Loading...
HomeMy WebLinkAboutcoa.lu.co.730 E Durant Ave.0086.2004.asluZ30 E DURANT AVE CONDOMINIUMIZATION _ 273718242005 CASE 0086.2004.ASLU r" C COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 (970) 920-5090 City of Aspen Land Use: 131041 Deposit � 131042 Flat Fee 131043 HPC 131046 Zoning and Sign Referral Fees: 151163 City Engineer 251205 Environmental Health 237001 Housing Building Fees: 211071 Board of Appeals 211072 Building Permit 211073 Electrical Permit 211074 Energy Code Review 211075 Mechanical Permit 211076 Plan Check 211077 Plumbing Permit 211078 Reinspection 211079 Aspen Fire Other Fees: 111006 Copy 111165 Remp Fee 601303 GIS Fee 231480 Housing Cash in Lieu 111165 Open Space Cash in Lieu Park Dedication Parking Cash in Lieu School District Land Ded. Code Sales (Joint) Contractor Licensing (Joint) TOTAL NAME: ADDRESS/PROJECT: PHONE CHECK# CASE/PERMIT#:_- # OF COPIES: DATE: INITIAL: 1 -'I 150- �cf,�- - P�TYIN CnUNT, {LE�[ AND RE(OR0ER O1'�4'O5 #4 Sw��HR6 1.00 SUB`� �1.00 TvTAi ��Ji.K��� CATFi/P �1.00 |�#7FER 0974 |3:4STM 0 THE CITY OF ASPEN City of Aspen Community Development Dept. CASE NUMBER 0086.2004.ASLU PARCEL ID NUMBER 2737-18-2-42-005 PROJECT ADDRESS 730 E DURANT AVE PLANNER CHRISTOPHER LEE CASE DESCRIPTION PROPOSE CONDOMINIUMIZING THE 2 FLOORS OF OFFICE AND REPRESENTATIVE CHUCK FRIAS 970-429-2411 DATE OF FINAL ACTION 1/21/2005 CLOSED BY Denise Driscoll s To: From: Date: Re: MEMORANDUM Chuck Frias Christopher Lee, Planner December 16, 2004 C� 730 East Durant Avenue Condominium Map - Community Development Department's Comments Please make the following modifications to the proposed plat: 1. Sheet 1: Include Vicinity Map. 2. Sheet 1: Add the width of the alley ROW. 3. Sheet 1: Identify the box labeled "XFMR" that is located in parking space #7. 4. Sheet 1: Eliminate parking space # 7 behind the building. It does not meet City dimensional requirements in that parked cars aren't allowed to encroach into the alley ROW. 5. Sheet 2: Add the following language: Sheet 2 of 2, 730 East Durant Condominium Map. Sheet 2: On the parking garage floor plan, label each of the storage areas as either GCE or-LCE. Sheet 2: Label each of the parking spots in the garage as either GCE or LCE. 8. After making the above corrections, submit two (2) mylar copies complete with the signatures for the Owner's Certificate, Surveyor's Certificate and Title Certificate, accompanied by a recordation fee of $21 (check payable to the Pitkin County Clerk and Recorder). Staff will obtain signatures of Community Development Director, Community Development Engineer, and County Clerk and Recorder. � J1 J CAS, �,-- J P R O P E R T I E S O F A S P E N Chuck Frias Managing Partner/Broker chuck @ FriasProperties.com 730 East Durant Avenue Aspen, Colorado 81611 970 920 2000 - www.FriasProperties.com find what you seek w mw a Alk A I"-10' 0 10 20 VICINITY MAP LEGEND AND NOTES O FOUND SURVEY MONUMENT AS DESCRIBED 9 CITY MONUMENT POSTED ADDRESS: " ❑ UTILITY BOX TITLE INFORMATION FURNISHED BY: STEWART TITLE OF ASPEN INC. ORDER NO. 43133 DATED: OCTOBER 8, 2004 d1h® MANHOLE ® WATER VALVE P FIRE HYDRANT BASIS OF BEARINGS BETWEEN THE SOUTH CORNERS OF BLOCK 106 I\ _ AS SHOWN: N 75°09'I1'W PARKING SPACE 8.5'X 18' ALL PLANTERS ARE GCE GCE GENERAL COMMON ELEMENT LCE LIMITED COMMON ELEMENT CITY MONUMENT SW BLOCK 106 NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT ON THIS PLAT WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS PLAT BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON. THE CERTIFICATION IS VOID IF NOT WET STAMPED WITH THE SEAL OF THE 730 EAST DURANT CONDOMINIUM SITUATED ON LOT R AND S BLOCK 106 CITY AND TOWNSITE OF ASPEN CONTAINING 6 002 SO. FT. •/- (0.138 ACRES •/ ) / CITY OF ASPEN COUNTY OF PITKIN STATE OF COLORADO PL^NTER N0.5 RE -BAR NB So9 IS /1 W \ OF BE2,10 AR NGs/O. Pit VEO SET 25947 DISK li 6 S Jj� FMR R Ow ® c 7T p06 / CON o09 IS ROA Hes o 60. 