HomeMy WebLinkAboutagenda.apz.19930316
!
.
AGENDA
=-=;;:;:=
ASPEN PLANNING AND ZONING COMMISSION
REGULAR MEETING
March 16, 1993, Tuesday
4:30 P.M.
2nd Floor Meeting Room
city Hall
I. COMMENTS
" Commissioners
~lanning Staff
Public
II . MINUTES
III. PUBLIC HEARING
-.............A.
Transierra Conditional Use Review for an Accessory
Dwelling Unit, Kim Johnson
cz
':1, \
"-/f.".:, D.
'~ ~'Q
Gordon/callahan Resubdivision Substanti~l PUD
Amendment and Lot Line Adjustment, Leslie La~ont (To
be tabled)
C.
East Cooper Affordable Housing Final PUD,
Subdivision, Rezoning to Affordable Housing Zone
District, GMQS Exemptions, and Special Reviews, Kim
Johnson (continued from March 2, 1993)
IV. NEW BUSINESS
A. Rio Grande Conceptual SPA Master Plan Adoption,
Leslie Lamont
B. Schermer Hallam Lake ~luff ESA Review, Kim Johnson
V. ADJOURN
~
r_ A11141
TO: Aspen Planning and Zoning Commission
FROM: Suzanne Wolff, Administrative Assistant
RE: Upcoming Agendas
DATE: March 16, 1993
Regular Meeting - April 6
Superblock Study Worksession (LL)
Benedict Building SPA Map Amendment, SPA Plan and GMQS Exemption,
Kim Johnson
a.nex
I
March 3, 1993
Ms. Kim Johnson
Aspen/Pitkin County Planning
130 S. Galena
Aspen, CO 81611
RE: Affidavit of Public Notice
East Cooper Affordable Housing Residential Development
Final Submission
Dear Kim,
As representative of C & G Mustard Seed, Ltd., applicant of the above referenced project, I hereby
certify that a Notice of Public Hearing, attached, was mailed to property owners within a three hundred
foot radius (300') of the project on March 3, 1993, and that signage was posted on the property notifying
the public as to the time and date of the Public Hearing. Said notice was placed on site on March 3,
1993. A photo is included verifying said posting of the property.
Attached is the certified mailing list of owners within the required three hundred foot radius of the project
with a copy of the public notice mailed to those owners.
Sincerely,
Thomas G. Stevens
President
SUBSCRIBED, CERTIFIED AND SWORN TO ME in the City of Aspen and Pitkin County, State of
Colorado, this �,M day of March, 1993, by Yvonne Gassman.
My commission expires:
IV1y Commission expires 9/27/96
Notary/ ublic
Red Onion Offices, 418 E. Cooper Ave., Suite 205, Aspen, Colorado 81611
(303) 925-6717 FAX: (303) 925-6707
PUBLIC NOTICE
RE: EAST COOPER AFFORDABLE HOUSING
NOTICE IS HEREBY GIVEN that a public hearing will, be held on
Tuesday, March 16, 1993 at a meeting to begin at 4:30 pm before the
Aspen Planning and Zoning Commission, 2nd Floor Meeting Room, City
Hall, 130 S. Galena, Aspen, CO to consider an application submitted
by the C & G Mustard Seed, Ltd., 300 E. Hyman, Suite E, Aspen, CO,
requesting Final Submission approval of Final Planned Unit
Development, Map. Amendment to rezone the parcel to Affordable
Housing zone district (AH), Subdivision, GMQS Exemption for six
free market units and thirteen deed restricted units,
Condominiumization of the affordable housing townhomes, Exemption
from the Park Development Impact Fee, Vested Property Rights, and
Special Review for Open Space and parking `-'And waiver �of the water
line extension moratorium. The applicant proposes six free market
lots, one deed restricted lot and twelve deed restricted
condominiums, on Parcels A and B of the Riverside Addition. For
further information, contact Kim Johnson at the Aspen/Pitkin
Planning Office, 130 S. Galena, Aspen, -CO 920-5100
s Jasmine Tygre, Chairman
Planning and Zoning Commission -
1195 East Cooper Ove
Aspen, CO 81611
Betty A. Johnson
2414 Hidden Valley Drive #2
Grand Junction, CO 81503
Terry F. Goodrich
2249 North Burling
Chicago, IL 60614
James Crown
P.O..Box 11842
Aspen, CO 81612
James J. Costley
80 Summerhill Place
Newman, GA 30263
Lantz Welch
City Center Square
P.O. Box 26250
Kansas City, NO 64196
Joan Lea therbury
P.O. Box 1420
Aspen, CO 81612
Nahum Amiran
P.O. Box 1114
Aspen, CO 81612
William P. Lucchesi
P.O. Box 11412
Aspen, CO 81612
Con Sullivan Estate
C/O Mrs. Su 1 l i va n
12486 Viewcrest Road
Studio City, CA 91604
Elyse Elliott
717 Cemetary Lane
Aspen, CO 81611
CIO Au rey M. Lee
450 South Riverside Dr.
Aspen, CO 81611
Robert L. Orr
500 Paterson Road
Grand Junction, CO 81506
Roberta Goodrich
P.O. Box 11842
Aspen, CO 81611,,
Diana L. Bauer
7 Oak Hill Drive -
Newmmonte Springs, FL 32714
Michael Alan and Gail M. Craig
1195 East Cooper Ave.
P.O. Box 26250
Kansas City, MO 64196
Crestahaus Limted Partnership
5150 Overland Ave.
Culver City, CA 90230
Y
John Prosser
Box 2539
Aspen, CO 81612
Selma Feldman
P.O. Box 4550
Aspen, CO 81612
Rocky Mountain Natural Gas
113 Atlantic Ave.
Aspen, CO 81611
The Alan S. Englander Revocable Tr
190 Taconic Road
Greenwich, CT 06831
Jeanie A. Rechard
Box 9296
Aspen, CO 81612
0
EXHIBIT
"B ►►
r
Terry M. and Molly Swanton
Box 1403
Helen Ann Kl anderud
Aspen, CO 81612
Box 1558
Aspen, CO 81612
Lizabeth Kerr Duson
9030 Greenville Ave.
Music Associates 0)f Aspen, Inc.
Dallas, TX 75243
600 East Hopkins
Aspen, CO 81612
Jay D. Lussan
Rt. 1, Box 199E
Richard and Joan -Osur. .
Al die, VA 22001
17 Tobey Brook
Pittsford, NY 14534
Fowler P. Stone, III
611 Fred Ln
Judith G. Jones
Aspen, Co 81611
1230 Riverside Drive
Aspen, CO 81611
Russell Trust of 1980 U.D. T.
Box 327
Magillicutty Corporation
Provo, UT- 84603
1280 Riverside Drive
Aspen, CO 81611
Cherie G. Oates
1205 Riverside Drive
Dorothy Kelleher
Aspen. CO .81611
P.O. Box 1
z
Aspen, CO 81612
Bette J. Kallstrom
1225 Riverside Dr.
Robert E. Cadger, Jr.
Aspen, CO 81611
Box 4 712
Aspen, CO 81612
Elliott Robinson
0025 Blue Bonnet Trail
Aspen, CO 81611
Donald M. and Judith P. Morris
4016 Picardy
Northbrook, IL 60062
Robert Murray
439 Carnation
Douglas G. Michalowski
Corna Del Mar, CA 92625
1240 E. Cooper Ave.
Aspen, CO 81611
Lorna Alta Corporation
6210 North Central Expressway
Ellen Sandler
Dallas, TX 75206
100 Midland Ave.
Dal 1 a s, TX 75206
Jack A. Robinson
1589 Kirkway
Albert W. Anderson
Bloomfield Hills, MI 48013
1825 Crest
Williston, North, MI 48013
Riverside Joint Venture
C/O Ted Enloe
Russell B. Penning
P.O. Box 655644
1201 Riverside Drive
Dallas, TX 75265
Aspen. CO 81611
Joseph M. Samalion
540 Solado Prado
Karin C. Speck
Coral Gables, FL 33156
Box 9912
Aspen, CO 81612
Kent Stephens
Donald L. Lee
605 EAST MAIN STREET
ASPEN, COLORADO 81611
TELEPHONE 3031925-4755
FACSIMILE 3031920-2950
I certify that on February 23, 1993, 1 mailed a Public Notice regarding this hearing, to
the homewoners with in a 300 foot radius (see attached list).
