two districts.
There are still a large number of inventoried properties not
designated ; and the number of structures designated should be
increased. The present Municipal Code only gives property owners
the incentives for rehabilitation if structures are individually
43
listed as historic. The HPC needs to look at some of the
outstanding modern residences by Bayer, Benedict and other :recent
architects for designation to ensure preservation.
Expansion of Historic Districts
Through the discussions with the Historic Preservation Committee,
Planning Commission and City Council, the notion of expanding the
historic overlay districts has received considerable attention,
including both support and opposition. Limited expansion into
mainly historic residential neighborhoods has significant
implications for the review of renovation to old buildings,
whether the owners desired designation or not . Review could be
accomplished for all new structures "in-filling" the blocks of
the West End or other neighborhoods brought into historic
districts.
Expansion of HPC review to a Citywide function would totally
transform the reviewing body' s present mandate to examine for
historic preservation objectives, into overall architectural
review. It is likely that a new architectural review body would
need to be created to accomplish this task. This body would need
to be fully integrated into the overall land use review process
in Aspen, and would have significant time and cost effects on the
development community. In either case, more study is necessary
to evaluate the effects of district expansion. The discrete
expansion into residential neighborhoods can be examined in the
context of a proposed amendment to the zoning map. The City-wide
architectural review concept requires a more thorough study of
44
the ramifications on land use, scale, aesthetics and necessary
revisions to Aspen's development guidelines and review proce-
dures.
Growth Management Quota Exemption For Historic Preservation
The Growth Management Quota System exemption (b ) of Municipal
Code Section 24-11 .2 allows for the enlargement of, or change in
use of a structure having individual historic designation. This
exemption has been an effective positive incentive for making
improvements to historic structures, but has been an issue of
controversy .
The incentives for Historic Preservation provided by this GMP
exemption are two-fold :
1 . The structures are exempt from competition for additions or
changes in use ; and
2 . The exempted project is not subject to Planning and Zoning
Commission or City Council review unless some other review
process applies (i. e. , conditional use, PUD amendment ) .
The first incentive has played a very positive role in encourag-
ing restoration and renovation activity . There are clear
procedural and economic benefits available for owners of individ-
ually designated historic buildings not needing a GMP allocation
to accomplish a project . The second incentive - absence of
Planning Commission or Council review - may encourage historic
45
preservation at the expense of other land use consideration. An
historic preservation project might entail environmental, neigh-
borhood compatibility , public service and other impacts that
would not be addressed.
While some favorable treatment in development impact mitigation
might be appropriate for historic structures, the absence of
Council or Planning Commission review may deny the opportunity
for any chance of such mitigation, and this seems contrary to the
intent of the GMP system. Even the employee housing GMP exemp-
tion, which is another incentive for a high priority community
goal , requires a two-step P&Z/Council approval process. The
historic preservation exemption may be too broad and should
include review by at least one of the two bodies. The consensus
of the Planning and Zoning Commission was that change to the GIMP
exemption is not appropriate, and therefore no action is recom-
mended .
Historic Structures On Main Street
West Main Street has a predominant underlying zoning of 0-Office
with some L-3 lodge zones and the Public zone (Pitkin County
Library) . The Main Street Historic Overlay District (see Figure
3) incorporates all of West Main Street from Monarch to SE�venth
Streets. Sixteen (16) structures have been individually desig-
nated, while some thirty-five (35) structures in total were
evaluated to have historic significance in the 1980 Inventory .
46
It is obvious that Main Street is one of the areas of greatest
historic importance in the City, and that the historic structures
contribute a great deal to maintaining the mixed residential
boulevard feeling of the street .
The historic character of Main Street is increasingly threatened
by such factors as: loss of cottonwood trees, dilapidation of
Victorian houses, discordant commercial and lodge facilities,
excessive traffic, dust, and lack of continuous sidewalks for
convenient pedestrian access. Nonetheless, Main Street remains
visually one of the most interesting streets in Aspen and
contains some of our finest Victorian and modern architecture.