02 . l /N i /BA \ `V// ti CON C LOAD/NG ?nGCE COLIC. d FLOOR \ a 2 STORY IBUILDINC WITH BASEMENT n /o 30.p o l ?ad FLOOR \ 1` 2,,d FLOOR P \ \ L^NTER� CO/yC \ \ PATI BASEMEN O GCE \ B^oEME PAT 10 PL^NTER GCE N 75o0911"W 60 0.2 C CONC. WALK CURB ^ND GUTTER ,5 00 R 0`If 1 V IV 2C PLA NTER /I ti w o� �e u O ? O 0 o o h > J U NO I RE -BAR CONTROL 9184 L7F. OWNER'S CERTIFICATE KNOW ALL PERSONS BY THESE PRESENTS THAT MOUNTAIN RESORT TRUST BEING THE RECORD OWNER OF CERTAIN LAND IN PITKIN COUNTY COLORADO., AS DESCRIBED AS: LOT R AND S BLOCK 106 CITY AND TOONSITE OF ASPEN COUNTY OF PITKIN STATE OF COLORA60 DO HEREBY CERTIFY THAT THIS MAP HAS BEEN PREPARED PURSUANT TO THE PURPOSES STATED IN THE DECLARATION FOR 730 EAST DURANT CONDOMINIUMS RECORDED THE _ DAY OF 2004 AS RECEPTION NUMBER IN THE RECORDS OF THE CLERK AND RECORDER OF THE COUNTY OF PITKIN STATE OF COLORADO. MOUNTAIN RESORT TRUST BY: DONNA FISHER, TRUSTEE STATE OF COLORADO) ) 65 COUNTY OF PITKIN ) THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS _ DAY OF 2004 BY DONNA FISHER TRUSTEE MOUNTAIN RESORT TRUST. NOTARY PUBLIC SURVEYORS' CERTIFICATE I JOHN M. HOWORTH HEREBY CERTIFY THAT A SURVEY WAS PERFORMED DURING DECEMBER 2004 UNDER MY DIRECTION AND SUPERVISION OF THE HEREON DESCRIBED PROPERTY. THE BUILDING SHOWK HEREON WAS FOUND TO EE LOCATED THEREONAS SHOWN ON THIS COMMON INTEREST COMMUNITY MAP. THE LOCATION AND ,/, EXTERIOR DIMENSIONS OF THE UNITS ARE ACCURATELY SHOWN ON THIS MAP AND THE MAP ACCURATELY AND SUBSTANTIALLY DEPICTS THE LOCATION AND HORIZONTAL DIMENSIONS OF fHE BUILDINGS AND THE UNIT DESIGNATIONS THEREOF. SIGNED: JOHN HOWORTH, P.L.S. 25947 TITLE CERTIFICATE THE UNDERSIGNED A DULY AUTHORIZED REPRESENTATIVE OF STEWART TITLE OF ASPEN INC REGULARLY DOING BUSINESS IN PITKIN COUNTY COLORADO DOES HEREBY CERTIFY THAT THE PERSONS LISTE15 AS OWNERS ON THIS PLAT DO IN FEE SIMPLE TITLE TO THE WITHIN REAL PROPERTY FREE AND CLEAR OF ALL LIENS AND ENCUMBRANCES EXCEPT THOSE LISTED ON THE OWNERS CERTIFICATE. ALTHOUGH WE BELIEVE THE FACTS STATED ON THIS PLAT ARE TRUE THIS CERTIFICATE IS NOT TO BE CONSTRUED AS AN ABSTRACT OF TITLE NOR AN OPINION OF TITLE NOR A GUARANTEE OF TITLE AND IT IS UNDERSTOOD AND AGREED THAT STEWART TITLE OF ASPEN NEITHER ASSUMES NOR WILL BE CHARGED 'KITH ANY FINANCIAL OBLIGATION OR LIABILITY WHATSOEVER ON ANYISTATEMENT CONTAINED HEREIN . STEWART TITLE OF ASPEN, INC. 620 E. HOPKINS ASPEN COLORADO 81611 SIGNED: BY: TITLE: STATE OF COLORADO) sa COUNTY OF PITKIN ) THE FOREGOING TITLE CERTIFICATE WAS ACKNOWLEDGED BEFORE ME THIS _ DAY OF 2004" BY AS OF STEWART TITLE OF ASPEN INC.. NOTARY PUBLIC COMMUNITY DEVELOPMENT ENGINEER APPROVAL THIS MAP WAS APPROVED BY THE COMMUNITY DEVELOPMENT ENGINEER OF THE CITY OF ASPEN COLORADO SIGNED THIS DAY OF 2004. COMMUNITY DEVELOPMENT ENGINEER COMMUNITY DEVELOPMENT APPROVAL THIS MAP WAS APPROVED BY THE COMMUNITY DEVELOPMENT DIRECTOR OF THE CITY OF ASPEN COLORADO SIGNED THIS DAY OF 2004. COMMUNITY DEVELOPMENT DIRECTOR �+ CLERK AND RECORDERS ACCEPTANCE THIS MAP WAS ACCEPTED FOR FILING THE OFFICE OF THE CLERK AND RECORDER OF THE COUNTY OF PITKIN STATE OF COLORADO AT _O'CLOCK M. THIS DAY OF 2004 AND RECORDED IN PLAT BOOK AT PAGE_ AS RECEPTION NUMBER 3 CLERK AND RECORDER b e C tf b PREPARED BY INDEX ASPEN SURVEY ENGINEERS" INC. SHEET I: SITE SURVEY, PLAT LANGAUAGE 210 SOUTH GALENA STREET SHEET 2: PLAN AND ELEVATION VIEWS ASPEN COLORADO 81611 PHONE/FAX (970) 925-3816 DATE JOB SHEET 1 OF 2 12/04 3061A L mw WALK NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACT ON BASED UPON ANY DEFECT ON THIS PLAT WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS PLAT BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON. THE CERTIFICATION IS VOID IF NOT WET STAMPED WITH THE SEAL OF THE