Signed this 16th day of March, 1993.
pd*A10--
Mary � L-�)
Martin Keller
Florence E. Keller
13880 Wide Acres Road
Golden, Colorado 80401
Zoe Murphy Compton
531 East Cooper Street
Aspen, Colorado 81611
Charles Worth
Ann G. Worth
P.O. Box 930
Aspen, Colorado 81612
Penny Evans
P.O. Box 4774
Aspen, Colorado 81612
Courtney & Karen Lord
Ralph E. Heyman
3031 O. Street N.W.
Washington, D.C. 20007
Jacquelyn R. Wynne
Cochran Parts Meredith
P.O. Box 35688
Dallas, Texas 75235
Shirley G. Cleveland
1445 Red Butte Drive
Aspen, Colorado 81611
Timothy J. Fortier
Lisa A. Fortier
#7, 160 North Park Avenue
Aspen, Colorado 81611
Lot 5, Red Butte Subdivision
001430 Red Butte Drive
2735-013-02-006
Lot 6, Red Butte Subdivision
001420 Red Butte Drive
2735-013-02-007
Lot 8, Red Butte Subdivision
001380 Red Butte Drive
2735-013-02-011
Lot 9, Red Butte Subdivision
001395 Red Butte Drive
2735-013-02-012
Lot 10, Red Butte Subdivision
001405 Red Butte Drive
2735-013-02-010
Lot 11, Red Butte Subdivision
001425 Red Butte Drive
2735-013-30-001
Lot 12, Red Butte Subdivision
001445 Red Butte Drive
2735-013-30-002
2735-013-30-003
Joy M. Gross
Marvin Gross
10880 Wilshire Blvd.
Los Angeles, California 90024
Victor E. Goodhard
Estate of Eileen V. Goodhard
P.O. Box 539
Aspen, Colorado 81612
Marjorie B. Stein
Stein and Zulfer Trustees
P.O. Box 1047
Aspen, Colorado 81612
001360 Red Butte Drive
2735-013-00-008
001098 Red Butte Drive
2735-013-00-007
2643-354-00-001
PUBLIC NOTICE
RE: TRANSIERRA CONDITIONAL USE REVIEW FOR AN ACCESSORY DWELLING
UNIT
NOTICE IS HEREBY GIVEN that a public hearing will be held on
Tuesday, March 16, 1993 at a meeting to begin at 4:30 pm before
the Aspen Planning & Zoning Commission, 2nd Floor Meeting Room,
City Hall, 130 S. Galena, Aspen to consider an application
submitted by Transierra Corporation, c/o Graham & James, 525
University, 14th Floor, Palo Alto, CA requesting approval of a
Conditional Use Review for a 500 square foot accessory dwelling
unit located in the area of the present garage. The property is
located at 1410 Red Butte Drive, Lot 7, Block 1, Red Butte
Subdivision. For further information, contact Kim Johnson at the
Aspen/Pitkin Planning Office, 130 S. Galena St., Aspen, CO 920-
5100.
sliasmine Tygre, chairman
Planning and Zoning commission
R
'1 7D
Ac.'PLEII�, COLOF'i�,!-J-0
605 EAST MAIN STREET
ASPEN, COLORADO 81611
TELEPHONE 3031925-4755
FACSIMILE 3031920-2950
I certify that on March 4, 1993, 1 placed a Public Notice on Lot 7, Block 1 of Red Butte
Subdivision.
Signed this 16th day of March, 1993.
Kim Weil
KENORANDUM
TO: Planning and Zoning Commission
FROM: Kim Johnson, Planner
RE: Transierra Conditional Use for an Attached Accessory
Dwelling Unit - Public Hearing
DATE: March 16, 1993
SUMMARY: The Planning Office recommends approval of the Transierra
Conditional Use for a 500 s.f. above -grade attached studio
accessory dwelling unit with conditions.
APPLICANT: Transierra Corporation, represented by Kim Weil
LOCATION: 1410 Red Butte Dr. (Lot 7, Block 1, Red Butte
Subdivision) . The lot is 37, 8i2 s. f. , bordered on the north by the
Roaring Fork River.
ZONING: R-30
APPLICANT'S REQUEST: The applicant requests Conditional Use for
the voluntar�7 construction of an accessory dwelling unit where the
garage currently is located. A new garage will be included in a
subsequent phase of development. Because the ADU is 100% above
grade the applicant is eligible for an FAR bonus of 250 s.f. for
the principal structure. .However, no FAR bonus is being requested
at this time. The applicant has submitted plan and elevation
drawings. See Attachment`"A".
Also requested is exemption from stream margin review in order to
install a foundation wall for phase two construction during phase
one work. This is currently being processed by the Planning Office
and will be final prior to issuance of any building permits.
PROCESS: The Planning Commission shall make a determination on the
Conditional Use for the accessory dwelling unit.
REFERRAL COMMENTS: Complete referral memos are attached as Exhibit
"Bn
Housing: The proposed unit must meet the requirements of Section
24-5-510 of the Aspen Municipal Code. It shall be between 300 and
--TKO --square feet of net livable---er-ea, ---deed -restricted to -resident
occupancy, and have minimum lease periods of 6 months. The deed
restriction shall be approved by the -Housing Office, recorded with
the County Clerk, and proof of recordation forwarded to the Housing
Office prior to issuance of any building permits for the site.
Engineering:
1. The site plan for building permit shall notate all required
parking on the parcel.
2. The final site plan for building permit shall clarify that the
not regarding the "area of conflict" relates to the adjacent
property owners. If this problem relates
s to setbacks, a final
lot line' location must be established prior to issuance of any
,building permit.
3. The applicant must work out any issues regarding the private
water well with the Water Dej-'artment prior to issuance of any
building permit.
4. The site plan included in the building permit shall be
approved by the City Engineer prior to issuance. of any
building permit.
5. Prior to any site grading, the applicant shall install hay
bales or other mechanisms to insure construction run-off does
not go down the slope to the river.
6. Residential run-off shall not drain to the river.
7. The applicant shall agree -to join any future improvements
districts which may be formed for the purpose of constructing
improvements in the public right-of-way.
STAFF COMMENTS:
The Commission has the authority to review and approve development
applications for conditional uses pursuant to the standards of
Section 7-304:
A. The conditional use is consistent with the purposes, goals,
objectives and standards of the Aspen Area Comprehensive Plan,
and with the intent of the Zone District in which it ' is
proposed to be located.
RESPONSE: This proposed unit will be deed restricted to allow the
property tc, house a local employees in a residential area,, which
complies with the zoning and Aspen Area Comprehensive Plan.
B. The conditional use is consistent and compatible with the
character of the immediate vicinity of the parcel proposed for
development and surrounding land uses, or enhances the mixture
of complimentary uses and activities in the immediate vicinity
of the parcel proposed for development.
RESPONSE: The accessory dwelling use is compatible with the other
residential uses in the surrounding neighborhood. The unit will
not be visible as a distinct unit from the exterior of the
residence.
C. The location, size, design and operating characteristics -of
-the proposed conditional use minimizes adverse --affects,
fects,
including visual impacts, impacts on pedestrian and vehicular
circulation, parking, trash, service delivery, noise,
vibrations and odor on surrounding properties.
2
RESPONSE: The accessory unit will be completely contained within
the existing structure. The total bedroom count once the remodel
is finished will be 5, including the ADU. The site will contain
a three car garage and at least two exterior spaces within the auto
court. The parcel is located about 300 yards from the Snowbunny
bus stop. Staff believes that a designated space for ADU parking
is not necessary. The unit will. have an exterior access via a
patio to the driveway. Interior access is provided to a mudroom
area. As per past P&Z concerns, a recommended condition of
approval requires that the unit be identified on building permit
plans as a separate dwelling unit requiring compliance with U.B.C.
Chapter 35 for sound attenuation. No other significant impacts are
anticipated.
D. There are adequate public facilities and services to serve the
conditional -use including but not limited to roads, potable
water, sewer, solid waste, parks, police, fire protection,
emergency medical services, hospital and medical services,
drainage systems, and schools.
RESPONSE: All public facilities are all ready in place for the
duplex home and neighborhood.
E. The applicant commits to supply affordable housing to meet the
incremental need for increased employees generated by the
conditional use.
RESPONSE: The proposed deed restricted unit is be provided
voluntarily. The applicant must file appropriate deed restrictions
for resident occupancy, including 6 month minimum leases. Proof
of recordation must be forwarded to the Planning Office and dousing
Office prior to issuance of any building permits.
F. The proposed .conditional use complies with. all additional
standards imposed on it by -the Aspen Area Comprehensive Plan
and by all other applicable requirements of this chapter.
RESPONSE: This use complies with the Aspen Area Comprehensive Plan
and any other applicable conditional use standards.
Please Note: As this accessory dwelling unit is loot above grade,
the main structure is eligible for floor area bonus not to exceed
one half of the floor area of the ADU as allowed by Ordinance 1.
----------------------------
STAFF RECOMENDATION: Planning recommends approval of the
Transierra Conditional Use for an above -grade 500's.f. studio
accessory dwelling unit with the following conditions:
3
1. The owner shall submit the appropriate deed restriction to the
Aspen/Pitkin County. Housing Office for approval. The
accessory dwelling unit shall be deed restricted to resident
occupancy with ?minimum 6 month leases. Upon approval by the
Housing Office, the Owner shall record the deed restriction
with the Pitkin County Clerk and Recorder's Office.
2. Prior to issuance of any building permits, a copy of the
recorded deed restriction for the accessory dwelling unit must
be forwarded to the Planning Office.
3. The ADU shall be clearly identified as a separate dwelling
unit on Building Permit plans and shall comply with U.B.C.
Chapter 35 sound attenuation requirements.
4. The site plan 'for building permit shall notate all required
parking on the parcel.
5. The final site plan for building permit shall clarify that the
not regarding the "area of conflict" relates to the adjacent
property owners. If this problem relates to setbacks, a final
lot line location must be established prior to issuance of any
building permit.
6. The applicant must work out any issues regarding the private
water well with the Water Department prior to issuance of any
building permit.
7. The site plan included in the building permit shall be
approved by the City Engineer prior to issuance of any
building permit. a
8. Prior to any site grading, the applicant shall install hay
bales or other mechanisms to insure construction run-off does
not go down the slope to the river.
9. Residential run-off shall not drain to the river._.
10. The applicant shall agree to join any future improvements
districts which may be formed for the purpose of constructing
improvements in the public right-of-way.
11. All material representations made by the applicant in the
application and during public meetings with the Planning and
Zoning Commission shall be adhered to and considered
conditions of approval, unless otherwise amended by other
conditions.
RECOMMENDED NOTION: "I move approve a Conditional ' Use for a 500
s.f. above -grade accessory dwelling unit for the Transierra
Residence at 1410 Red Butte Drive with the conditions recommended
in the Planning Office memo dated 3/16/93."
2
Exhibits:
"A" - Proposed Site Plan, Floorplans, and Elevations
"B" - Referral Memos
5
.�
P O
P ING ONING G m SSTO'F
r E HIT M APPR VED r
` 1 BY RESFOLUTION
z
IL
d
s
Ir
• • N
sc
co:A ' 0
- - \ _
LP
- 4#, - rI�{^p)
7
y ' '•° v
•� ..f., a �'o ,,, Yid !r •� `' '` .,''--; ` '�r� `�`
a:� Z,�
i
RpARiNb FOB AVER
-
r
C
cam• ^ O�a"� W-M t 6H p11�"� S� =_ .