It may be appropriate to examine the expansion of conditional
uses allowed in the Office zone . Appropriate rehabilitation of
historic structures and greater economic vitality to help reverse
trends towards deterioration should be encouraged. For example,
bed and breakfasts, mixed commercial/residential uses, public and
quasi-public buildings, small theaters, camera shops, music
stores and small groceries could be considered. The Office zone
conditional uses are the collection of existing uses at the time
of rezoning in 1975-1977 . Other low-impact commercial uses may
be equally appropriate, provided that Main Street is not turned
into a commercial shopping district , with attendant traffic,
parking and visual impacts.
47
Expanded uses and the transfer of development rights for out-
standing architectural structures should be looked at when the
Land Use Element of the Comprehensive Plan is developed. An
update of the Main Street study of the 1970 ' s should be completed
to develop a detailed plan for the future image of our entrance
to town. The code listing of permitted and conditional uses
should be analyzed in the Code Simplification effort underway .
Landscape improvements should be studied in conjunction with land
use, transportation, and historic preservation. Street lighting,
decorative lighting of trees and buildings, signage and outside
uses are other important factors that shape one ' s impressions of
Main Street, worthy of further study and possibly revised regula-
tions and plans.
It seems clear that the long-standing policy of preventing Main
Street from becoming a commercial strip should be maintained. It
also appears reasonable to maintain current restrictions regard-
ing FAR, set-backs, height restrictions, and requirements
pertaining to off-site parking.
Capital Budgeting for Historic Preservation
Local government should take an active investment role to help
realize the community ' s objectives of historic preservation. The
following discussion deals with maintenance of and improvement to
public buildings, street narrowing, a tree planting program,
48
commemorative placques program, facade easement dedication and a
revolving loan fund.
Maintenance and Improvements to Public Buildings
Restoration of the Pitkin County Courthouse, on-going since the
early 1970s, is one of the most authentic and highest quality
restorations in the community. It is appropriate that this
outstanding structure has been so carefully treated as the
Courthouse is a symbol of the City and County ' s history .
Internal renovation is continuing to occur so to better serve the
needs of the County and joint City/County operations. The
present high level of maintenance given the Courthouse should be
a high priority budgeting item for the years to come.
The Wheeler Opera House is another excellent restoration in
Aspen, recently accomplished through City of Aspen funding and
private contributions. This structure also deserves commitment
for continued high level maintenance.
Plans for the renovation of City Hall are being developed at this
time. Privatization of the building and construction of an annex
are being considered. While the main objective is better
internal space utilization, the exterior of the building should
be restored to ensure its structural stability .
49
• 0
The Stallard House is an important property owned by the Aspen
Historical Society. The Society has identified restoration. needs
for this structure and is working on a master plan for the site
to accommodate more buildings for museum functions.
A Ski Museum would be a major historical, cultural and tourist
resource for the community. This museum should be built on the
Lift 1/Willoughby Park site or on the Stallard House grounds, as
is determined to be the most appropriate place.
Street Narrowing
Prior to the 1960s, there were no paved streets in Aspen except
for Main Street . Rights of way generally consisted of relal_ively
narrow dirt streets and a wider band of vegetation. Cottonwoods
fed by irrigation channels composed many streetscapes . Since
that time, streets have been widened and paved throughout the
community. This innovation allowed for more traffic and parking
and easier snow removal, however, it generally detracts from the
small town or village scale of streetscape. Many streets do not
presently carry (or are expected to carry) so much traffic as to
require the present street widths. Whenever consistent with
other community transportation and land use plans, wide street
pavement should be narrowed, the irrigation ditches restored, and
cottonwood trees planted. Neck-downs and planter islands can
achieve some of the same purpose. It may be possible to experi-
ment with neckdowns on a temporary basis. Street narrowing plan
50
i •
should be consistent with transportation, bicycle trail and land
use plans.
Tree Planting Program
Cottonwoods and spruces appear to be the trees historically
planted in Aspen. They have both grow well here and contribute a
great deal to the sense of scale and ambience of the community .