SURVEYOR. PREMIUM' PARAPET 134.3 EAST ELEVATION ALLEY I -10' 0 10 20 PREPARED BY ASPEN SURVEY ENGINEERS 210 SOUTH GALENA STREET ASPEN COLORADO 81611 PHONE/FAX (970) 925-3816 DATE JOB 11/04 3061C INC.I Cb�u�-�- �aa� 0 0 • • • • Allk LA WALK NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACT ON BASED UPON ANY DEFECT ON THIS PLAT WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS PLAT BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON. THE CERTIFICATION IS VOID IF NOT WET STAMPED WITH THE SEAL OF THE SURVEYOR, PARAPET 134.3 EAST IE IL IE V A T H® N ALLEY GARAGE I--10' 0 10 20 PREPARED BY ASPEN SURVEY ENGINEERS INC. 210 SOUTH GALENA STREET ASPEN COLORADO 81611 PHONE/FAX (970) 925-3816 DATE JOB 11/04 3061C i � • i i i • i ATTACHMENT 2 —LAND USE APPLICATION APPLICANT: Name: GCT Partners Location: 730 E. Durant Block # 106, Lot R and Lot S (Indicate street address, lot & block number, legal description where appropriate) Parcel ID # (REQUIRED) 273718242005 REPRESENTATIVE: Name: Chuck Frias Address: 730 E Durant, Aspen, CO 81611 Phone #: 970 429 2411 PROJECT: Name: 730 East Durant Condominium Association Address: 730 E. Durant, Aspen, CO 81611 970 429 2411 Phone#: TYPE OF APPLICATION: (please check all that apply): ❑ Conditional Use ❑ Conceptual PUD ❑ Conceptual Historic Devt. ❑ Special Review ❑ Final PUD (& PUD Amendment) ❑ Final Historic Development ❑ Design Review Appeal ❑ Conceptual SPA ❑ Minor Historic Devt. ❑ GMQS Allotment ❑ Final SPA (& SPA Amendment) ❑ Historic Demolition ❑ GMQS Exemption El Subdivision ❑ Historic Designation ❑ ESA — 8040 Greenline, Stream vI� �ubdiv ision Exemption (includes ❑ Small Lodge Conversion/ Margin, Hallam Lake Bluff, condominiumization) Expansion Mountain View Plane ❑ Lot Split ❑ Temporary Use ❑ Other: ❑ Lot Line Adjustment ❑ Text/Map Amendment EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) Building has not changed since approved in 1978. THe building is a 2 story office building with underground parking and outside parking in the back. PROPOSAL: (description of proposed buildings, uses, modifications, etc.) Propose condominiumizing the 2 floors of office and each of the parking spaces and stora 4 units. Have you attached the following? FEES DUE: $ ❑ Pre -Application Conference Summary ❑ Attachment #1, Signed Fee Agreement RVAIN FOR Pc 'j'^"NENT RE C�D ❑ Response to Attachment #3, Dimensional Requirements Form ❑ Response to Attachment #4, Submittal Requirements- Including Written Responses to Review Standards All plans that are larger than 8.5" x I I" must be folded and a floppy disk with an electronic copy of all written text (Microsoft Word Format) must be submitted as part of the application. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT Aereenient for Payment of City of Armen Development Application Fees CITY OF ASPEN (hereinafter CITY) and GCT Partners (hereinafter APPLICANT) AGREE AS FOLLOWS: 1. APPLICANT has submitted to CITY an application for 730 East Durant Condominium Association (hereinafter, THE PROJECT). 2. APPLICANT understands and agrees that City of Aspen Ordinance No. 57 (Series of 2000) establishes a fee structure for Land Use applications and the payment of all processing fees is a condition precedent to a determination of application completeness. 3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. APPLICANT and CITY further agree that it is in the interest of the parties that APPLICANT make payment of an initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis. APPLICANT agrees additional costs may accrue following their hearings and/or approvals. APPLICANT agrees he will be benefited by retaining greater cash liquidity and will make additional payments upon notification by the CITY when they are necessary as costs are incurred. CITY agrees it will be benefited through the greater certainty of recovering its full costs to process APPLICANT'S application. 