�~ �00 t ,'
R t389�', L r MS.
T
T,
N
\
j�
�'Af
nil
7 1-
KV ROOM
•xr
ON r,
o�
KntA!h
trrroo
Kxx
0xho
EY - - - - - - J
PLANNING & ZONING COMMISSION
19 BY RESOLUTION •
MEMORANDUM
TO: Kim Johnson, City Planner .
FROM: Cindy Christensen, Housing Office
DATE: March 1, 1993
RE: TRANSIERRA CONDITIONAL USE REVIEW FOR AN ACCESSORY
DWELLING UNIT; 1410 RED BUTTE DRIVE
After reviewing the above -referenced application, the Housing
Office approves the proposed attached accessory dwelling unit
pursuant to Chapter 24, Section 5-510, of the City- of Aspen
Municipal Code:
Accessory dwelling units shalt contain not less than three hundred (300) square feet of
allowable floor area and not more than seven hundred (700) square feet of allowable floor area.
The unit shall be deed restricted, meeting the housing authority's guidelines for resident
occupied units and shall be limited to rental periods of not less than.six (6) months in
d_�er on. Owners of the principal residence shall have the right to place a qualified employee
or employees of his or her choosing in the accessory dwelling unit.
The floor area requirement is for net liveable square feet as
defined by the Hous-ir-7 Office below:
Net Liveable Square Footage is calculated on interior Living area and is measured interior watt
to interior wall, including all interior partitions including, but not limited to, habitable
basements and interior storage areas, closets and laundry area. Exclusions include, but are
not limited to, uninhabitable basements, mechanical areas; exterior storage, stairwells,
garages (either attached or detached), patios, decks and porches. i
Prior to building permit approval, a signed and recorded Deed
Restriction must be completed. Floor plans showing the exact net
liveable square footage and footprint of the accessory dwelling
unit will have to be submitted. Recording of the deed restriction
could take from three to four days. The Housing Office must have
the recorded book and page number prior to building permit
approval.
\word\referral\transier.ref
To: Kim Johnson, Planning Office
From: Chuck Roth, City Engineer 64)e—
Date: Mara; 3. 199;
Re: Transierra Conditional Use Review for Accessory Dwelling Unit
Having reviewed the above referenced application, and ha�-ing made a site inspection, the
engineering department has the following comments:
I. Parking - There appears to be more than adequate space on site for off-street parking,
however the final development plan must indicate all parking spaces and dimensions. The
minimum code requirement is 8 1/2' x 18' x 7' high.
2. Stream Margin Exemption - The final development plan must indicate the 100-year
floodplain line. The floodplain maps indicate that the line is coincident with the mean
high water line. Since no construction is proposed within the 100-year floodplain, the
Engineering Department recommends granting an exemption from the stream margin
review process with the condition of approval that the applicant ensure that no storm
runoff from earth exposed during construction reaches the Roaring Fork River ,and that
no storm runoff from the residence drains to the river.
14
3. "Sidewalk" -The recently adopted Pedestrian Plan has reinforced the public right-of-
way design guideline of providing pedestrians a space for walking outside of street surfaces.
This neighborhood does not have sidewalks, does not have high traffic volumes, and i� -rn,
indicated in the Ped Plan as a pedestrian commuter area. However, no development of
the right-of-way shall be undertaken which precludes pedestrians the ability to move off
of the pavement, out of the way of vehicular traffic.
4. Trash - The site plan does not indicate a trash storage area. The final development
must indicate a trash storage area in order to preclude such use of the public right-of-
way.
5. Utilities - If new utility pedestals are required for the project, they must -be located on the applicant's property and not in the public right-of-way.
6. Development in the Public R &t-of-way - Given the continuous problems of
unapproved work and development in public rights -of -way, we would advise the applicant
as follows:
The applicant shall consult city engineering (920-5080) for design
considerations of development within public rights -of -way, parks department
(920-5120) for vegetation species, and shall obtain permits for any work or
development, including landscaping, within public rights-of-,� a) from city
streets department (920-5130).
7. "Area of Conflict" - The final development plan shall clarify that this note relates to
a disagreement between adjacent property owners concerning the precise location of the
lot line. If this disagreement relates to setback issues, a final lot line location must be
established prior to issuance of a building permit.
8. Domestic Water Supply - The application indicates that domestic water supply is from
a well. The applicant shall contact the Water Department about the possible need to
provide City water in conjunction with obtaining a building permit.
Recommended Conditions of Approval
1. Prior to issuance of a building permit, the applicant shall submit a revised development
plan to be approved by the Engineering Department.
2. The applicant shall ensure that no storm runoff from earth exposed during construction
reaches the Roaring Fork Rl�er and that no storm runoff fr6n, the residence drains to the
river.
3. The applicant shall agree to Join any future improvement districts which may be
formed for the purpose of constructing improvements in the public right-of-way.
cc: Bob Gish, Public Works Director
Larry Ballenger, Water Superintendent
Judy McKenzie, Utilities Department
N93.57
�csxoRANDUX
TO: Aspen Planning and Zoning Commission
FROM: Kim Johnson, Planner
RE: East Cooper Affordable Housing Project - Rezoning to AH
(Affordable- Housing), Final PUD Development Plan,
Subdivision, GMQS Exemption for Affordable and Free
Market Housing, and Special Review for Open Space and
Parking (public hearing)
DATE: March 16, 1993
SUMMARY: This item was first presented on March 2, 1993. The
public hearing was put off until March 16 due to a notification
error. At the March 2 meeting, Planning staff and the Applicant
gave brief introductions to the project. The Commission also heard
comments from many members of the audience which included neighbors
of the property and prospective owners of the property.
Staff reminds the Commission to bring their original staff memo and
application booklet to the March 16 meeting.' Full size prints will
be available at the meeting.
The Commission also asked staff to invite Housing Director Tom
Baker to attend the public hearing. He has confirmed that he will
be there to explain the Housing Board's policy on deed restriction
categories for private sector development of affordable housing.
Also, Tom will discuss the 67:33 ratio of deed restricted $�o free
market units, and give background on the 70:30 ratio established
by the AH zone district.
Commission comments'from"the last meeting included praise for the
Extra size of the affordable units, the need for a homeowner's
association for the townhomes including covenants emphasizing good
maintenance and cleanliness of the complex, support for the
increased setbacks to buffer this project from its neighbors, and
the need to make sure the landscaping at the corner of the highway
does not block sight distances.
The public comments ranged from the need to limit FAR on the East
Cooper free market lots, not enough.impact reductions benefitting
the Riverside Dr. neighbors, lowering free market density, and
---restrictions on landscaping, dogs, and accessory buildings ran -the
East Cooper property.
Since March 2, staff has added two new conditions of approval to
the list of twenty conditions in your packet:
1
21. Building heights for the townhomes shall be measured from the
"natural grade" as presented in the CTL Thompson, Inc. report,
as supported by the Acting Building Official.
22. In the case of opportunities to underground existing primary
and/or secondary aerial utilities where new trenches are to
be dug for new utilities work, the applicant shall work with
adjacent property owners and with the subject utility
companies to accomplish such utility undergrounding.
3
i
f`.
_ s
ui
R'
r
w ac
L E
C
5 s
2
�[BI+iOjt�l�tDUK
TO: Planning and Zoning Commission
FROM: Kim Johnson, Planning office
RE: Schermer Ha l l ar Lake Bluff ESA Review
DATE: March 16, 1993
summary: The Planning Office recommends approval of this request
with conditions. The applicant seeks to add onto an existing 2,200
single family residence and create a duplex totaling 4,150 s.f.
FAR.
Applicant: Lloyd and Betty Schermer, represented by Doug Graybeal
Location: 210 Lake Ave. (Lot 19, Block 103, Hallam's Addition)
Zoning: R-6, with Hallam Lake Bluff Environmentally Sensitive Area
(ESA) overlay. The parcel is 10,760 s.f. Please see Exhibit "A"
for vicinity map and Exhibit "B" for proposed site plan and site
section.
Referral Comments: See Exhibit "C" for complete memos.
Parks Department: Rebecca Baker stated that any trees slated for
relocation (broken or healthy) must receive tree removal/relocation
permits from the Parks Department prior to issuance of a building
permit. Prior to issuance of any building permits, tree protection
barricades must be erected at the drip lines of the twq large
spruces in the rear year. The barricades shall be construbted to
prevent soil compaction, material storage, and' spillage of
deleterious substances under the trees.
Housing Office: The addition of another dwelling unit requires
compliance with Ordinance 1 requirements. 'The cash -in -lieu payment
in effect at the time must be paid prior to issuance of any
building permits. The current rate is $8.33.00 per square foot of
new construction (1,978 s.f.).
A.C.E.S. - In a phone conversation with staff, Tom Cardamone
expressed that a more complete landscape plan is necessary to
determine the vegetation screening between the residence and the
nature sanctuary. Tom also expressed concern about the "emergency
- li-ght ng"- which _is mentioned as --an- -excerption to the lighting
--criteria. Low level, low voltage -righting is acceptable,- -but wall
mounted floodlights are not acceptable.
Engineerinct: Chuck Roth submits the following comments:
1) Provision of four new spaces with variance to one space (HPC)
is acceptable. If the driveway is shared with the neighbor per the
original site plan in the application, a signed access agreement
must accompany the building permit application. If the driveway
is fully contained'on the Schermer property, final design details
must be included on the BuPermit ilding site plan for approval by
the City Engineer prior to issuance of the Building Permit. The
curb cut cannot exceed 10' in width.