At the present. time the City Parks Department operates a small
nursery and planting program for placement of trees on the Golf
Course and other City property. There should be an expanded
cottonwood and spruce nursery and planting program for public
rights-of-way as well as replacement of old trees on private
property . Consultation should be sought regarding what type, if
any, irrigation is necessary to keep the trees healthy . This
program is necessary because of the loss of trees over the past
several years.
Commemorative Placque Program
A number of outstanding restorations and some modern buildings
have recently been completed in Aspen which the Historic Preser-
vation Committee would like to commemorate . Brass placques could
be placed on those buildings to show the community' s appreciation
for the good work . This small act would do a great deal to
demonstrate the City's commitment to historic preservation and
provide an important education service .
51
J 1
Facade Easement Dedication
A facade easement program by which historic facades are donated
to the City of Aspen, the Aspen Historical Society, or another
preservation organization set up for such donations, should be
investigated. By donating a preservation easement, the property
owner may qualify for significant tax benefits, such as a
charitable contribution deduction for federal income tax pur-
poses . Property owners may continue to use or live in the
structure or convey it to a successive owner, notwithstanding the
conveyance of the easement interest in the property . The holder
of the easement benefits by being granted the right to enforce in
perpetuity the owner ' s maintenance of the property in accordance
with specified standards at the owner' s expense.
Revolving Loan Fund
The City or an assignee of the City could establish a revolving
loan program for the purpose of financing restoration work that
meets specific program criteria of historic preservation. The
mechanics of such a program as well as the availability of local
and non-local funding should be investigated. An attractive
feature of both the facade easement and revolving loan fund
programs is that they give positive incentives to residential
rehabilitation. Most of the City Zoning Code incentives and the
federal tax incentive program apply mainly to commercial struc-
tures.
52
State and Federal Incentives for Historic Preservation
The Colorado Historic Society is a major force in the State
behind historic preservation and offers technical assistance and
grants. State legislative action would be necessary to allow for
either state of local government tax incentives for preservation.
Eligibility for benefits and special consideration in federal
programs generally depend upon listing on the National Registry
of Historic Sites and Places. At the present, the income tax
credit is one of the main federal tax incentives, although the
credit has dropped from previous years from 25 to 20 percent .
The City is coordinating a National Registry nomination project
which should help avail more properties to the advantages of
being listed, as well as promote local preservation.
Open Space, Transportation and Land Use
It has been demonstrated through this Element that there are
numerous associations between historic preservation, transporta-
tion and open space and land use issues. The historic scale of
Aspen is defined in large part by the surrounding mountain edge
and meadow open space and should be protected. Street narrowing
and cottonwood planting suggestions are also open space provi-
sions. Land use in the commercial core and on ruin Street needs
to be further analyzed considering historic preservation objec-
tives .
bjec-
tives . In short, the Open Space, Transportation and Land Use
Elements need to be coordinated with this Element .
53
� �
'rte
a
Z
r
Introduction
The implementation chapter of the Historic Preservation Element
includes recommended actions to address the existing and future
needs of the community regarding historic preservation. The
actions described in this section are broken into the categories
of : Code amendments, HPC Operations and Procedures, Capital
Budgeting, Information Programs, and Historic Preservation
Studies.
This plan has become focused on specific implementation efforts
because of the relative coherence of the tools in place at the
present time . In effect , the Plan is to continue most of the
present programs, and to fine-tune the City Code, HPC functions
and information systems. Capital budgeting suggestions introduce
some new activities for the City of Aspen and should be consi-
dered in the Land Use Element and Capital Improvements Plan. To
the extent that local historic districts are expanded, the City
may need to increase staffing to HPC and rework the composition,
responsibilities and compensation to the Committee.
Code Amendments
Color and Illumination
The Historic Preservation Committee wishes to initiate a Code
amendment to Section 24-9 of the Municipal Code to add exterior
colors and illumination to the HPC review and approval authority .
54
c
The HPC Guidelines would also need to be amended to include the
criteria of review.