4. CITY and APPLICANT further agree that it is impracticable for CITY staff to complete processing or present sufficient information to the Planning Commission and/or City Council to enable the Planning Commission and/or City Council to make legally required findings for project consideration, unless current billings are paid in full prior to decision. 5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect full fees prior to a determination of application completeness, APPLICANT shall pay an initial deposit in the amount of $ 546.00 which is for hours of Community Development staff time, and if actual recorded costs exceed the initial deposit, APPLICANT shall pay additional monthly billings to CITY to reimburse the CITY for the processing of the application mentioned above, including post approval review at a rate of $205.00 per planner hour over the initial deposit. Such periodic payments shall be made within 30 days of the billing date. APPLICANT further agrees that failure to pay such accrued costs shall be grounds for suspension of processing, and in no case will building permits be issued until all costs associated with case processing have been paid. CITY OF ASPEN By: Julie Ann Woods Community Development Director g:\support\forms\agrpayas.doc 1/10/01 APPLICANT By: s Date: J Mailing Address: 730 E. Durant Aspen, CO 81611 ATTN: Chuck Frias RETAIN FOR RECORD ATTACHMENT 3 DIMENSIONAL REQUIREMENTS FORM Project: 730 East Durant Condominiums Applicant: GCT Partnna a Location: 730 E. Durant Aspen 'CO Zone District: NC Lot Size: 6,000 Lot Area: 6,000 (for the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: 5,500 Proposed: Number of residential units: Existing: 0 Proposed: Number of bedrooms: Existing: 0 Proposed: Proposed % of demolition (Historic properties only): DIMENSIONS: Floor Area: Existing: 5,500 Allowable: Proposed:_ Principal bldg. height: Existing: 16.5'4 Allowable: Proposed.•_ Access. bldg. height: Existing: n/a Allowable: Proposed:_ On -Site parking: Existing: 24 Required.• Proposed:_ % Site coverage: Existing: 64% Required: Proposed: % Open Space: Existing: 36% Required: Proposed:_ Front Setback: Existing: 5 Required: Proposed: Rear Setback: Existing: 20' Required: Proposed.•_ Combined F/R: Existing: Required: Proposed: Side Setback: Existing: 0 Required: Proposed: Side Setback: Existing: 0 Required: Proposed:_ Combined Sides: Existing: Required: Proposed: Distance Between Existing 0, Required: Proposed.• Buildings Existing non -conformities or encroachments: none Variations requested: none 0 4 0 0 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT Agreement for Payment of City of Aspen Development Application Fees CITY OF ASPEN (hereinafter CITY) and GCT Partners (hereinafter APPLICANT) AGREE AS FOLLOWS: 1. APPLICANT has submitted to CITY an application for 730 East Durant Condominium Association (hereinafter, THE PROJECT). 2. APPLICANT understands and agrees that City of Aspen Ordinance No. 57 (Series of 2000) establishes a fee structure for Land Use applications and the payment of all processing fees is a condition precedent to a determination of application completeness. 3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. APPLICANT and CITY further agree that it is in the interest of the parties that APPLICANT make payment of an initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis. APPLICANT agrees additional costs may accrue following their hearings and/or approvals. APPLICANT agrees he will be benefited by retaining greater cash liquidity and will make additional payments upon notification by the CITY when they are necessary as costs are incurred. CITY agrees it will be benefited through the greater certainty of recovering its full costs to process APPLICANT'S application. 