2) A drainage plan for improvements from 1981 forward must be
prepared by a registered engineer prior to issuance of a building
permit. Construction certification by the engineer must be
provided prior to issuance of C.O.
3) The site plan for building permit shall indicate a usable, five
foot wide pedestrian space.
4) The fence which encroaches into the right-of-way must either be
removed or receive an encroachment license from the Engineering
Department prior to the issuance of any building permits.
Staff Comments:
Hallam Lake Bluff E.S.A. Review: The intent of the Hallam Lake
overlay area is to provide a minimal level of protection from
development impacts on the A.C.E.S. nature preserve below this
hillside. Various human impacts to the nature preserve that
concern A.C.E.S. include visual, noise, and light intrusion as well
as damage to the slope and vegetation which may increase runoff and
erosion.
The review standards contained in the ordinance are as follows:
1. No development, excavation or fill, other than native
vegetation planting, shall take place below the top of slope.
Response: None of these activities will take place below the top
of slope per the application.
2. All development within the 15' setback from the top of slope
shall be at grade. Any proposed development not at grade
within the 15' setback must be approved by special review
pursuant to Section 7-404D of this Article 7.
Response: An existing shed along the rear property line must be
,removed as part of the reconstruction/addition to the residence.
The landscape plan does not show any other development (terraces,
decks, spas, or patios) between the house and the top of slope.
Therefore, any contemplated development of this type must be
submitted for review as an amendment to this E.S.A. review.
3. All development outside the 15' setback from the top of slope
shall not exceed a height delineated by a line drawn at a 45
siegree angle from ground level at the top of slope. --Height
- -.-----shall be -measured and determined by the Zoning Officer
utilizing that definition set.forth at Section'3-101 of this
Chapter 24.
Response: The 3/9/93 revised section drawing shows that the
2
proposed structure to complies with this height limit.
4. A landscape plan shall be submitted with all development
applications. Such plan shall include native vegetative
screening of no less than 50 percent of the development as
viewed from the rear (slope) of the parcel. All vegetative
screening shall be maintained in perpetuity and shall be
replaced with the same or comparable material should it die.
Response: The landscaping plan indicates two huge spruce trees
which block from view a fair amount of the structure from the rear.
However, the tree -line sketch taken off of a photograph does not
adequately show if 50% screening is accomplished as viewed squarely
from the rear of the parcel. More information must be provided to
staff and ACES to make the final determination. It is recommended
that a supplemental landscape plan can be reviewed by staff and Tom
Cardamone prior to issuance of a building permit..
The plan also shows that three chokecherry trees and three russian
olives will be relocated to the rear property line. The russian
olive is not a native species to this hillside area. Any tree
relocations must receive City's tree removal permits.
5. All exterior lighting shall be low and downcast with no
light(s) directed toward the nature preserve or located down
the slope.
Response: The application states that all exterior lighting will
be designed in accordance with this requirement except for
emergency lighting. This exception concerns both staff and Tom
Cardamone from ACES. Wall -mounted motion activated lighting would
be a disturbance to the, nature sanctuary below this property.
Staff recommends a condition prohibiting wall -mounted motion
activated lighting. Only low-level (3' high max.) low voltage
pathway lighting should be used for emergency lighting.
6. No fill material or debris shall be placed on the face of the
slope. Historic drainage patterns and rates must be
maintained. Pools or hot tubs cannot be drained down the
slope.
Response: The application states that this requirement will be -met.
No hot tub is indicated on the plans. A drainage plan is being
required by Engineering prior to issuance of a building permit.
7. Site sections drawn by a registered architect, landscape
_ arcchitect, or engineer -shall. be __submitted showing all existing _
and proposed site elements, -the top--of-slop-e, and -pertinent
elevations above sea level.
Response: The 3/9/93 revised sketch shows the slope and proposed
structure.
3
RECOMMENDATIONS: Staff recommends approval of the Schermer Hallam
Lake Bluff ESA Review with the following conditions:
1. Any trees slated for relocation (broken or healthy) must
,receive, tree removal/relocation permits from the Parks
Department prior to issuance of a building permit.
2. Prior to issuance of any building permits, tree protection
barricades must be erected at the drip lines of the two large
spruces in the rear year. The barricades shall be constructed
to prevent soil compaction, material storage, and spillage of
deleterious substances under the trees. They shall remain in
place throughout exterior construction and grading.
3. Compliance with Ordinance 1 is required. The cash -in -lieu
payment based on new construction (1,978 s.f.) in effect at
the time must be paid prior to issuance of any building
permits.
4. If the driveway is shared with the neighbor per the original
site plan in the application, a signed access agreement must
accompany the building permit application. If the driveway
is fully contained on the' subject property, final design
details must be included on the Building Permit site plan for
approval by the City Engineer prior to issuance of the
Building Permit. The curb cut cannot exceed 10' in width.
5. A drainage plan for improvements from 1981 forward must be
prepared by a registered engineer prior to issuance of a
building permit. Construction certification by the engineer
must be provided prior to issuance of C.O. •
6. The site plan for building permit shall indicate a usable,
five foot wide pedestrian space.
7. The fence which. encroaches into the right-of-way must either
be removed or receive an encroachment license from the
Engineering Department prior to the issuance of any building
permits.
8. A landscape plan and rear view landscape sketches shall be
submitted and approved by ACES and Planning staff prior to
issuance of any building permit. only native vegetation may
be installed in the rear yard.
9. Any future landscape development -t i.nciuding but not Limited
to decks, spa, -terrace, fencing) must be submitted for review
as an amendment to this E.S.A. review.
10. Only low-level (3' high max.) low voltage pathway lighting
should be used for emergency lighting.
4
11. All material representations made by the applicant in the
applic=4 on and during public meetings with the Historic
Preservation Committee and the Planning and Zoning Commission
shall be adhered to and considered conditions of approval,
unless otherwise amended by other conditions.
Exhibits: "A" - Vicinity Map
"B" - Site Plan, Section, and Landscape Plan
"C" - Referral Memos
schermer.esa.memo
9
s
0
•o .. •p o
r�
i
. q 1 t li 1 � «�•.
7 W7-7.
w
z
W
P�ZpG rxONZpGCO)041SS'Iolq
IT APPROVED
'Mal LUTION
Tam
INV"
awn
ExigUA4 spruc*
SL-TBAC,K UNE
210 LAKE AVE
=Cm I
LOCATION
0%0
Gff&qnt ASA
r -A-
v t�� 4 ti �' �wy wr S
1-1 itor -
A -AN. "ilk
47 7-
Iris
CIB,
" 'Z
� PROPoSBD ADD1TIpN
PROPOSED `
NORTH ELE VATIpIV C�RJ
PLANNING i ZONING COMMISSION
EXHIBIT , APPROVED ,
19 BY RESOLUTION
►�1 u•�y� Ju
To: Kim Johnson, Planning Office
From: Chuck Roth, City Engineer C-
Date: March 10, 1993
Re: Schermer Hallam Lake Review - Additional Information
Parking; & Driveway - Section '19-101 of the . Municipal Code specifies that there be 25'
between driveways/curb cuts, , "except common driveways may be used on adjoining
properties." The land use review process is not intended to provide final approvals for
development in the public right-of-way, which approval is obtained when excavation
permits are applied for. However it is desirable to identify as many issues as possible.
The xerox copy of the map that you dropped off only shows two parking spaces. The
other two still must be indicated on the final development plan. The 19'-20.5' is
acceptable for the turning radius into the garage.
I would prefer for the driveway width in the public right-of-way to be 10' with the
widening for parking spaces to be on private property. The 19' does provide adequate
width for tlhc pLrallc, parking maneuver.
4
Section 19-101(a) of the code requires that the driveway apron between the valley pan ai
the pavement edge and the property line be paved for the full width of the driveway.
cc: Bob Gish. Public Works Director
M93.0
MEMORANDUM
To: Kim Johnson, Planning Office
From: Chuck Roth, City Engineer
Date: February 27, 1993
Re: Schermer Hallam Lake Review
Having reviewed the above referenced application, and having made a site inspection. the
Engineering Department has the following comments:
1. Parldna - Reference is made in the application to providing on -site parking. This
should be documented on a development plan. The applicant requests a 'variance" in
parking requirements from five spaces to four. Is this a variance that is granted by the
HPC given the designation of the property? Since the project is providing an excellent
improvement by adding four on -site parking spaces, the Engineering Department would
not object to permitting one less space than required by code. We do however need to
have a plan showing the spaces in order to be able to certify their size and vehicle turning .
movements.
Dri eway The application discusses an agreement to use the adjacent,property
owners driveway. Having one less curb cut and driveway is a benefit to the neighborhood
as well as to the applicant and the project. Perhaps the applicant should obtain a written
easement for the driveway use.
2. Storm Runoff - The history of additions to the structure is not clear as regards storm
runoff considerations. The 1981 subdivision approvals for this property included
compliance with Section 24-7-1004.C.4.f of the Municipal Code. The site visit did not
reveal an obvious drainage problem either onto Lake Street or over the hillside into
Hallam Lake. However, a drainage plan for improvements since 1981 and for currently
proposed improvements, including any new impermeable surfaces such as a concrete patio,
must be prepared by a registered engineer prior to issuance of a building permit. Any
drainage mitigation measures designed by the engineer shall be certified as constructed
prior to issuance of a Certificate of Occupancy. --- -
Mitigation of storm run-off during project construction should be provided as
needed to keep any storm runoff from exposed earth on site.
3. Given the continuous problems of unapproved work and development in public rights -
of -way, we would advise the applicant as follows:
The applicant shall consult City Engineering (920-5080) for design
considerations of development within public rights -of -way, Parks Department
(920-5120) for vegetation species, and shall obtain permits for any work or
development, including landscaping, within public rights -of -way from Streets
Department (920-5130).
