Loading...
HomeMy WebLinkAboutminutes.hpc.19831115RECORD OF PROCEEDINGS Leaves Historic Preservation Committee Regular Meeting November 15, 1983 Chambers Present were Connie Mc Grudden, Mona Frost, Colette Penne, and Bill Drueding. This meeting is more of an information meeting except for Awnings at Tom Mix, and that we should listen to what the parties have to say. the Bill Poss gave a report on the status of the Epicure Building, or the old Chippwood Block, Mikeal Solheim is a general partner there and he has been doing is getting a refinancing of the project, which has taken longer than he first thought, There has been question with the Building permit, that need clearin~ also, they will be resubmitting drawings the for the resturant section for the tenative improvments, construction will start back up in three or four weeks, the completetion date will be Epicure- probable next spring. Chippwood Block The outside needs to be finished up, the masonary around the Up-date steel columns are on the outside, so those peirs will be masonary in, and all the windows will be redone; Colette Penne asked about the peirs on the west side appears to be inside and on the east side they are on the exterior first of all why is that, and when you masonary them in will they match? Bill Poss said the reason is that it is on the outside is the request of the owner,and they wanted maximum space inside for an antique bar, rather than work around the columns and have to cut the bar, and H~C has approved it that way; with Bill Clark was chairperson. To match them, they will paint them to match the building, and in the spring with new color samples; The windows will just hav~ ~ glass in them, and the frames will be duplicated as they are now, Colette Penne said that she wanted to remind them that if they plan for outside dinning, they should put there application in to the planning office this winter, there will be a class action which will let each applicate pay about $60.00 Mona Frost said the only thing she does not like is to see people refer to the Epicure Building instead of the orginal name of the Chippwood Block, which was its name for 70-80 years. Mona Frost said that HPC objected to the name being changed when Andre's put up his name of the building, New Business: Awnings Tom Mix The review of awnings and facade color change for the Sanderson Building or Tom Mix, by Larry Yaw. One is to basicly repaint the existing surface facing Hyman Street Mall, then add awnings on on the upper level for sun control purposes, the awnings will project appr and will not exceed the code limit, the color will be close to the Aspen Block Building in choice. The primary color of both the building and the awning will be a blue- grey color, with trim and accent color to be a medium value blue -grey;the awning will be with moderate scallop retractable and with no signage, Connie Mc Crudden and Mona Frost approved of the presentation and asked that Colette Penne be given the choice to approve the colors and type as she h~ the administative decision to do so for the awnings for the Tom Mi~ Building. Aspen Community Church Tom Crews architect, will be doing the renovation and rehabilitation for the Aspen Community Church, there will be a site visit when more members can attend; The exterior is really all HPC can comment on, but this building does belong to the national register so the interior would not want to be changed that it would hurt and be taken off the national register, Tom has been imcontact with the state and so far with the plans the state has not objected. And one of the plans is no open up the alcove again, but as of, yet, they do not know what is behind it. The outside he would like to sand blasting the stone, much like what was done at the Wheeler, the mortar is in many shades of colors and missing in some places, and needs to be replaced in others, the actually stone has changed colors due to the rain gutter being removed and having the stone be changed; The stone is referred to as Frying Pan sand stone, but they do not know if more would be availble or not, there is a Small pile in the back of the church; Colette Penne said she would really caution them on sand blasting water blasting or asid cleaning would be much better, and Colette was not sure but felt that sand blasting a building was against the guide lines for buildings in the Historic nature; Tom Crews said he would be glad to look at other methods for cleaning up the stone. Colette said that if Meril Wilson could come up then would be a good time for the site visit. Discussion continued with the mention of repairing the roof, the shingles on the Bell Tower, and In the back of the building there is a shed roof, the hope is to ma~e this more of an entrance for the activities for the lower level during the week, The exterior hopefully will be done in the spring. Colette Penne felt that there will probably be a couple of meetings on this, one a public Hearing, A copy of the interior and exterior changes planned will follow minutes. Meeting adjourned. -OCTOBER 1983 ASPEN COMMUNITY CHURCH EXTERIOR WORK 1. CLEAN DISCOLORED STONE 2. PATCH TO MATCH MORTAR JOINTS 3. BELL TOWER SHINGLES (VERT. TO BE REPLACED )S BELL OPENINGS REPLACED/ REPAIRED REFINISH/REFURBISH FRONT DOORS & REHANG~ WEATHER STRIPS REPLACE TRIM & CAULK 5. CLEAN UP ENTRY LIGHT GLOBES RE-ROUTE ELEC. CONDUIT 6. WINDOW REPAIR/REPLACEMENT~ WEATHERSTRIP OPERABLE WINDOWS 7. RE-DESIGN/REPLACE SIGN 8. REPAIR STAIRWELL WALL (WEST~ DRYWELL DRAIN §. REFLASH MAIN ROOF TO BELL TOWER 10. REPAIR/REPLACE ROOFING @ AND AROUND DORMER @ ENTRY, INCLUDING FLASHING 11. BELL TOWER ROOFING 12. N.W. CORNER - PUT WIRE ON INTERIOR 13. REPLACE/REPAIR COAL DOOR 14. REDESIGN/REPLACE BACK ENTRY SHED ROOF) R & R DOORS WITH WEATHER- STRIPPING 15. REPAIR CHIMNEY (NEARTOP) INTERIOR WORK 1. ENTRY AREA: (A) REPLACE CEILING. (B) REPAIR B REPLASTER WALLS/STRIP PLASTER (C) REFINISH WOOD TRIM, STAIR RAILINGS~ WAINSCOTING (D) REPLACE CARPET (E) REDESIGN BATHROOM? 2. BELL TOWER STAIR/REPAIR - REPLACE CARPET (A) WIRING CHANNEL? VENT PIPE 3. SANCTUARY ENTRY (A) REPAIR PLASTER WORK PAGE -2- ASPEN COMMUNITY CHURCH SANCTUARY (A) STRIP AND SAND FLOOR~ REFINISH (B) PEWS - STRIP~ REPAIR~ REFINISH (C) RE-PLASTER WALLS (O) NEW CARPET RUNNERS (E) MOVE ORGAN PIPES (F) OPEN ALTAR ALCOVE (G) REPAIR & REPAINT CEILING (H) REFINISH (REPAIR) BALCONY RAILINGS~ & BACK COVERINGS ON PEWS? (I) REPLACE COVER @ CHANDELIER BELL TOWER (A) CARPET UPPER STAIRS (B) REPLACE CEILING (C) REFINSH FLOOR (D) REPLACE/REPAIR DOORS TO BALCONY (E) REPLACE/REFINISH PEWS (F) REPLACE/REFINISH BALCONY RAILINGS (G) REPAIR/REFINISH WOOD ARCHES ATTIC (A) REMOVE OLD INSULATION ~ REPLACE WITH NEW R-30 INSULATION DOWNSTAIRS (A) REDESIGN ~ REBUILD KITCHEN (B) NEW DISHWASHER (C) GUT & REDESIGN ALL (O) N.W. CORNER WALL BOWING IN EXISTING BOILER 840~000 BTU/HR OUTPUT 650,200 BTU/HR NET OUTPUT ~OSSIBLE FABRIC SEAT MIN. )