4. CITY and APPLICANT further agree that it is impracticable for CITY staff to complete processing or present sufficient information to the Planning Commission and/or City Council to enable the Planning Commission and/or City Council to make legally required findings for project consideration, unless current billings are paid in full prior to decision. 5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect full fees prior to a determination of application completeness, APPLICANT shall pay an initial deposit in the amount of $ 546.00 which is for hours of Community Development staff time, and if actual recorded costs exceed the initial deposit, APPLICANT shall pay additional monthly billings to CITY to reimburse the CITY for the processing of the application mentioned above, including post approval review at a rate of $205.00 per planner hour over the initial deposit. Such periodic payments shall be made within 30 days of the billing date. APPLICANT further agrees that failure to pay such accrued costs shall be grounds for suspension of processing, and in no case will building permits be issued until all costs associated with case processing have been paid. CITY OF ASPEN By: Julie Ann Woods Community Development Director g:\suppor1\forms\agrpayas.dDc 1/10/01 APPLICANT By: Date: ✓ _ Mailing Address: 730 E. Durant Aspen, CO 81611 ATTN: Chuck Frias ATTACHMENT 2 —LAND USE APPLICATION APPLICANT: Name: GCT Partners Location: 730 E. Durant Block # 106, Lot R and Lot S (Indicate street address, lot & block number, legal description where appropriate) Parcel ID # (REQUIRED) 273718242005 REPRESENTATIVE: Name: Chuck Frias Address: 730 E Durant, Aspen, CO 81611 Phone#: 970 429 2411 PROJECT: Name: 730 East Durant Condominium Association Address: 730 E Durant, Aspen, CO 81611 Phone#: 970 429 2411 TYPE OF APPLICATION: (please check all that apply): ❑ Conditional Use ❑ Conceptual PUD ❑ Conceptual Historic Devt. ❑ Special Review ❑ Final PUD (& PUD Amendment) ❑ Final Historic Development ❑ Design Review Appeal ❑ Conceptual SPA ❑ Minor Historic Devt. ❑ GMQS Allotment ❑ Final SPA (& SPA Amendment) ❑ Historic Demolition ❑ GMQS Exemption ❑ Subdivision ElHistoric Designation El0 ESA — 8040 Greenline, Stream Subdiv ision Exemption (includes ❑ Small Lodge Conversion/ Margin, Hallam Lake Bluff, condominiumization) Expansion Mountain View Plane ❑ Lot Split ❑ Temporary Use ❑ Other: ❑ Lot Line Adjustment ❑ Text/Map Amendment EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) Building has not changed since approved in 1978. THe building is a 2 story office building with underground parking and outside parking in the back. PROPOSAL: (description of proposed buildings, uses, modifications, etc.) Propose condominiumizing the 2 floors of office and each of the parking spaces and stora E units. Have you attached the following? FEES DUE: $ ❑ Pre -Application Conference Summary ❑ Attachment #1, Signed Fee Agreement ❑ Response to Attachment #3, Dimensional Requirements Form ❑ Response to Attachment #4, Submittal Requirements- Including Written Responses to Review Standards All plans that are larger than 8.5" x 11" must be folded and a floppy disk with an electronic copy of all written text (Microsoft Word Format) must be submitted as part of the application. ATTACHMENT 3 DIMENSIONAL REQUIREMENTS FORM Project: 730 East Durant Condominiums Applicant: C�CT pnrtnaro Location: 730 E. Durant, Aspen. "'CO Zone District: NC Lot Size: 6,000 Lot Area: 6,000 (for the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: 5,500 proposed: Number of residential units: Existing: 0 Proposed: Number of bedrooms: Existing: 0 Proposed: Proposed % of demolition (Historic properties only): DIMENSIONS: Floor Area: Existing: 5,500 Allowable: Proposed:_ Principal bldg. height: Existing: 16.5' Allowable: Proposed.