This requirement relates to referenced proposed landscaping improvements and any other
work contemplated for the public right-of-way adjacent to the applicant's property. The
Eng;�,c`r:ng Department is particularly concerned about possible landscaping proposals for
the public right-of-way. The site improvement survey makes reference to a site plan for
proposed landscaping revisions, but we did not receive a copy of landscaping proposals.
"Sidewalk" -The recently adopted Pedestrian Plan has reinforced the public right-of-way
design guideline of West End area residences maintaining a space of the public right-of-
way to be usable for pedestrians. The construction of concrete sidewalks is not required
and is in fact prohibited in the West End, but the final project site plan must indicate a
usable, five foot wide pedestrian space, preferably with a five foot buffer area between
the edge of the concrete drainage pan and the pedestrian use area. The site visit did not
reveal landscaping underneath the snow, but there was no existing vegetation visible that
would compromise pedestrian use.
Encroachment - There is a fence that encroaches into the public right-of-way about four
feet. It would be typica, to require such an encroachment to be relocated at a time when
redevelopment of a property is being undertaken. The proposed redevelopment should
include relocating the fence onto the applicant's property, however the applicant does have
the right to apply for an encroachment license from the Engineering Department.
Recommended Conditions of Approval
1. Prior to issuance of a building permit, a development plan shall be submitted to and
approved by the Engineering Department.
2. Prior to issuance of a building permit, a drainage plan prepared by a registered
engineer must be submitted which addresses new construction and meets the requirements
of Section 24-7-1004.C.4.f of the Municipal Code. Prior to issuance of a C.O., the
engineer must certify the construction of any drainage improvements.
3. The applicant shall agree to join any future improvement districts which may be
formed for the purpose of constructing improvements in the public right-of-way.
cc: Bob Gish, Public Works Director
M93.52
MEMORANDUM
TO: Kim -Johnson, Planning Office
FROM: Tom Baker., Housing Offic
DATE: February 16, 1993
RE: Referral Comment: Schermer Hallam Lake Review
REFERRAL COMMENT: Article 5 Division 7 Affordable.Housing Impact
Fee (aka Ordinance 1, 1990) applies to this application.
Based upon the information in the application package, it appears
that the applicant will be required to mitigate for 1,978 square
feet of new constructic-:'.. �-,:rrentjy,
the cash -in -lieu payment for
this type of development is $8.33/square foot of new construction.
However, the cash -in -lieu payment shall be determined at the time
of building permit and is based upon the existing cash -in -lieu
requirement for a moderate income employee.
ref.schermer
1
TO:
FROM:
DATE
RE:
.
VZKORANDUK
Aspen Planning and Zoning Commission
Leslie Lamont, Senior
March 16, 1993
Rio Grande Conceptual
Planner
E
SPA Master Plan
- all
Attached for you review is the Rio Grande conceptual SPA Master
Plan. Please review the plan making recommendations to staff
regarding missing pieces or changes that the Commission would
propose for the text or land use maps.
Adoption of a conceptual SPA plan is a two step review process.
The Commission shall review the plan and make a recommendation to
Council. The City Council will review the plan at a public hearing
and adopt by Resolution.
Staff recommends approval of the conceptual SPA plan for the Rio
Grande property.
LOCATION: Rio Grande property located between Rio Grande Drive and
the Roaring Fork River, Aspen, Colorado.
ZONING: Public with Specially Planned Area overlay.
STAFF COMMENTS: Staff has been worYing with a citizen committee,
the Rio Grande Group, to,formulate the conceptual Rio Grande SPA
plan. The Group has recommended several land use actions ,:nd has
developed three land use development scenarios. Those three
scenarios are represented by the land use maps provided in Appendix
A of the plan. The maps are intended to serve as guides for site
_;Specific development.
Once the conceptual SPA plan is adopted, site specific development
proposals may be reviewed based upon a final SPA development plan.
-The final SPA plan should be created as very specific development
is proposed for the property. However, final SPA development plans
must be consistent with the conceptual SPA plan unless that plan
has been amended by the Commission and Council.
Pursuant to Section 24-7-804.C.3, a development application for a
final development plan shall be submitted within two years of the
_- Wate of approval of a conceptual development plan.--Unle$s an -
extension is granted, by the City Council prior to expiration,
failure to file such an application within this time period shall
render null and void the approval of a conceptual development plan.
Staff recommends that both the Commission and Council grant a
permanent extension of this conceptual SPA plan until a final SPA
z
plan is approved or either the Commission or Council wishes to
amend the conceptual plan. Staff has worked over a year to develop
this conceptual plan. Many citizen hours are represented in this
document. Many future land uses being considered for this large
property are more than two years from fruition. Because the
property is publically owned and the variety of uses and players
many and complex, Council's Resolution (with the Commission's
recommendation) should include a provision enabling the extension
of the conceptual SPA plan for the Rio Grande property beyond two
years until such time that a final SPA plan is adopted or the
conceptual plan is amended.
RECOMMMMATION: Staff recommends that the Commission recommend to
Council adoption of the Rio Grande conceptual SPA Master Plan with
the following condition:
1. The conceptual SPA Master Plan for the Rio Grande property
shall remain in effect until a final SPA plan for the entire
property is approved or the conceptual plan is amended..
2
r
CITY OF ASPEN RIO GRANDE
CONCEPTUAL MASTER PLAN 1993
f
Prepared by:
Aspen/Pitkin Planning Office
achnical assistance provided by:
Rick McGill
CREDITS
The Planning Department would like to thank those individuals who
donated their valuable time to this plan: Kirk Baker, Rebecca
Baker, Sally Barnett, Fritz Benedict, Alan Bloomqu.ist, Tom
Bracewell, Jon Busch, Chris Churchill, Hal Clark, Ed Cross,
Patrick Duffield, Jim Duke, Suzanne Farver, Andy Freeman, Chris
Hall, Roger Hunt, Julia Marshall, Carol Lowenstern, Lance Luckett,
Ramona Markalunas, Bruce Matherly, Jack Reid, George Robinson, and
Chuck Roth.
TABLE OF CONTENTS
Title
Purpose of the Master Plan
Location Map
Process
Summarized History
Assumptions
Site A
* Existing Conditions
* Map
* Goals
* Recommended Land Uses/Activities
* Recommended Action Plan Summary
Site B
* Existing Conditions
* Map
* Goals
* Recommended Land Uses/Activities
* Recommended Action Plan Summary
Appendix A - Land Use baps
!Appendix B - History of Parcel
i
Page
1
1
2
3
4
5
6
7
8
•
4 Y
12
13
14
14
18
19 ILI Oj a W: II.,W t4v�j V
The Aspen City Council direc11--ed staff to create a Specially Planned
Area (SPA) master plan to guide future development of the remaining
"undeveloped" portion of the Rio Grande property. Council's intent
for a new plan was to identify appropriate activities and land use
patterns for the Rio Grande property. Council emphasized that all
public interests should be considered in this new planning effort.
The Rio Grande property is zoned Public with a Specially Planned
Area (SPA) overlay. The purpose of a SPA overlay is to provide
design flexibility for land which requires innovative
consideration. The SPA allows for the development of mixed land
uses through the encouragement of innovative design practices and
establishment of a procedure whereby land that contains multiple
land uses, which are considered appropriate, can be planned and
redeveloped in a holistic manner providing for the greatest public
benefit.
The property is bordered by Rio Grande Drive on the south, the
Roaring Fork River on the,north, Mill Street on the west, and the
Eagles Club/Patsy Newbury Park on the east.
MM r � .r err N
rll.d w� ��iPa
�f .IrwRa .ems �wd� NT M
poor v consir &M"
Aspen
Rio Grande SPA
Master Plan Site
$I
The Rio Grande master plan was developed as a conceptual SPA Plan.
Following it's adoption, new development or significant alterations
must 'be consistent with this conceptual SPA plan and shall be
reviewed pursuant to the final SPA development review process. A
similar process was conducted. in .zoo wrier, Lne Parking Garage,
Library, and Youth Center were all planned and developed in
accordenc_-e with conceptual and final SPA plans.
In addition to characterizing .the Rio Grande parcel as two separate
but, interactive pieces, this document summarizes the history of the
entire -parcel, outlines existing conditions, identifies goals for
each piece, proposes land uses/activities, and makes
recommendations for future use.
The document provides three land use plans/maps for the entire
study area depicting how the uses may be integrated, Appendix A.
The three land use maps are intended to serve as guides for
specific development scenarios. Timing and particular needs of
future programs will dictate which land use scenario is best to
utilize.
Staff formed the Rio Grande Group (a citizens review group) and
began the planning process in November of 1991. The charge to the
Group was to work with staff to develop the conceptual SPA plan.
The Group was expected to identify critical features of the
property that should be enhanced and/or preserved, resolve land
use issues pertaining to the site and make recommendations
regarding appropriate land use development.
However, it was not the purpose of the .Group to decide whether
community -wide issues such as the valley -wide rail or a crops -town
trolley system should be pursued. There are other decision -making
arenas that will decide the fate of those projects. Some of those
alternatives were considered when making recommendations.
The Rio Grande Group met approximately 16 times over an eight month
period. One of the first tasks of the Rio Grande Group was to
review existing and proposed land uses for this vital piece of
community property. Initial meetings were devoted to a
presentation and discussion of particular land uses on each section
of property.
The property was divided into two manageable discussion sites
for which primary land use goals and recommendations for
--de=velopment were made: - -
Site A: the area between the river and bike path next to
the snow welter (page 6); and
2
Site B: the recycle site (Old Impound lot) and the
playing field (page 13).
This is a brief summary of the planning review history of the
property. For a more thorough history refer to Appendix B.
In 1967, the Denver Rid Grande Western Railroad began discussions
with the City and County regarding redevelopment of their property
and right-of-way. Since those initial discussions there have been
many plans regarding this is acre parcel:
* 1973 - The City used 7th penny transportation funds
to purchase a majority of. the Rio Grande
property.