Demolition and Removal Review
A Code amendment should be initiated to give the HPC authority to
review any plans to demolish or move buildings identified on the
1980 Inventory of Historic Sites and structures (as updated)
prior to the Building Department issuing a demolition permit . In
effect, this amendment would give all structures on the Inventory
a first level designation status for demolition review only.
Floor Area Ratio
Revision of the FAR calculation or implementing another mechanism
to limit bulk of new single family or duplex structuees should be
studied to determine if a higher degree of neighborhood compati-
bility can be achieved .
Individual Historic Designation
More structures on the inventory and some outstanding :modern
structures should be individually designated in order to protect
these structures and provide the incentives available to those
properties.
Historic District Expansion
With a track record of success, expansion into more areas should
be undertaken. Limited expansion into the Hallam Lake/Community
55
Capital Budgeting
Public Buildings
As part of the general renovation project , City Hall ' s exterior
should be restored as acceptable to the Historic Preservation
Committee and the National Trust for Historic Sites and Struc-
tures. Exterior alterations to the County Courthouse should
continue to reinforce the building' s fine historic appearance .
Plans for a ski museum should be developed.
Street Narrowing
Neck-downs of selected streets in Aspen' s historic residential
neighborhoods should be implemented at first on a trial basis, if
found through the land use and transportation elements. If the
trial project is successful, the narrowing of streets program
should be accomplished through special improvement districts.
Tree Planting
A cottonwood and spruce nursery should be financed by the City,
or such services contracted to private farmers, for the replace-
ment of old trees on public rights-of-way and private property .
Irrigation ditches and other systems should be constructed and
maintained as necessary . The City Parks Department should be
responsible for this program.
57
Commemorative Placques
City Council should appropriate funds for the purchase of brass
placques to be placed on outstanding historic buildings as
selected by the Historic Preservation Committee. As an alterna-
tive, paper certificates of appreciation for framing could be
issued by the HPC to be hung inside the building.
Informational Programs
Update City Inventory of Historic Sites and Structures
The Planning Office and volunteers from the community should
update the 1980 Inventory of Historic Sites and Structures. This
update is particularly important if the basis of demolition
review is whether or not the structure is listed in this inven-
tory.
Restoration and Renovation Know-How
The Aspen Historical Society should create in its archives a
reference library of restoration techniques and materia7Ls to
assist local homeowners, builders and architects.
Assistance to the Aspen Historical Society
The City of Aspen should provide increased financial assistance
to the Historical Society as compensation for research assistance
and for maintaining this public amenity.
58
Church residential area should be a short-term priority, so to
protect the changing character of this neighborhood. Recommended
in 1980 were three additional historic districts beyond the
Commercial Core and Main Street. They are West Bleeker/Hallam
Street, Hallam Lake and Community Church (see Figure 3) . These
districts should be reexamined and considered for implementation
by phases.
Conditional Uses in Office Zone
The conditional uses for individual historic structures in the
Office zone should be examined for the objective of giving more
use options for the preservation of vain Street historic build-
ings.
Historic Preservation Committee Operations and Procedures
Development Guidelines
The HPC should use the suggested guidelines prepared by the
University of Colorado student team as a basis to revamp the
Development Guidelines . The new Guidelines should then be
adopted by the Committee.
Review and Application Procedures
An application form with instructions for applicants should be
developed to the satisfaction of the HPC and routinely distri-
buted to applicants by the Planning Office .
56
Historic Preservation Studies
Main Street
The Land Use Element of the Comprehensive Plan should include a
detailed study of Main Street, taking account of historic
preservation objectives and needs as discussed in this Element .
Expansion of the Historic District to Encompass the Aspen
Townsite and Early Additions
A study of major historic district expansion should be conducted
to examine the review criteria, review body set-up, staffing, and
land use implications associated with the proposal .
Facade Easements, Transfer of Development Rights and Revolving
Loan Fund
Further study is needed to determine the need, financial require-
ments, and implementing organization for a local facade easement,
revolving loan, or transfer of development rights program .
x.hpc
59