-_ Access. bldg. height: Existing. n1a Allowable: Proposed:_ On -Site parking: Existing: 24 Required: Proposed.•_ % Site coverage: Existing: 64% Required: Proposed:_ % Open Space: Existing: 36% Required: Proposed:_ Front Setback: Existing: 5"Required: Proposed: Rear Setback: Existing: 20' Required: Proposed:_ Combined F/R: Existing: Required: Proposed: Side Setback: Existing: 0 Required: Proposed:_ Side Setback: Existing: 0 Required: Proposed:_ Combined Sides: Existing: Required: Proposed: Distance Between Existing 0, Required: Proposed: Buildings Existing non-- conformities or encroachments: none none Variations requested: CITY OF ASPEN PRE -APPLICATION CONFERENCE SUMMARY PLANNER: Chris Lee, 920.5095 DATE: 11 / 19/04 PROJECT: 730 E. Durant Condominiumization REPRESENTATIVE: Chuck Frias OWNER: TYPE OF APPLICATION: 0 Step. Condominiumization DESCRIPTION: The Applicant would like to condominiumize the existing office -use building at 730 E Durant Avenue. Land Use Code Section(s) 26.480.090 Condom iniumization Review by: Community Development Staff for appropriate plat contents. Public Hearing: No, if the request is only to condominiumize the existing mixed -use building. Referral Agencies: Engineering. Planning Fees: $302 Flat Fee Referral Agency Fees: Engineering ($185) Total Deposit: $487 To apply, submit the following information: 1. Fee. 2. Proof of ownership. 3. Signed fee agreement. 4. Applicant's name, address and telephone number in a letter signed by the applicant which states the name, address and telephone number of the representative authorized to act on behalf of the applicant. 5. Completed Land Use Application form. 6. 24" x 36" draft condominium plat prepared by a professional surveyor licensed in the State of Colorado. 7. 2 Copies of entire application package (items 2-6 above). Review Process: Apply. Then the Community Development Staff and Engineer will review the proposed plat and return required corrections. Applicant's surveyor then will make corrections to plat and the Applicant will submit 2 mylar copies of the corrected plat to obtain signatures from the Community Development Director, Community Development Engineer, and the Pitkin County Clerk and Recorder prior to the plats recordation at the Pitkin County Clerk and Recorder's Office. Recordation fee of $11 for first page and $10 for each additional page to be recorded shall be submitted when mylar plats. are submitted for signature. Please Note: 1. A building without existing walls can be condominiumized if a plat is completed, and officially recorded, showing the placement of all walls when built out. 2. When development actually occurs, the Applicant will need to apply for a plat amendment if any changes are proposed to the building layout as recorded in the previously recorded plat. 3. If it is proposed to change an existing office use to residential use, it will need to be approved through GMQS. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. File Edit Record Navigate Form Reports Format Tab Help pp � y A •' » Q r� 'J Jump 1 i "J6 3 -�1 QW . Routing History I Conditions Sub Permits I Valuation j Public Comment I Attacfaments Main Roytirg Status Arch/Eng Parcels I Custom Fields I Fee. Fee Summary I fictions Permit Type Permit 0086.2004ASLU ^ Address 1730 EDURANT AVE J Apt/Suite. City JASPEN State CO ZQ 81611 I Permit Information Master Permit Routing Queue Iaslu Project Status 1pending Description PROPOSE CONDOMINIUMIZING THE 2 FLOORS OF OFFICE AND EACH OF THE PARKING SPACES AND STORAGE UNITS Submitted (CHUCK FRIAS 970-429.2411 r Visible on the web? Owner Last Name DURANT & ORIGINAL ASS Z:J Firat Name Phone r 0 wner I s Appicant? Clock Runrring Days F -D Permit ID: 1 32359 Applied 12/17/2004 Approved F-_J Issued F Final F-fil J Expires 12/12/2005 3 PO BOX 7846 ASPEN CO 81612 v