* 1975 - A Performing Arts Center for the property was
1978 studied.
* 1981 - A non -specified 1.5 acre site was set aside for
a future Performing Arts /Conference Center and
the City moved the snow dump for the Sanitation
District property to the Rio Grande property.
* 1982 - The City and County exchanged the Aspen One,
Oden and stable properties.
* 1988 - A conceptual SPA master plan was adopted by
Council identifying a parking garage, the
library, the Spring Street extension,.a snow
melt facility and an arts usage area. ,
* 1989 - A final SPA plan was approved by Council for
the parking garage and the Pitkin County
library.
* 1990 - A final SPA plan was approved by Council for
the Youth Center.
* 1991 - Council denied conceptual SPA approval for the
trolley, Theatre in the Park, recycle facility
and snow melt operation and instead directed
staff to prepare a conceptual SPA master plan
for the entire site.
3
ASSUMMONS
The Group identified several assumptions with regard to the
property. From the basis of these assumptions the Group began
their review of existing land uses and proposed land uses.
The first assumption vas past planning efforts. As indicated by
the summarized history of the site, there have been many Rio Grande
plans. Rather than completely replan the parcel, the Group began
their review of the property from the perspective of existing uses
and past plans.
Secondly, the Group considered why and how the differentpieces of
property were purchased. Some of -Site A and all of Site B were
purchased with transportation funds and most of the river frontage
was purchased with open space funds.
Third, the extensive work on the whitewater course and initial
regrading of Site A, has required adjustments to the traditional
method of dumping snow on Site A. In 1991, the City Council
directed the Public Works Department to find an alternative to
dumping snow on the parcel. -In response, the Department is
attempting to purchase land adjacent to the County Maintenance
Facility for snow storage.. The -site will not be ready for
approximately two years so the snow welter is still needed for that
period. The Group is confident that the operation of the - snow
melter, if adjusted, can continue in the near future without
compromising the use of the property as a passive recreation park.
Fourth, the Group realized that there were other decision making
processes which could affect development of the two sites. The
Group knew that a valley"Twide rail system terminating on the Rio
Grande, ultimately a tri-county decision, could use a signlf icant
portion of the property. The possibility of the Trolley System
affecting the property is also beyond the Group's control and is
now in the hands of the Transportation Implementation Committee.
However, the Group reviewed the two proposed land uses and made
specific recommendations if the train and trolley were developed
on the property.
Finally, additional SPA review will be required for site specific
development and dimensional requirements and development details
will be considered at that time. Depending upon how the land was
originally purchased future permanent development may require voter
approval which is also out of the Group's purview.
-with the considerations sentioned -above --the Group reviewed and
potential land uses of each site.
4
SITE A
Z. Existino Conditions
Site A is generally described as the land between the bike path
and row of large cottonwoods that edge the playing field, and the
river. However, it also encompasses the existing snow melter and
the drainage pond closest to Mill Street. Please refer to Map 1.
The property is 2.213 acres.
Site A consists of the snow
sedimentation pond necessary for
the site has also been used as a
or dumping into the snow melter.
melter, and sand filter and
this operation. Traditionally,
"snow dump" for melting on site
For seven years, the Aspen Theatre in the Park has set up its
theatre tent on this site for live performances June through
September. For the summer of 1992, the theatre received a
temporary use permit to set up a larger tent with increased back
stage capacity.
The Art Park group has been very active and generous in its efforts
to reverse a trend of neglect towards this portion of the Rio
Grande property. The group has rejuvenated the westerly portion
of Site A near the Ron Karagian bridge and the berm adjacent to the
theatre tent. The Art Park has evolved into a beautiful garden
showcasing local artist's work.
The Art Park and Theatre groups have been the catalyst for the City
to reconsider their stewardship of this community property. They
first rallied the community to enhance the riverbank emphoLsizing
the river. and park interaction. As a result, City council
allocated approximately $60, 000 to excavate the high water channel,
adjacent to the main river channel, for a whitewater course. As
part of the development of the course, the City created a
pedestrian path along the river and revegetated the river bank and
slope of the property down to the whitewater course. The walking
path is intended to enhance the river experience and meander along
the river's edge changing elevation as it follows the white water
course. The path will not be paved because the existing paved bike
path at the edge of the park is intended to serve multi -users.
Finally, Site
downtown, the
neighborhood.
was not until
a strong link
A is an important pedestrian connection between
Art Museum, Herron Park and the dense Hunter Creek
The Karagian bridge has long been in place but it
the Art Park revitalization that the bridge became
to the ,Museum .
5
Map 1
Site A
Muse=
cf"LANE I�
CONDOS �•
—`•SI. V •� i — — — — — — `
- ' ,-- ART PARK
j
i
\ •` buffer zone
5 B \ •
ation / Transportation \ \ �• '�
410
nver
ITE
PUMC
6th
*memo 00wome
—�-.� ~
♦THEATRE `♦` ' \ ` '
♦ FACKJTY
•� `�` 1,-2 handicapped
,�� �• -
buffer
•
•
y
to ,
0
�41k
II. Goals
The basis of the goals identified for this Site were the funding
sources for the initial purchase and the unique characteristics of
the Site. The majority of the Site is comprised of the Aspen One
Property (acquired with Sixth Penny Open Space Funds in 1978) and
the parcel the City traded vith Pitkin County in 1982. A smaller
piece of the parcel was purchased with'7tih Penny Transportation
Funds.
The parcel contains prime Public river frontage and was 'Identified
as a key piece in the 1973 Roaring Fork Greenway Plan. The
Greenway Plan promotes preservation of indigenous species and
maintenance of the riparian environment along the Roaring Fork
River and its tributaries. The Greenway Plan also supports an
extensive trail system throughout the "Greenway" for "maximum
possible recreational and educational potential."
The site is also an important hub in the bikeway/pedestrian trail
system and is consistent with future plans to extend the pedestrian
and bike paths upriver. From this point, one can go up or down
river, into downtown, to the Art Museum or over to the post office
retail center all on pedestrian/bike paths.
The following Goals were established for redevelopment of Site A:
a. Develop a passive park offering a quiet open space for
the community.
b. Visually and physically connect the river with the park.
C. Support the Art Theme connecting various art oriented
elements such as the art park, Theatre in the Pa*rk and
Aspen Art Museum.
d. Discourage permanent development except for structures
which support the Art ThemE or enhance the edge of the
river as a people place.
e. Discourage employee housing as an inappropriate use for
this site.
f. Provide a venue for local artists in support of the Art
Theme.
9. Limit vehicular access except for theatre
..delivery/service and —parking -for the -disabled -at -the
--theatre.
h. Coordinate park activities with the Art Museum.
i. Maintain pedestrian/bike paths throughout the site.
7
III. Recommended Land Uses/Activities for Site A
This site is divided into several elements for discussion purposes:
1. Site Enhancement -
The.whitewater course is almost. completed. The river
bank has been regraded and recontoured to create more of
a visual and physical connection to the river's edge.
The banks of the channel have been revegetated and
stabilized.
A river walk has been established at a lower elevation
from the park with the intent of being more remote from
activities of the City and more restive for the
pedestrian.
A small bowl -shaped sitting area has been carved into the
bank above the river walk to afford viewing of the new
whitewater course.
The sitting area remains unfinished. More dirt should
be removed from that area to sculpt the curve of the bowl
and reduce the steepness of slope so. people can sit
comfortably. However, further regrading of the rest of
the site is unnecessary because it will eliminate the
flat surface and inhibit park use. Irrigation should be
considered along the slope for growth and as well as a
water feature.
Some revegetation and channel work have yet to be
finalized, including the land surrounding the pond near
Mill Street. Native wildflower mix and irrigation
ditches will be integrated into the landscape.- Other
footpaths may be needed in the future and should be
considered as park use evolves.
Revegetation of the park shall include the theatre tent.
The landscaping should help screen the tent's stored
trusses, storage shed and wood floor in the off season.
It is important to note that the regrading and
recontouring of the site does not impact the temporary
use of the snowmelter or sedimentation pond. It does,
however, require an alternative site for the dumping of
snow. The city has begun to accommodate snow dumping in
other locations and is --attempting to -purchas.e-iLnother
_ site for dumping snow. _ -- ---- -- -- --
The Group has concluded -that snow melt activity is
inappropriate in the long-term view of the park. The
snow dump should be relocated immediately and the snow
8
melter relocated from Site A as soon as possible. An
alternative location may be considered on the recycle
site integrated with the expanded recycle facility and/or
Trolley Barn.
As long as the snow melter remains in the current
location, the existing sand filter is necessary but
should be reshaped into a water feature for the summer.
The edges of the sedimentation pond will be reworked to
give a more landscaped finish. Both the inside and
outside of the pond should be sloped to provide a more
gentle finish and reduce the water depth.
2. Art Park Theme
A strong Art Theme should be promoted as an important use
for the Rio Grande parcel. The Art Theme is already
supported by a variety of existing uses: the Theatre in
the Park, on -site sculpture and flower gardens introduced
by the Art Park group and direct access to the Art
Museum.
Continued support for the Art Park group's efforts will
provide local artists a venue for their work. Art will
be located in the park on a revolving basis and maximum
flexibility can be'achieved by variety of spaces. This
is important to accommodate different works. The Art
Park group also proposes to continue to maintain the
flower gardens, sponsor and encourage outdoor sculpture,
and expand irrigation and lighting systems. To ensure
maintenance and management of program responsibi1itiEZ
the Art Park group must work with the City to'define
policies or agree on a contract. .
Aspen Theatre in.the Park is a key component of the Art
Theme. The theatre recently installed a new wood floor
with an improved drainage system. The company also
received a temporary use permit to put up a larger tent.
The tent is approximately 60 feet x 80 feet and 26 feet
high and seats approximately 100 patrons. This permit
will be reviewed on an annual basis unless the company
receives final SPA approval. Aspen Theatre in the Park
runs from June through August performing four nights a
week.
At the close of each season the theatre will take
down the tent and store the support beams on -site. The
wood floor and a small (12.9' X 12.91) shed for equipment
storage will remain on site. The shed will -also provide
locked storage during the summer.
E
At this point, Aspen Theatre in the Park is not
considering a year round facility. If the need for a
year round facility is supported by the community, then
future development at this site should be reviewed at
that time. Review should consider the proposed
improvements, infrastructure needs and impacts on the
passive park use.
The theatre has often :considered on -site housing for
personnel. The Rio Grande Group does not support housing
for theatre personnel finding the use inappropriate on
this site. Housing Would conflict with the "passive
park" use identified for the site. In addition, housing
in the park sets a bad precedent for other City and
County parks.
3. Level of Activity -
Other land uses pertaining to food or commercial uses
have been discussed for this area. The anticipated
argument for locating these uses on the river's edge is
the creation of more activity_ along the river within the
urban setting of the City. Food booths along the paths
could encourage a more festive gathering place in the
park.
However, careful evaluation must be given to future
vending along the river. The character of the Rio Grande
parcel, although not void of structured activity or
development i.e. the Theatre in the Park, should focus
primarily on the river. The visual and physical
connection to the river is the fundamental goal for land
use on this site. The Art Theme and other improvements
are to support and compliment the river as the primary
amenity. Any commercial venture must not detract from
that goal.
Thus, small vending booths or food stands cannot block
visual access to the river. Physical access to and
through the parcel or use of the footpath cannot be
diminished by vending operations. Potential impacts
generated by these types of uses: vehicle related
deliveries, trash, fumes, noise, power lines, must also
be contained and kept at a minimum at best.
Given the above constraints, the Art Museum appears to
be a more suitable I ation for these types of_proposed
-uses. In addition, the Museum side receives more sun
than the Rio Grande side, a retail venture is more
consistent vith the commercial orientation of the Art
Museum, and the Museum has the water and sewer services
for food oriented activities.'
10
f
4. Access to the Site -
There is a service drive that currently accesses the site
(Art Park Way ). The road will be eliminated and replaced
with a 12-14 foot wide concrete pedestrain/bike path.
The path may be used by theatre service/delivery and park
maintenance vehicles one. The access may also be used
by the disabled when attending the theatre. Two
handicapped parking spaces, that will double as delivery
space, will be provided at the tent.
To alleviate the impact of only one access point to the
park and to encourage less trzffie oi, the access road,
another point of access for pedestrians has been
identified. Access frill be upgraded, to include a
sidewalk and gutter, between the Eagles Club and the
recycle site. A pull-out area will be provided at that
portion of Rio Grande Drive for drop-off.
IV. Recommended Action Plan Summary for Site A
To achieve the goals and proposed land uses for this site, the Rio
Grande Group recommends the following actions for Site A:
1. The regraded site should be revegetated and ditches
should be added throughout the park area adding water
features and park irrigation.
2. Pedestrian paths may be developed in the future if
warranted.
3. Pond and irrigation ditch le.};age should be corrected.
v
4. The snow melter should be relocated out of Site Avwithin
two years frolr the purchase of an alternative snow dump
site.
5. The sand filter should be reshaped for use as a summer
water feature and more efficient operation unless the
eventual relocation of the snow melter no longer requires
the filter in which case it should be eliminated.
6. The pond closest to the snow melter (sedimentation pond)
should be recontoured to compliment the surrounding park
landscape and revamped to improve its function as a
settling pond for the snow melter.
7. A small turn around for service/delivery combined with
two disabled parking spaces should -be designed next to
the theatre tent at the end of new pedestrian/bike path.
081
S. The small bowl -shaped seating area should be finished.
9. Access frill be upgraded at the path between the Eagles
Club and the recycle site. Drop-off will be provided for
access to Patsy Newbury park and Rio Grande.
10. A 20 foot buffer has been delineated on the site maps.
This buffer is the boundary between Site A and Site B.
The buffer lends protection for Site A from encroachments
and .inappropriate uses -from Site B yet provides site
development flexibility for Site B.
SITE B
Site B encompasses the existing recycle site on the eastern portion
of the parcel, the access road down to Site A, the small triangle
of open space between the access road and bike/pedestrian path, and
the playing field. This piece of the master plan is bordered by
Rio Grande Drive, Mill Street, and a row of Cottonwoods and a
pedestrian/bike path to the north (please see Map 2).
I. Existing Conditions
The community's recycling drop-off center has temporarily occupied
the eastern portion of Site B for several years. The facility.
accepts the widest variety of materials, and because of its central
location, is one of the most accessible drop points within Pi
in
County. The materials accepted at the site are: aluminum, tin,
glass, plastic, newsprint, cardboard, low grade paper, high grade
paper, green bar computer paper, and used dry cell batteries.
There is a 20 yard roll off dumpster for glass, a 100 yard trailer
for cardboard, twenty-five 90 gallon containers for a 1 um i nuID, tin,
plastic and all grades of paper and a. small container for
batteries. An employee;of Pitkin County Public Resources monitors
collection of materials at the site. Recently, the berms
surrounding this area have been increased in order to shield the
recycle activity from view, to prevent blowing trash and to reduce
haul costs during the construction of the white water course.
The access road (snow dump road) used for the snow welter and the
theatre is approximately 40 feet wide.
The playing field, which occupies the majority of this parcel, was
established as a temporary use until such time that the field is
converted for transportation uses.
-Other -than the -goal posts end tw0- r'ary-r'ecyc3-e--cont-a-iners tie
parcel is void of any structural development.
12
an
Im
CAK
AUTO
7 VR
,� ,•• ���*�r�i�lul t tam ` _ - - , _ _ - \\�.►� r `L.r
• `�' ' Aar PARK
- - Nb � • '�
THEATRE
! \ - FACL rY ♦ 1 ♦ R
�%E B `' \ ` `J 2 handicapped s
.S♦{,
e Reei'eation / Transportation •�, -\, , -
PARXWG
i smile
♦i♦',� - Yom
La"RY
♦6 ,
•�V r I�tlt / 1■ total
Ee
pos riscycle/snowme/ter
.t • BASS / OBERMEYER B
Courm JAL
ya rec yc,
0
coulrMOUSE
r--7 �
13
II. Goals
Because the site was purchased Frith 7th Penny Transportation funds
the basis of future development goals is transportation, oriented.
The parcel is also across the. street from multiple land uses
including the Bass/Obermeyer building, which is zoned
Service/Commercial/Industrial (SCI). Because of the close
proximity to the SCI zone district and to downtown, a variety of
land uses, including light industrial, are considered appropriate
for this site.
The Rio Grande Group has identified the following Goals for the
redevelopment of Site B:
a. Locate light industrial -oriented uses which are considered
essential community services in the eastern portion of Site
B.
b. Maintain existing land uses on the accessible eastern portion
of the site. Because of this area's location and visibility,
ensure that existing and future uses are compatible with
surrounding land uses.
C. Satisfy transportation related needs first'when considering
use of the site.
d. Retain and optimize park/recreational uses in this area and
replace the active park and playfield only with a regional
rail facility.
e. Preserve view planes to the river and Independence Pass with
low -profile development.
III. Recommended Land Uses/Activities for Parcel B
This parcel can be divided into several different elements for
discussion purposes:
1. Recycle Site
The recycling center is in critical need of an enclosed
space for collection of material. Blowing trash has been
a problem and inclement weather reduces the site to mud.
Pitkin County Public Resources proposes to construct a
facility that is partially below grade and will make
collection, bailing, and hauling of material more
efficient.The proposed facility is approximately 5,200 square feet.
This option eliminates several bins and moves part of
the floor plan below grade for increased efficiency.
14
The enclosed bins and below grade bailing will eliminate
unsightly conditions and blowing trash. Enlarged
collection areas and more storage for material will
reduce the number of trips made to haul the material off -
site. Efficient drop-off will encourage residents to
continue to use the site.
Customer access to the recycle site should be directly
off of Rio Grand Drive. Haulers should access off of
snow dump road on the west side of the site.
If the trolley barn is located on the site the cuts into
the embankment, necessary for trolley access to the
trolley barn, can also provide truck access to the
recycle facility.
The upgrade of the recycle facility -should, consider
relocation possibilities to City land across the street
on the corner of Spring and East Bleeker Streets.
2. Trolley Barn -
The Trolley Group proposes to develop a trolley rail
system. The system includes a car barn facility, tracks
and poles, and several trolley cars. This review will
focus on the proposed operation and routing which is
suggested to occur on the Rio Grande parcel.
According to the plans, a trolley will leave the barn,
cross the pedestrian/bike trail and Rio Grande Drive and
travel in between the Youth Center and Jail to Main and
Galena Streets. The Trolley Group proposes to run track
along the north side of the ball' field providinj stops
at the Art Park then Mill Street. The .Trolley would
continue across Mill Street and utilize Puppy Smith
right-of-way for a stop at the post office.
The Group proposes to develop a car barn approximately
7,000 square feet which includes 1,000 square feet for
accessory office, storage, and related uses. The barn
will house the trolleys and provide a garage for light
maintenance.
Depending upon the location of the barn it can be
incorporated with the proposed expansion and enclosure
of the recycle facility or integrated with a future rail
terminal on the playing field.
The structure is proposed to be one story in height.
This is consistent with _the recommendation for low -
profile development on the parcel to avoid blocking views
to the river if the barn is developed near the playing
15
0
field or Independence Pass. If the barn is developed on
the eastern portion of the site.
The building could also be designed to enable 5,700
square feet of affordable housing on a second level.
The Trolley Group cannot fund the : cost of the housing but
is willing to make the structure available for future
housing development. Impacts to the river and
IndEron3ence Pass view planes would have to be
considered.
Although the Group believes that housing associated with
the theatre was an inappropriate land use, housing on top
of the trolley barn may be more suitable if developed on
the eastern portion of the site. The site's proximity
to the street, S/C/I zone district and location on the
edge of the park lend a more urban feel for a multi -use
development.
3. Access Road
The access road to the snow melter and theatre (snow dump
road) is 40 feet wide. Vehicular access into the park
should be eliminated. A new pedestrian/bike path should
replace the existing pedestrian/bike path and access
road. It should be 12-14 feet wide and located either
next to the playing field or recycle site. The new'path
is intended for pedestrian and bikes but the width can
accommodate theatre service/delivery and park maintenance
vehicles. Two accessible parking spaces will also be
provided at the tent for the disabled attending a
production at the tent.
4. New Walking Trail -
A new walking trail has been roughed -in above the snow
melter. The trail is approximately halfway up the berm
surrounding the recycling lot. The trail should be
graded and improved as a walking path connecting .to Patsy
Newbury Park. The trail should not encroach into the
recycle site.
5. Snow Melter -
The snow melter will be removed from Site A. The current
recycle site should be considered as a relocation
,alternative for the _-aaaw =se Lt;ir.--_-_Xn#sgration vi-th -fie
expanded recycle operation and/or Trolley barn should be
considered.
16
6. Additional Activities -
In the event either the Trolley Barn, recycling center
or the snowmelter are not built on the eastern portion
of the site, other light service/industrial oriented land
uses may be located on site. However, a final SPA review
would be required. Because transportation funds were
used to purchase this piece of property transportation
related services should be given priority.
7. Active Park -
Although the eventual development of a valley -wide rail
system will require the use of the majority of Site B as
a rail terminal, it may be years before a rail system is
implemented in the Roaring Fork Valley. Therefore, the
Group identified interim uses which are considered
appropriate for Site B.
Increased recreational activities should be installed on
Site B. A full -court basketball court (52' x 901) can
be located in the open space between the recycle center
and playing field. A half -pipe skateboard ramp (42' x
241) can be located next to the basketball court in the
open space. Location of these activities in this area
requires trolley access to the barn to be moved down to
the 20 foot buffer separating Site A from Site B or
eventual relocation to the field if the barn is
integrated with the rail terminal.
The rugby field (390' x 2251) should be squared off to
enhance the playing area.
Park and recreational uses should exist on this site only
to be replaced by a regional rail facility. ,
The valley -wide Rail Task Force has been actively
pursuing a valley -wide rail that will terminate at Site
B. This master plan did not address the rail question
in detail because the decision -making involves a broader
forum.
Initially commuter rail would not require the loss of the
playing field. Recreational activity can still be
accommodated if the commuter and trolley_ tracks are
installed at the northern edge of the playing field. A
ticket kiosk, located next to the new pedestrian;L�ke
could service -both the trolley and -commuter-rai3 - ---
passengers.
17
If rail develops from commuter to regional rail service,
the rail terminal may be developed at the far end of the
field thus preserving some open space for park purposes.
The .trolley barn could also be incorporated into the rail
terminal to preserve space. However, the majority 'of
the playing field will be lost when the rail becomes
fully developed. A terminal, passenger platforms, and
possibly three sets of tracks would be necessary for
regional rail. The existing transportation center, under
the parking garage, could be used for ticketing, baggage,
and.passenger services.
The trolley tracks on the north side of the field will
remain and a trolley stop will be tied into the rail
terminal.
IV. Recommended Action Plan Summary for Site B
To achieve the goals and proposed land uses for this site, the Rio
Grande Group recommends the following actions for Site B:
1. The City of Aspen should decide whether a City-wide
trolley system is appropriate in Aspen. If the Trolley
is approved as proposed, the eastern portion of Site B
is the recommended site for the Trolley barn. However,
the barn may be integrated with a regional rail facility
when that land use is developed.
2. A height limit of one story should accompany any
development on Site B unless housing is approved. for the
Trolley barn on the eastern portion of the site.
3. Development on the eastern portion of Site B shoul� be
screened from the playing field and Site A.
4. The slope and berms on the eastern portion of Site B
should be revegetated to blend into the park on the rest
of Site B and Site A.
5. Any development on the eastern portion of Site B should
not intrude into the Independence Pass view plane.
6. The City and County should review the recommendations of
the Roaring Fork Forum study relating to a regional -wide
recycling program and other remedies that are being
considered for the County recycling program. If the
__.ribcycl.ing operation--#s considered necessary at _-this
location then the recycling site - should be cover-e---or
contained and may be expanded up to 5,200 square feet.
The recycling facility should be incorporated into the
Trolley barn structure and/or snow melt facility, and
18
should front the street for easy public access.
7. The access road (snow dump road) should be eliminated.
The pedestrian/bike path connecting Rio Grande Drive to
Site A should be 12-14 feet wide and may accommodate
theatre service/delivery and park maintenance vehicles
only. The path may also be used by the disabled to park
at the theatre during a performance.
8. The walking path should be improved at the higher
elevation along the slope that forms the edge of the
recycle site.
9. The City should work with the Youth Center to develop
more recreational activities on Site B.
10. The City should consider extending recreational
activities onto Patsy Newbury
11. The temporary active. park and playfield should be
maintained on Site B only to be replaced by a regional
rail facility.
12. If a transportation use is developed on the playing
field, then an equivalent parcel, in the City, should
replace the playing field.
13. A rail terminal and accessory facilities, if developed
on the Rio Grande property, should be developed only on
Site B.
14. Development of rail facilities should not block -off
access, both visually and physically, to Site A.•
15. The Youth Center
and the
City should build a full -court
basketball court
in the
open space between
the recycle
facility and the
playing
field.
16. The Youth Center
and the
City should install
a half -pipe
skateboard ramp
in the
open space between
the recycle
facility and the
playing
field.
17. The City should
realign
the playing field.
19
APPENDIX A
CONCEFFUAL LAND USE MAPS
PUBLIC NOTICE
DATE •
TIME !s _
PLACE � -" ��L
PURPOSE =+ram
4k
i _J • � i,/
II y
SCENARIO # 1
COMMUTER RAIL & LOCAL TROLLEY
• View corridors from Mill Street to Independence
Pass unobstrui:ted
" Ticket kiosk/sheker serves both trolley and
commuter rail
• Playing field is preserved
* Temporary trolley barn can be moved
" Youth recreational area maintained
" Lower site remains open
* Pedestrian/Bike trails remain connected and
unimpaired
Disadvantages
• Ticket kiosk/shelter is a possible visual obstruction
• Access to lower site may require underpass
• Would loose first stand of cottonwoods and some
of second stand
• At -grade crossing of MAI Street blocks vehicular
traffic
LEGEND
0000�� combined pedestrian/service
path
r
vehicular circulation
r... Q
Qoa O Youth recreational use
RIO GRANDE
CONCEPTUAL MASTER PLAN
0 25 50 106 200
Graphics: Rick Mao
SCENARIO #2
REGIONAL RAIL & LOCAL TROLLEY
(COMBINED FACILITY)
• Two sites are not consumed by transportation
related uses
• Site B is open for other uses
• Youth recreational use is preserved
• Lower Site remains Open
• Efficient combination of services
• PedestrianlMe trails remain connected and
unimpaired
• More of playing field is consumed by combined
building
• Access to terminal is very impactive to open space
• At -grade crossing of Mill Street blocks vehicular
traffic
• Access to lower site may require underpass
• Possible visual obstruction
LEGEND
�oo� combined pedestrian/service
path
D0000 vehicular circulation
0
Qom, D Youth recreational use
RIO GRANDE
CONCEPTUAL MASTER PLAN
0 25 50 100 200
Graphics: Maic Magill
. e
er .
Q
Aspen
Art
ti
Museum
Gibapq AAvonue
s�•� � . 'D"5v Sr
�� fifl�i l�ii lot I laoloil"cFAR
CONDOS NE •, - - - - - - �� --�_KOYak
` ` • ♦j.,.I . ` - ; - .river ` m
ART PARK`
A� Plublic Pa `
DARKS . o
MARKET - . (. •�.�...5�I 6th
� buffer zone � V �en_K..�
I----�
THEATRE ♦ `
• \ FACILITY j •♦� dr t
e.1 ecreat%on / Transportatl' �• � . , _ ,
park/active recreation • . , , _ - - - c
jbuffer
regional dery
1 •` j aia
rail �. _ `• •� � •
PARKING ` facility Yy ° •�'. �� - ''�
•��,. PARKING ��o' �,�// �Y•QV � � / ° O � � ' �
OAPs - lA/e'recyc%/sfiowmeker faci/ity
AUTO •� '? _ youth r tuina u4F
i
�RTAtjON blot �\
YouTN
LIBRARY '�,� V s �; CENTS .. � �l�r ` •� \ ` '�`-ram_.
BASS / OBERMEYER BU) total o1 �r�r \
�.,y rl Ii1�1 1• —
n �
�... .t
� COUNTY JAIL (',
st, recycle facility
COURTHOUSE y
o ff
SCENARIO #3
REGIONAL RAIL & LOCAL TROLLEY
Advantages
• Majority of playing field is preserved
• Access to terminal is less impactive
• End of terminal is close to parking garage
• Lower site remains open
• Pedestrian/Bike trails remain connected and
unimpaired
Disadvanta_ Aw
• Possible visual obstruction
• Trolley barn and terminal on two separate parcels
• Access to lower site may require underpass
• At -grade crossing blocks vehicular traffic
LEGEND
0000�� '
combined pedestrian/service
path
Od000�
vehicular circulation
o�o
Qoo�
youth recreational use
RIO GRANDE
CONCEPTUAL MASTER PLAN
0 25 50 100' 200
• l
Grooles: Rick MagIM